Digital City
Capacity Crunch
Digital City
It is observed that
international bandwidth
will exceed current
capacity before 2018
2018
Digital City
Age and Usage
http://www.broadbandtvnews.com/2014/05/22/millennials-more-likely-to-use-home-networks-for-media-purposes/
The younger eat bandwidth for Breakfast!
Digital City
“Most interesting is how
rapidly this media orientation
drops off as the age of the
home network user
increases,” noted Michael
Greeson, TDG president and
co-author of the new report.
“Beyond Millennials, this
emphasis shifts incrementally
toward a more data-driven
behavior characterized by
the use of net-connected,
networked PCs for
‘productivity’ or non-media
needs.”
And youngsters are the majority
Digital City
Digital City
It is observed that
international bandwidth
will exceed current
capacity before 2018
2018
Build to stay ahead of the curve
09th April 2014
The Fiber landscape
On present trends, in 4 years Safaricom will have more fiber than
the whole competition
Total Fiber network 8.850 Km
• Telkom Kenya 4,500km,
• JTL 4,000km
• AccessKenya 350km (major % is direct-buried)
• Safaricom Digital City has not only quantity
• It has quality
• Fibre is FTTx ready.
• Competition has limited room to expand
09th April 2014
Where is Safaricom today
20 months from contract awarded to on service
Safaricom delivered 923 Km on service
With 587 Km of metro fiber work in progress in advanced stage of contrition to be
delivered second quarter FY
Two cities Nakuru and Mombasa already with metro fiber on service
431 sites migrate to Safaricom Digital City
170 Sites to complete migration between end June and end July
Safaricom has put on service 170 FTTB connections
09th April 2014
No potential customer is away from a Safaricom Digital City Project fiber point
Residential
Commercial
Industrial
Safaricom Digital City
is never more than
300m away from any
customer
09th April 2014
Only Safaricom can stay ahead of the curve
Staying ahead of the curve
Only Safaricom Digital City on boarded resources has
delivery capabilities of 600km per year
09th April 2014
FTTH
Safaricom needs to leverage its broadband transport to the PoP to be part of the
content ecosystem
As we control cost quality and scalability of our sites (PoP) backhaul to the sites
We will have the advantage of having the ability to control end-to end service
quality.
Give content providers the ability to offer 1 million simultaneous viewers of
broadcast events here in Nairobi

Demograhics and the capacity crunch

  • 1.
  • 2.
    Digital City It isobserved that international bandwidth will exceed current capacity before 2018 2018
  • 3.
    Digital City Age andUsage http://www.broadbandtvnews.com/2014/05/22/millennials-more-likely-to-use-home-networks-for-media-purposes/ The younger eat bandwidth for Breakfast!
  • 4.
    Digital City “Most interestingis how rapidly this media orientation drops off as the age of the home network user increases,” noted Michael Greeson, TDG president and co-author of the new report. “Beyond Millennials, this emphasis shifts incrementally toward a more data-driven behavior characterized by the use of net-connected, networked PCs for ‘productivity’ or non-media needs.” And youngsters are the majority
  • 5.
  • 6.
    Digital City It isobserved that international bandwidth will exceed current capacity before 2018 2018 Build to stay ahead of the curve
  • 7.
    09th April 2014 TheFiber landscape On present trends, in 4 years Safaricom will have more fiber than the whole competition Total Fiber network 8.850 Km • Telkom Kenya 4,500km, • JTL 4,000km • AccessKenya 350km (major % is direct-buried) • Safaricom Digital City has not only quantity • It has quality • Fibre is FTTx ready. • Competition has limited room to expand
  • 8.
    09th April 2014 Whereis Safaricom today 20 months from contract awarded to on service Safaricom delivered 923 Km on service With 587 Km of metro fiber work in progress in advanced stage of contrition to be delivered second quarter FY Two cities Nakuru and Mombasa already with metro fiber on service 431 sites migrate to Safaricom Digital City 170 Sites to complete migration between end June and end July Safaricom has put on service 170 FTTB connections
  • 9.
    09th April 2014 Nopotential customer is away from a Safaricom Digital City Project fiber point Residential Commercial Industrial Safaricom Digital City is never more than 300m away from any customer
  • 10.
    09th April 2014 OnlySafaricom can stay ahead of the curve Staying ahead of the curve Only Safaricom Digital City on boarded resources has delivery capabilities of 600km per year
  • 11.
    09th April 2014 FTTH Safaricomneeds to leverage its broadband transport to the PoP to be part of the content ecosystem As we control cost quality and scalability of our sites (PoP) backhaul to the sites We will have the advantage of having the ability to control end-to end service quality. Give content providers the ability to offer 1 million simultaneous viewers of broadcast events here in Nairobi