SlideShare a Scribd company logo
www.ark3000.comTel: +971 4 880 3171
ÄRK GLOBAL
COMPANY PROFILE
Based in Singapore with global operating headquarters located in Dubai, UAE,
Ärk’s global presence and our own fleet of equipment have allowed us to deliver an
incomparable service to our clients over the course of many years.
Our presence in the industry even before the inception of Ärk has formulated the
bedrock of the company.
We take pride in being an asset-based company with 25 years of industry-specific
experience.
We have excelled in providing our clients with tailored solutions in the specific
industries of Energy and Power.
ABOUT ÄRK
Tel: +971 4 880 3171 1Tel: +971 4 880 3171 www.ark3000.com
GLOBAL HEADQUARTERS
Tel: +971 4 880 3171 2Tel: +971 4 880 3171 www.ark3000.com
GLOBAL STRUCTURE
Tel: +971 4 880 3171 www.ark3000.com 3Tel: +971 4 880 3171 www.ark3000.com
GLOBAL ALLIANCES
Ärk is exclusively represented by Compass in following countries:
• Saudi Arabia
• Kuwait
• Oman
• Kazakhstan
• Qatar
• India
• UK
• Australia
Tel: +971 4 880 3171 www.ark3000.com 4Tel: +971 4 880 3171 www.ark3000.com
GLOBAL EQUIPMENT LIST
Ärk currently has equipment based in the Middle East, Indian Subcontinent, South East Asian Regions and
African regions:
• Goldhofer Modular Trailers (MT / SPMT)
• Scheuerle Modular Trailers (MT / SPMT)
• Cranes (Sany / XCMG / Zoomlion)
• Crawler Cranes
• Mobile Cranes
• Tower Cranes
• Shacman Prime Movers 550 HP
• Forklift (TEU / Heli)
• Goldhofer Drop Decks
• Intermediate Platforms (Goldhofer / Scheuerle)
• Stools
• Beams
Tel: +971 4 880 3171 www.ark3000.com 5Tel: +971 4 880 3171 www.ark3000.com
GLOBAL EQUIPMENT LIST
SN DESCRIPTION CAPACITY
1 3-axle Modular Trailer (GOLDHOFER) * 45 MT / Axle Line
2 4-axle Modular Trailer (GOLDHOFER) * 36 MT / Axle Line
3 6-axle Modular Trailer (GOLDHOFER) * 45 MT / Axle Line
4 Crawler Crane 90 tons
5 Crawler Crane 260 tons
6 Crawler Crane 150 tons
Mobile Crane 50 tons
1. OMAN
NOTE: Our fleet of equipment includes a total of 166 Goldhofer and 24 Scheuerle Heavy Duty Modular Trailers. Several of
which have been moved across the GCC region to be deployed in the projects executed in the region. An additional fleet of
Goldhofer trailers have been moved outside the GCC region for the deployment in the projects that are currently being
executed in Myanmar.
ASIA (MIDDLE EAST / INDIAN SUB-CONTINENT / SOUTH EAST)
6Tel: +971 4 880 3171 www.ark3000.com
SN DESCRIPTION CAPACITY
1 Tractive Tractor X550 90 tons
2 Truck Crane 50 tons
3 Crawler Crane 90 tons
4 Crawler Crane 150 tons
5 Mobile Crane 50 tons
2. SAUDI ARABIA
SN DESCRIPTION CAPACITY
1 Mobile crane 25 tons
2 Mobile crane 50 tons
3 Crawler Crane 150 tons
4 Crawler Crane 260 tons
3. KUWAIT
7Tel: +971 4 880 3171 www.ark3000.com
SN DESCRIPTION CAPACITY
1 3-axle Modular Trailer (GOLDHOFER) * 45 MT / Axle Line
2 4-axle Modular Trailer (GOLDHOFER) * 36 MT / Axle Line
3 Mobile crane 50 tons
4 Crawler Crane 260 tons
5 Crawler Crane 650 tons
4. DUBAI - UAE
SN DESCRIPTION CAPACITY
1 Mobile Crane 50 tons
2 Crawler Crane 55 tons
3 Crawler Crane 400 tons
5. JORDAN
SN DESCRIPTION CAPACITY
1
Mobile Crane
25 tons
2 Mobile Crane 50 tons
3 Mobile Crane 80 tons
4 Crawler Crane 55 tons
5 Crawler Crane 85 tons
6 Crawler Crane 90 tons
7 Crawler Crane 150 tons
8 Crawler Crane 260 tons
9 Heavy Duty Tractor (Titan) 1,000 HP
6. PAKISTAN
8Tel: +971 4 880 3171 www.ark3000.com
SN DESCRIPTION CAPACITY
1 Mobile Crane 25 tons
2 Mobile Crane 50 tons
3 Mobile Crane 55 tons
4 Crawler Crane 80 tons
7. LAOS
SN DESCRIPTION CAPACITY
1 3-axle Modular Trailer 45 MT / Axle Line
2 6-axle Modular Trailer 45 MT / Axle Line
3 Prime Movers 550 HP
4 Heavy Duty Tractor (Titan) 1000 HP
8. BANGLADESH
9Tel: +971 4 880 3171 www.ark3000.com
SN DESCRIPTION CAPACITY
1 SCHEUERLE Polyfill Axle Line 48 MT / Axle Line
2 SCHEUERLE Intermediate Platform
9. BAHRAIN
AFRICA
SN DESCRIPTION CAPACITY
1 Crawler Crane 260 tons
2 Crawler Crane 150 tons
3 Tower Crane 16 tons
4 Tower Crane 40 tons
5 Mobile Crane 50 tons
6 Mobile Crane 25 tons
7 Forklift 5 tons
8 Forklift 3 tons
1. MOROCCO
SN DESCRIPTION CAPACITY
1 Mobile Crane 55 tons
2 Mobile Crane 25 tons
2. TANZANIA
10Tel: +971 4 880 3171 www.ark3000.com
3. ZAMBIA
SN DESCRIPTION CAPACITY
1 Mobile Crane 50 tons
2 Mobile Crane 55 tons
3 Mobile Crane 25 tons
4 Crawler Crane 50 tons
5 Trucks
6 Lowbeds
11Tel: +971 4 880 3171 www.ark3000.com
SN DESCRIPTION CAPACITY
1 Mobile Crane 50 tons
2 Mobile Crane 55 tons
3 Crawler Crane 400 tons
4. DJIBOUTI
SN DESCRIPTION CAPACITY
1 Mobile Crane 55 tons
2 Mobile Crane 25 tons
5. ETHIOPIA
SERVICES
o Technical Engineering support
o Turnkey operations
o Heavy-lift, route survey, transport
o Crane lifting, Jacking, Lifting system
o Warehouse & materials management
o Vessel stowage, Lashing & Securing
o Chartering services & logistics services
www.ark3000.com 12Tel: +971 4 880 3171 www.ark3000.com
PROJECT MANAGEMENT
We provide project management for different multimodal transports
including rail logistics, heavy haul, specialized transport, crane and rigging,
barge transport, ocean freight and warehouse management.
Our project managers are onsite and managing the project from project
initiation.
We provide real-time information to our customers, thereby ensuring a
proactive approach to overcoming any potential challenges to moving
mission-critical cargo.
www.ark3000.com 13Tel: +971 4 880 3171 www.ark3000.com
SITE MANAGEMENT
• Inventory control & tracking
• Stowage plan
• Labor and task management
• HSEQ management
• Site Coordination
• Value-added service
www.ark3000.com 14Tel: +971 4 880 3171 www.ark3000.com
WAREHOUSE FACILITY (JEBEL ALI, DUBAI)
15Tel: +971 4 880 3171 www.ark3000.com
• Total area of the plot : 9,462 sqm
• Area of the warehouse : 5,480 sqm
• Location : Jebel Ali Free Zone, Dubai-UAE
UPCOMING WAREHOUSE FACILITIES
www.ark3000.com 16Tel: +971 4 880 3171 www.ark3000.com
• Area of the plot: 17,000 sqm
• Area of the warehouse: 7,800 sqm
• Area of the office: 1,500 sqm
• Date of completion: Nov 2019
• WAREHOUSE & OFFICE FACILITY
JEBEL ALI, DUBAI-UAE
• Area of the plot: 1,500 sqm
• Area of the warehouse: 1,000 sqm
• Area of the office: 500 sqm
• Date of completion: May 2019
• WAREHOUSE & OFFICE FACILITY
FREE ZONE, KINGDOM OF BAHRAIN
• WORKSHOP & OFFICE FACILITY
DIP, DUBAI-UAE
• Area of the plot: 7,899 sqm
• Area of the warehouse: 1,361 sqm
• Area of the office: 306 sqm
• Date of completion: Sep 2019
YARD FACILITIES
17Tel: +971 4 880 3171 www.ark3000.com
• YARD FACILITY DUQM,OMAN
- Area :10,000 SQM
- Accessibility :5 km from Port of Duqm
• YARD FACILITY IN SOHAR, OMAN
- Area of the yard :20,000 SQM
- Accessibility :10 km from Port of Sohar
• YARD FACILITY IN MUHARRAQ, KINGDOM OF BAHRAIN
- Area of the yard :5,000 SQM
- Accessibility :In the vicinity of Al Muharraq jetty port
• YARD FACILITY IN LUSAKA, ZAMBIA
- Area of the yard :6,613 SQM
- Accessibility :In the vicinity of Zambezi River and
Kenneth International Airport
NOOR-CSP MOROCCO PROJECTS
• PROJECT OUTLINE:
The Noor Solar Complex was a part of the Moroccan Solar Plan (MSP), envisioned by the Moroccan Solar Energy Agency (MASEN).
COMPLETED PROJECT
www.ark3000.com 18Tel: +971 4 880 3171 www.ark3000.com
• PROJECT FACTS:
o Project Value : US$ 3.23 billion
o Project Duration : 2 years
o Project Capacity : 580 MW
o Cargo Volume Handled : 390,000 FRT
o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd.
o Location of Project : Ouarzazate, Morocco
o Start Date : May 2015
o Project Highlights : Handled 390,000 FRT of cargo including 121,280 tons of molten salt
HANDLING, STORAGE AND
TRANSPORTATION OF MOLTEN SALT
The cargo handled by Ärk during the project Noor CSP Morocco included molten salt. It was required to handle the molten salt in compliance
with the safety and health regulations.
Ärk Global took up the challenge and successfully executed the project by handling, storing and transporting 121,280 FRT of molten salt to
the project site with all the strict health and safety standards of hazardous materials in purview.
NOOR-CSP MOROCCO PROJECT
www.ark3000.com 19Tel: +971 4 880 3171 www.ark3000.com
ONEE-JERADA COAL FIRED POWER PLANT
(MOROCCO)
JERADA SITE PRIOR TO THE OPERATIONS JERADA SITE AFTER THE OPERATIONS
COMPLETED PROJECT
www.ark3000.com 21Tel: +971 4 880 3171 www.ark3000.com
• PROJECT OUTLINE:
ONEE-Jerada Coal Fire Power Plant is one of the 15 public-private partnership agreements made between the leaders of the nation.
• PROJECT FACTS:
o Project Value : US$ 300 million
o Project Duration : 3 years
o Project Capacity : 318 MW
o Cargo Volume Handled : 120,000 FRT
o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd.
o Location of Project : Jerada Province, Morocco
o Start Date : May 2014
o Project Highlights : Provided services including Route Survey and transportation for over 140,000 CBM of breakbulk
shipment
IBRI INDEPENDENT POWER PLANT (OMAN)
COMPLETED PROJECT
www.ark3000.com 22Tel: +971 4 880 3171 www.ark3000.com
• PROJECT OUTLINE:
Ibri Independent Power Plant is one of the latest natural gas fired power projects in Oman.
• PROJECT FACTS:
o Project Value : US$ 660 million
o Project Duration : 3 years
o Project Capacity : 1,509 MW
o Cargo Volume Handled : 12,000 FRT
o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd.
o Location of Project : Ibri, Oman
o Start Date : August 2016
o Project Highlights : Receiving cargo of 12,000 FRT at Duqm Port with a maximum unit weight of 310 MT at Ärk’s yard in
Duqm and transporting cargo to project site located 670 km away from the temporary yard.
SOHAR II POWER PLANT (OMAN)
COMPLETED PROJECT
www.ark3000.com 23Tel: +971 4 880 3171 www.ark3000.com
• PROJECT OUTLINE:
Sohar II Power Plant with is one of the public-private partnership agreements made between the leaders of the nation.
• PROJECT FACTS:
o Project Value : US$ 1 billion
o Project Duration : 2 years
o Project Capacity : 1,714.9 MW
o Cargo Volume Handled : 14,200 FRT
o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd.
o Location of Project : Sohar, Oman
o Start Date : September 2016
o Project Highlights : Receiving cargo of 14,200 FRT at Sohar Port at Ärk’s yard in Sohar and unloading cargo to project site.
HAVELI POWER PLANT (PAKISTAN)
www.ark3000.com
COMPLETED PROJECT
24Tel: +971 4 880 3171 www.ark3000.com
• PROJECT OUTLINE:
Upon completion, Haveli Power Plant was able to generate energy for more than 2.5 million homes in Pakistan.
• PROJECT FACTS:
o Project Value : US$ 176 million
o Project Duration : 2 years
o Project Capacity : 1,230 MW
o Cargo Volume Handled :13,500 CBM
o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd.
o Location of Project : Punjab, Pakistan
o Project Highlights : Door-to-door delivery and offloading of 13,500 CBM of cargo to the site located in Punjab.
PORT QASIM POWER PLANT (PAKISTAN)
www.ark3000.com
COMPLETED PROJECT
25Tel: +971 4 880 3171 www.ark3000.com
• PROJECT OUTLINE:
Port Qasim Power Plant is is one of the priority energy projects being undertaken in the China Pakistan Economic Corridor (CPEC).
• PROJECT FACTS:
o Project Value : US$ 2.085 billion
o Project Duration : 2 years
o Project Capacity : 1,320 MW
o Cargo Volume Handled : 320,000 CBM
o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd.
o Location of Project : Karachi, Pakistan
o Start Date : May 2015
o Project Highlights : Door-to-door delivery and offloading of 320,000 CBM of cargo to the site located in Karachi, Pakistan
from locations all over the world.
SIRAJGANJ DUEL FUEL COMBINED CYCLE
POWER PLANT (BANGLADESH)
www.ark3000.com
COMPLETED PROJECT
26Tel: +971 4 880 3171 www.ark3000.com
• PROJECT OUTLINE:
The Sirajganj Dual Fuel Combined Cycle Power Plant that commenced its operations at a capacity of 150MW was later upgraded to 225MW
under the authority of Bangladesh Power Development Board.
• PROJECT FACTS:
o Project Value : US$ 1.6 billion
o Project Duration : 3 years
o Project Capacity : 225 MW
o Cargo Volume Handled : 70,000 CBM
o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd.
o Location of Project : Sirajganj, Bangladesh
o Start Date : May 2015
o Project Highlights : Ärk handled transportation and offloading of 70,000 CBM to the Chittagong Port.
YANBU POWER AND DESALINATION
PLANT PHASE III (KSA)
www.ark3000.com
ONGOING PROJECT
27Tel: +971 4 880 3171 www.ark3000.com
• PROJECT OUTLINE:
With 5 units of about 628 MW gross power each, firing heavy fuel-oil and natural gas, each featuring a supercritical boiler and Alstom turbine-
generator Yanbu Power Plant is one of the largest power plants being built currently.
• PROJECT FACTS:
o Project Value : US$ 972 million
o Project Duration : 3 years
o Project Capacity : 2.7 GW
o Cargo Volume Handled : 25,000 FRT
o EPC Contractor : Doosan Heavy Industries & Construction
o Location of Project : Yanbu, Jeddah, Kingdom of Saudi Arabia
o Project Highlights : Ärk is currently engaged in vessel chartering, transportation and offloading of 25,000 FRT to the project site.
AL ZOUR SOUTH 3 POWER PLANT
(KUWAIT)
www.ark3000.com
ONGOING PROJECT
28Tel: +971 4 880 3171 www.ark3000.com
• PROJECT OUTLINE:
The project's scope of work involves the conversion of open cycle gas turbine power plant to a combined cycle power plant located at Al Zour,
Kuwait.
• PROJECT FACTS:
o Project Value : US$ 33 million
o Project Duration : 7 years
o Cargo Volume Handled : 14,359.49 CBM
o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd.
o Location of Project : Al Zour, Kuwait
o Project Highlights : Ärk is currently engaged in vessel chartering and direct delivery of of 14,359.49 CBM cargo to the project
Shuaiba Port and direct delivery of the cargo to Al Zour Power Plant project site.
29
ONGOING PROJECT
KYAUSKE GAS POWER PLANT (MYANMAR)
29Tel: +971 4 880 3171 www.ark3000.com
• PROJECT OUTLINE:
Project is to improve the power supply by constructing a combined-cycle gas-fired power plant, thereby contributing to economic development of
Myanmar.
• PROJECT FACTS:
o Project Value : US$ 100 – 120 million
o Project Duration : 5 years
o Project Capacity : 320 MW
o Cargo Volume Handled : 30,000 FRT
o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd.
o Location of Project : Kyaukse, Mandalay Region
o Project Highlights : Ärk Global has already handled around 30,000 FRT of cargo including an engine (Dimensions:
14.3m*4.09m*6.05m GW: 72T) from Ngazun jetty to the project site
EBS OIL REFINERY IN FAO (IRAQ)
30Tel: +971 4 880 3171 www.ark3000.com
ONGOING PROJECT
• PROJECT OUTLINE:
The refinery in Fao will have the capacity to produce 300,000 barrels per day and will include a petrochemical plant and Ärk is currently
contributing to the project’s progress.
• PROJECT FACTS:
o Project Duration : 5 years
o Project Capacity : 300,000 barrels-a-day capacity
o EPC Contractor : SEP PowerChina and Norinco International
o Location of Project : Fao, Iraq
o Project Highlights : Ärk Global is currently handling customs clearance and transportation services for the cargo in the project.
EGA (EMIRATES GLOBAL ALUMINIUM)
POWER PLANTS (UAE)
ONGOING PROJECTS
31Tel: +971 4 880 3171 www.ark3000.com
• PROJECT OUTLINE:
The Combined Cycle Power Plant project is initiated by Emirates Global Aluminium, Mubadala Investment Company and Dubai Holdings.
• PROJECT FACTS:
o Project value : US$ 272.3 million
o Project Capacity : 600 MW
o EPC Contractor : Emirates Global Aluminium
o Location of project : Jebel Ali, Dubai –UAE
o Start date : First half of 2019
o Project Highlights : Ärk Global is currently providing customs clearance and transportation for cargo for the project.
LAFARGE CEMENT PLANT (FRANCE)
32Tel: +971 4 880 3171 www.ark3000.com
ONGOING PROJECTS
• PROJECT OUTLINE:
LafargeHolcim invested in modernizing its Martres-Tolosane cement plant in France which is active since 1965 to enhance waste recycling and
reduce their CO2 footprint and energy consumption.
• PROJECT FACTS:
o Project value : US$ 112 million
o Annual production : 0.715 million tons of cement
o Location of project : Martres-Tolosane, France
o Cargo Volume Handled : 13,000 CBM
o Project Highlights : Ärk Global has already cleared and transported 13,000 CBM of cargo and the next shipment with 14,000 CBM
of cargo is set to arrive in France in late August.
INTERNATIONAL MARITIME INDUSTRIES
MEGA-SHIPYARD (KSA)
ONGOING PROJECTS
33Tel: +971 4 880 3171
• PROJECT FACTS:
o Project value : US$ 3 billion
o EPC Contractor : PowerChina
o Location of project : Ras Al Khair on Saudi Arabia’s Gulf coast
o Partners of the project : Saudi Aramco, Bahri, Lamprell and Hyundai Heavy Industries
o Expected duration : July 2019
o Project Highlights : Ärk Global is currently providing customs clearance, barge transportation and land transportation for
cargo for the project.
• PROJECT OUTLINE:
The newly established International Marine Industries (IMI) will operate the shipyard complex that is set to be completed in Ras Al Khair on Saudi
Arabia’s Gulf coast with four zones for activities covering the maintenance, repair and overhaul of rigs and ships.
www.ark3000.com
REDSTONE SOLAR THERMAL POWER
PLANT (SOUTH AFRICA)
34Tel: +971 4 880 3171
UPCOMING PROJECTS
• PROJECT OUTLINE:
Redstone Solar Thermal Power Plant, the Concentrating Solar Power (CSP) plant with Molten Salt Energy Storage, is a part of 27 renewable-
energy independent power projects in South Africa.
• PROJECT FACTS:
o Project value : US$ 715 million
o Project Capacity : 100 MW
o Location of project : Postmasburg, South Africa
www.ark3000.com
AL DUR INDEPENDENT WATER AND
POWER PLANT (BAHRAIN)
UPCOMING PROJECTS
35Tel: +971 4 880 3171
• PROJECT OUTLINE:
The project’s scope of work consists of an independent water and power plant (IWPP) located in Manama, Bahrain.
• PROJECT FACTS:
o Project value : US$ 1.5 billion
o Project Capacity : 1,200-1,500 MW
o EPC Contractor : Saudi-based ACWA Pow
o Location of project : Manama, Bahrain
o Start date : October, 2019
o Project Highlights : Ärk Global is set to commence operations of handling more than 13,000 CBM of cargo in October, 2019.
www.ark3000.com
ADANI GODDA THERMAL POWER PLANT
(INDIA)
UPCOMING PROJECTS
36Tel: +971 4 880 3171
• PROJECT OUTLINE:
Adani Godda is a proposed 1600 MW coal fired power project promoted by Adani Power and Bangladesh Power Development Board (BPDB).
• PROJECT FACTS:
o Project value : US$ 2.1 billion
o Project Capacity : 1,600 MW
o EPC Contractor : Adani Power
o Location of project : Godda, India
o Project Highlights : Ärk Global is set to commence operations in the near future.
www.ark3000.com
ENERGY PROJECTS
COMPLETED PROJECTS
o GUATEMALA / Guatemala Hydroelectric Power Plant
o OMAN / Sohar III Power Plant
o OMAN / Sohar III Power Plant (for Ibri Independent Power Plant)
o MOROCCO / Jerada Power Station
o MOROCCO / Noor 3 Power Station
o SAUDI ARABIA / Saudi Yanbu 5 x 660 MWP Power Plant Phase II Project
o KUWAIT / Kuwait Al-zour South 3 Project
o UAE / Mohammed Bin Rashid Al Maktoum Solar Park
o SOUTH AFRICA / Redstone Solar Thermal Power Plant
o MOROCCO / Noor Thermosolar Power Project
o PAKISTAN / Port Qasim Power Plant
o PAKISTAN / Haveli Power Plant
o PAKISTAN / Wind Power Projects (Master, HAE, Hawa, and JPL)
o BANGLADESH / Sirajganj Dual Fuel Combined Cycle Power Plant
www.ark3000.com 37Tel: +971 4 880 3171 www.ark3000.com
o INDIA / Godda Thermal Power Project
o BAHRAIN / Al Dur Independent Water and Power Project
ONGOING PROJECTS
UPCOMING PROJECTS
INFRASTRUCTURE PROJECTS
o DJIBOUTI / Ethiopia - Djibouti Railway Rolling Stock Supply Project
o INDIA / Bangalore Metro Rail Corporation
OIL AND GAS PROJECTS
o SAUDI ARABIA / ZP Arabia Drilling
o SAUDI ARABIA / Bilfinger Deutsche Babcock
o SAUDI ARABIA / Saudi Arabian Development Company
o MIDDLE EAST / Sinopec
o MIDDLE EAST / Petrofac
o MIDDLE EAST / KCA Deutag
o MIDDLE EAST / Petrogas Piping
www.ark3000.com 38Tel: +971 4 880 3171 www.ark3000.com
TELECOMMUNICATION PROJECTS
o ALGERIA / Algerie Telecom SMW4 Annaba Site
o BRUNEI DARUSSALAM / Brunei International Gateway Cable Project
o INDIA / TATA Communications
o SUDAN / Sudan Telecom Company
o TUNISIA / Tunisie Telecom SMW4 Bizerte Site
o BAHRAIN / Bahrain Internet Exchange
o KUWAIT / Ministry of Telecom
o OMAN / Oman Telecom Company
o QATAR / GBI Network Operation
o UAE / Reliance Globalcom
o SAUDI ARABIA / Saudi Telecom IMEWE Project, Saudi Telecom SMW4 Project
www.ark3000.com 39Tel: +971 4 880 3171 www.ark3000.com
CONTACT US
GLOBAL OPERATING HEADQUARTERS
JAFZA, DUBAI -UAE
ARK GLOBAL FZE
P.O.Box: 17376
Plot no. S40104B Jebel Ali Free Zone
Dubai – UAE
Tel: +971 5 0789 0122
Fax: +971 4 880 3229
CORPORATE HEADQUARTERS
SINGAPORE
ARK CORPORATE PTE LTD
15 Beach Road GF-100
Beach Centre
Singapore – 189677
Tel: +65 6591 8658
Contact person:
Abdul Sameer Mohamed
CEO
asm@ark3000.com
Contact person:
Alan Paul Montano
Assistant to CEO
amontano@ark3000.com
40Tel: +971 4 880 3171 www.ark3000.com

More Related Content

What's hot

SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)
Aquilino Raimundo
 
Psn resume
Psn   resume Psn   resume
Psn resume
PramodShankarNair
 
NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)Norfadzly Nordin
 
DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2Ian Kelly
 
Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...
Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...
Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...
EOI Escuela de Organización Industrial
 
Resume jeyakkumar.CRANE OPERATION
Resume jeyakkumar.CRANE OPERATIONResume jeyakkumar.CRANE OPERATION
Resume jeyakkumar.CRANE OPERATIONjaya kumar
 

What's hot (10)

SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)
 
Psn resume
Psn   resume Psn   resume
Psn resume
 
NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)
 
CV Bernard(compact)
CV Bernard(compact)CV Bernard(compact)
CV Bernard(compact)
 
DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2
 
C.Bartolo CV-2
C.Bartolo CV-2C.Bartolo CV-2
C.Bartolo CV-2
 
AMOD RESUME
AMOD RESUMEAMOD RESUME
AMOD RESUME
 
Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...
Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...
Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...
 
Resume jeyakkumar.CRANE OPERATION
Resume jeyakkumar.CRANE OPERATIONResume jeyakkumar.CRANE OPERATION
Resume jeyakkumar.CRANE OPERATION
 
sandeep singh CV
sandeep singh CVsandeep singh CV
sandeep singh CV
 

Similar to Corporate Profile | Ärk Global

SAL Company Brochure
SAL Company BrochureSAL Company Brochure
SAL Company Brochure
Paul Heinrich
 
Force Capability Statement
Force Capability StatementForce Capability Statement
Force Capability StatementBen MacKinnon
 
Ronald smith resume queensland.doc (2)
Ronald smith resume queensland.doc (2)Ronald smith resume queensland.doc (2)
Ronald smith resume queensland.doc (2)
Ron Smith
 
Ronald Smith resume Queensland.doc (2)
Ronald Smith resume Queensland.doc (2)Ronald Smith resume Queensland.doc (2)
Ronald Smith resume Queensland.doc (2)Ron Smith
 
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEMADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
iQHub
 
Future Shipbuilding & Offshore Opportunities in Myanmar Shipyards
Future Shipbuilding & Offshore Opportunities in Myanmar ShipyardsFuture Shipbuilding & Offshore Opportunities in Myanmar Shipyards
Future Shipbuilding & Offshore Opportunities in Myanmar Shipyards
Dr. Oliver Massmann
 
KONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.pptKONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.ppt
udayRavi10
 
Obijackson Group Corporate Profile
Obijackson Group Corporate ProfileObijackson Group Corporate Profile
Obijackson Group Corporate Profile
ObijacksonGroup
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
Paul Heinrich
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
Nora Kohlhase
 
Mscs Group Presentation 2009
Mscs Group Presentation 2009Mscs Group Presentation 2009
Mscs Group Presentation 2009rebecca0302
 
ISG Pit to Ship Bulk Container Brochure 2015
ISG Pit to Ship Bulk Container Brochure 2015ISG Pit to Ship Bulk Container Brochure 2015
ISG Pit to Ship Bulk Container Brochure 2015
ISG Pit to Ship Solutions
 
Drill Pipe Storage & Transportation
Drill Pipe Storage & TransportationDrill Pipe Storage & Transportation
Drill Pipe Storage & Transportation
CEA Project Logistics
 
2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf
KhalidJ6
 
Dockwise magazine
Dockwise magazineDockwise magazine
Dockwise magazineDockwise
 

Similar to Corporate Profile | Ärk Global (20)

SAL Company Brochure
SAL Company BrochureSAL Company Brochure
SAL Company Brochure
 
CURRICULUM VITAE
CURRICULUM   VITAECURRICULUM   VITAE
CURRICULUM VITAE
 
Force Capability Statement
Force Capability StatementForce Capability Statement
Force Capability Statement
 
Ronald smith resume queensland.doc (2)
Ronald smith resume queensland.doc (2)Ronald smith resume queensland.doc (2)
Ronald smith resume queensland.doc (2)
 
Ronald Smith resume Queensland.doc (2)
Ronald Smith resume Queensland.doc (2)Ronald Smith resume Queensland.doc (2)
Ronald Smith resume Queensland.doc (2)
 
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEMADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
 
Future Shipbuilding & Offshore Opportunities in Myanmar Shipyards
Future Shipbuilding & Offshore Opportunities in Myanmar ShipyardsFuture Shipbuilding & Offshore Opportunities in Myanmar Shipyards
Future Shipbuilding & Offshore Opportunities in Myanmar Shipyards
 
KONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.pptKONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.ppt
 
Brochure CMR Marine
Brochure CMR MarineBrochure CMR Marine
Brochure CMR Marine
 
Obijackson Group Corporate Profile
Obijackson Group Corporate ProfileObijackson Group Corporate Profile
Obijackson Group Corporate Profile
 
AMOD RESUME
AMOD RESUMEAMOD RESUME
AMOD RESUME
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Mscs Group Presentation 2009
Mscs Group Presentation 2009Mscs Group Presentation 2009
Mscs Group Presentation 2009
 
pame cv
pame cvpame cv
pame cv
 
ISG Pit to Ship Bulk Container Brochure 2015
ISG Pit to Ship Bulk Container Brochure 2015ISG Pit to Ship Bulk Container Brochure 2015
ISG Pit to Ship Bulk Container Brochure 2015
 
Drill Pipe Storage & Transportation
Drill Pipe Storage & TransportationDrill Pipe Storage & Transportation
Drill Pipe Storage & Transportation
 
2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf
 
AMOD CV CHINA 2017 - Copy
AMOD CV CHINA 2017 - CopyAMOD CV CHINA 2017 - Copy
AMOD CV CHINA 2017 - Copy
 
Dockwise magazine
Dockwise magazineDockwise magazine
Dockwise magazine
 

Recently uploaded

一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
zechu97
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 

Recently uploaded (20)

一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 

Corporate Profile | Ärk Global

  • 1. www.ark3000.comTel: +971 4 880 3171 ÄRK GLOBAL COMPANY PROFILE
  • 2. Based in Singapore with global operating headquarters located in Dubai, UAE, Ärk’s global presence and our own fleet of equipment have allowed us to deliver an incomparable service to our clients over the course of many years. Our presence in the industry even before the inception of Ärk has formulated the bedrock of the company. We take pride in being an asset-based company with 25 years of industry-specific experience. We have excelled in providing our clients with tailored solutions in the specific industries of Energy and Power. ABOUT ÄRK Tel: +971 4 880 3171 1Tel: +971 4 880 3171 www.ark3000.com
  • 3. GLOBAL HEADQUARTERS Tel: +971 4 880 3171 2Tel: +971 4 880 3171 www.ark3000.com
  • 4. GLOBAL STRUCTURE Tel: +971 4 880 3171 www.ark3000.com 3Tel: +971 4 880 3171 www.ark3000.com
  • 5. GLOBAL ALLIANCES Ärk is exclusively represented by Compass in following countries: • Saudi Arabia • Kuwait • Oman • Kazakhstan • Qatar • India • UK • Australia Tel: +971 4 880 3171 www.ark3000.com 4Tel: +971 4 880 3171 www.ark3000.com
  • 6. GLOBAL EQUIPMENT LIST Ärk currently has equipment based in the Middle East, Indian Subcontinent, South East Asian Regions and African regions: • Goldhofer Modular Trailers (MT / SPMT) • Scheuerle Modular Trailers (MT / SPMT) • Cranes (Sany / XCMG / Zoomlion) • Crawler Cranes • Mobile Cranes • Tower Cranes • Shacman Prime Movers 550 HP • Forklift (TEU / Heli) • Goldhofer Drop Decks • Intermediate Platforms (Goldhofer / Scheuerle) • Stools • Beams Tel: +971 4 880 3171 www.ark3000.com 5Tel: +971 4 880 3171 www.ark3000.com
  • 7. GLOBAL EQUIPMENT LIST SN DESCRIPTION CAPACITY 1 3-axle Modular Trailer (GOLDHOFER) * 45 MT / Axle Line 2 4-axle Modular Trailer (GOLDHOFER) * 36 MT / Axle Line 3 6-axle Modular Trailer (GOLDHOFER) * 45 MT / Axle Line 4 Crawler Crane 90 tons 5 Crawler Crane 260 tons 6 Crawler Crane 150 tons Mobile Crane 50 tons 1. OMAN NOTE: Our fleet of equipment includes a total of 166 Goldhofer and 24 Scheuerle Heavy Duty Modular Trailers. Several of which have been moved across the GCC region to be deployed in the projects executed in the region. An additional fleet of Goldhofer trailers have been moved outside the GCC region for the deployment in the projects that are currently being executed in Myanmar. ASIA (MIDDLE EAST / INDIAN SUB-CONTINENT / SOUTH EAST) 6Tel: +971 4 880 3171 www.ark3000.com
  • 8. SN DESCRIPTION CAPACITY 1 Tractive Tractor X550 90 tons 2 Truck Crane 50 tons 3 Crawler Crane 90 tons 4 Crawler Crane 150 tons 5 Mobile Crane 50 tons 2. SAUDI ARABIA SN DESCRIPTION CAPACITY 1 Mobile crane 25 tons 2 Mobile crane 50 tons 3 Crawler Crane 150 tons 4 Crawler Crane 260 tons 3. KUWAIT 7Tel: +971 4 880 3171 www.ark3000.com SN DESCRIPTION CAPACITY 1 3-axle Modular Trailer (GOLDHOFER) * 45 MT / Axle Line 2 4-axle Modular Trailer (GOLDHOFER) * 36 MT / Axle Line 3 Mobile crane 50 tons 4 Crawler Crane 260 tons 5 Crawler Crane 650 tons 4. DUBAI - UAE
  • 9. SN DESCRIPTION CAPACITY 1 Mobile Crane 50 tons 2 Crawler Crane 55 tons 3 Crawler Crane 400 tons 5. JORDAN SN DESCRIPTION CAPACITY 1 Mobile Crane 25 tons 2 Mobile Crane 50 tons 3 Mobile Crane 80 tons 4 Crawler Crane 55 tons 5 Crawler Crane 85 tons 6 Crawler Crane 90 tons 7 Crawler Crane 150 tons 8 Crawler Crane 260 tons 9 Heavy Duty Tractor (Titan) 1,000 HP 6. PAKISTAN 8Tel: +971 4 880 3171 www.ark3000.com
  • 10. SN DESCRIPTION CAPACITY 1 Mobile Crane 25 tons 2 Mobile Crane 50 tons 3 Mobile Crane 55 tons 4 Crawler Crane 80 tons 7. LAOS SN DESCRIPTION CAPACITY 1 3-axle Modular Trailer 45 MT / Axle Line 2 6-axle Modular Trailer 45 MT / Axle Line 3 Prime Movers 550 HP 4 Heavy Duty Tractor (Titan) 1000 HP 8. BANGLADESH 9Tel: +971 4 880 3171 www.ark3000.com SN DESCRIPTION CAPACITY 1 SCHEUERLE Polyfill Axle Line 48 MT / Axle Line 2 SCHEUERLE Intermediate Platform 9. BAHRAIN
  • 11. AFRICA SN DESCRIPTION CAPACITY 1 Crawler Crane 260 tons 2 Crawler Crane 150 tons 3 Tower Crane 16 tons 4 Tower Crane 40 tons 5 Mobile Crane 50 tons 6 Mobile Crane 25 tons 7 Forklift 5 tons 8 Forklift 3 tons 1. MOROCCO SN DESCRIPTION CAPACITY 1 Mobile Crane 55 tons 2 Mobile Crane 25 tons 2. TANZANIA 10Tel: +971 4 880 3171 www.ark3000.com
  • 12. 3. ZAMBIA SN DESCRIPTION CAPACITY 1 Mobile Crane 50 tons 2 Mobile Crane 55 tons 3 Mobile Crane 25 tons 4 Crawler Crane 50 tons 5 Trucks 6 Lowbeds 11Tel: +971 4 880 3171 www.ark3000.com SN DESCRIPTION CAPACITY 1 Mobile Crane 50 tons 2 Mobile Crane 55 tons 3 Crawler Crane 400 tons 4. DJIBOUTI SN DESCRIPTION CAPACITY 1 Mobile Crane 55 tons 2 Mobile Crane 25 tons 5. ETHIOPIA
  • 13. SERVICES o Technical Engineering support o Turnkey operations o Heavy-lift, route survey, transport o Crane lifting, Jacking, Lifting system o Warehouse & materials management o Vessel stowage, Lashing & Securing o Chartering services & logistics services www.ark3000.com 12Tel: +971 4 880 3171 www.ark3000.com
  • 14. PROJECT MANAGEMENT We provide project management for different multimodal transports including rail logistics, heavy haul, specialized transport, crane and rigging, barge transport, ocean freight and warehouse management. Our project managers are onsite and managing the project from project initiation. We provide real-time information to our customers, thereby ensuring a proactive approach to overcoming any potential challenges to moving mission-critical cargo. www.ark3000.com 13Tel: +971 4 880 3171 www.ark3000.com
  • 15. SITE MANAGEMENT • Inventory control & tracking • Stowage plan • Labor and task management • HSEQ management • Site Coordination • Value-added service www.ark3000.com 14Tel: +971 4 880 3171 www.ark3000.com
  • 16. WAREHOUSE FACILITY (JEBEL ALI, DUBAI) 15Tel: +971 4 880 3171 www.ark3000.com • Total area of the plot : 9,462 sqm • Area of the warehouse : 5,480 sqm • Location : Jebel Ali Free Zone, Dubai-UAE
  • 17. UPCOMING WAREHOUSE FACILITIES www.ark3000.com 16Tel: +971 4 880 3171 www.ark3000.com • Area of the plot: 17,000 sqm • Area of the warehouse: 7,800 sqm • Area of the office: 1,500 sqm • Date of completion: Nov 2019 • WAREHOUSE & OFFICE FACILITY JEBEL ALI, DUBAI-UAE • Area of the plot: 1,500 sqm • Area of the warehouse: 1,000 sqm • Area of the office: 500 sqm • Date of completion: May 2019 • WAREHOUSE & OFFICE FACILITY FREE ZONE, KINGDOM OF BAHRAIN • WORKSHOP & OFFICE FACILITY DIP, DUBAI-UAE • Area of the plot: 7,899 sqm • Area of the warehouse: 1,361 sqm • Area of the office: 306 sqm • Date of completion: Sep 2019
  • 18. YARD FACILITIES 17Tel: +971 4 880 3171 www.ark3000.com • YARD FACILITY DUQM,OMAN - Area :10,000 SQM - Accessibility :5 km from Port of Duqm • YARD FACILITY IN SOHAR, OMAN - Area of the yard :20,000 SQM - Accessibility :10 km from Port of Sohar • YARD FACILITY IN MUHARRAQ, KINGDOM OF BAHRAIN - Area of the yard :5,000 SQM - Accessibility :In the vicinity of Al Muharraq jetty port • YARD FACILITY IN LUSAKA, ZAMBIA - Area of the yard :6,613 SQM - Accessibility :In the vicinity of Zambezi River and Kenneth International Airport
  • 19. NOOR-CSP MOROCCO PROJECTS • PROJECT OUTLINE: The Noor Solar Complex was a part of the Moroccan Solar Plan (MSP), envisioned by the Moroccan Solar Energy Agency (MASEN). COMPLETED PROJECT www.ark3000.com 18Tel: +971 4 880 3171 www.ark3000.com • PROJECT FACTS: o Project Value : US$ 3.23 billion o Project Duration : 2 years o Project Capacity : 580 MW o Cargo Volume Handled : 390,000 FRT o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd. o Location of Project : Ouarzazate, Morocco o Start Date : May 2015 o Project Highlights : Handled 390,000 FRT of cargo including 121,280 tons of molten salt
  • 20. HANDLING, STORAGE AND TRANSPORTATION OF MOLTEN SALT The cargo handled by Ärk during the project Noor CSP Morocco included molten salt. It was required to handle the molten salt in compliance with the safety and health regulations. Ärk Global took up the challenge and successfully executed the project by handling, storing and transporting 121,280 FRT of molten salt to the project site with all the strict health and safety standards of hazardous materials in purview. NOOR-CSP MOROCCO PROJECT www.ark3000.com 19Tel: +971 4 880 3171 www.ark3000.com
  • 21.
  • 22. ONEE-JERADA COAL FIRED POWER PLANT (MOROCCO) JERADA SITE PRIOR TO THE OPERATIONS JERADA SITE AFTER THE OPERATIONS COMPLETED PROJECT www.ark3000.com 21Tel: +971 4 880 3171 www.ark3000.com • PROJECT OUTLINE: ONEE-Jerada Coal Fire Power Plant is one of the 15 public-private partnership agreements made between the leaders of the nation. • PROJECT FACTS: o Project Value : US$ 300 million o Project Duration : 3 years o Project Capacity : 318 MW o Cargo Volume Handled : 120,000 FRT o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd. o Location of Project : Jerada Province, Morocco o Start Date : May 2014 o Project Highlights : Provided services including Route Survey and transportation for over 140,000 CBM of breakbulk shipment
  • 23. IBRI INDEPENDENT POWER PLANT (OMAN) COMPLETED PROJECT www.ark3000.com 22Tel: +971 4 880 3171 www.ark3000.com • PROJECT OUTLINE: Ibri Independent Power Plant is one of the latest natural gas fired power projects in Oman. • PROJECT FACTS: o Project Value : US$ 660 million o Project Duration : 3 years o Project Capacity : 1,509 MW o Cargo Volume Handled : 12,000 FRT o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd. o Location of Project : Ibri, Oman o Start Date : August 2016 o Project Highlights : Receiving cargo of 12,000 FRT at Duqm Port with a maximum unit weight of 310 MT at Ärk’s yard in Duqm and transporting cargo to project site located 670 km away from the temporary yard.
  • 24. SOHAR II POWER PLANT (OMAN) COMPLETED PROJECT www.ark3000.com 23Tel: +971 4 880 3171 www.ark3000.com • PROJECT OUTLINE: Sohar II Power Plant with is one of the public-private partnership agreements made between the leaders of the nation. • PROJECT FACTS: o Project Value : US$ 1 billion o Project Duration : 2 years o Project Capacity : 1,714.9 MW o Cargo Volume Handled : 14,200 FRT o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd. o Location of Project : Sohar, Oman o Start Date : September 2016 o Project Highlights : Receiving cargo of 14,200 FRT at Sohar Port at Ärk’s yard in Sohar and unloading cargo to project site.
  • 25. HAVELI POWER PLANT (PAKISTAN) www.ark3000.com COMPLETED PROJECT 24Tel: +971 4 880 3171 www.ark3000.com • PROJECT OUTLINE: Upon completion, Haveli Power Plant was able to generate energy for more than 2.5 million homes in Pakistan. • PROJECT FACTS: o Project Value : US$ 176 million o Project Duration : 2 years o Project Capacity : 1,230 MW o Cargo Volume Handled :13,500 CBM o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd. o Location of Project : Punjab, Pakistan o Project Highlights : Door-to-door delivery and offloading of 13,500 CBM of cargo to the site located in Punjab.
  • 26. PORT QASIM POWER PLANT (PAKISTAN) www.ark3000.com COMPLETED PROJECT 25Tel: +971 4 880 3171 www.ark3000.com • PROJECT OUTLINE: Port Qasim Power Plant is is one of the priority energy projects being undertaken in the China Pakistan Economic Corridor (CPEC). • PROJECT FACTS: o Project Value : US$ 2.085 billion o Project Duration : 2 years o Project Capacity : 1,320 MW o Cargo Volume Handled : 320,000 CBM o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd. o Location of Project : Karachi, Pakistan o Start Date : May 2015 o Project Highlights : Door-to-door delivery and offloading of 320,000 CBM of cargo to the site located in Karachi, Pakistan from locations all over the world.
  • 27. SIRAJGANJ DUEL FUEL COMBINED CYCLE POWER PLANT (BANGLADESH) www.ark3000.com COMPLETED PROJECT 26Tel: +971 4 880 3171 www.ark3000.com • PROJECT OUTLINE: The Sirajganj Dual Fuel Combined Cycle Power Plant that commenced its operations at a capacity of 150MW was later upgraded to 225MW under the authority of Bangladesh Power Development Board. • PROJECT FACTS: o Project Value : US$ 1.6 billion o Project Duration : 3 years o Project Capacity : 225 MW o Cargo Volume Handled : 70,000 CBM o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd. o Location of Project : Sirajganj, Bangladesh o Start Date : May 2015 o Project Highlights : Ärk handled transportation and offloading of 70,000 CBM to the Chittagong Port.
  • 28. YANBU POWER AND DESALINATION PLANT PHASE III (KSA) www.ark3000.com ONGOING PROJECT 27Tel: +971 4 880 3171 www.ark3000.com • PROJECT OUTLINE: With 5 units of about 628 MW gross power each, firing heavy fuel-oil and natural gas, each featuring a supercritical boiler and Alstom turbine- generator Yanbu Power Plant is one of the largest power plants being built currently. • PROJECT FACTS: o Project Value : US$ 972 million o Project Duration : 3 years o Project Capacity : 2.7 GW o Cargo Volume Handled : 25,000 FRT o EPC Contractor : Doosan Heavy Industries & Construction o Location of Project : Yanbu, Jeddah, Kingdom of Saudi Arabia o Project Highlights : Ärk is currently engaged in vessel chartering, transportation and offloading of 25,000 FRT to the project site.
  • 29. AL ZOUR SOUTH 3 POWER PLANT (KUWAIT) www.ark3000.com ONGOING PROJECT 28Tel: +971 4 880 3171 www.ark3000.com • PROJECT OUTLINE: The project's scope of work involves the conversion of open cycle gas turbine power plant to a combined cycle power plant located at Al Zour, Kuwait. • PROJECT FACTS: o Project Value : US$ 33 million o Project Duration : 7 years o Cargo Volume Handled : 14,359.49 CBM o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd. o Location of Project : Al Zour, Kuwait o Project Highlights : Ärk is currently engaged in vessel chartering and direct delivery of of 14,359.49 CBM cargo to the project Shuaiba Port and direct delivery of the cargo to Al Zour Power Plant project site.
  • 30. 29 ONGOING PROJECT KYAUSKE GAS POWER PLANT (MYANMAR) 29Tel: +971 4 880 3171 www.ark3000.com • PROJECT OUTLINE: Project is to improve the power supply by constructing a combined-cycle gas-fired power plant, thereby contributing to economic development of Myanmar. • PROJECT FACTS: o Project Value : US$ 100 – 120 million o Project Duration : 5 years o Project Capacity : 320 MW o Cargo Volume Handled : 30,000 FRT o EPC Contractor : SEPCO III Electric Power Construction Co. Ltd. o Location of Project : Kyaukse, Mandalay Region o Project Highlights : Ärk Global has already handled around 30,000 FRT of cargo including an engine (Dimensions: 14.3m*4.09m*6.05m GW: 72T) from Ngazun jetty to the project site
  • 31. EBS OIL REFINERY IN FAO (IRAQ) 30Tel: +971 4 880 3171 www.ark3000.com ONGOING PROJECT • PROJECT OUTLINE: The refinery in Fao will have the capacity to produce 300,000 barrels per day and will include a petrochemical plant and Ärk is currently contributing to the project’s progress. • PROJECT FACTS: o Project Duration : 5 years o Project Capacity : 300,000 barrels-a-day capacity o EPC Contractor : SEP PowerChina and Norinco International o Location of Project : Fao, Iraq o Project Highlights : Ärk Global is currently handling customs clearance and transportation services for the cargo in the project.
  • 32. EGA (EMIRATES GLOBAL ALUMINIUM) POWER PLANTS (UAE) ONGOING PROJECTS 31Tel: +971 4 880 3171 www.ark3000.com • PROJECT OUTLINE: The Combined Cycle Power Plant project is initiated by Emirates Global Aluminium, Mubadala Investment Company and Dubai Holdings. • PROJECT FACTS: o Project value : US$ 272.3 million o Project Capacity : 600 MW o EPC Contractor : Emirates Global Aluminium o Location of project : Jebel Ali, Dubai –UAE o Start date : First half of 2019 o Project Highlights : Ärk Global is currently providing customs clearance and transportation for cargo for the project.
  • 33. LAFARGE CEMENT PLANT (FRANCE) 32Tel: +971 4 880 3171 www.ark3000.com ONGOING PROJECTS • PROJECT OUTLINE: LafargeHolcim invested in modernizing its Martres-Tolosane cement plant in France which is active since 1965 to enhance waste recycling and reduce their CO2 footprint and energy consumption. • PROJECT FACTS: o Project value : US$ 112 million o Annual production : 0.715 million tons of cement o Location of project : Martres-Tolosane, France o Cargo Volume Handled : 13,000 CBM o Project Highlights : Ärk Global has already cleared and transported 13,000 CBM of cargo and the next shipment with 14,000 CBM of cargo is set to arrive in France in late August.
  • 34. INTERNATIONAL MARITIME INDUSTRIES MEGA-SHIPYARD (KSA) ONGOING PROJECTS 33Tel: +971 4 880 3171 • PROJECT FACTS: o Project value : US$ 3 billion o EPC Contractor : PowerChina o Location of project : Ras Al Khair on Saudi Arabia’s Gulf coast o Partners of the project : Saudi Aramco, Bahri, Lamprell and Hyundai Heavy Industries o Expected duration : July 2019 o Project Highlights : Ärk Global is currently providing customs clearance, barge transportation and land transportation for cargo for the project. • PROJECT OUTLINE: The newly established International Marine Industries (IMI) will operate the shipyard complex that is set to be completed in Ras Al Khair on Saudi Arabia’s Gulf coast with four zones for activities covering the maintenance, repair and overhaul of rigs and ships. www.ark3000.com
  • 35. REDSTONE SOLAR THERMAL POWER PLANT (SOUTH AFRICA) 34Tel: +971 4 880 3171 UPCOMING PROJECTS • PROJECT OUTLINE: Redstone Solar Thermal Power Plant, the Concentrating Solar Power (CSP) plant with Molten Salt Energy Storage, is a part of 27 renewable- energy independent power projects in South Africa. • PROJECT FACTS: o Project value : US$ 715 million o Project Capacity : 100 MW o Location of project : Postmasburg, South Africa www.ark3000.com
  • 36. AL DUR INDEPENDENT WATER AND POWER PLANT (BAHRAIN) UPCOMING PROJECTS 35Tel: +971 4 880 3171 • PROJECT OUTLINE: The project’s scope of work consists of an independent water and power plant (IWPP) located in Manama, Bahrain. • PROJECT FACTS: o Project value : US$ 1.5 billion o Project Capacity : 1,200-1,500 MW o EPC Contractor : Saudi-based ACWA Pow o Location of project : Manama, Bahrain o Start date : October, 2019 o Project Highlights : Ärk Global is set to commence operations of handling more than 13,000 CBM of cargo in October, 2019. www.ark3000.com
  • 37. ADANI GODDA THERMAL POWER PLANT (INDIA) UPCOMING PROJECTS 36Tel: +971 4 880 3171 • PROJECT OUTLINE: Adani Godda is a proposed 1600 MW coal fired power project promoted by Adani Power and Bangladesh Power Development Board (BPDB). • PROJECT FACTS: o Project value : US$ 2.1 billion o Project Capacity : 1,600 MW o EPC Contractor : Adani Power o Location of project : Godda, India o Project Highlights : Ärk Global is set to commence operations in the near future. www.ark3000.com
  • 38. ENERGY PROJECTS COMPLETED PROJECTS o GUATEMALA / Guatemala Hydroelectric Power Plant o OMAN / Sohar III Power Plant o OMAN / Sohar III Power Plant (for Ibri Independent Power Plant) o MOROCCO / Jerada Power Station o MOROCCO / Noor 3 Power Station o SAUDI ARABIA / Saudi Yanbu 5 x 660 MWP Power Plant Phase II Project o KUWAIT / Kuwait Al-zour South 3 Project o UAE / Mohammed Bin Rashid Al Maktoum Solar Park o SOUTH AFRICA / Redstone Solar Thermal Power Plant o MOROCCO / Noor Thermosolar Power Project o PAKISTAN / Port Qasim Power Plant o PAKISTAN / Haveli Power Plant o PAKISTAN / Wind Power Projects (Master, HAE, Hawa, and JPL) o BANGLADESH / Sirajganj Dual Fuel Combined Cycle Power Plant www.ark3000.com 37Tel: +971 4 880 3171 www.ark3000.com o INDIA / Godda Thermal Power Project o BAHRAIN / Al Dur Independent Water and Power Project ONGOING PROJECTS UPCOMING PROJECTS
  • 39. INFRASTRUCTURE PROJECTS o DJIBOUTI / Ethiopia - Djibouti Railway Rolling Stock Supply Project o INDIA / Bangalore Metro Rail Corporation OIL AND GAS PROJECTS o SAUDI ARABIA / ZP Arabia Drilling o SAUDI ARABIA / Bilfinger Deutsche Babcock o SAUDI ARABIA / Saudi Arabian Development Company o MIDDLE EAST / Sinopec o MIDDLE EAST / Petrofac o MIDDLE EAST / KCA Deutag o MIDDLE EAST / Petrogas Piping www.ark3000.com 38Tel: +971 4 880 3171 www.ark3000.com
  • 40. TELECOMMUNICATION PROJECTS o ALGERIA / Algerie Telecom SMW4 Annaba Site o BRUNEI DARUSSALAM / Brunei International Gateway Cable Project o INDIA / TATA Communications o SUDAN / Sudan Telecom Company o TUNISIA / Tunisie Telecom SMW4 Bizerte Site o BAHRAIN / Bahrain Internet Exchange o KUWAIT / Ministry of Telecom o OMAN / Oman Telecom Company o QATAR / GBI Network Operation o UAE / Reliance Globalcom o SAUDI ARABIA / Saudi Telecom IMEWE Project, Saudi Telecom SMW4 Project www.ark3000.com 39Tel: +971 4 880 3171 www.ark3000.com
  • 41. CONTACT US GLOBAL OPERATING HEADQUARTERS JAFZA, DUBAI -UAE ARK GLOBAL FZE P.O.Box: 17376 Plot no. S40104B Jebel Ali Free Zone Dubai – UAE Tel: +971 5 0789 0122 Fax: +971 4 880 3229 CORPORATE HEADQUARTERS SINGAPORE ARK CORPORATE PTE LTD 15 Beach Road GF-100 Beach Centre Singapore – 189677 Tel: +65 6591 8658 Contact person: Abdul Sameer Mohamed CEO asm@ark3000.com Contact person: Alan Paul Montano Assistant to CEO amontano@ark3000.com 40Tel: +971 4 880 3171 www.ark3000.com