OBJECTIVES
The main objectives of this project are:
• To study the current waste management system
in the industry.
• To replace the manually transported waste into
automated waste transportation to the truck.
INTRODUCTION
De-inking Plant
• In de-inking plant the pulp is produced from waste paper. It is
soaked in water and then slushed to slurry form.
• Hopper seperates the pulp from the plastic and other waste.
• Those waste are removed manually after the hopper removes it.
• Sodium hydroxide is added .The ink and other impurities are
removed and the good fiber is separated.
• Hydrogen peroxide is in the first stage bleaching. The de-inking pulp
is sorted in a concrete tank and it is pumped to paper machine
plant.
• In the De-inking plant the waste coming out of the hopper
is collected in a 1m x 1m x 1m box.
• From the hopper the waste comes in equal interval of time.
Later on, this after getting piled up, is manually transferred
to the truck using a shovel. This process is repeated and
requires much time which is a hectic job.
• The installation of this Automated Waste Disposal
System (AWDS) will be a substitute for that human labour.
• Through this project the design proposal of the Automated
Waste Disposal System (AWDS) is clearly shown.
HOPPER
Waste Collected
From Hopper
DESIGN LAYOUT
PARTS
The different parts used for the design of the AWDS are:
• Box
• Chain and Sprocket drive
• Motor
• Shaft
• Bearing
• Pneumatic Piston
• Rails and Roller Wheels
• Sensors
– Limit Switch Sensor
– Transmitter- Receiver- Light- Barrier Sensor
WORKING
• There is a 1 mX 1 mX 1m box placed under the hopper.
After the box is filled up the box starts moving using a
chain mechanism according to the contour.
• A sensor senses as the box reaches the truck triggering
the piston attached at the bottom door of the box for
opening the exit of the waste.
• The chain is moving using an outsource which is a motor.
After a time interval of One and Half hours ie, three time
waste collection from hooper to the box it starts moving. As
it reaches the truck the box movement stopping sensor
senses stops the box and gives signal for the opening of
the door. And thus the waste is been exited.
• After the waste exit the door is closed and the box reaches
back to the initial position. This process is repeated.
• Small modifications are made for the automation system
such as :
• Bottom doors are attached to the box
• Chains are included at the sides of the box for its
movement
• Sensors are added for :
– detection of the truck
– starting and stopping of the box movement
PARTS
The different parts used for the design of the AWDS are:
• Box
• Chain and Sprocket drive
• Motor
• Shaft
• Bearing
• Pneumatic Piston
• Rails and Roller Wheels
• Sensors
– Limit Switch Sensor
– Transmitter- Receiver- Light- Barrier Sensor
BOX
CHAIN
SPROCKET
MOTOR
PNEUMATIC PISTON
LIMIT SWITCH
SHAFT
TRANSMITTER- RECEIVER-
LIGHT BARRIER SENSORS
ASSEMBLED FIGURE
CALCULATIONS
Total waste coming from the hooper = (water+ pulp+ plastic)
= 100 kg
Total amount of plastic waste = 40% of total waste
= 40 kg = 40000 g
Density of plastic waste = 0.56 g/cm3
Volume = Mass/Density
= 40000/0.56
= 71428.57 cm3
Considering the space available and safety factors, the dimension of
the metal box is selected to be 1m x 1m x 1 m
Box size = 1m x 1m x 1 m
ie, Volume of box = 1000000 cm3
So we can fill the box in almost 14 times.
Design of Box
Bottom gate:
Length = 1 m
Height = 1 m
Thichness = 0.01 m
Total volume of the gate = Length x Height x Thickness
= 1 x 1 x 0.01
= 0.01 m3
Material selected for the gate = Cast Iron
Density Cast Iron ranging from = 6800 – 7800 kg/m3
Selecting Density of Cast Iron = 7000 kg/m3
Therefore Mass of gate = Volume x Density
= 7000 x 0.01
= 70 kg (Perforated bottom)
Frame:
Dimensions of outer side
Length = 1 m
Height = 1 m
Thickness = 0.005 m
Volume = Length x Height x Thickness
= 1 x 1 x 0.005
= 0.005 m3
Dimensions of inner side
Length = 1- 0.02
= 0.98 m
Height = 0.98 m
Thickness = 0.005 m
Volume = Length x Height x Thickness
= 0.98 x 0.98 x 0.005
= 4.802 x 10-3 m3
Hence Volume of the constructed frame = Outer dimension – Inner dimension
= 0.005 – (4.802 x 10-3)
= 1.98 x 10-4 m3
Mass of one frame = Volume x Density
= 1.98 x 10-4 x 7000
= 1.386 kg
Total weight for 4 sides = 4 x 1.386
= 5.544 kg
Side walls:
Length = 1 m
Height = 1 m
Thickness = 0.005 m3
Volume of one bar = Length x Height x Thickness
=1 x 1 x 0.005
= 0.005 m3
Volume of 23 bars = 23 x 2 x 10-2 x 1 x 0.005
= 2.3 x 10-3 m3
Selected Density of Cast Iron = 7000 kg/m3
Mass = Volume x Density
= 2.3 x 10-3 x 7000
= 16.1 kg (which is mass of one grill ,ie
one side)
Total mass for 4 grills ,ie 4 sides = 4 x 16.1
= 64.4 kg
Angle plate:
Length = 3 cm
Breadth = 3 cm
Height = 100 cm
Thickness = 0.5 cm
Area of the cross section of the angle plate
1st part = 3 x 3
= 9 cm2
2nd part = (3 - 0.5) x (3 - 0.5)
= 2.5 x 2.5
= 6.25 cm2
Therefore the area = 9 – 6.25
= 2.75 cm2
Volume of one plate = Area x Height
= 2.75 x 100
= 275 cm3
Volume of 4 angle plates = 4 x 275 cm3
=1.1 x 10-3 m3
Selected Density of Cast Iron = 7000 kg/m3
Mass = Volume x Density
= 1.1 x 10-3 x 7000
= 7.7 kg
Total box weight = 70 + 64.4 + 7.7+ 5.544 kg
= 147.644 kg
Approximate weight for safety ≈ 160 kg (considering welding and hinges)
So total weight of box including
water, pulp, waste and pneumatic piston = 300 kg
Force Analysis
In horizontal:
Frictional force on the rail and rotor = µRN
Coefficient of Friction, µ =0.2 for cast iron
Normal Reaction, RN = 300
= 0.2 x 300
= 60 kgf
Inertia force = m a
Mass, m = 300 kg
Acceleration of the chain = 0.2 m/s
= 300 x 0.2
= 60 kgf
Total force during starting time = 60 + 60
= 120 kgf
In inclination:
Force in the direction of motion = mg sin 450
Mass x Acceleration due to gravity = Weight (w)
= w sin 450
= 300 x (1/√2)
= 212.13 kgf
Force due to friction = mg cos 450 x µ
= w x cos 450 x µ
= 300 x (1/√2) x 0.2
= 42.42 kgf
Hence total Force required in inclination = 42.42 + 212.13
= 254.55 kgf
FREE BODY DIAGRAM
Force acting downwards = mg
Couple due to that force = mg x half the length
= 300 x 9.8 x 0.5
= 1470 Nm
Frictional Force = µRN
= 0.2 x 300
= 60 kgf
Couple due to Frictional Force = µRN x g x height
= 60 x 9.8 x .5
= 294 Nm
Here couple due to the downward force is greater than
couple due to frictional force so the box will not trip
and fall.
Chain Selection
Force acing in one chain = 254.55/2
= 127.27 kgf
Taking factor of safety = 3
Calculated Breaking Load = 127.27 x 3
= 381.81 kgf
Therefore selecting a chain with a breaking load greater than 381.81 kgf is from
PSG Design Data Book.
Taking the chain R830, with
Breaking load = 460 kgf
Pitch = 8 mm
Roller diameter maximum = 5 mm
Width between inner plates minimum, w = 3.10 mm
Pin body diameter maximum, Pp = 2.31 mm
Plate depth maximum, G = 7.05 mm
Overall over joint masses , A1, A2, A3 = 11.10 mm
Bearing area = 0.11 mm
Weight per meter = 0.18 kg/m
Chain Material = Cast Iron
Sprocket Selection
ISO 05 BI (8 x 3.0 mm) Simple Roller Chain selected from Sprocket
Catlogue
No of teeth = 45
Pitch circle diameter, d0 = 114.69 mm
Tip circle diameter, dk = 118.6 mm
Pilot bore, di = 38mm
Pitch = 8 mm
Inner width = 5 mm
Roller diameter = 5 mm
Teeth width = 2.8 mm
Radius = 114.69/2
= 57.34 mm
Sprocket Material = Stainess Steel
Calculation for Power and
Torque
Load = 254.55kgf
Required velocity = 0.4 m/s
Power = Force x Velocity
= 254.55 x 10 x 0.4
= 1018.2 W
In HP = Power/746
=1018.2/746
=1.36 HP
Torque required = Force x Radius
= 2550 x 0.05769
= 147.11 Nm
Power = (2 ∏ NT)/60
1018.2= (2 ∏ x N x 147.11)/60
Therefore N = 66.12 rpm
≈ 66 rpm
Motor Selection
Geared Motor Selected from Hindustan Motors catalogue
H_M402050_0904(1.5Hp)
From the above conditions, motor is selected with,
RPM = 63 rpm
Torque = 161.7 Nm
Service Factor = 1.4
Phase and Voltage = 3 phase, 415 V
Rating = 0.12 to 7.3 kw =Taking 7.3 kw
Ratio = 3.6/1 to 45/1 = Taking 23 /1
Shaft diameter = 24 to 60 mm = Taking 40 mm
Mounting = Foot and Flange
Shaft Selection
Taking shaft diameter = 40 mm
Length of shaft = 3.25 m
Shaft Material = Forged Steel
Density of Shaft = Forged Steel = 7850 kg/m3
Shaft Volume = ∏r2l
= ∏ x (0.02)2 x 3.25
= 4.084 x 10-3 m3
Shaft Mass = Volume x Density
= 4.084 x 10-3 x 7850
= 32.059 kg
Bearing Design
Density of Sprocket = Stainless Steel = 7480-8000 kg/m3
Selecting Density of Stainless Steel = 7500 kg/m3
Sprocket Volume = ∏r2l
= ∏ x ([118.6/2]2 – [40/2]2) x 2.8
= 27414.0778 mm3
Sprocket Mass = Volume x Density
= 27414.0778 x 10-9 x 7500
= 0.205 kg x 2
= 0.411 kg
Total Radial Load Acting on the Bearing = Shaft Mass + Bearing Mass
= 32.059 + 0.411
= 32.4702 kg
Axial Load, Fa = 0 kgf
Radial Load, Fr = 32.4702 /2
= 16.23 kg (for one bearing)
Equivalent Load , P = ( X Fr + Y Fa) S
Taking ,
Radial Factor, X = 1
Thrust Factor, Y = 0
Service Factor, S = 1.3
Therefore ,P = X Fr S
= 1 x 16.23 x 1.3
= 21.099 kg
Length of Chain at Inclination
According to Pythagoras Theorem
AC2 = √( AB2 +BC2)
AC = (2.52 + 2.52)
AC = 3.5 m
Total travel distance = 2.5 +3.5 + 1.5
= 7.5 m
Velocity, V = ω r
Radial Velocity, ω = [(2 x ∏ x N)/60]
rpm, N = 63 rpm
Therefore, V = [(2 x ∏ x N)/60] x r
= [(2 x ∏ x 63)/ 60] x (0.11469/2)
= 0.37 m/s
Therefore time of travel = Distance / Velocity
= 7.5 / 0.37
= 19.83 sec
Two way travel = 2 x 19.83
= 39.67 sec
Work time ≈ 60 secs = 1 min
Total work time for one day = 16 mins
In hours = 16/60
= 0.27 hrs
Required Life of Bearing in million revolutions, for 8 years
L = 0.27 hrs x (365days/1yr) x 8 yrs
x 63 rev/min x (60min/1hr) x
(1mr/106 rev)
= 2.98 mr
Therefore Dynamic Capacity, C = (L/L10)1/K x P
L10 = 1 mr
K = 3 for ball bearings
Therefore, C = (2.98/1)1/3 x 21.099
= 30.36 kgf
Selecting Bearing SKF 6008
d = 40 mm
D1 = 45 mm
D = 68 mm
D2 = 63 mm
B = 15 mm
r ≈ 1.5 mm
r1 = 1.0 mm
Basic Static Capacity, C0 = 980 kgf
Basic Dynamic Capacity, C = 1320 kgf
Maximum Permissible Speed, rpm = 10000 rpm
Bearing Probability of Survival
We know that, C1 = (L101/L10)1/K x P1
= (L101/1)1/3 x 21.099
Therefore, L101 = 244870.336 mr
L/L101 = [ln(1/p1)/ln(1/p10)]1/b
L101 = calculated life of the selected bearing, for given load for 90%
survival
Ln(1/p10) = ln(1/0.9) = 0.1053
b = 1.34 for deep grove ball bearings
2.98/244870.336 = [ln (1/p)/ 0.1053)1/1.34
Therefore, p1 = 0.9999
= 99.99%
Piston Selection
NORGREN RN920 (stroke 300mm)
Force acting on the piston = 100 kgf
= 1000 N
Taking diameter of the piston = 2 inch
Stroke = 300 mm
Operating Pressure = 2 – 10 bar
Operating temperature = -20˚C - 80˚C
Area = ∏ r2
= ∏ x 2.542
= 20.258 cm
Therefore Pressure acting = Force / Area
= 1000 / (20.258 x 10-4)
= 493632.14 Pa
= 4.936 bar.
CONCLUSION
• By completion of this project the Industry
gets a good profit.
• This machine can also be used in many
Industry. Can used also in various raw
material transportation.
• Though this kind of system exists in
various fields, the AWDS is one of a kind
which is so simple and is ecofriendly.
BIBLIOGRAPHY
• PSG Data book
• www.fotoelectik-pauly.de
• www.imis.com
• Hindustan electric motors Catlogue
• Norgen RM Cylinders Catlogue
PROJECT DEMO final

More Related Content

What's hot

Steel Plate Girder Bridge Design
Steel Plate Girder Bridge DesignSteel Plate Girder Bridge Design
Steel Plate Girder Bridge DesignVenkatesh A
 
Design and Fabrication of a Tricycle for Municipal Waste Collection
Design and Fabrication of a Tricycle for Municipal Waste CollectionDesign and Fabrication of a Tricycle for Municipal Waste Collection
Design and Fabrication of a Tricycle for Municipal Waste Collectioninventionjournals
 
Theory of machines solution ch 11
Theory of machines solution ch 11 Theory of machines solution ch 11
Theory of machines solution ch 11 Saif al-din ali
 
压铸铝箱产品简介(英文版)
压铸铝箱产品简介(英文版)压铸铝箱产品简介(英文版)
压铸铝箱产品简介(英文版)david cao
 
Advanced Composites Final Paper
Advanced Composites Final PaperAdvanced Composites Final Paper
Advanced Composites Final Paperaileencv
 
CSEC Physics Lab - Use of makeshift beam balance to find density of liquid
CSEC Physics Lab - Use of makeshift beam balance to find density of liquidCSEC Physics Lab - Use of makeshift beam balance to find density of liquid
CSEC Physics Lab - Use of makeshift beam balance to find density of liquidRonaldo Degazon
 
Chst math 2019 w answers
Chst math 2019 w answersChst math 2019 w answers
Chst math 2019 w answersJohn Newquist
 
ppt on summer training Vardhman's Mahavir Spinning Mills Baddi (weaving devis...
ppt on summer training Vardhman's Mahavir Spinning Mills Baddi (weaving devis...ppt on summer training Vardhman's Mahavir Spinning Mills Baddi (weaving devis...
ppt on summer training Vardhman's Mahavir Spinning Mills Baddi (weaving devis...Bharat Rana
 
Ultrasonic Machining (USM) - Batch 4
Ultrasonic Machining (USM) - Batch 4Ultrasonic Machining (USM) - Batch 4
Ultrasonic Machining (USM) - Batch 4deepakmenon52
 
Steel strucure lec # (5)
Steel strucure lec #  (5)Steel strucure lec #  (5)
Steel strucure lec # (5)Civil Zone
 

What's hot (14)

Steel Plate Girder Bridge Design
Steel Plate Girder Bridge DesignSteel Plate Girder Bridge Design
Steel Plate Girder Bridge Design
 
Design and Fabrication of a Tricycle for Municipal Waste Collection
Design and Fabrication of a Tricycle for Municipal Waste CollectionDesign and Fabrication of a Tricycle for Municipal Waste Collection
Design and Fabrication of a Tricycle for Municipal Waste Collection
 
Theory of machines solution ch 11
Theory of machines solution ch 11 Theory of machines solution ch 11
Theory of machines solution ch 11
 
压铸铝箱产品简介(英文版)
压铸铝箱产品简介(英文版)压铸铝箱产品简介(英文版)
压铸铝箱产品简介(英文版)
 
costing1
costing1costing1
costing1
 
Advanced Composites Final Paper
Advanced Composites Final PaperAdvanced Composites Final Paper
Advanced Composites Final Paper
 
C012421626
C012421626C012421626
C012421626
 
CSEC Physics Lab - Use of makeshift beam balance to find density of liquid
CSEC Physics Lab - Use of makeshift beam balance to find density of liquidCSEC Physics Lab - Use of makeshift beam balance to find density of liquid
CSEC Physics Lab - Use of makeshift beam balance to find density of liquid
 
Chst math 2019 w answers
Chst math 2019 w answersChst math 2019 w answers
Chst math 2019 w answers
 
ppt on summer training Vardhman's Mahavir Spinning Mills Baddi (weaving devis...
ppt on summer training Vardhman's Mahavir Spinning Mills Baddi (weaving devis...ppt on summer training Vardhman's Mahavir Spinning Mills Baddi (weaving devis...
ppt on summer training Vardhman's Mahavir Spinning Mills Baddi (weaving devis...
 
Ultrasonic Machining (USM) - Batch 4
Ultrasonic Machining (USM) - Batch 4Ultrasonic Machining (USM) - Batch 4
Ultrasonic Machining (USM) - Batch 4
 
5 hardness
5  hardness5  hardness
5 hardness
 
Steel strucure lec # (5)
Steel strucure lec #  (5)Steel strucure lec #  (5)
Steel strucure lec # (5)
 
Chst math
Chst mathChst math
Chst math
 

Similar to PROJECT DEMO final

CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNCONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNAkshika Mahanama
 
material handling in mines numerical problems
material handling in mines numerical problems material handling in mines numerical problems
material handling in mines numerical problems Ashok Kumar
 
Planing,designing and analysis of HI TECH SHOPPING MALL
Planing,designing and analysis of HI TECH SHOPPING MALLPlaning,designing and analysis of HI TECH SHOPPING MALL
Planing,designing and analysis of HI TECH SHOPPING MALLArshana Anu
 
Manufacture of nitrobenzene
Manufacture of nitrobenzeneManufacture of nitrobenzene
Manufacture of nitrobenzeneparthdhurvey
 
Sums on Rigid Pavement Design
Sums on Rigid Pavement DesignSums on Rigid Pavement Design
Sums on Rigid Pavement DesignArnabKarmakar18
 
ME 8403- Lecture2 - Belt Conveyors.pptx
ME 8403- Lecture2 - Belt Conveyors.pptxME 8403- Lecture2 - Belt Conveyors.pptx
ME 8403- Lecture2 - Belt Conveyors.pptxKIJAMALEGI
 
Cylindrical liner
Cylindrical linerCylindrical liner
Cylindrical linerHridoy Saha
 
Deduction of opening , Number of bars and Bar Bending Scheduling
Deduction of opening , Number of bars and Bar Bending SchedulingDeduction of opening , Number of bars and Bar Bending Scheduling
Deduction of opening , Number of bars and Bar Bending SchedulingYash Patel
 
Vertical Screw Conveyor - Design Project
Vertical Screw Conveyor - Design ProjectVertical Screw Conveyor - Design Project
Vertical Screw Conveyor - Design ProjectPoorna Hewapathirana
 
trainingonchp-170107190647.pdf
trainingonchp-170107190647.pdftrainingonchp-170107190647.pdf
trainingonchp-170107190647.pdfDINESHRANJANPAL
 
Design of fischer tropsh reactor zbj -ppt file
Design of fischer tropsh reactor  zbj -ppt fileDesign of fischer tropsh reactor  zbj -ppt file
Design of fischer tropsh reactor zbj -ppt fileZuhair Bin Jawaid
 
Class 7 PHYSICAL QUANTITY & MEASUREMENT
Class 7 PHYSICAL QUANTITY & MEASUREMENTClass 7 PHYSICAL QUANTITY & MEASUREMENT
Class 7 PHYSICAL QUANTITY & MEASUREMENTSouvikChatterjee53
 
Design and development of ridge profile power weeder
Design and development of ridge profile power weederDesign and development of ridge profile power weeder
Design and development of ridge profile power weederGajanan Bele
 
BALL SCREW SELECTION.pdf
BALL SCREW SELECTION.pdfBALL SCREW SELECTION.pdf
BALL SCREW SELECTION.pdfssuser0d5a76
 
Ship design project & presentation 3
Ship design project &  presentation 3Ship design project &  presentation 3
Ship design project & presentation 3Kifayath Chowdhury
 

Similar to PROJECT DEMO final (20)

section 5.pptx
section 5.pptxsection 5.pptx
section 5.pptx
 
Guntry girder
Guntry girderGuntry girder
Guntry girder
 
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNCONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
 
Section 4
Section 4Section 4
Section 4
 
material handling in mines numerical problems
material handling in mines numerical problems material handling in mines numerical problems
material handling in mines numerical problems
 
Planing,designing and analysis of HI TECH SHOPPING MALL
Planing,designing and analysis of HI TECH SHOPPING MALLPlaning,designing and analysis of HI TECH SHOPPING MALL
Planing,designing and analysis of HI TECH SHOPPING MALL
 
Manufacture of nitrobenzene
Manufacture of nitrobenzeneManufacture of nitrobenzene
Manufacture of nitrobenzene
 
Sums on Rigid Pavement Design
Sums on Rigid Pavement DesignSums on Rigid Pavement Design
Sums on Rigid Pavement Design
 
ME 8403- Lecture2 - Belt Conveyors.pptx
ME 8403- Lecture2 - Belt Conveyors.pptxME 8403- Lecture2 - Belt Conveyors.pptx
ME 8403- Lecture2 - Belt Conveyors.pptx
 
Casement Type Wind Turbine
Casement Type Wind TurbineCasement Type Wind Turbine
Casement Type Wind Turbine
 
Cylindrical liner
Cylindrical linerCylindrical liner
Cylindrical liner
 
Deduction of opening , Number of bars and Bar Bending Scheduling
Deduction of opening , Number of bars and Bar Bending SchedulingDeduction of opening , Number of bars and Bar Bending Scheduling
Deduction of opening , Number of bars and Bar Bending Scheduling
 
Vertical Screw Conveyor - Design Project
Vertical Screw Conveyor - Design ProjectVertical Screw Conveyor - Design Project
Vertical Screw Conveyor - Design Project
 
trainingonchp-170107190647.pdf
trainingonchp-170107190647.pdftrainingonchp-170107190647.pdf
trainingonchp-170107190647.pdf
 
Design of fischer tropsh reactor zbj -ppt file
Design of fischer tropsh reactor  zbj -ppt fileDesign of fischer tropsh reactor  zbj -ppt file
Design of fischer tropsh reactor zbj -ppt file
 
Class 7 PHYSICAL QUANTITY & MEASUREMENT
Class 7 PHYSICAL QUANTITY & MEASUREMENTClass 7 PHYSICAL QUANTITY & MEASUREMENT
Class 7 PHYSICAL QUANTITY & MEASUREMENT
 
CHP
CHP CHP
CHP
 
Design and development of ridge profile power weeder
Design and development of ridge profile power weederDesign and development of ridge profile power weeder
Design and development of ridge profile power weeder
 
BALL SCREW SELECTION.pdf
BALL SCREW SELECTION.pdfBALL SCREW SELECTION.pdf
BALL SCREW SELECTION.pdf
 
Ship design project & presentation 3
Ship design project &  presentation 3Ship design project &  presentation 3
Ship design project & presentation 3
 

PROJECT DEMO final

  • 1. PROJECT DEMO DESIGN PROPOSAL OF AUTOMATED WASTED DISPOSAL SYSTEM FOR HINDUSTAN NEWSPRINT LIMITED, VELLOR PRESENTED BY, KRISHNA KUMAR. B SANDEEP.S.S SHYAM.K THOMAS.P.S
  • 2. Project members with guide Mr.Prasad Rajan (Sr.Manager ,Mechanical engg,HNL)
  • 3. Project members with college guide Mr.Jithu.J (Lecturer, Mechanical Dept, TIST)
  • 4. OBJECTIVES The main objectives of this project are: • To study the current waste management system in the industry. • To replace the manually transported waste into automated waste transportation to the truck.
  • 5. INTRODUCTION De-inking Plant • In de-inking plant the pulp is produced from waste paper. It is soaked in water and then slushed to slurry form. • Hopper seperates the pulp from the plastic and other waste. • Those waste are removed manually after the hopper removes it. • Sodium hydroxide is added .The ink and other impurities are removed and the good fiber is separated. • Hydrogen peroxide is in the first stage bleaching. The de-inking pulp is sorted in a concrete tank and it is pumped to paper machine plant.
  • 6.
  • 7. • In the De-inking plant the waste coming out of the hopper is collected in a 1m x 1m x 1m box. • From the hopper the waste comes in equal interval of time. Later on, this after getting piled up, is manually transferred to the truck using a shovel. This process is repeated and requires much time which is a hectic job. • The installation of this Automated Waste Disposal System (AWDS) will be a substitute for that human labour. • Through this project the design proposal of the Automated Waste Disposal System (AWDS) is clearly shown.
  • 11. PARTS The different parts used for the design of the AWDS are: • Box • Chain and Sprocket drive • Motor • Shaft • Bearing • Pneumatic Piston • Rails and Roller Wheels • Sensors – Limit Switch Sensor – Transmitter- Receiver- Light- Barrier Sensor
  • 12. WORKING • There is a 1 mX 1 mX 1m box placed under the hopper. After the box is filled up the box starts moving using a chain mechanism according to the contour. • A sensor senses as the box reaches the truck triggering the piston attached at the bottom door of the box for opening the exit of the waste. • The chain is moving using an outsource which is a motor. After a time interval of One and Half hours ie, three time waste collection from hooper to the box it starts moving. As it reaches the truck the box movement stopping sensor senses stops the box and gives signal for the opening of the door. And thus the waste is been exited. • After the waste exit the door is closed and the box reaches back to the initial position. This process is repeated.
  • 13. • Small modifications are made for the automation system such as : • Bottom doors are attached to the box • Chains are included at the sides of the box for its movement • Sensors are added for : – detection of the truck – starting and stopping of the box movement
  • 14. PARTS The different parts used for the design of the AWDS are: • Box • Chain and Sprocket drive • Motor • Shaft • Bearing • Pneumatic Piston • Rails and Roller Wheels • Sensors – Limit Switch Sensor – Transmitter- Receiver- Light- Barrier Sensor
  • 15. BOX
  • 16. CHAIN
  • 18. MOTOR
  • 21. SHAFT
  • 24. CALCULATIONS Total waste coming from the hooper = (water+ pulp+ plastic) = 100 kg Total amount of plastic waste = 40% of total waste = 40 kg = 40000 g Density of plastic waste = 0.56 g/cm3 Volume = Mass/Density = 40000/0.56 = 71428.57 cm3 Considering the space available and safety factors, the dimension of the metal box is selected to be 1m x 1m x 1 m Box size = 1m x 1m x 1 m ie, Volume of box = 1000000 cm3 So we can fill the box in almost 14 times.
  • 25. Design of Box Bottom gate: Length = 1 m Height = 1 m Thichness = 0.01 m Total volume of the gate = Length x Height x Thickness = 1 x 1 x 0.01 = 0.01 m3 Material selected for the gate = Cast Iron Density Cast Iron ranging from = 6800 – 7800 kg/m3 Selecting Density of Cast Iron = 7000 kg/m3 Therefore Mass of gate = Volume x Density = 7000 x 0.01 = 70 kg (Perforated bottom)
  • 26. Frame: Dimensions of outer side Length = 1 m Height = 1 m Thickness = 0.005 m Volume = Length x Height x Thickness = 1 x 1 x 0.005 = 0.005 m3 Dimensions of inner side Length = 1- 0.02 = 0.98 m Height = 0.98 m Thickness = 0.005 m Volume = Length x Height x Thickness = 0.98 x 0.98 x 0.005 = 4.802 x 10-3 m3 Hence Volume of the constructed frame = Outer dimension – Inner dimension = 0.005 – (4.802 x 10-3) = 1.98 x 10-4 m3 Mass of one frame = Volume x Density = 1.98 x 10-4 x 7000 = 1.386 kg Total weight for 4 sides = 4 x 1.386 = 5.544 kg
  • 27. Side walls: Length = 1 m Height = 1 m Thickness = 0.005 m3 Volume of one bar = Length x Height x Thickness =1 x 1 x 0.005 = 0.005 m3 Volume of 23 bars = 23 x 2 x 10-2 x 1 x 0.005 = 2.3 x 10-3 m3 Selected Density of Cast Iron = 7000 kg/m3 Mass = Volume x Density = 2.3 x 10-3 x 7000 = 16.1 kg (which is mass of one grill ,ie one side) Total mass for 4 grills ,ie 4 sides = 4 x 16.1 = 64.4 kg
  • 28. Angle plate: Length = 3 cm Breadth = 3 cm Height = 100 cm Thickness = 0.5 cm Area of the cross section of the angle plate 1st part = 3 x 3 = 9 cm2 2nd part = (3 - 0.5) x (3 - 0.5) = 2.5 x 2.5 = 6.25 cm2 Therefore the area = 9 – 6.25 = 2.75 cm2 Volume of one plate = Area x Height = 2.75 x 100 = 275 cm3 Volume of 4 angle plates = 4 x 275 cm3 =1.1 x 10-3 m3 Selected Density of Cast Iron = 7000 kg/m3 Mass = Volume x Density = 1.1 x 10-3 x 7000 = 7.7 kg Total box weight = 70 + 64.4 + 7.7+ 5.544 kg = 147.644 kg Approximate weight for safety ≈ 160 kg (considering welding and hinges) So total weight of box including water, pulp, waste and pneumatic piston = 300 kg
  • 29. Force Analysis In horizontal: Frictional force on the rail and rotor = µRN Coefficient of Friction, µ =0.2 for cast iron Normal Reaction, RN = 300 = 0.2 x 300 = 60 kgf Inertia force = m a Mass, m = 300 kg Acceleration of the chain = 0.2 m/s = 300 x 0.2 = 60 kgf Total force during starting time = 60 + 60 = 120 kgf
  • 30. In inclination: Force in the direction of motion = mg sin 450 Mass x Acceleration due to gravity = Weight (w) = w sin 450 = 300 x (1/√2) = 212.13 kgf Force due to friction = mg cos 450 x µ = w x cos 450 x µ = 300 x (1/√2) x 0.2 = 42.42 kgf Hence total Force required in inclination = 42.42 + 212.13 = 254.55 kgf
  • 31. FREE BODY DIAGRAM Force acting downwards = mg Couple due to that force = mg x half the length = 300 x 9.8 x 0.5 = 1470 Nm Frictional Force = µRN = 0.2 x 300 = 60 kgf Couple due to Frictional Force = µRN x g x height = 60 x 9.8 x .5 = 294 Nm Here couple due to the downward force is greater than couple due to frictional force so the box will not trip and fall.
  • 32. Chain Selection Force acing in one chain = 254.55/2 = 127.27 kgf Taking factor of safety = 3 Calculated Breaking Load = 127.27 x 3 = 381.81 kgf Therefore selecting a chain with a breaking load greater than 381.81 kgf is from PSG Design Data Book. Taking the chain R830, with Breaking load = 460 kgf Pitch = 8 mm Roller diameter maximum = 5 mm Width between inner plates minimum, w = 3.10 mm Pin body diameter maximum, Pp = 2.31 mm Plate depth maximum, G = 7.05 mm Overall over joint masses , A1, A2, A3 = 11.10 mm Bearing area = 0.11 mm Weight per meter = 0.18 kg/m Chain Material = Cast Iron
  • 33. Sprocket Selection ISO 05 BI (8 x 3.0 mm) Simple Roller Chain selected from Sprocket Catlogue No of teeth = 45 Pitch circle diameter, d0 = 114.69 mm Tip circle diameter, dk = 118.6 mm Pilot bore, di = 38mm Pitch = 8 mm Inner width = 5 mm Roller diameter = 5 mm Teeth width = 2.8 mm Radius = 114.69/2 = 57.34 mm Sprocket Material = Stainess Steel
  • 34. Calculation for Power and Torque Load = 254.55kgf Required velocity = 0.4 m/s Power = Force x Velocity = 254.55 x 10 x 0.4 = 1018.2 W In HP = Power/746 =1018.2/746 =1.36 HP Torque required = Force x Radius = 2550 x 0.05769 = 147.11 Nm Power = (2 ∏ NT)/60 1018.2= (2 ∏ x N x 147.11)/60 Therefore N = 66.12 rpm ≈ 66 rpm
  • 35. Motor Selection Geared Motor Selected from Hindustan Motors catalogue H_M402050_0904(1.5Hp) From the above conditions, motor is selected with, RPM = 63 rpm Torque = 161.7 Nm Service Factor = 1.4 Phase and Voltage = 3 phase, 415 V Rating = 0.12 to 7.3 kw =Taking 7.3 kw Ratio = 3.6/1 to 45/1 = Taking 23 /1 Shaft diameter = 24 to 60 mm = Taking 40 mm Mounting = Foot and Flange
  • 36. Shaft Selection Taking shaft diameter = 40 mm Length of shaft = 3.25 m Shaft Material = Forged Steel Density of Shaft = Forged Steel = 7850 kg/m3 Shaft Volume = ∏r2l = ∏ x (0.02)2 x 3.25 = 4.084 x 10-3 m3 Shaft Mass = Volume x Density = 4.084 x 10-3 x 7850 = 32.059 kg
  • 37. Bearing Design Density of Sprocket = Stainless Steel = 7480-8000 kg/m3 Selecting Density of Stainless Steel = 7500 kg/m3 Sprocket Volume = ∏r2l = ∏ x ([118.6/2]2 – [40/2]2) x 2.8 = 27414.0778 mm3 Sprocket Mass = Volume x Density = 27414.0778 x 10-9 x 7500 = 0.205 kg x 2 = 0.411 kg Total Radial Load Acting on the Bearing = Shaft Mass + Bearing Mass = 32.059 + 0.411 = 32.4702 kg Axial Load, Fa = 0 kgf Radial Load, Fr = 32.4702 /2 = 16.23 kg (for one bearing) Equivalent Load , P = ( X Fr + Y Fa) S Taking , Radial Factor, X = 1 Thrust Factor, Y = 0 Service Factor, S = 1.3 Therefore ,P = X Fr S = 1 x 16.23 x 1.3 = 21.099 kg
  • 38. Length of Chain at Inclination According to Pythagoras Theorem AC2 = √( AB2 +BC2) AC = (2.52 + 2.52) AC = 3.5 m Total travel distance = 2.5 +3.5 + 1.5 = 7.5 m Velocity, V = ω r Radial Velocity, ω = [(2 x ∏ x N)/60] rpm, N = 63 rpm Therefore, V = [(2 x ∏ x N)/60] x r = [(2 x ∏ x 63)/ 60] x (0.11469/2) = 0.37 m/s
  • 39. Therefore time of travel = Distance / Velocity = 7.5 / 0.37 = 19.83 sec Two way travel = 2 x 19.83 = 39.67 sec Work time ≈ 60 secs = 1 min Total work time for one day = 16 mins In hours = 16/60 = 0.27 hrs
  • 40. Required Life of Bearing in million revolutions, for 8 years L = 0.27 hrs x (365days/1yr) x 8 yrs x 63 rev/min x (60min/1hr) x (1mr/106 rev) = 2.98 mr Therefore Dynamic Capacity, C = (L/L10)1/K x P L10 = 1 mr K = 3 for ball bearings Therefore, C = (2.98/1)1/3 x 21.099 = 30.36 kgf Selecting Bearing SKF 6008 d = 40 mm D1 = 45 mm D = 68 mm D2 = 63 mm B = 15 mm r ≈ 1.5 mm r1 = 1.0 mm Basic Static Capacity, C0 = 980 kgf Basic Dynamic Capacity, C = 1320 kgf Maximum Permissible Speed, rpm = 10000 rpm
  • 41. Bearing Probability of Survival We know that, C1 = (L101/L10)1/K x P1 = (L101/1)1/3 x 21.099 Therefore, L101 = 244870.336 mr L/L101 = [ln(1/p1)/ln(1/p10)]1/b L101 = calculated life of the selected bearing, for given load for 90% survival Ln(1/p10) = ln(1/0.9) = 0.1053 b = 1.34 for deep grove ball bearings 2.98/244870.336 = [ln (1/p)/ 0.1053)1/1.34 Therefore, p1 = 0.9999 = 99.99%
  • 42. Piston Selection NORGREN RN920 (stroke 300mm) Force acting on the piston = 100 kgf = 1000 N Taking diameter of the piston = 2 inch Stroke = 300 mm Operating Pressure = 2 – 10 bar Operating temperature = -20˚C - 80˚C
  • 43. Area = ∏ r2 = ∏ x 2.542 = 20.258 cm Therefore Pressure acting = Force / Area = 1000 / (20.258 x 10-4) = 493632.14 Pa = 4.936 bar.
  • 44. CONCLUSION • By completion of this project the Industry gets a good profit. • This machine can also be used in many Industry. Can used also in various raw material transportation. • Though this kind of system exists in various fields, the AWDS is one of a kind which is so simple and is ecofriendly.
  • 45. BIBLIOGRAPHY • PSG Data book • www.fotoelectik-pauly.de • www.imis.com • Hindustan electric motors Catlogue • Norgen RM Cylinders Catlogue