1. The document discusses various types of special concretes including lightweight concrete, foam concrete, self-compacting concrete, vacuum concrete, fibre reinforced concrete, ferrocement, ready mix concrete, slurry infiltrated fibre concrete (SIFCON), and shotcrete.
2. Lightweight concrete uses lightweight aggregates like shale, clay, or slate to reduce density while maintaining strength. Foam concrete is made by injecting air or gas into the mix to create a cellular structure.
3. Self-compacting concrete can be placed without vibration due to its fluidity. Vacuum concrete has water removed using vacuum mats to increase strength.