Bo Garcia
Pipe Designer/Construction Supervisor
Houston,TX 77089
bpgarcia.15@gmail.com (832)317-4475
Willing to relocate: Within the US
Authorized to work in the US for any employer
WORK EXPERIENCE
Lead As-Built Draftsman
Kinder Morgan, Inc. Houston, TX – January 2016 to Present
• Assessmentofprojectinformation. Estimate costand hours for completion.Assign according to drafters
work load.
• Coordinate drawing files and electronic transmittals with third-party firms,project managers,and operations
group.
• Stage and assign projects to third-party firms for project completion.
• Coordinate billing and invoicing.
• Work efficiently with other departmentteam leads to ensure smooth work flow for all groups.
• Ensure efficientand accurate drafting CAD standards.(Per Kinder Morgan, Inc. Standards)
• QA/QC projects completed from drafters and third-partyfirm.
• Electronic File Managementand Data Management.(BC-Meridian)
• Review daily progress and reportto PDSM manager.
• Complete new projects within given timeline to reduce backlog.
• Forecastman hours maintaining 180 hour scheduled work for in-house drafters.
Pipe Designer/Construction Supervisor
Swift Worldwide Resources - Seminole,TX - June 2013 to December 2015
Work performed for HESS Seminole Gas Processing Plant& Seminole San Andres Field Production.
• Design piping upgrades for maintenance and capital projects.
• Use AutoCAD, Cadworx Plant, and Cadworx P&IDs to develop construction packages.
• File managementto keep data and information updated and accurate.
• Daily walk downs and red line changes or upgrades.
• Review entry level designer drawings for quality.
• Design according to specifications and standards.
• Issue BOM for material ordering.
• Order materials in a timelymanner to align with projectschedule.
• Inventory and track materials.
• Assign projects to designers.
• Manage projects issued outto other designers.
• Create 2D, 3D models,isometric drawings,and field sketches as changes are made during projects.
• Understand process safetyand operations for field and CO2 Gas Separation Plant.
• Understand the technical drawings and specifications for industrial construction.
• Propose economical alternatives to the scope ofwork. Understand detailed project
schedules.
• Understand qualityrequirements and industrystandards for various construction crafts.
• Manage and coordinate both material and human resources.Reportthe daily progress ofsubcontractors.
• Supportsubcontractors in a manner thatadheres to construction/contractschedule.
• Facilitate technical approvals by the engineers,coordinate craftproduction,and release
work in a timely manner to meetsubcontractand project schedules.
• Plan and organize the scope ofwork, work schedule and listofsupporting technical
documents.Review bids and assistwith selection ofsubcontractors.
• Propose modifications to engineering design and interpreting drawings, specifications and other technical
documents for the subcontractors.
• Knowledge ofconstruction activities including material,equipment,costand time
requirements to perform construction tasks.
• Costtracking to keep project on budget.
• Work with facilities engineers to develop,design,and execute in the project.
Projects:
• 10 Well Drilling Campaign- Design and supervise constructions consisting of pipelines and first stage
gathering plant.Project delivered under budget.(Brownfield)
• Gas Loop Line- Design and supervise construction ofgas pipeline.1 stage gathering
Plants de-bottle neck. Projectcompletion increased production by40%.
(Brownfield)
• Stage 3 & 4 Well conversion and deepening- Design and supervise conversions ofoil
wells to co2 injectors.Increase the line sizing of existing wells to increase production
from deepening.Design and supervise 6,1ststage plantupgrades.
Maintenance Operator
Brownfield - Seminole,TX - September 2012 to June 2013
Work performed for HESS Seminole Gas Processing Plant& Seminole San Andres Field Production.
• Maintained the operabilityof CO2 gas separation plant.
• Knowledge concerning heatexchangers,boilers,reactors,valves, and chemicals.
• Ability to operate heavy equipmentsuch as,60 ton and below crane, man lifts,fork
lifts, and overhead cranes.
• Followed all companypolicies and procedures along with OSHA standards,and safetyguidelines.
• Repaired and expanding structural support,piping,and concreate foundations.
Boilermaker
Turner Industrial - Pasadena,TX - January 2008 to May 2008
Work performed for PRSI Refinery Plant turnaround project.
• Blinded equipmentand vessels.
• Hydrostatic test on new installations ofpiping,and vessels.
• Break down of heatexchangers for cleaning,repairs and pressure testing.
• Pipe fabricated on site.
• Installed new valves and piping,as well as a new compressor and required components.
Boilermaker
Austin Industrial - Deer Park, TX - September 2007 to January 2008
Work performed for Texas Petro Chem Refineryturnaround project.
• Blinded equipmentand vessels.
• Hydrostatic test on new installations ofpiping,and vessels.
• Break down of heatexchangers for cleaned,repaired and pressure tested.
• Pipe fabricating on site.
• Installed ofnew valves and piping.
• Installed new compressor and required components.
Pipefitter Class B/Field Maintenance
Ref-Chem - Texas City, TX - August 2005 to July 2007
Work performed for Marathon Oil and Gas.
• Use ISO drawings to fabricate piping.
• Fresh line breaks on existing equipment.
• Blinded and isolated equipmentand vessels for inspection and confined space entry.
• Operated heavy equipment.
Work performed for Occidental Permian.
• Pipe line installation consisted offlow lines,and gathering systems.
• Constructed new batteries for oil gathering and sales and new satellites for oil
separation and testing.
• Maintained accurate data and safety procedures.
EDUCATION
Associates of Applied Science in Applied Science
Trinity Valley CommunityCollege - Athens, TX
March 2009 to June 2011
ADDITIONAL INFORMATION
Skills:
• Bilingual and fluentin English and Spanish.
• Competentand skilled in OSHA standards policies and guidelines concerning
excavations, and confined space.
• 13 years total experience in the industryranging from,pipeline,gas plants,chemical
plants,and refineries.
• AutoCAD 2010 and above, CADWorks, Plant, P&IDs,EquipmentInventor, Microsoft
Office, ArcGIS.
• Excavation competenttrained yearly.
• Forklift, Man-lift, and small crane certified.
• Rigging trained updated yearly.
• BC-Meridian Data Management
Resume

Resume

  • 1.
    Bo Garcia Pipe Designer/ConstructionSupervisor Houston,TX 77089 bpgarcia.15@gmail.com (832)317-4475 Willing to relocate: Within the US Authorized to work in the US for any employer WORK EXPERIENCE Lead As-Built Draftsman Kinder Morgan, Inc. Houston, TX – January 2016 to Present • Assessmentofprojectinformation. Estimate costand hours for completion.Assign according to drafters work load. • Coordinate drawing files and electronic transmittals with third-party firms,project managers,and operations group. • Stage and assign projects to third-party firms for project completion. • Coordinate billing and invoicing. • Work efficiently with other departmentteam leads to ensure smooth work flow for all groups. • Ensure efficientand accurate drafting CAD standards.(Per Kinder Morgan, Inc. Standards) • QA/QC projects completed from drafters and third-partyfirm. • Electronic File Managementand Data Management.(BC-Meridian) • Review daily progress and reportto PDSM manager. • Complete new projects within given timeline to reduce backlog. • Forecastman hours maintaining 180 hour scheduled work for in-house drafters. Pipe Designer/Construction Supervisor Swift Worldwide Resources - Seminole,TX - June 2013 to December 2015 Work performed for HESS Seminole Gas Processing Plant& Seminole San Andres Field Production. • Design piping upgrades for maintenance and capital projects. • Use AutoCAD, Cadworx Plant, and Cadworx P&IDs to develop construction packages. • File managementto keep data and information updated and accurate. • Daily walk downs and red line changes or upgrades. • Review entry level designer drawings for quality. • Design according to specifications and standards. • Issue BOM for material ordering. • Order materials in a timelymanner to align with projectschedule. • Inventory and track materials. • Assign projects to designers. • Manage projects issued outto other designers. • Create 2D, 3D models,isometric drawings,and field sketches as changes are made during projects. • Understand process safetyand operations for field and CO2 Gas Separation Plant. • Understand the technical drawings and specifications for industrial construction. • Propose economical alternatives to the scope ofwork. Understand detailed project schedules. • Understand qualityrequirements and industrystandards for various construction crafts. • Manage and coordinate both material and human resources.Reportthe daily progress ofsubcontractors. • Supportsubcontractors in a manner thatadheres to construction/contractschedule. • Facilitate technical approvals by the engineers,coordinate craftproduction,and release work in a timely manner to meetsubcontractand project schedules. • Plan and organize the scope ofwork, work schedule and listofsupporting technical documents.Review bids and assistwith selection ofsubcontractors. • Propose modifications to engineering design and interpreting drawings, specifications and other technical
  • 2.
    documents for thesubcontractors. • Knowledge ofconstruction activities including material,equipment,costand time requirements to perform construction tasks. • Costtracking to keep project on budget. • Work with facilities engineers to develop,design,and execute in the project. Projects: • 10 Well Drilling Campaign- Design and supervise constructions consisting of pipelines and first stage gathering plant.Project delivered under budget.(Brownfield) • Gas Loop Line- Design and supervise construction ofgas pipeline.1 stage gathering Plants de-bottle neck. Projectcompletion increased production by40%. (Brownfield) • Stage 3 & 4 Well conversion and deepening- Design and supervise conversions ofoil wells to co2 injectors.Increase the line sizing of existing wells to increase production from deepening.Design and supervise 6,1ststage plantupgrades. Maintenance Operator Brownfield - Seminole,TX - September 2012 to June 2013 Work performed for HESS Seminole Gas Processing Plant& Seminole San Andres Field Production. • Maintained the operabilityof CO2 gas separation plant. • Knowledge concerning heatexchangers,boilers,reactors,valves, and chemicals. • Ability to operate heavy equipmentsuch as,60 ton and below crane, man lifts,fork lifts, and overhead cranes. • Followed all companypolicies and procedures along with OSHA standards,and safetyguidelines. • Repaired and expanding structural support,piping,and concreate foundations. Boilermaker Turner Industrial - Pasadena,TX - January 2008 to May 2008 Work performed for PRSI Refinery Plant turnaround project. • Blinded equipmentand vessels. • Hydrostatic test on new installations ofpiping,and vessels. • Break down of heatexchangers for cleaning,repairs and pressure testing. • Pipe fabricated on site. • Installed new valves and piping,as well as a new compressor and required components. Boilermaker Austin Industrial - Deer Park, TX - September 2007 to January 2008 Work performed for Texas Petro Chem Refineryturnaround project. • Blinded equipmentand vessels. • Hydrostatic test on new installations ofpiping,and vessels. • Break down of heatexchangers for cleaned,repaired and pressure tested. • Pipe fabricating on site. • Installed ofnew valves and piping. • Installed new compressor and required components. Pipefitter Class B/Field Maintenance Ref-Chem - Texas City, TX - August 2005 to July 2007 Work performed for Marathon Oil and Gas. • Use ISO drawings to fabricate piping. • Fresh line breaks on existing equipment. • Blinded and isolated equipmentand vessels for inspection and confined space entry. • Operated heavy equipment. Work performed for Occidental Permian. • Pipe line installation consisted offlow lines,and gathering systems.
  • 3.
    • Constructed newbatteries for oil gathering and sales and new satellites for oil separation and testing. • Maintained accurate data and safety procedures. EDUCATION Associates of Applied Science in Applied Science Trinity Valley CommunityCollege - Athens, TX March 2009 to June 2011 ADDITIONAL INFORMATION Skills: • Bilingual and fluentin English and Spanish. • Competentand skilled in OSHA standards policies and guidelines concerning excavations, and confined space. • 13 years total experience in the industryranging from,pipeline,gas plants,chemical plants,and refineries. • AutoCAD 2010 and above, CADWorks, Plant, P&IDs,EquipmentInventor, Microsoft Office, ArcGIS. • Excavation competenttrained yearly. • Forklift, Man-lift, and small crane certified. • Rigging trained updated yearly. • BC-Meridian Data Management