2. Problem # Spin plan for a cotton mill (For 80s
Ne combed yarn)
1) Ring frame:
Total no of spindles = 25000
Spindles/frame = 480
Spindle speed = 18000 rpm
Yarn count = 80s
(Ne)
TPI = 27
Waste = 2.5%
Efficiency = 90%
Average stoppage time = 5%
Solution:
Required ring frame = β = 52.08 β 52 for (52x480) 24960 spindles
No of running spindles =
= 23712
Production/hr =
=
= 352.86 lb
2) Simplex:
Spindle speed = 1600 rpm
Spindles/frame = 120
Roving hank (for 80s
count) = 3.5
TM = 1
TPI = 1β = 1.87
Waste = 0.5%
3. Efficiency = 90%
Average stoppage time = 5%
Solution:
Total production of simplex = ring frame production x ( )
= ( )
= 361.68 lb
Production/hr/spindle =
=
= 0.44 lb
No of running spindles =
No of established spindles =
=
= 863.1 β 863
No of simplex machine = β 7
3) Comber
Feed/nip = 7mm
Nips/min = 300
Feed lap wt = 900 grains/yd
Feed lap hank = 0.0093
Delivery lap wt = 50 grains/yd
Delivery lap hank = 0.16
Noil = 16%
No of head = 8
Efficiency = 90%
Avg stoppage time = 5%
4. Solution:
Production in comber =
=
= 363.5 lb
Production/hr = (Feed/nip) X(nips/min) X Lap wt in grain X No of heads X Efficiency
=
= 127.14 lb
No of comber =
No of installed comber =
=
= 2.96 β 3
4) Super lap former
Delivery speed = 90 m/min
Lap wt = 850 grains/yd
Lap hank = 0.0098
Efficiency = 90%
Waste = 2.5%
Avg stoppage time = 5%
Solution:
Production in super lap former =
=
= 421.66 lb
Production/hr =
=
= 625.5 lb
5. No of lap former =
No of installed lap former =
=
= 0.70 β 1
5) Draw frame
Delivery roller speed = 400 yd/min
Sliver hank = 0.176
Delivery head/machine = 2
Waste = 0.75%
Efficiency = 90%
Avg stoppage time = 5%
Draft = 6
Doubling = 6
Solution:
Draw frame production = p o m p o on
=
= 432.2 lb
Production/hr/frame =
=
= 321.4 lb
Running draw frame =
Installed draw frame =
=
= 1.407 β 2
D/F sl v h nk
πΆπππ π πππ£ππ πππ π π·ππππ‘
π·ππ’πππππ
=
π
= 0.176
6. 6) Carding
Doffer Diameter = 27β
Doffer speed = 45 rpm
Sliver hank = 0.16
Efficiency = 90%
Waste = 5%
Avg stoppage time = 5%
Draft = 110
Solution:
Carding Production =
=
= 435.4 lb
Production/hr =
=
= 42.6 lb
Running carding machines =
Installed carding machines =
=
= 10.73 β 11
7) Blow room
Bottom calendar roller diameter = 10β
Bottom calendar roller speed = 12 rpm
Lap wt = 12 oz/yd
Lap hank = 0.0016
Waste = 5%
Efficiency = 90%
Card sl v h nk Blow oom l p h nk X D
= 0.0016 X 110
= 0.176
7. Scutcher/Blow room line = 2
Avg stoppage time = 5%
Solution:
Production in Blowroom = n p o on
=
= 457.17 lb
Production/hr =
=
= 420.7 lb
Running scutchers =
Total scutchers =
=
= 1.15 β 2
No of Blowroom line =
Summary:
No of required machine for 25000 spindles and 80s
(Ne) Cotton yarn:
1) Blowroom line = 1 (scutcher = 2)
2) Carding machine = 11
3) Drawframe = 2
4) Super lap former = 1
5) Comber = 3
6) Simplex = 7
7) Ring frame = 52