1. my SlideShare profile
Doha, Qatar
Cairo, Egypt
Mobile:(+974) 50070063;
E-mail: MAHMED210@GMAIL.COM
ABDULLAH AHMED AL-KHADRAWY
RICS, PMI-PMP, RMP
PERSONAL INFORMATION
Nationality Egyptian
Date of Birth 16/8/1984
Marital Status Married
EDUCATION
BSc. (hons): Civil Engineering: Benha university: Faculty of engineering Shoubra: department, Structure division
2006.
Evaluation: Very Good (HONS)
Graduation project: Construction Projects’ Management, Evaluation: Excellent.
CERTIFICATES & SKILLS
Certificates:-
1. Project Management Professional: PMI-PMP® (April 2011) (PMP#1404911)
2. Risk Management Professional: PMI-RMP® (April 2016) (RMP# 1919681)
3. AssocRICS (7-2018) (Professional#6788714)
4. Primavera Certified for (P6) - (2008)
5. Primavera Certified for (Contract Manager 12) - (2009)
Computer Skills:
OraclePrimavera Certified for (P6) (basic & Advanced) up to the latestversion.
OraclePrimavera Certified for Primavera ContractManager (12).
Primavera projectplanner for the Enterprise (P5 (V5, V6)).
Primavera projectplanner (P3 (V3.1)).
MS Project2013
MS Office(Word, Excel, Power point). [Professional applicantfor MS Excel]
Auto-cad (2D).
Professional Courses:
Operations Management (2017)
Engineering Contracts’Arbitrators’Preparation Course(Syndicateof Engineers, Egypt) (2013).
FIDIC Contracts Management (RED BOOK 1999) (2012).
Certified Cost Professional-AACE.(Preparation Course) (2012).
Language Skills:
Arabic: Native . English: Very good in communication for both verbal & written.
General Duties :
Develop the detailed time scheduleand prepare the submission packageas specified in the Contract and
revisethis scheduleduringconstruction as required.
Estimation of the required Resources to the Schedule activities & loadingthem to the time schedule.
Risk Management Activities,prepare project risk management plan,Risk register,& Risk register updates.
Coordinatewith other Departments, to ensure that we meet the planned dates
Have hands on implementation of standard methods of delay analysis
2. * More details available in:
ESSENTIAL WORK ACTIVITIES
· Planning & Scheduling / Assessing /Estimation / Evaluating/Risk management.
· Implementing / Coordinating · Integrating / Coding / estimating.
· Checking · Reviewing / Evaluating.
· Using Tools/ machinery · Controlling / Directing.
PROFESSIONAL EXPIERIENCE
{Dec. 2014 Current} Consolidated Contractors International Company, Doha, Qatar :
* { Jun. 2019 Current } Sr. Planning & Risk Engineer:
NFE – ESW - Procurement and Construction ofthe Early Site Works for NFE Onshore Project
* { May. 2018 Jun. 2019 } Sr. Planning & Risk Engineer:
UMRP-CONSTRUCTION & UPGRADING OF MESAIMEER ROAD Project
* { Jan. 2018 May 2018 } Sr. Planning & Risk Engineer: Doha Metro, SY.DW Qatar Rail Stabling Yard, Doha West.
* { Dec.2017 Jan. 2018 } Sr. Planning Engineer: Doha Metro, QRDB Qatar Rail Depot Building
(Building, B14: Administration and Integrated Control Center)
* { Jan. 2017 Dec.2017 } Sr. Planning Engineer: Doha Metro, QRMS Main Stations’ Construction Project (PH II)
* { May. 2016 Jan. 2017 } Sr. Planning Engineer: Doha Metro, QRCM Main Stations’ Construction Management (PH I)
* { Dec. 2014 May. 2016} Sr. Planning Engineer: SMRC Sidra Medical & Research Center, Doha (Qatar Foundation) (Buildings-
Roads-Infrastructure, utilities & Landscape)
{Dec 2013 Dec 2014} Assad Said Contracting Co. (General Contractors), Riyadh, Saudi Arabia :
* PlanningManager (actingas planningmanager & senior planningengineer) : KingAbdullah Project for JudiciaryDevelopment (Constructionof
22 Courts, 14 Judges CapacityType)
(1.25 billion SR – total number of 22courts spreads through 12 different sites in theKSA)
{ Mar 2013 Dec 2013} Egyptian society of engineers at cairo , Cairo, Egypt :
* Contract Management & ArbitrationPractitioner
{Sep 2007 Mar 2013} AL-ARRAB Company (General Contractors), Riyadh, Saudi Arabia :
**{ Jul 2012 March2013} Sr.PlanningEngineer (AL-AQEEQ- AL-BAHA-SAUDIARABIA)
- Al-Baha University
1-Staff HousingCompound(13bdgs+99Villas) (410mSR).
2-Students housing– residential (98 m SR)
**{Sep 2007 Jul 2012} Planning SectionHead(MAKKAH AL MOKARRAMA- SAUDIARABIA)
Umm Al-Qura Universityprogram Sumof 14 Projects of (864 MILLION SR):
1-UniversityTeachingHospital (400Beds Capacity): (3StoryBuilding-27,000 m²) (320 mSR)
2-Girls Central Spine: ( Passage toconnect all girls campus colleges 780m') (150 mSR)
3-Pharmacy College Building: (3 Story Building-14,000 m²) ( 70 mSR)
4-AppliedMedical Science College Building: (3 StoryBuilding-19,000m²) ( 76 mSR)
5-Boys Accommodation (1): (2StoryThree Typical Buildings + External Works) ( 50 mSR)
6-Academy SupportingBuildings: (3 Buildings + Academic Court) ( 53 mSR)
7-Multi Deck Car Parking(2): (3storyprecast concrete building.) ( 25 mSR)
And other 7 Projects Valued: 130 mSR
{Feb 2007 Aug 2007} HCE: Hosney Consulting Engineers (EGYPT-CAIRO): Site Planner
Kattamea Hills Project: (105 villas Residential compound)- Mixeduse project ) (Buildings-
Roads-Infrastructure, utilities & Landscape)
Nile university Project: Varity of construction & InfrastructureProjects (consultant Side) Mixeduse project (Buildings-
Roads-Infrastructure, utilities & Landscape)
N.D.I.CO.(newdesign international company): Site Engineer: Supervisionof constructionof five villas plus factory have various items ( 1 Aug.
2006 31Oct. 2006).