ACKNOWLEDGEMENT
The internship opportunity that I had with SSGC was a
great chance for learning and professional development.
I am grateful for having a chance to meet professionals
who led through this internship period. I am thankful to
all the executives/technicians for their constant support
and guidance.
pg. 3
CONTENTS
1.Introduction.………………………………………………5-6
2. Aim of Internship…………………………….…………6
3. Services Department …………………………….…..7
3.1) HVAC……………………………………………………………7
3.2) Absorption Chiller ..………………………………………8
3.3) Evaporator……………………………………………………8
3.4) Absorber ……………………………………………………..9
3.5) High Pressure Generator.……………………………..9
3.6) Low Pressure Generator………………………………10
3.7) Condenser…………………………………………………..10
3.8) Air Handling Unit…………………………………………11
4. Elevators……………………………………………………12
4.1) Water Filtration and Fire Hydrant Sys………….12
5. Power Generation……………………………………..13
5.1) Waukesha………………………………………………….14-15
5.2). Guascor ……………………………………………………15-16
5.3) Caterpillar………………………………………………….16
pg. 4
6. K-Electric Supply………………………………………..17
6.1) Transformers …………………………………………..17
6.2) Circuit Breakers……………………………………….17
6.3) Air Circuit Breakers………………………………….18
7. Capacitor Banks………………………………………..19
8.UPS Room…………………………………………..…….20
pg. 5
1.INTRODUTION:
Sui Southern Gas Company (SSGC) is a Public Listed
Large Scale Company and is a Pakistan's leading
integrated gas Company. The Government or Pakistan
directly and indirectly owns the majority of the
shareholding of Company. The company is engaged in
the business of transmission and distribution of
natural gas besides installation of high pressure
transmission and low pressure distribution systems.
pg. 6
Sui Gas Transmission Company Limited was formed in
1954 with a primary responsibility of gas purification
at the Sui field in Baluchistan and its transmission to
the consumption centers at Karachi. Two distribution
companies were established in 1955 and were
responsible for the distribution of gas to consumers in
Karachi and other towns along the route of the
transmission pipeline between Sui and Karachi. In
1985, these two distribution companies were merged
to form southern Gas Company Limited and later, in
1989, Southern Gas Company Limited and Sui Gas
Company Limited were merged to form a Sui Southern
Gas Company Limited.
2)AIM OF THIS INTERNSHIP:
The aim of this internship was to have learning
opportunities for the development of skill. Secondly to
learn and develop professional skills. I got familiar
with different machines. It was quite a good
experience.
pg. 7
3) SERVICES DEPARTMENT
The services department in SSGC is responsible for
maintaining Heat Ventilation. Air conditioning(HVAC)
and power generation systems. HVAC maintains Heat
Chillers, Fire hydrant system, Water filtration and
elevators.
3.1) HVAC (HEATING VENTILATION AND
AIR CONDITIONIN:
This department deals with the Heating, Ventilation
and Air-conditioning of all the 9 floors of the building.
Cooling towers are installed at the roof top of the
building while the chillers are installed in the
basement and they run throughout the day. This
Department also maintains the elevator system, water
filtration plant Building Management System(BMS)
and Air Handling Units(AHU). The parts of HVAC are
described as under:
pg. 8
3.2) ABSORPTIONCHILLAR:
There are two chillers of Mitsubishi weighing 450 tons
each. They work on the principle of thermodynamics.
In this system, pure water is used as a refrigerant and
lithium bromide is used as an absorbent while gas is
used as a source of energy. Furthermore, the chiller
consists of the main shell with low pressure generator,
condenser, absorber, evaporator and a separate shell
with high pressure generator.
3.3) AVAPORATOR
Pure water is pumped up and sprayed over evaporator
tube, it takes the heat from the chilled water flowing
in the tubes. This water is used for air conditioning for
building and process cooling for factory and then it is
evaporated. The pressure the lower shell is 6mm Hg
abs and the refrigerator Evaporates at about 5°C.
When the chilled water enters the evaporator, it is
cooled down It about 7°C.
pg. 9
3.4) ABSORBER:
The lithium bromide solution that is returned from the
low temperature neat exchanger is sprayed over the
absorber at the tubes of absorber and it absorbs the
refrigerant vapor from the evaporator continuously to
become dilute. The heat generated here is removed
by the cooling water flowing in the absorber tubes.
3.5) HIGH PRESSUREGENERATORE:
The diluted solution is send to the low temperature
heat exchanger by the solution pump. Half of the
dilute solution flows into the high pressure generator
through the high temperature heat exchanger and is
heated by burning gas flowing inside the furnace.
Now, some of the refrigerant in the solution
evaporates and the dilute solution is concentrated.
The burning gas is send to the smoke duct passing
through the furnace.
pg. 10
3.6) LOW PRESSUREGENERATORE:
The remaining dilute solution is send to the low
pressure generator and it is concentrated by the
refrigerant vapor generated in the high pressure
generator. Then concentrated solution from the low
pressure generator mixes with the intermediate
concentrated solution returned from the high
pressure generator through the high temperature
heat exchanger and then passes through the low
temperature heat exchanger and at last it Is sprayed in
the upper parts of tubes in the absorber.
3.7) CONDENSOR:
It cools down the refrigerant vapor formed in the low
pressure generator and the refrigerant is drained in
the tubes of low pressure generator, cool water flows
into the condenser tubes. Now this condensed
refrigerant is sent to the upper part of the evaporator
through the pipe connected and then it is sprayed on
the external Surface of the evaporator tubes.
pg. 11
3.8) AIR HANDLING UNIT(AHU):
The AHU is used to control the following parameters
of the space.
i. Temperature
ii. Humidity
iii. Air Movement
iv. Air Cleanliness
These units are distributed floor wise in the whole
building. The supply duct is directly connected to AHU.
The standardized components are interchangeable.
These components are facilitated by removable panels
and access doors.
pg. 12
4) ELEVATOR
There are four elevators in head office which are
controlled by machine controlled unit. Each elevator
can carry weight of 1600 kg and has a 30kW driving
motor attached to a pulley system. Safety gears are
also there for emergency situations. There is a
generator rope which is used to pull the elevator if it
gets stuck.
4.1) WATER FILTRATON AND FIRE
HYDRANT SYSTEM:
The red color water pipes are used for fire hydrant
system which can be seen on each and every floor of
the building. They lead to the fire hose which is to be
used in emergencies. There is an alarming system as
well which is present on the ground floor. A water
filtration system is also present which is used to
remove unwanted impurities from water such as
sediment, taste and odour, hardness and bacteria to
result in better quality water.
pg. 13
5) POWER GENERATION:
Power generating system are generally treated as heat
engines to convert heat input into work, hence to
produce electricity at a sustained rate. SSGC uses their
own generators as a primary source of power during
the office hours and KE supply is used after office
hours. The company has the largest production of
Natural gas. Which is used as a fuel for the engine of
generators.
There are five generators overall, 2 Waukesha,1
Gauscor and 1 caterpillar (CAT).CAT Generator is for
backup if any of the generator shuts down or if a fault
1.763MW whereas maximum operating load is of
1.2MW.
pg. 14
5.1) WAUKESHA:
Waukesha generator sets are built for efficiency,
durability and longevity, and
provide reliable power for continuous and
intermittent power applications. These
generators come with VHP engines that are built
sturdy, last long and are known tor
their durability. SSGC has two Waukesha generators
which were bought in 2002.Following are its
specification:
1.Power: 440 KW
2.Power Rating: 550 KVA(each)
3.No. of Cylinder: 6 side each
4.Power Factor: 0.8
5.No. of Batteries: 4 each
6.Fuel: Gas
7.Maximum temperature:630°C
8.Revolution: 1000 rpm
9.Current Capacity: 760 Amps
pg. 15
These two generators are synchronized with the help
of control panel and their output
1s displayed on Waukesha Enigmatic Control and
Engine Oil.
5.2) GUASCOR:
This generator is used tor CRD medical building.
Following are its specification:
Power Rating: 523 KW
Power Factor: 0.93
No. of Batteries: 2
Revolution: 1500 rpm
Current Capacity: 940 Amps
pg. 16
5.4) CATERPILLAR:
This generator is used as a backup source in SSGC. It's
specification are mentioned
as under:
1.Power Rating: 45OKVA
2.Power :360K W
3.No. of Cylinders: 12
4.Power factor: 0.8
5.Ambient Temperature: 40°C
6.Current Capacity: 649 Amps
7.Revolution: 1500 rpm
pg. 17
6) K-ELECTRIC SUPPLY:
KE supply is used after office hours when generators
are turned off. The supply
is of 11KV.This 11KV is stepped down to 440V and is
used for various operations.
6.1) TRANSFORMERS:
Two step down transformers of 1250 KVA are used to
step down the KE Supply
which is of 11KV to 440 V.
6.2) CIRCUIT BREAKERS:
Air circuit breaker(ACB) is used here. Usually, ACB is
used for the protection of
11KV system.
pg. 18
6.3) AIR CIRCUIT BREAKER(ACB):
Air Circuit Breaker (ACB) is an electronic equipment
that is used for the protection
or electric circuits from short circuits or overcurrent.
The ACB Operates a
atmospheric pressure in air. ACB is used in the
switching mechanism and protection
or the electrical system. They are used in low voltage
application below 490V.
pg. 19
7) CAPACITOR BANK:
A Capacitor bank is merely a group Several capacitors
of the same rating. Capacitor banks may be connected
in series or parallel, depending upon the desired
rating. As with an individual capacitor, bank of
capacitors is used to store electrical energy and
condition the flow of that energy. Increasing the
number of capacitors in a bank will increase the
capacity of energy can be stored on a single device.
The resulting device is then used to improve The of
the power factor the power which is generated from
the generators. The improvement is is from 0.7 to
0.9pf.
pg. 20
8) UPS ROOM:
Two UPS of 100KVA and 80KVA are placed as a backup
incase fluctuation
Occurs. Each UPS has 36 batteries with 12 V each.
pg. 21

More Related Content

What's hot

Forced induction - Turbochargers vs. Superchargers ( ms office 2007 format)
Forced induction - Turbochargers vs. Superchargers ( ms office 2007 format)Forced induction - Turbochargers vs. Superchargers ( ms office 2007 format)
Forced induction - Turbochargers vs. Superchargers ( ms office 2007 format)
jayakrishna310
 
Gas turbine engine
Gas turbine engineGas turbine engine
Gas turbine engine
Uday Wankar
 
Method of supercharging
Method of superchargingMethod of supercharging
Method of supercharging
Dharmajeetsinh Jadeja
 
Turbojet engines
Turbojet enginesTurbojet engines
Turbojet engines
sanjana_ane
 
Diesel Power Plant
Diesel Power PlantDiesel Power Plant
Diesel Power Plant
Vanita Thakkar
 
Turbochargers
TurbochargersTurbochargers
Turbochargers
talhaanjum
 
Turbocharger and-supercharger
Turbocharger and-superchargerTurbocharger and-supercharger
Turbocharger and-supercharger
Nikhil Surve
 
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
Affiliated Corporation To Help the International Students of Shenyang Aerospace University
 
Turbo jet engine
Turbo jet engineTurbo jet engine
Turbo jet engine
Asha A
 
UNIT - IV JET ENGINE PROPULSION
UNIT - IV JET ENGINE PROPULSIONUNIT - IV JET ENGINE PROPULSION
UNIT - IV JET ENGINE PROPULSION
sureshkcet
 
Difference between Turbocharger vs supercharger
Difference between Turbocharger vs superchargerDifference between Turbocharger vs supercharger
Difference between Turbocharger vs supercharger
Yuga Aravind Kumar
 
Turbine engine 1
Turbine engine 1Turbine engine 1
Turbine engine 1
Zaib Amjad
 
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
Affiliated Corporation To Help the International Students of Shenyang Aerospace University
 
Introduction to turbojet engines
Introduction to turbojet enginesIntroduction to turbojet engines
Introduction to turbojet engines
Vamsi Krishna
 
Pneumatic bike
Pneumatic bikePneumatic bike
Pneumatic bike
Pravi Pravinth
 
Unit v
Unit vUnit v
Unit v
Asha A
 
Diesel engine report
Diesel engine reportDiesel engine report
Diesel engine report
Aljon Altiche
 
Jet propulsion
Jet propulsionJet propulsion
Jet propulsion
SANDIP THORAT
 
New microsoft power point presentation
New microsoft power point presentationNew microsoft power point presentation
New microsoft power point presentation
Aftab Chitragar
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
001Abhishek1
 

What's hot (20)

Forced induction - Turbochargers vs. Superchargers ( ms office 2007 format)
Forced induction - Turbochargers vs. Superchargers ( ms office 2007 format)Forced induction - Turbochargers vs. Superchargers ( ms office 2007 format)
Forced induction - Turbochargers vs. Superchargers ( ms office 2007 format)
 
Gas turbine engine
Gas turbine engineGas turbine engine
Gas turbine engine
 
Method of supercharging
Method of superchargingMethod of supercharging
Method of supercharging
 
Turbojet engines
Turbojet enginesTurbojet engines
Turbojet engines
 
Diesel Power Plant
Diesel Power PlantDiesel Power Plant
Diesel Power Plant
 
Turbochargers
TurbochargersTurbochargers
Turbochargers
 
Turbocharger and-supercharger
Turbocharger and-superchargerTurbocharger and-supercharger
Turbocharger and-supercharger
 
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
 
Turbo jet engine
Turbo jet engineTurbo jet engine
Turbo jet engine
 
UNIT - IV JET ENGINE PROPULSION
UNIT - IV JET ENGINE PROPULSIONUNIT - IV JET ENGINE PROPULSION
UNIT - IV JET ENGINE PROPULSION
 
Difference between Turbocharger vs supercharger
Difference between Turbocharger vs superchargerDifference between Turbocharger vs supercharger
Difference between Turbocharger vs supercharger
 
Turbine engine 1
Turbine engine 1Turbine engine 1
Turbine engine 1
 
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
 
Introduction to turbojet engines
Introduction to turbojet enginesIntroduction to turbojet engines
Introduction to turbojet engines
 
Pneumatic bike
Pneumatic bikePneumatic bike
Pneumatic bike
 
Unit v
Unit vUnit v
Unit v
 
Diesel engine report
Diesel engine reportDiesel engine report
Diesel engine report
 
Jet propulsion
Jet propulsionJet propulsion
Jet propulsion
 
New microsoft power point presentation
New microsoft power point presentationNew microsoft power point presentation
New microsoft power point presentation
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 

Similar to SSGC Karachi Internship report

SSGC Karachi Internship report
SSGC Karachi Internship report SSGC Karachi Internship report
SSGC Karachi Internship report
FarooqueAhmed20
 
thermal-plant-report-mechatronics.pdf
thermal-plant-report-mechatronics.pdfthermal-plant-report-mechatronics.pdf
thermal-plant-report-mechatronics.pdf
FarzanMehmood
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
Shivam Sharma
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
guru nanak institute of technology
 
KTPS
KTPSKTPS
thermal training report
thermal training reportthermal training report
thermal training report
Rakesh Kumar
 
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd UnchaharAbhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
ABHINAV KUMAR
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
DurgSingh
 
Power Plant Report
Power Plant ReportPower Plant Report
Power Plant Report
Eslam Ahmed
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
Utkarsh Chaubey
 
We, the fourth-year students of the Dept. of Mechanical Engineering, SUST, vi...
We, the fourth-year students of the Dept. of Mechanical Engineering, SUST, vi...We, the fourth-year students of the Dept. of Mechanical Engineering, SUST, vi...
We, the fourth-year students of the Dept. of Mechanical Engineering, SUST, vi...
Joy Raj Bhowmik
 
Introduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power PlantIntroduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power Plant
SWAPNILTRIVEDI6
 
Cogeneration
CogenerationCogeneration
Cogeneration
skdass23
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
Tarun Kumar
 
Project report on MTPS
Project report on MTPSProject report on MTPS
Project report on MTPS
Suvajit Cazador
 
MTPS Bappa main
MTPS Bappa mainMTPS Bappa main
MTPS Bappa main
Báppådìtÿâ Màîtÿ
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
applesam8
 
Industrial Training BHEL
Industrial Training BHELIndustrial Training BHEL
Industrial Training BHEL
Lalit Kumar
 
kota super thermal power plant report
kota super thermal power plant reportkota super thermal power plant report
kota super thermal power plant report
LakshyaPareek1
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
Ramendra Dhiman
 

Similar to SSGC Karachi Internship report (20)

SSGC Karachi Internship report
SSGC Karachi Internship report SSGC Karachi Internship report
SSGC Karachi Internship report
 
thermal-plant-report-mechatronics.pdf
thermal-plant-report-mechatronics.pdfthermal-plant-report-mechatronics.pdf
thermal-plant-report-mechatronics.pdf
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
 
KTPS
KTPSKTPS
KTPS
 
thermal training report
thermal training reportthermal training report
thermal training report
 
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd UnchaharAbhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
 
Power Plant Report
Power Plant ReportPower Plant Report
Power Plant Report
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
 
We, the fourth-year students of the Dept. of Mechanical Engineering, SUST, vi...
We, the fourth-year students of the Dept. of Mechanical Engineering, SUST, vi...We, the fourth-year students of the Dept. of Mechanical Engineering, SUST, vi...
We, the fourth-year students of the Dept. of Mechanical Engineering, SUST, vi...
 
Introduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power PlantIntroduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power Plant
 
Cogeneration
CogenerationCogeneration
Cogeneration
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
Project report on MTPS
Project report on MTPSProject report on MTPS
Project report on MTPS
 
MTPS Bappa main
MTPS Bappa mainMTPS Bappa main
MTPS Bappa main
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
 
Industrial Training BHEL
Industrial Training BHELIndustrial Training BHEL
Industrial Training BHEL
 
kota super thermal power plant report
kota super thermal power plant reportkota super thermal power plant report
kota super thermal power plant report
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
 

More from FarooqueAhmed20

sociology final Year Project.pptx
sociology final Year Project.pptxsociology final Year Project.pptx
sociology final Year Project.pptx
FarooqueAhmed20
 
PM Imran Khan
PM Imran Khan PM Imran Khan
PM Imran Khan
FarooqueAhmed20
 
Feminisms in Pakistan
Feminisms  in Pakistan Feminisms  in Pakistan
Feminisms in Pakistan
FarooqueAhmed20
 
Foundation Power Plant Report
Foundation Power Plant Report Foundation Power Plant Report
Foundation Power Plant Report
FarooqueAhmed20
 
The Pillars Of Islam
The Pillars Of IslamThe Pillars Of Islam
The Pillars Of Islam
FarooqueAhmed20
 
Load bank
Load bank Load bank
Load bank
FarooqueAhmed20
 

More from FarooqueAhmed20 (6)

sociology final Year Project.pptx
sociology final Year Project.pptxsociology final Year Project.pptx
sociology final Year Project.pptx
 
PM Imran Khan
PM Imran Khan PM Imran Khan
PM Imran Khan
 
Feminisms in Pakistan
Feminisms  in Pakistan Feminisms  in Pakistan
Feminisms in Pakistan
 
Foundation Power Plant Report
Foundation Power Plant Report Foundation Power Plant Report
Foundation Power Plant Report
 
The Pillars Of Islam
The Pillars Of IslamThe Pillars Of Islam
The Pillars Of Islam
 
Load bank
Load bank Load bank
Load bank
 

Recently uploaded

Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
mamamaam477
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 

Recently uploaded (20)

Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 

SSGC Karachi Internship report

  • 1. pg. 1 SUI SOUTHERN GAS COMPANY LIMITED INTERNSHIP REPORT NAME. FAROOQUE AHMED MAHAR DEP: ELECTRICAL ENGINEERING UNIVERSITY: MUHAMMADALI JINNAH UNIVERSITY KARACHI INTERNSHIP DURATION: 12 MAY-6, AUG.2021 FOR: Services departmentHead Office (SSGC) Karachi
  • 2. pg. 2 ACKNOWLEDGEMENT The internship opportunity that I had with SSGC was a great chance for learning and professional development. I am grateful for having a chance to meet professionals who led through this internship period. I am thankful to all the executives/technicians for their constant support and guidance.
  • 3. pg. 3 CONTENTS 1.Introduction.………………………………………………5-6 2. Aim of Internship…………………………….…………6 3. Services Department …………………………….…..7 3.1) HVAC……………………………………………………………7 3.2) Absorption Chiller ..………………………………………8 3.3) Evaporator……………………………………………………8 3.4) Absorber ……………………………………………………..9 3.5) High Pressure Generator.……………………………..9 3.6) Low Pressure Generator………………………………10 3.7) Condenser…………………………………………………..10 3.8) Air Handling Unit…………………………………………11 4. Elevators……………………………………………………12 4.1) Water Filtration and Fire Hydrant Sys………….12 5. Power Generation……………………………………..13 5.1) Waukesha………………………………………………….14-15 5.2). Guascor ……………………………………………………15-16 5.3) Caterpillar………………………………………………….16
  • 4. pg. 4 6. K-Electric Supply………………………………………..17 6.1) Transformers …………………………………………..17 6.2) Circuit Breakers……………………………………….17 6.3) Air Circuit Breakers………………………………….18 7. Capacitor Banks………………………………………..19 8.UPS Room…………………………………………..…….20
  • 5. pg. 5 1.INTRODUTION: Sui Southern Gas Company (SSGC) is a Public Listed Large Scale Company and is a Pakistan's leading integrated gas Company. The Government or Pakistan directly and indirectly owns the majority of the shareholding of Company. The company is engaged in the business of transmission and distribution of natural gas besides installation of high pressure transmission and low pressure distribution systems.
  • 6. pg. 6 Sui Gas Transmission Company Limited was formed in 1954 with a primary responsibility of gas purification at the Sui field in Baluchistan and its transmission to the consumption centers at Karachi. Two distribution companies were established in 1955 and were responsible for the distribution of gas to consumers in Karachi and other towns along the route of the transmission pipeline between Sui and Karachi. In 1985, these two distribution companies were merged to form southern Gas Company Limited and later, in 1989, Southern Gas Company Limited and Sui Gas Company Limited were merged to form a Sui Southern Gas Company Limited. 2)AIM OF THIS INTERNSHIP: The aim of this internship was to have learning opportunities for the development of skill. Secondly to learn and develop professional skills. I got familiar with different machines. It was quite a good experience.
  • 7. pg. 7 3) SERVICES DEPARTMENT The services department in SSGC is responsible for maintaining Heat Ventilation. Air conditioning(HVAC) and power generation systems. HVAC maintains Heat Chillers, Fire hydrant system, Water filtration and elevators. 3.1) HVAC (HEATING VENTILATION AND AIR CONDITIONIN: This department deals with the Heating, Ventilation and Air-conditioning of all the 9 floors of the building. Cooling towers are installed at the roof top of the building while the chillers are installed in the basement and they run throughout the day. This Department also maintains the elevator system, water filtration plant Building Management System(BMS) and Air Handling Units(AHU). The parts of HVAC are described as under:
  • 8. pg. 8 3.2) ABSORPTIONCHILLAR: There are two chillers of Mitsubishi weighing 450 tons each. They work on the principle of thermodynamics. In this system, pure water is used as a refrigerant and lithium bromide is used as an absorbent while gas is used as a source of energy. Furthermore, the chiller consists of the main shell with low pressure generator, condenser, absorber, evaporator and a separate shell with high pressure generator. 3.3) AVAPORATOR Pure water is pumped up and sprayed over evaporator tube, it takes the heat from the chilled water flowing in the tubes. This water is used for air conditioning for building and process cooling for factory and then it is evaporated. The pressure the lower shell is 6mm Hg abs and the refrigerator Evaporates at about 5°C. When the chilled water enters the evaporator, it is cooled down It about 7°C.
  • 9. pg. 9 3.4) ABSORBER: The lithium bromide solution that is returned from the low temperature neat exchanger is sprayed over the absorber at the tubes of absorber and it absorbs the refrigerant vapor from the evaporator continuously to become dilute. The heat generated here is removed by the cooling water flowing in the absorber tubes. 3.5) HIGH PRESSUREGENERATORE: The diluted solution is send to the low temperature heat exchanger by the solution pump. Half of the dilute solution flows into the high pressure generator through the high temperature heat exchanger and is heated by burning gas flowing inside the furnace. Now, some of the refrigerant in the solution evaporates and the dilute solution is concentrated. The burning gas is send to the smoke duct passing through the furnace.
  • 10. pg. 10 3.6) LOW PRESSUREGENERATORE: The remaining dilute solution is send to the low pressure generator and it is concentrated by the refrigerant vapor generated in the high pressure generator. Then concentrated solution from the low pressure generator mixes with the intermediate concentrated solution returned from the high pressure generator through the high temperature heat exchanger and then passes through the low temperature heat exchanger and at last it Is sprayed in the upper parts of tubes in the absorber. 3.7) CONDENSOR: It cools down the refrigerant vapor formed in the low pressure generator and the refrigerant is drained in the tubes of low pressure generator, cool water flows into the condenser tubes. Now this condensed refrigerant is sent to the upper part of the evaporator through the pipe connected and then it is sprayed on the external Surface of the evaporator tubes.
  • 11. pg. 11 3.8) AIR HANDLING UNIT(AHU): The AHU is used to control the following parameters of the space. i. Temperature ii. Humidity iii. Air Movement iv. Air Cleanliness These units are distributed floor wise in the whole building. The supply duct is directly connected to AHU. The standardized components are interchangeable. These components are facilitated by removable panels and access doors.
  • 12. pg. 12 4) ELEVATOR There are four elevators in head office which are controlled by machine controlled unit. Each elevator can carry weight of 1600 kg and has a 30kW driving motor attached to a pulley system. Safety gears are also there for emergency situations. There is a generator rope which is used to pull the elevator if it gets stuck. 4.1) WATER FILTRATON AND FIRE HYDRANT SYSTEM: The red color water pipes are used for fire hydrant system which can be seen on each and every floor of the building. They lead to the fire hose which is to be used in emergencies. There is an alarming system as well which is present on the ground floor. A water filtration system is also present which is used to remove unwanted impurities from water such as sediment, taste and odour, hardness and bacteria to result in better quality water.
  • 13. pg. 13 5) POWER GENERATION: Power generating system are generally treated as heat engines to convert heat input into work, hence to produce electricity at a sustained rate. SSGC uses their own generators as a primary source of power during the office hours and KE supply is used after office hours. The company has the largest production of Natural gas. Which is used as a fuel for the engine of generators. There are five generators overall, 2 Waukesha,1 Gauscor and 1 caterpillar (CAT).CAT Generator is for backup if any of the generator shuts down or if a fault 1.763MW whereas maximum operating load is of 1.2MW.
  • 14. pg. 14 5.1) WAUKESHA: Waukesha generator sets are built for efficiency, durability and longevity, and provide reliable power for continuous and intermittent power applications. These generators come with VHP engines that are built sturdy, last long and are known tor their durability. SSGC has two Waukesha generators which were bought in 2002.Following are its specification: 1.Power: 440 KW 2.Power Rating: 550 KVA(each) 3.No. of Cylinder: 6 side each 4.Power Factor: 0.8 5.No. of Batteries: 4 each 6.Fuel: Gas 7.Maximum temperature:630°C 8.Revolution: 1000 rpm 9.Current Capacity: 760 Amps
  • 15. pg. 15 These two generators are synchronized with the help of control panel and their output 1s displayed on Waukesha Enigmatic Control and Engine Oil. 5.2) GUASCOR: This generator is used tor CRD medical building. Following are its specification: Power Rating: 523 KW Power Factor: 0.93 No. of Batteries: 2 Revolution: 1500 rpm Current Capacity: 940 Amps
  • 16. pg. 16 5.4) CATERPILLAR: This generator is used as a backup source in SSGC. It's specification are mentioned as under: 1.Power Rating: 45OKVA 2.Power :360K W 3.No. of Cylinders: 12 4.Power factor: 0.8 5.Ambient Temperature: 40°C 6.Current Capacity: 649 Amps 7.Revolution: 1500 rpm
  • 17. pg. 17 6) K-ELECTRIC SUPPLY: KE supply is used after office hours when generators are turned off. The supply is of 11KV.This 11KV is stepped down to 440V and is used for various operations. 6.1) TRANSFORMERS: Two step down transformers of 1250 KVA are used to step down the KE Supply which is of 11KV to 440 V. 6.2) CIRCUIT BREAKERS: Air circuit breaker(ACB) is used here. Usually, ACB is used for the protection of 11KV system.
  • 18. pg. 18 6.3) AIR CIRCUIT BREAKER(ACB): Air Circuit Breaker (ACB) is an electronic equipment that is used for the protection or electric circuits from short circuits or overcurrent. The ACB Operates a atmospheric pressure in air. ACB is used in the switching mechanism and protection or the electrical system. They are used in low voltage application below 490V.
  • 19. pg. 19 7) CAPACITOR BANK: A Capacitor bank is merely a group Several capacitors of the same rating. Capacitor banks may be connected in series or parallel, depending upon the desired rating. As with an individual capacitor, bank of capacitors is used to store electrical energy and condition the flow of that energy. Increasing the number of capacitors in a bank will increase the capacity of energy can be stored on a single device. The resulting device is then used to improve The of the power factor the power which is generated from the generators. The improvement is is from 0.7 to 0.9pf.
  • 20. pg. 20 8) UPS ROOM: Two UPS of 100KVA and 80KVA are placed as a backup incase fluctuation Occurs. Each UPS has 36 batteries with 12 V each.