Ajay Kumar
Mobile: +91-7837465273,
E-Mail: parashar.ajay30@gmail.com,
Permanent Address: S/O Sh. Bhagwan Dass,
House NO. 29683, St. No. 5, Gopal Nagar,
Bathinda-151005. Punjab (INDIA)
Home Phone: +91-164-2283939
Looking for challenging career in Welding Engineering in EPC Oil and Gas Pipeline Sector
PRECIS
⇒ A competent professional with approx. 9 years + of experience in Welding Engineering.
⇒ Possess insightful experience in Providing Technical solutions for QC and Welding related
Problems in Shop and Work Site
⇒ Skilled at handling multiple tasks and projects simultaneously in challenging environments with
excellent relationship management skills & the ability to relate to people at any level of business
and management.
⇒ Possess excellent communication, interpersonal, analytical & negotiation skills with strong
organizational and team building abilities.
EMPLOYMENT DETAILS
M/S PABLA ENGINEERING WORKS, ROPAR. PUNJAB
15-JAN-2015 to TILL DATE (ASSISTANT MANAGER WELDING/Q.A.Q.C)
• Plan and evaluate new projects, consulting with project engineer.
• Review project specifications for welding process, base metals, filler metals, heat treatment,
and NDE requirements; select appropriate WPS.
• Interpreting the RT & UT and understanding design drawings.
• Review order packages and advise the Project Manager of potential materials, welding, heat
treatment, or NDE problems.
• Manage the overall design of process flow sheets, plant layouts, material handling systems,
manpower requirements, equipment procurement and material utilization
• Monitoring quality standards in manufacturing and finishing;
• Writing documents, manuals, metallurgical investigations, and reports in support of customer
liaison
• Design and direct the testing of processing procedures.
• Determine causes of product failure and develop solutions.
• Directs and coordinates technical personnel in performing inspections to ensure works'
compliance with established welding procedures.
• To oversee the work of welders and ensure that they.
• To conduct meetings regularly to update your team members on current work progress and
potential problems.
• Develop and manage welding operations and work practices that maximize operational
efficiencies.
• Improve plant operating performance; reduce waste and delays; promote cost reductions; and
achieve a high level of operating efficiency
• Create and distribute monthly welding and quality reports to planning and billing deptt.
• Responsible for identifying new technologies and process improvements to reduce waste and
enable future strategies.
M/S ESSAR CONSTRUCTION OVERSEAS LTD. ABU DHABI, UAE
15-FEB-2014 to 29 DEC-2014 (Welding Engineer Q.A/Q.C)
Project Name : Replacement of 16” condensate Pipeline from Habshan to Ruwais with
24” diameter.
Client/Owner : GASCO, Abu Dhabi Gas Industries Ltd.
Contractor : Essar Construction overseas limited. Abu Dhabi.
● Coordinate with the Pipe line Stringing team and ROW team (for the timely delivery of material
to site. (After inspection and documentation of Incoming material).
● Co-ordinates with the client for the timely inspection of the various activities involved in pipe line
● Inspection of Incoming pipes with respective to test certificates, and necessary documents.
● Preparing Pipe book & Bar charts and DPR for the progress and updating.
● Witness welder performance qualification Test (WPQT) as per ASME SEC-IX and API-1104 and
as well as WQT Record reviewing to see the actual tested and range qualified.
● Involved in welding of pipe line by using PWT technique (Automatic GMAW welding).
● Preparing Inspection and test plan (ITP) for different activities and submitting the same to client
for approval.
● Preparing and maintaining the sequence of welding according to the site conditions .( As per the
ROW clearance )
● Preparation of WPS, Qualification of welders, planning of welding sequence and Coordinating
with NDT activities.
● Reviewing of NDT Reports like RT & UT.
● Preparing the documents for Auto welding & Manual welding ,Trenching, Tie in , Field joints
coating , Holiday testing , Hydrostatic testing , backfilling activities.
● Providing Technical leadership & strategic directions to the team members as per the
requirements
● Preparing the schedules and maintaining the Calibration records for all the measuring
equipment’s.
● Onsite Inspection of welding related activities (Fit up, Welding parameters, Weld Visual, Final
dimensions after welding, consumable storage condition and baking records).
● Weld metal calculation, consumable planning & Consumable TC’s review.
M/S PUNJ LLOYD LTD. Bangkok, THAILAND
7-March-2012 to 31-Dec-2013 (Welding Engineer Q.A/Q.C)
Project Name : Fourth Transmission Pipeline Project-Thailand (Approx. 300 km of 42’’
diameter High Pressure gas pipeline)
Owner : PTT Public company limited
Client : Penspen.
Contractor : Punj Lloyd Ltd.
● Coordinate with the Pipe line Stringing team and ROW team (for the timely delivery of material
to site. (After inspection and documentation of Incoming material).
● Co-ordinates with the client for the timely inspection of the various activities involved in pipe line
● Inspection of Incoming pipes with respective to test certificates, and necessary documents.
● Prepared the supporting documents for the approval of ECA (Engineering Critical assessment)
in comparison to API 1104 acceptance criteria, which helps to reduce the repair percentage of
welds.
● Preparing Pipe book & Bar charts and DPR for the progress and updating.
● Witness welder performance qualification Test (WPQT) as per ASME SEC-IX and as well as
WQT Record reviewing to see the actual tested and range qualified.
● Involved in welding of pipe line by using PWT technique (Automatic GMAW welding).
● Preparing Inspection and test plan (ITP) for different activities and submitting the same to client
for approval.
● Preparing and maintaining the sequence of welding according to the site conditions .( As per the
ROW clearance )
● Preparation of WPS, Qualification of welders, planning of welding sequence and Coordinating
with NDT activities.
● Reviewing of NDT Reports like RT & UT.
● Preparing the documents for Auto welding & Manual welding ,Trenching, Tie in , Field joints
coating , Holiday testing , Hydrostatic testing , backfilling activities.
● Providing Technical leadership & strategic directions to the team members as per the
requirements
● Preparing the schedules and maintaining the Calibration records for all the measuring
equipment’s.
● Control of Welding consumable at fabrication yard and Inspection of incoming welding
consumable as per Technical Annexure and Purchase order.
● Preparing the schedules and maintaining the Calibration records for all the measuring
equipment’s
● Onsite Inspection of welding related activities (Fit up, Welding parameters, Weld Visual, Final
dimensions after welding, consumable storage condition and baking records).
● Weld metal calculation, consumable planning & Consumable TC’s review.
● Implementation of New Welding processes and welding related development work
● Visual examination of all welds and carrying out proper NDT as per client approved NDT plan.
M/S VRC Construction (India) Limited Bathinda Project at HMEL Refinery Bathinda (INDIA)
15-Jan-2010 to 31 July -2011 (Sr. Engineer Mech. Q.A/Q.C Deptt.)
 Weld visual inspection and Final dimensional Inspection of pipelines.
 Various activities of Q.A/Q.C
 NDT reports review like as LPT, RT & VT.
 Co-ordination with Client for various stages of inspection E.I.L & Bridge & Roof.
 Monitoring welder’s continuity record and Performance.
 Maintaining the records of electrode Consumables.
 Welding inspection as per welding schedule of structure and piping.
 Maintaining & Updating WPS/PQR
 Welder’s Qualification.
M/S Unipro Techno Infra Limited . Project @ IPH Himachal Pradesh
15-Sep-2009 to 10 Jan -2010 (Sr. Engineer Mech. Q.A/Q.C Deptt.)
 Weld visual inspection and Final dimensional Inspection of pipelines.
 Various activities of Q.A/Q.C
 NDT reports review like as LPT, RT & VT.
 Co-ordination with Client for various stages of inspection E.I.L & Bridge & Roof.
 Monitoring welder’s continuity record and Performance.
 Maintaining the records of electrode Consumables.
 Welding inspection as per welding schedule of structure and piping.
 Maintaining & Updating WPS/PQR
 Welder’s Qualification.
M/S Bharati Shipyard Ltd. Mumbai (INDIA)
20-July’07 – 31-Aug-2009 Welding Engineer
It is basically a BVQI certified ISO 9001:2000 ship building organization. Manufacturers of
Commercial vessels like Tug cum Supply Vessels, Platform Supply Vessels, Anchor Handling
Vessels etc.
Project Handled: Tug cum Supply Vessels- Reliance Industries Ltd.
Multipurpose Supply Vessel- Bourbone Offshore France.
Anchor Handling cum Supply Vessel- G.E.S.C.O.
Key Responsibilities:
 Preparation and Qualification of Welding Procedures.
 Maintaining & Updating WPS/PQR.
 Welder’s Qualification.
 Preparing & Submission of QC procedures for Client approval.
 Weld visual inspection and Final dimensional Inspection.
 RT film review and NDT reports review like as RT, UT & LPT, VT.
 Successfully working on ASME Section 5 & Section 9.
 Deals with the preparation of WPS (Welding Procedure Specification).
 Imparting Training for the Workers, Technicians and Supervisors in the field of Welding.
 Co-ordination with Client for various stages of inspection
 Monitoring welder’s continuity record and Performance.
 Maintaining the records of electrode Consumables.
 Welding inspection as per welding schedule of structure.
M/S D&H Secheron Electrodes Pvt Ltd. Indore
7-Nov’06 – 12 -July’07 G.E.T (R&D Deptt.)
An ISO 9001:2000 Certified Company.
Key Responsibilities:
Involves looking after all process involved in production.
⇒ Did analysis on some key products.
⇒ Successfully operated R&D & Quality Assurance column for a period.
⇒ Visited all units of D&H at various locations, and was involved in giving some valuable
suggestions.
⇒ Successfully completed a technical project. SSCC & HIC At high Temperature & pressures.
⇒ Successfully working on ASME Section 2 part C & Section 9. For making jobs.
⇒ Deals with the preparation of WPS (Welding Procedure Specification).
⇒ Check the quality of electrodes by performing various destructive and non destructive tests.
INDUSTRIAL TRAINING
Organisation : N.F.L Bathinda.
Duration : 3 months
Department : Mechanical/Welding
Organisation : B.H.E.L Hardwar.
Duration : 45 days
Department : Mechanical/Welding
Organisation : Northern Machinery Limited Ludhiana
Duration : 45 days
Department : Mechanical/Welding
PROJECTS WORKS
Title : Fabrication of Friction Welding Machine
Location : SLIET, Longowal
Duration : Jan. – May. 2003
Role : Project Leader
Scope : The project was carried out with the motive welding of Aluminium
Title : Online monitoring of manual metal arc welding
Duration : Jan. 05 – June 05
Role : Project Leader
Title : Effect of Heat Input on Chemical Composition On Weldment of SAW by
Using Recycle Slag.
Duration : Jan. 06– June 06
Role : Project Leader
CADEMIA
B. E. in Mechanical Engineering SLIET, Longowal Scored 65.2% 2006
(Specialisation in Welding Technology)
Diploma in Mechanical Engineering SLIET, Longowal Scored 66.66% 2003
(Specialisation in Welding Technology.)
Certificate Course in Mechanical Engineering SLIET, Longowal Scored 62.8% 2001
(Specialisation in Welding Technology)
NDT Level-II BITT, Mumbai Scored 81% 2009
COMPUTER PROFICENCY
Operating Systems - Microsoft Office
PERSONAL DETAILS
Date of Birth : 25th Feb, 1981
Marital Status : Married
Languages Known : English, Hindi & Punjabi
PASSPORT NO. : N3450666
Expected Salary : Negotiable
Place : Bathinda
INDUSTRIAL TRAINING
Organisation : N.F.L Bathinda.
Duration : 3 months
Department : Mechanical/Welding
Organisation : B.H.E.L Hardwar.
Duration : 45 days
Department : Mechanical/Welding
Organisation : Northern Machinery Limited Ludhiana
Duration : 45 days
Department : Mechanical/Welding
PROJECTS WORKS
Title : Fabrication of Friction Welding Machine
Location : SLIET, Longowal
Duration : Jan. – May. 2003
Role : Project Leader
Scope : The project was carried out with the motive welding of Aluminium
Title : Online monitoring of manual metal arc welding
Duration : Jan. 05 – June 05
Role : Project Leader
Title : Effect of Heat Input on Chemical Composition On Weldment of SAW by
Using Recycle Slag.
Duration : Jan. 06– June 06
Role : Project Leader
CADEMIA
B. E. in Mechanical Engineering SLIET, Longowal Scored 65.2% 2006
(Specialisation in Welding Technology)
Diploma in Mechanical Engineering SLIET, Longowal Scored 66.66% 2003
(Specialisation in Welding Technology.)
Certificate Course in Mechanical Engineering SLIET, Longowal Scored 62.8% 2001
(Specialisation in Welding Technology)
NDT Level-II BITT, Mumbai Scored 81% 2009
COMPUTER PROFICENCY
Operating Systems - Microsoft Office
PERSONAL DETAILS
Date of Birth : 25th Feb, 1981
Marital Status : Married
Languages Known : English, Hindi & Punjabi
PASSPORT NO. : N3450666
Expected Salary : Negotiable
Place : Bathinda

Ajay Kumar Resume

  • 1.
    Ajay Kumar Mobile: +91-7837465273, E-Mail:parashar.ajay30@gmail.com, Permanent Address: S/O Sh. Bhagwan Dass, House NO. 29683, St. No. 5, Gopal Nagar, Bathinda-151005. Punjab (INDIA) Home Phone: +91-164-2283939 Looking for challenging career in Welding Engineering in EPC Oil and Gas Pipeline Sector PRECIS ⇒ A competent professional with approx. 9 years + of experience in Welding Engineering. ⇒ Possess insightful experience in Providing Technical solutions for QC and Welding related Problems in Shop and Work Site ⇒ Skilled at handling multiple tasks and projects simultaneously in challenging environments with excellent relationship management skills & the ability to relate to people at any level of business and management. ⇒ Possess excellent communication, interpersonal, analytical & negotiation skills with strong organizational and team building abilities. EMPLOYMENT DETAILS M/S PABLA ENGINEERING WORKS, ROPAR. PUNJAB 15-JAN-2015 to TILL DATE (ASSISTANT MANAGER WELDING/Q.A.Q.C) • Plan and evaluate new projects, consulting with project engineer. • Review project specifications for welding process, base metals, filler metals, heat treatment, and NDE requirements; select appropriate WPS. • Interpreting the RT & UT and understanding design drawings. • Review order packages and advise the Project Manager of potential materials, welding, heat treatment, or NDE problems. • Manage the overall design of process flow sheets, plant layouts, material handling systems, manpower requirements, equipment procurement and material utilization • Monitoring quality standards in manufacturing and finishing; • Writing documents, manuals, metallurgical investigations, and reports in support of customer liaison • Design and direct the testing of processing procedures. • Determine causes of product failure and develop solutions. • Directs and coordinates technical personnel in performing inspections to ensure works' compliance with established welding procedures. • To oversee the work of welders and ensure that they. • To conduct meetings regularly to update your team members on current work progress and potential problems.
  • 2.
    • Develop andmanage welding operations and work practices that maximize operational efficiencies. • Improve plant operating performance; reduce waste and delays; promote cost reductions; and achieve a high level of operating efficiency • Create and distribute monthly welding and quality reports to planning and billing deptt. • Responsible for identifying new technologies and process improvements to reduce waste and enable future strategies. M/S ESSAR CONSTRUCTION OVERSEAS LTD. ABU DHABI, UAE 15-FEB-2014 to 29 DEC-2014 (Welding Engineer Q.A/Q.C) Project Name : Replacement of 16” condensate Pipeline from Habshan to Ruwais with 24” diameter. Client/Owner : GASCO, Abu Dhabi Gas Industries Ltd. Contractor : Essar Construction overseas limited. Abu Dhabi. ● Coordinate with the Pipe line Stringing team and ROW team (for the timely delivery of material to site. (After inspection and documentation of Incoming material). ● Co-ordinates with the client for the timely inspection of the various activities involved in pipe line ● Inspection of Incoming pipes with respective to test certificates, and necessary documents. ● Preparing Pipe book & Bar charts and DPR for the progress and updating. ● Witness welder performance qualification Test (WPQT) as per ASME SEC-IX and API-1104 and as well as WQT Record reviewing to see the actual tested and range qualified. ● Involved in welding of pipe line by using PWT technique (Automatic GMAW welding). ● Preparing Inspection and test plan (ITP) for different activities and submitting the same to client for approval. ● Preparing and maintaining the sequence of welding according to the site conditions .( As per the ROW clearance ) ● Preparation of WPS, Qualification of welders, planning of welding sequence and Coordinating with NDT activities. ● Reviewing of NDT Reports like RT & UT. ● Preparing the documents for Auto welding & Manual welding ,Trenching, Tie in , Field joints coating , Holiday testing , Hydrostatic testing , backfilling activities. ● Providing Technical leadership & strategic directions to the team members as per the requirements ● Preparing the schedules and maintaining the Calibration records for all the measuring equipment’s. ● Onsite Inspection of welding related activities (Fit up, Welding parameters, Weld Visual, Final dimensions after welding, consumable storage condition and baking records). ● Weld metal calculation, consumable planning & Consumable TC’s review. M/S PUNJ LLOYD LTD. Bangkok, THAILAND 7-March-2012 to 31-Dec-2013 (Welding Engineer Q.A/Q.C) Project Name : Fourth Transmission Pipeline Project-Thailand (Approx. 300 km of 42’’ diameter High Pressure gas pipeline) Owner : PTT Public company limited Client : Penspen. Contractor : Punj Lloyd Ltd.
  • 3.
    ● Coordinate withthe Pipe line Stringing team and ROW team (for the timely delivery of material to site. (After inspection and documentation of Incoming material). ● Co-ordinates with the client for the timely inspection of the various activities involved in pipe line ● Inspection of Incoming pipes with respective to test certificates, and necessary documents. ● Prepared the supporting documents for the approval of ECA (Engineering Critical assessment) in comparison to API 1104 acceptance criteria, which helps to reduce the repair percentage of welds. ● Preparing Pipe book & Bar charts and DPR for the progress and updating. ● Witness welder performance qualification Test (WPQT) as per ASME SEC-IX and as well as WQT Record reviewing to see the actual tested and range qualified. ● Involved in welding of pipe line by using PWT technique (Automatic GMAW welding). ● Preparing Inspection and test plan (ITP) for different activities and submitting the same to client for approval. ● Preparing and maintaining the sequence of welding according to the site conditions .( As per the ROW clearance ) ● Preparation of WPS, Qualification of welders, planning of welding sequence and Coordinating with NDT activities. ● Reviewing of NDT Reports like RT & UT. ● Preparing the documents for Auto welding & Manual welding ,Trenching, Tie in , Field joints coating , Holiday testing , Hydrostatic testing , backfilling activities. ● Providing Technical leadership & strategic directions to the team members as per the requirements ● Preparing the schedules and maintaining the Calibration records for all the measuring equipment’s. ● Control of Welding consumable at fabrication yard and Inspection of incoming welding consumable as per Technical Annexure and Purchase order. ● Preparing the schedules and maintaining the Calibration records for all the measuring equipment’s ● Onsite Inspection of welding related activities (Fit up, Welding parameters, Weld Visual, Final dimensions after welding, consumable storage condition and baking records). ● Weld metal calculation, consumable planning & Consumable TC’s review. ● Implementation of New Welding processes and welding related development work ● Visual examination of all welds and carrying out proper NDT as per client approved NDT plan. M/S VRC Construction (India) Limited Bathinda Project at HMEL Refinery Bathinda (INDIA) 15-Jan-2010 to 31 July -2011 (Sr. Engineer Mech. Q.A/Q.C Deptt.)  Weld visual inspection and Final dimensional Inspection of pipelines.  Various activities of Q.A/Q.C  NDT reports review like as LPT, RT & VT.  Co-ordination with Client for various stages of inspection E.I.L & Bridge & Roof.  Monitoring welder’s continuity record and Performance.  Maintaining the records of electrode Consumables.  Welding inspection as per welding schedule of structure and piping.  Maintaining & Updating WPS/PQR  Welder’s Qualification.
  • 4.
    M/S Unipro TechnoInfra Limited . Project @ IPH Himachal Pradesh 15-Sep-2009 to 10 Jan -2010 (Sr. Engineer Mech. Q.A/Q.C Deptt.)  Weld visual inspection and Final dimensional Inspection of pipelines.  Various activities of Q.A/Q.C  NDT reports review like as LPT, RT & VT.  Co-ordination with Client for various stages of inspection E.I.L & Bridge & Roof.  Monitoring welder’s continuity record and Performance.  Maintaining the records of electrode Consumables.  Welding inspection as per welding schedule of structure and piping.  Maintaining & Updating WPS/PQR  Welder’s Qualification. M/S Bharati Shipyard Ltd. Mumbai (INDIA) 20-July’07 – 31-Aug-2009 Welding Engineer It is basically a BVQI certified ISO 9001:2000 ship building organization. Manufacturers of Commercial vessels like Tug cum Supply Vessels, Platform Supply Vessels, Anchor Handling Vessels etc. Project Handled: Tug cum Supply Vessels- Reliance Industries Ltd. Multipurpose Supply Vessel- Bourbone Offshore France. Anchor Handling cum Supply Vessel- G.E.S.C.O. Key Responsibilities:  Preparation and Qualification of Welding Procedures.  Maintaining & Updating WPS/PQR.  Welder’s Qualification.  Preparing & Submission of QC procedures for Client approval.  Weld visual inspection and Final dimensional Inspection.  RT film review and NDT reports review like as RT, UT & LPT, VT.  Successfully working on ASME Section 5 & Section 9.  Deals with the preparation of WPS (Welding Procedure Specification).  Imparting Training for the Workers, Technicians and Supervisors in the field of Welding.  Co-ordination with Client for various stages of inspection  Monitoring welder’s continuity record and Performance.  Maintaining the records of electrode Consumables.  Welding inspection as per welding schedule of structure. M/S D&H Secheron Electrodes Pvt Ltd. Indore 7-Nov’06 – 12 -July’07 G.E.T (R&D Deptt.) An ISO 9001:2000 Certified Company. Key Responsibilities: Involves looking after all process involved in production. ⇒ Did analysis on some key products. ⇒ Successfully operated R&D & Quality Assurance column for a period. ⇒ Visited all units of D&H at various locations, and was involved in giving some valuable suggestions. ⇒ Successfully completed a technical project. SSCC & HIC At high Temperature & pressures. ⇒ Successfully working on ASME Section 2 part C & Section 9. For making jobs. ⇒ Deals with the preparation of WPS (Welding Procedure Specification). ⇒ Check the quality of electrodes by performing various destructive and non destructive tests.
  • 5.
    INDUSTRIAL TRAINING Organisation :N.F.L Bathinda. Duration : 3 months Department : Mechanical/Welding Organisation : B.H.E.L Hardwar. Duration : 45 days Department : Mechanical/Welding Organisation : Northern Machinery Limited Ludhiana Duration : 45 days Department : Mechanical/Welding PROJECTS WORKS Title : Fabrication of Friction Welding Machine Location : SLIET, Longowal Duration : Jan. – May. 2003 Role : Project Leader Scope : The project was carried out with the motive welding of Aluminium Title : Online monitoring of manual metal arc welding Duration : Jan. 05 – June 05 Role : Project Leader Title : Effect of Heat Input on Chemical Composition On Weldment of SAW by Using Recycle Slag. Duration : Jan. 06– June 06 Role : Project Leader CADEMIA B. E. in Mechanical Engineering SLIET, Longowal Scored 65.2% 2006 (Specialisation in Welding Technology) Diploma in Mechanical Engineering SLIET, Longowal Scored 66.66% 2003 (Specialisation in Welding Technology.) Certificate Course in Mechanical Engineering SLIET, Longowal Scored 62.8% 2001 (Specialisation in Welding Technology) NDT Level-II BITT, Mumbai Scored 81% 2009 COMPUTER PROFICENCY Operating Systems - Microsoft Office PERSONAL DETAILS Date of Birth : 25th Feb, 1981 Marital Status : Married Languages Known : English, Hindi & Punjabi PASSPORT NO. : N3450666 Expected Salary : Negotiable Place : Bathinda
  • 6.
    INDUSTRIAL TRAINING Organisation :N.F.L Bathinda. Duration : 3 months Department : Mechanical/Welding Organisation : B.H.E.L Hardwar. Duration : 45 days Department : Mechanical/Welding Organisation : Northern Machinery Limited Ludhiana Duration : 45 days Department : Mechanical/Welding PROJECTS WORKS Title : Fabrication of Friction Welding Machine Location : SLIET, Longowal Duration : Jan. – May. 2003 Role : Project Leader Scope : The project was carried out with the motive welding of Aluminium Title : Online monitoring of manual metal arc welding Duration : Jan. 05 – June 05 Role : Project Leader Title : Effect of Heat Input on Chemical Composition On Weldment of SAW by Using Recycle Slag. Duration : Jan. 06– June 06 Role : Project Leader CADEMIA B. E. in Mechanical Engineering SLIET, Longowal Scored 65.2% 2006 (Specialisation in Welding Technology) Diploma in Mechanical Engineering SLIET, Longowal Scored 66.66% 2003 (Specialisation in Welding Technology.) Certificate Course in Mechanical Engineering SLIET, Longowal Scored 62.8% 2001 (Specialisation in Welding Technology) NDT Level-II BITT, Mumbai Scored 81% 2009 COMPUTER PROFICENCY Operating Systems - Microsoft Office PERSONAL DETAILS Date of Birth : 25th Feb, 1981 Marital Status : Married Languages Known : English, Hindi & Punjabi PASSPORT NO. : N3450666 Expected Salary : Negotiable Place : Bathinda