Date : November ‘2016
To,
The Manager
Human Recourse Department,
Subject : Manager/ Assistant Manager -MechanicalEngineering
Sir,
It is requested to you that I am keenly interested to serve your esteemed organization.
I have a very vast experience in Multi National / Pakistan Leading Companies, as project
costing, scheduling / timeline, designing, execution, testing & commissioning of Utilities piping
specially in Firefighting system as per standards (FMG / NFPA / PSAP) which is mentioned in
my attached Curriculum Vitae.
Currently I am serving M/s. Philip Morris Pakistan Limited as OTS-Projects Design and
Construction of Mechanical works under IBEX since May 2014.
Here, I like to assure you that I will apply my best possible efforts to increase Productivity in
your organization with my hard working and dedication to my Job.
I will be very thankful to you if you consider my application for the vacancy.
Thanks & Regards:
Rehan Ahmed
Cell No. 0306-2858986
1
Career Highlights
I have diversified exposure of more than 23 years of experience in Design & execution Mechanical
Projects, Project executions of various sectors including, but not limited to, the Manufacturing, Automotive,
Trading & Servicing etc. very rich experience of Working w ith Leading companies in Pakistan. Further
Details are enclosed in my Resume
Career Focus
To achieve self-actualization by being a dynamic part of an organization that believes in creating value by
coordinated efforts of its team members.
Career Snapshot
- Approximately 2 years w orking experience as execution engineer of Mechanical Utilities and
Firefighting system.
- 4.5 Years w orking experience w ith Fire Protection Trading and Execution Companies as a System
Designer and Executor.
- 14 Years w ith Automotive Sector in Plant Engineering as a Mechanical Designer
- 03 Years w ith Manufacturing as Draftsmen.
Key Skills
- Designing and Execution of Fire Protection System (Hydrant, Sprinkler, Automatic Suppuration System,
Fire Alarm / Detection System and Risk Assessment as per NFPA and FM Global standards.
- Design and execution of utilities upgrading (Steam, condensate return, w ater supply & drain,
Compressed Air & Vacuum supplies)
- 2D & 3D Designing in AutoCAD & Mechanical Desktop
- Making SOP’s for Project Documentation & Data Controlling
- Making BOQ, Costing, Negotiation w ith Contactors and Project Supervision.
- Extra ordinary skill in Making Presentation.
- Good Leadership of Work Force Controlling and Flow Work Plan Execution and Time Line.
- Trying to Level Best Projects Complete Timely and Efficiently
Personal Attributes
- Team Player as a Good Leadership
- Result Oriented Approach
- Time Management Skills
- Hard Working, Honest and Focused in our Goal
- Very Adaptive to new environment
- Technical Know ledge – Strength
- Cool Minded Good Listener and Hard Targeted
Overseas Training
10th ~ 30th Jun. 2004
Overseas Training TPLT (Toyota Production Leader Training) in Motomachi Plant Japan (Toyota’s Mother
Plant) Training Center GPC (Global Production Support) to Manage Projects and Applying Standards of
Toyota Production System. 1st
time presenting to Pakistan in Toyota Global as a Designer
PRESENT EXPERIENCE
PMPKL
From 08th
May 2014
Till date
PHILIP MORRIS PAKISTAN LIMITED
Department : IBEX as OTS - Project Design and Construction (Kotri & Sahiwal Project)
Responsibilities :
• Execute designing and costing of mechanical utilities (Steam, Water, Compressed Air
Supplies & Vacuum, Condensate return and w ater drain) upgrading of complete factory w ith
Consultant.
• Technical support to consultant in execution phase.
• Technical Support to design consultant for Fire Fighting System Designing and approval w ith
FMG for Kotri and Sahiw al Factory (Fire Hydrant Systems, Fire Alarm & Detection Systems
& Automatic Fire Suppuration Systems).
• Preparation of Project Installation Draw ings, Schedules, reports and commissioning.
• System Designing in AutoCAD as per Standards & Shop Draw ings.
• Supervision of Fabrication, Installation & Commissioning of Equipment and Re-Built Shop
Draw ings & System Layout as per Actual.
• Material Estimation and Contractors Bills Verification.
2
REHAN AHMED
House No. C 21, Aswan Town, Rafi Bangloze,
Malir - 15, Karachi – 25, Pakistan
Cell No. : 0300 - 2344135, 0306 - 2858986
e - mail : rehan_ad75@live.com
rehan_ad75@yahoo.com
PAST EXPERIENCE
From 06th Jun. 2011
Till 03rd May 2014
SAFETY SOLUTIONS PVT. LIMITED
YOUR SAFETY IS OUR CONCERN
Department : Fire Division as a Assistant Manager (Mechanical)
Sub Ordinate : Field Staff Responsibilities :
• Execution of New Fire Fighting System in PMPKL Kotri (Existing System also Execute by
myself as a Project Site Engineer).
• Designing, Costing, Execution, Testing and Commission of Fire Protection System (Fire
Hydrant & Alarm Detection system) and Successfully Handover the System to Client.
- PMPKL Kotri 2013 ~ 2014 Completed (Costing & Execution)
- General Tyre 2013 Completed (Designing & Costing)
- Prime Safety Ltd. 2012 ~ 2013 Completed (Designing, Costing & Execution)
- Shahbaz Garments 2012 Completed (Designing, Costing & Execution)
- Beltexco Limited 2011 ~ 2012 Completed (Designing, Costing & Execution)
- Other small projects of Alarm / Detection System
- Look after Yearly Maintenance Contracts
• Technical Support to Sales & Marketing Division For Fire Fighting System Designing (Fire
Hydrant Systems, Fire Alarm & Detection Systems & Automatic Fire Suppuration Systems
in AutoCAD.
• Survey of Fire Protection & Proposal for Clients
• Updating of Technical Literature and Data Sheets
• Preparation of Project Installation Draw ings & Schedules.
• System Designing in AutoCAD as per Standards & Shop Draw ings.
• Supervision of Fabrication, Installation & Commissioning of Equipment and Re-Built Shop
Draw ings & System Layout as per Actual.
• Material Estimation and Contractors Bills Verification.
• Correspondence w ith Clients for Safety & Technical Information.
From 03rd Dec. 2009
Till 23rd May 2011
HASEEN HABIB TRADING COMPANY
Leading The Way in Total FIRE PROTECTION & SAFETY
Department : Engineering as a Assistant Engineer
Sub Ordinate : Engineering / Site Staff
Responsibilities :
• Designing, Costing, Execution, Testing and Commission of Fire Protection System (Fire
Hydrant & Alarm Detection system) and Successfully Handover the System to Client.
- PMPKL Kotri 2010 Completed (Execution)
- PNSC Building 2009 Completed (Execution)
- Tabba Hart & Deses 2009 Completed (Designing & Execution)
- Other small projects of Alarm / Detection System
• Technical Support to Engineers For Fire Fighting System Designing (Fire Hydrant Systems,
Fire Alarm & Detection Systems & Automatic Fire Suppuration Systems in AutoCAD.
• Preparation of Project Installation Draw ings & Schedules.
• System Designing in AutoCAD as per Standards & Shop Draw ings.
• Supervision of Fabrication, Installation & Commissioning of Equipment and Re-Built Shop
Draw ings & System Layout as per Actual.
• Material Estimation and Contractors Bills Verification.
From 10th Nov. 2005
Till 07th Nov. 2009
DEWAN AUTOMOTIVE ENGINEERING LIMITED
Producing Chinese Technology FOTON Tractors + LIFAN Motorcycle (Star Bikes)
Department : Product Development as a Assistant
Manager Sub Ordinate : Design / AutoCAD Section Staff
Responsibilities :
• Future Plant Expansion Layout like a Master Plan. Technical Support to Tractor + Truck +
Motorcycle Division.
• Time & Motion Study of Production + Yamazumi Skill Charts.
• Project Implementation Schedules. Organization Charts and Work Instruction Sheets of
Production.
• Supervision of Fabrication and Installation of Equipment and Re-Lay outing for Capacity
Improvement and Plant Productivity.
• Material Estimation and Contractors Bills Verification.
• Plant Improvement Activates w ith Safety, Health & Environment.
• Correspondence w ith China for Technical Information and Internal Departments.
• Local Vendors Monthly Production Schedule and Flow Up.
• Coordination b/w PPMC Department and Vendors for Supply Issues.
3
From 28th Aug. 1996
Till 15th Oct. 2005
INDUS MOTOR COMPANY LIMITED
(Manufacturer of TOYOTA and DAIHATSU vehicles in Pakistan)
Department : Production Engineering as a Team Leader
Responsibilities :
• Future Master Plan Layout & Updating of Process Layouts and Draw ings.
• Support to Tool and Maintenance Shop in Welding Jigs Modification.
• Constriction draw ings of Main Office Building, Canteen, CKD Building, Display Center etc.
• Designing of Weld and Assembly Jigs and Air Piping Layouts.
• Supervision of Fabrication and Installation of Equipment and Re-Lay outing for Capacity
Enhancement and Productivity.
• Material Estimation and Contractors Bills Verification.
• Welding Jigs Designing and Modification for Cost Saving Project.
• Execution of Engine Project for Petrol Engine and Diesel Engine Fabrication and
Installation of Equipment, Jigs and Fixtures.
• Exclusive Hilux Line Project
- Designing, Modification and Supervision of Fabrication and Installation of Sub-Assembly
Tables, Jigs and Gauges, Process Planning and Layouts, Job Balancing, Shifting and
Installation of Line Side Equipment, and Time and Motion Studies.
• KAIZEN Activities (Kaizen is the Thinks of Continues Improvement)
- Support to Production in Kaizen Activities.
- Presentation of Annual Kaizen Convention.
From 10th Apr. 1993
Till 09th Apr. 1996
ALLWIN ENGINEERING INDUSTRIES LIMITED
(Biggest Manufacturer of PISTON and AUTOMOBILES PARTS in Pakistan)
Department : Design Office as a Apprentices Team Member (on job)
Responsibilities:
• On Job Training in Designing of Inspection Jigs and Gauges.
• Plant Layout as per Process.
• Filing and Handling of Draw ing Records.
• Graphs and Format (Production and Quality Related)
Professional
Qualifications
• D.A.E. Diploma of Associate Engineer in “Mechanical” from Pakistan Sw edish Institute of
Technology Karachi, Pakistan.
• Three (03) years Certificate Course of “Mechanical Designing & Drafting” from Apprentice
Training Center Karachi. Certificate Affiliated by Sind Board of Technical Education, Karachi,
Pakistan.
Academic
Qualifications
• High School Certificate (HSC) From Superior Science Collage in 1993 w ith Science from Board
of Intermediate Education Karachi, Pakistan.
Exceptional
Qualifications
• Excellent w orking know ledge and experience in Engineering Graphics Package Mechanical
Desktop Power Pack (2D & 3D Designing) solid and future bases modelling and AutoCAD
(Mechanical, Civil & Fabrication Draw ings).
• Commendable know ledge in Microsoft Office (Excel, Words & Pow erPoint)
Personal
Father’s Name
Date of Birth
Domicile No.
N.I.C. No.
Marital Statue
City
Country
Abdul Rehman
March 3rd
‘1975
Karachi – Sindh
42201 – 1984516 – 7
Marriage
Karachi
Pakistan
Reference  Provide as per Requirement
4

Rehan Ahmed - Mechanical (Nov-2016)

  • 1.
    Date : November‘2016 To, The Manager Human Recourse Department, Subject : Manager/ Assistant Manager -MechanicalEngineering Sir, It is requested to you that I am keenly interested to serve your esteemed organization. I have a very vast experience in Multi National / Pakistan Leading Companies, as project costing, scheduling / timeline, designing, execution, testing & commissioning of Utilities piping specially in Firefighting system as per standards (FMG / NFPA / PSAP) which is mentioned in my attached Curriculum Vitae. Currently I am serving M/s. Philip Morris Pakistan Limited as OTS-Projects Design and Construction of Mechanical works under IBEX since May 2014. Here, I like to assure you that I will apply my best possible efforts to increase Productivity in your organization with my hard working and dedication to my Job. I will be very thankful to you if you consider my application for the vacancy. Thanks & Regards: Rehan Ahmed Cell No. 0306-2858986 1
  • 2.
    Career Highlights I havediversified exposure of more than 23 years of experience in Design & execution Mechanical Projects, Project executions of various sectors including, but not limited to, the Manufacturing, Automotive, Trading & Servicing etc. very rich experience of Working w ith Leading companies in Pakistan. Further Details are enclosed in my Resume Career Focus To achieve self-actualization by being a dynamic part of an organization that believes in creating value by coordinated efforts of its team members. Career Snapshot - Approximately 2 years w orking experience as execution engineer of Mechanical Utilities and Firefighting system. - 4.5 Years w orking experience w ith Fire Protection Trading and Execution Companies as a System Designer and Executor. - 14 Years w ith Automotive Sector in Plant Engineering as a Mechanical Designer - 03 Years w ith Manufacturing as Draftsmen. Key Skills - Designing and Execution of Fire Protection System (Hydrant, Sprinkler, Automatic Suppuration System, Fire Alarm / Detection System and Risk Assessment as per NFPA and FM Global standards. - Design and execution of utilities upgrading (Steam, condensate return, w ater supply & drain, Compressed Air & Vacuum supplies) - 2D & 3D Designing in AutoCAD & Mechanical Desktop - Making SOP’s for Project Documentation & Data Controlling - Making BOQ, Costing, Negotiation w ith Contactors and Project Supervision. - Extra ordinary skill in Making Presentation. - Good Leadership of Work Force Controlling and Flow Work Plan Execution and Time Line. - Trying to Level Best Projects Complete Timely and Efficiently Personal Attributes - Team Player as a Good Leadership - Result Oriented Approach - Time Management Skills - Hard Working, Honest and Focused in our Goal - Very Adaptive to new environment - Technical Know ledge – Strength - Cool Minded Good Listener and Hard Targeted Overseas Training 10th ~ 30th Jun. 2004 Overseas Training TPLT (Toyota Production Leader Training) in Motomachi Plant Japan (Toyota’s Mother Plant) Training Center GPC (Global Production Support) to Manage Projects and Applying Standards of Toyota Production System. 1st time presenting to Pakistan in Toyota Global as a Designer PRESENT EXPERIENCE PMPKL From 08th May 2014 Till date PHILIP MORRIS PAKISTAN LIMITED Department : IBEX as OTS - Project Design and Construction (Kotri & Sahiwal Project) Responsibilities : • Execute designing and costing of mechanical utilities (Steam, Water, Compressed Air Supplies & Vacuum, Condensate return and w ater drain) upgrading of complete factory w ith Consultant. • Technical support to consultant in execution phase. • Technical Support to design consultant for Fire Fighting System Designing and approval w ith FMG for Kotri and Sahiw al Factory (Fire Hydrant Systems, Fire Alarm & Detection Systems & Automatic Fire Suppuration Systems). • Preparation of Project Installation Draw ings, Schedules, reports and commissioning. • System Designing in AutoCAD as per Standards & Shop Draw ings. • Supervision of Fabrication, Installation & Commissioning of Equipment and Re-Built Shop Draw ings & System Layout as per Actual. • Material Estimation and Contractors Bills Verification. 2 REHAN AHMED House No. C 21, Aswan Town, Rafi Bangloze, Malir - 15, Karachi – 25, Pakistan Cell No. : 0300 - 2344135, 0306 - 2858986 e - mail : rehan_ad75@live.com rehan_ad75@yahoo.com
  • 3.
    PAST EXPERIENCE From 06thJun. 2011 Till 03rd May 2014 SAFETY SOLUTIONS PVT. LIMITED YOUR SAFETY IS OUR CONCERN Department : Fire Division as a Assistant Manager (Mechanical) Sub Ordinate : Field Staff Responsibilities : • Execution of New Fire Fighting System in PMPKL Kotri (Existing System also Execute by myself as a Project Site Engineer). • Designing, Costing, Execution, Testing and Commission of Fire Protection System (Fire Hydrant & Alarm Detection system) and Successfully Handover the System to Client. - PMPKL Kotri 2013 ~ 2014 Completed (Costing & Execution) - General Tyre 2013 Completed (Designing & Costing) - Prime Safety Ltd. 2012 ~ 2013 Completed (Designing, Costing & Execution) - Shahbaz Garments 2012 Completed (Designing, Costing & Execution) - Beltexco Limited 2011 ~ 2012 Completed (Designing, Costing & Execution) - Other small projects of Alarm / Detection System - Look after Yearly Maintenance Contracts • Technical Support to Sales & Marketing Division For Fire Fighting System Designing (Fire Hydrant Systems, Fire Alarm & Detection Systems & Automatic Fire Suppuration Systems in AutoCAD. • Survey of Fire Protection & Proposal for Clients • Updating of Technical Literature and Data Sheets • Preparation of Project Installation Draw ings & Schedules. • System Designing in AutoCAD as per Standards & Shop Draw ings. • Supervision of Fabrication, Installation & Commissioning of Equipment and Re-Built Shop Draw ings & System Layout as per Actual. • Material Estimation and Contractors Bills Verification. • Correspondence w ith Clients for Safety & Technical Information. From 03rd Dec. 2009 Till 23rd May 2011 HASEEN HABIB TRADING COMPANY Leading The Way in Total FIRE PROTECTION & SAFETY Department : Engineering as a Assistant Engineer Sub Ordinate : Engineering / Site Staff Responsibilities : • Designing, Costing, Execution, Testing and Commission of Fire Protection System (Fire Hydrant & Alarm Detection system) and Successfully Handover the System to Client. - PMPKL Kotri 2010 Completed (Execution) - PNSC Building 2009 Completed (Execution) - Tabba Hart & Deses 2009 Completed (Designing & Execution) - Other small projects of Alarm / Detection System • Technical Support to Engineers For Fire Fighting System Designing (Fire Hydrant Systems, Fire Alarm & Detection Systems & Automatic Fire Suppuration Systems in AutoCAD. • Preparation of Project Installation Draw ings & Schedules. • System Designing in AutoCAD as per Standards & Shop Draw ings. • Supervision of Fabrication, Installation & Commissioning of Equipment and Re-Built Shop Draw ings & System Layout as per Actual. • Material Estimation and Contractors Bills Verification. From 10th Nov. 2005 Till 07th Nov. 2009 DEWAN AUTOMOTIVE ENGINEERING LIMITED Producing Chinese Technology FOTON Tractors + LIFAN Motorcycle (Star Bikes) Department : Product Development as a Assistant Manager Sub Ordinate : Design / AutoCAD Section Staff Responsibilities : • Future Plant Expansion Layout like a Master Plan. Technical Support to Tractor + Truck + Motorcycle Division. • Time & Motion Study of Production + Yamazumi Skill Charts. • Project Implementation Schedules. Organization Charts and Work Instruction Sheets of Production. • Supervision of Fabrication and Installation of Equipment and Re-Lay outing for Capacity Improvement and Plant Productivity. • Material Estimation and Contractors Bills Verification. • Plant Improvement Activates w ith Safety, Health & Environment. • Correspondence w ith China for Technical Information and Internal Departments. • Local Vendors Monthly Production Schedule and Flow Up. • Coordination b/w PPMC Department and Vendors for Supply Issues. 3
  • 4.
    From 28th Aug.1996 Till 15th Oct. 2005 INDUS MOTOR COMPANY LIMITED (Manufacturer of TOYOTA and DAIHATSU vehicles in Pakistan) Department : Production Engineering as a Team Leader Responsibilities : • Future Master Plan Layout & Updating of Process Layouts and Draw ings. • Support to Tool and Maintenance Shop in Welding Jigs Modification. • Constriction draw ings of Main Office Building, Canteen, CKD Building, Display Center etc. • Designing of Weld and Assembly Jigs and Air Piping Layouts. • Supervision of Fabrication and Installation of Equipment and Re-Lay outing for Capacity Enhancement and Productivity. • Material Estimation and Contractors Bills Verification. • Welding Jigs Designing and Modification for Cost Saving Project. • Execution of Engine Project for Petrol Engine and Diesel Engine Fabrication and Installation of Equipment, Jigs and Fixtures. • Exclusive Hilux Line Project - Designing, Modification and Supervision of Fabrication and Installation of Sub-Assembly Tables, Jigs and Gauges, Process Planning and Layouts, Job Balancing, Shifting and Installation of Line Side Equipment, and Time and Motion Studies. • KAIZEN Activities (Kaizen is the Thinks of Continues Improvement) - Support to Production in Kaizen Activities. - Presentation of Annual Kaizen Convention. From 10th Apr. 1993 Till 09th Apr. 1996 ALLWIN ENGINEERING INDUSTRIES LIMITED (Biggest Manufacturer of PISTON and AUTOMOBILES PARTS in Pakistan) Department : Design Office as a Apprentices Team Member (on job) Responsibilities: • On Job Training in Designing of Inspection Jigs and Gauges. • Plant Layout as per Process. • Filing and Handling of Draw ing Records. • Graphs and Format (Production and Quality Related) Professional Qualifications • D.A.E. Diploma of Associate Engineer in “Mechanical” from Pakistan Sw edish Institute of Technology Karachi, Pakistan. • Three (03) years Certificate Course of “Mechanical Designing & Drafting” from Apprentice Training Center Karachi. Certificate Affiliated by Sind Board of Technical Education, Karachi, Pakistan. Academic Qualifications • High School Certificate (HSC) From Superior Science Collage in 1993 w ith Science from Board of Intermediate Education Karachi, Pakistan. Exceptional Qualifications • Excellent w orking know ledge and experience in Engineering Graphics Package Mechanical Desktop Power Pack (2D & 3D Designing) solid and future bases modelling and AutoCAD (Mechanical, Civil & Fabrication Draw ings). • Commendable know ledge in Microsoft Office (Excel, Words & Pow erPoint) Personal Father’s Name Date of Birth Domicile No. N.I.C. No. Marital Statue City Country Abdul Rehman March 3rd ‘1975 Karachi – Sindh 42201 – 1984516 – 7 Marriage Karachi Pakistan Reference  Provide as per Requirement 4