NISHIT DALAL
Senior Project Engineer (Quantity Surveyor & Planning)
+91-9879756897 nishtdalal@gmail.com
“Working as a Quantity Surveyor in the project management system incorporating
contract documents and utilizing the construction methods and planning techniques
coupled with technical back ground. Prior to Quantity Surveyor, I have worked as a
Project Engineer, Having more than 10 years’ experience in different organizations in
INDIA”
 Professional Exposure
• 10 Year Experience, Results oriented, Customer focused, team player who can
significantly reduce costs & improve Organizational efficiency using skills in Civil
Engineering, Project Management.
• Well - versed with quantity take off from drawings and site measurements
• Preparation of Budgets for the projects
• Preparation of interim valuations for client’s certification.
• Measures and computes values to variations and prepares final accounts
• Scrutinization of bills of sub-contractors and taking remedial measures
• Establishes and operates cost and financial control systems.
• Checks the allocation of resources and their productivity
• Preparing estimates and costing of upcoming projects
• Dealing with sub-contractors, consultants and site people to complete projects in time
• Taking care for productivity, quality, safety, cleanliness and cost effective of projects.
• Best handling the works for proper utilization of materials and equipment
 Core Competencies
 Process Improvement:
• Minimizing/ eliminating repetitive nature of breakdowns through statistical control
tools, root cause analysis.
• Initiated processes to bring about drastic reduction in down time through
facilitating the engineering department with preventive maintenance jobs.
 Project management:
• Spearheading end to end project planning, Co-ordination & execution
• Ensuring timely co-ordination with various vendors and other support team
 Organizational Experience
 Ray Engineering India Ltd. Jan 2015 – Till Now
•Designation : Senior Project Engineer (Quantity Surveyor & Planning)
•Location : Bharuch (Dahej) Deepak phenolic (present), Petronet LNG (Previous)
•Team :55
 Job Profile
• Preparing of running & final bills as per contract condition and checking through
client.
• Physical measurement of quantities and tracking the productivity.
• Reconciliation of materials
• Best handling the work proper utilization material and equips
• Preparation of variations and final settlement of the projects. Coordination with
client and site
• Management for contractual issue
 Responsibilities:
• Quantities take off from drawings as well as from sites
• Preparation of client valuations and sub- contractor’s payment certificates
• Rate analysis and BOQ for the project. Making comparison of actual vs. theoretical
quantities for the project completed
• Best handling the work proper utilization material and equips
• Preparation of variations and final settlement of the projects. Coordination with
client and site management for contractual issue.
• Negotiation with subcontractors and accepting the quotations and finalized the
subcontractor orders etc.
• Quantities take off from drawings as well as from sites Preparation monthly report
and submitted to accounts dept. Plan for the procurement of resources.
• Month wise plan, day wise plan for current and monthly along with manpower &
equipment.
• Daily, weekly, and monthly Report.
• Preparing master plan for overall project
 Facilities & Building solutions March 2012 – Dec-2014
• www.fabs.co.in
Facilities & Building solutions March 2012 - till now
•Designation : Senior Project Engineer (Quantity Surveyor)
•Location : Banglore
•Team :45
 COMPANY PROFILE:
• Facilities And Building Solutions Pvt. Ltd. (FABS) was founded in February 2005
with the objective of providing world class Project and Construction Management
services for projects in Industrial, Residential, IT, and Commercial project sectors
in India and Asia.
 Job Profile
• Quantities take off from drawings as well as from sites, Preparation of valuations,
Preparation of sub- contractor’s payment certificate
• Preparing plans, contracts, budgets, bills of quantities and other documentation
• Cost control
• Arranging payments to suppliers and contractors
• Providing advice and forecasts about costs
• Supervising staff
 Achievements:
• Gained overall experience in Quantity Surveying and Project Management roles.
 Responsibilities:
• Preparation of estimates for Initial budget proposals for the cost of the project
• Take of quantities of area from GFC drawings
• Checking of site inspection reports for various works as per approved construction
drawings and
• Site verification works executed by the contractor
• Preparation of rate analysis for variation orders.
• Preparation of QS Report and Monthly Cash Flow.
• Preparations scrutinizing certifying and processing of contractor running and final
account bills
• This involves verification of contractor bills with the applicable terms and
conditions certification and ensuring compliance to the statutory requirements like
WCT and Service Tax
• Preparation of final jobs close out report and analyzing with theoretical quantities
verses actual quantities and preparation of as built drawings
• Assist the client in drawing up list of contractors
 SMP Construction Pvt. Ltd May 2011 - March 2012
• www.smpconstruction.com
•Designation : Project Engineer (Billing)
•Location : Bharuch
•Team : : 50
 COMPANY PROFILE:
• Incorporated in 2002 as a company specialized in industrial and commercial
construction, SMP Constructions Pvt. Ltd. has successfully defined its objectives &
positioned itself as one of the swiftly developing organizations in the construction
industry. Today, SMP Constructions Pvt. Ltd. has well equipped offices at all
project locations to serve its customers spread across the nation, efficiently and
effectively.
 Job Profile
• Preparing of running & final bills as per contract condition and checking through
client.
• Physical measurement of quantities and tracking the productivity.
• Reconciliation of materials
• Best handling the work proper utilization material and equips
• Preparation of variations and final settlement of the projects. Coordination with
client and site
• Management for contractual issue.
• Preparation of contract documents and letter of intent
 Achievements:
• Cost saving up to 15% from total cost of Project
 Responsibilities:
• Quantities take off from drawings as well as from sites
• Preparation of client valuations and sub- contractor’s payment certificates
• Rate analysis and BOQ for the project. Making comparison of actual vs. theoretical
quantities for the project completed
• Best handling the work proper utilization material and equips
• Preparation of variations and final settlement of the projects. Coordination with
client and site management for contractual issue.
• Negotiation with subcontractors and accepting the quotations and finalized the
subcontractor orders etc.
• Quantities take off from drawings as well as from sites Preparation monthly report
and submitted to accounts dept. Plan for the procurement of resources.
 Desai Construction Private Limited May 2009 - April 2011
• www.desaiconstruction.com
•Designation: Project Engineer (contract & Planning)
•Location : valsad
•Team: : 50
 COMPANY PROFILE:
• Desai Construction Pvt. Ltd. was formed over three decades ago, with a vision to
achieve leadership in the field of civil construction, providing our best services to
the satisfaction of all our clients. It was also the tenacity of a group of individuals
fired by imagination and professionalism that sought for this envious position.
 Job Profile
• Project Engineer in Contract & planning
• Quantities take off from drawings
• Preparation of sub-contractors payment certificate Preparation rate analysis, BOQ
for the project Reconciliation of Materials
• Finalized the subcontractor orders etc.
 Achievements:
• Gain extra 20% from the Project cost due to the extra work
 Responsibilities:
• Monitoring day to day activities to achieve planned target.
• Monitoring of all sub-contractors to increase the productivity and quality.
• Preparing reconciliation statement of materials month wise, Sub contractor bill and
Construction Schedule.
• Preparing client bill every month & planed Target amount of month & report cluster
office. Reporting the daily progress to the cluster head.
• Drawing issuing to the Site Engineers and controlling of the Drawings.
• Preparing & submitting compliance report and Daily/monthly progress report to the
client and cluster office
 Toyo Engineering India Limited May 2007 - Dec 2007
• www. Toyoindia.com
•Designation: Junior Engineer (Execution)
•Location : Bombay
•Team :100
 COMPANY PROFILE:
• For over three and a half decades, TOYO India has grown from strength to strength
and is now an epitome of progress and quality. Today, TOYO India is a
professionally managed corporate entity undertaking EPC, PMC or EPCM project
assignments in diverse sectors such as Oil & Gas Refineries, Petrochemicals, and
Fertilizers, Cryogenics, Infrastructure and Industrial solutions.
 Job Profile
• Junior Engineer (Execution) - site engineer
• Involved in Project Co-ordination and Execution for the Construction of all kind of
civil works
• Plan and schedule the work and efficiently as per the Quality Norms. Supervise and
monitor The Site activities
• Oversee quality control and safety matters on the site
• Oversee the selection and requisition of materials for use in the construction
• Periodical reports on the progress of work.
 Achievements:
• Individually handle survey and construction infrastructure
• Complete the 220 KV Switch yard with in three month
 Responsibilities:
• Deftly involved in conducting survey, planning and scheduling, quality control of
material, execution supervision of all EPC work like Road drain, all Building work,
Area grading and co- ordination for inspection with clients & consultants.
• Contributed in site inspection and billing.
• Managed & actively coordinating with sub-contractors for smooth flow of activities,
Surveyed construction activities including providing technical inputs for
methodologies of construction.
• Effectively supervising and executing construction works, certification of bills while
handling quality control, estimation, costing, checking of reinforcement etc.
• Organized weekly site meetings at the projects and maintained daily progress report/
labor reports at the site.
• Plan and schedule the work and efficiently organize the site/facilities in order to
meet an agreed Programmed of deadlines.
• Work Instructed & Monitor as per the Quality Norms.
• Supervise and monitor the site activities force through foreman, monitoring the work
of any subcontractors to complete the work as per customer's satisfaction.
• Oversee quality control and safety matters on the site, and ensure that regulations are
adhered to. Oversee the selection and requisition of materials for use in the
construction / maintenance, to check whether the materials are as specified.
• Supervise and ensure proper maintenance of materials and to advice on technology
and modifications required for a simpler and cost saving mechanism
• Planning & Project coordinating to complete the Project in the Schedule time.
 Suresh & Co Jun 2006 - From Jun 2006 -2013 Apr
Suresh & Co Jun 2006
•Designation: Project Engineer (Execution)
•Location : Bharuch
•Team :30
 Job Profile:
• Well - versed with quantity take off from drawings and site measurements
• Responsible for site supervision of work.
• Responsible of overall management of project from conception to completion.
• Responsible for all engineering functions of work.
• Scrutinization of bills of sub-contractors and taking remedial measures
 Achievements:
• Individually handled Residential Buildings, Underground Sewerage Systems Plant
Successfully make the plan of residential plan of worth Rs. 50 Cr.
 Responsibilities:
• Responsible for site supervision of work.
• Preparation of weekly and monthly reports to senior management. Review project
plan and update on a regular basis.
• Application and fixing of all type of Anchor Fixing System (anchor bolt) for
construction industry.
• Checked the site works for foundation and superstructure including water proofing
treatments, concrete pouring, shuttering and formwork, production of concrete,
precast elements, masonry construction and finishes.
• Co-ordinate review of contractor’s submittals, job overall management of project
from conception to completion.
• Review variation schedules and assess entitlement and income. Preparation,
Development and review of project Quality Plan. Ensure Compliance with client
Quality objective
• Responsible for all engineering functions of work. Preparation of sub- contractors
R.A Bills effect close liaison with client reps.
• Review project Program and update on a regular basis. Monitor safety and Quality
of contractor’s efforts.
 Academics
• Diploma in civil - 74% --, Year 2006
• SECONDARY (10TH) Gujarat Secondary Education Board -64% --, Year 1993
 KEY NOTES
• Diploma in civil engineer
• Microsoft Project - 2010 (MS-Project)
• AutoCAD-2008
• REVIT 2012 (architectural)
• PRMAVERA-7
 KEY STRENGTH
• Quality of motivating others
• Team work
• Dedicated hard working
• Good communicating skill possessing great amount of patience with positive
thinking
• Believing in doing best to achieve best in life & ability to deliver the good with
punctuality.
 CORE STRENGTH
• Project Management
• Team Management
• Quality Assurance
• Material Management
 Personal Details
• Date of birth: 1978
• Marital Status: Married
• Languages: Gujarati,Hindi,English
• Addres: 791, muktinagar,nr.shaktinathcircle, Bharuch Gujarat

resume-.PDF (2)

  • 1.
    NISHIT DALAL Senior ProjectEngineer (Quantity Surveyor & Planning) +91-9879756897 nishtdalal@gmail.com “Working as a Quantity Surveyor in the project management system incorporating contract documents and utilizing the construction methods and planning techniques coupled with technical back ground. Prior to Quantity Surveyor, I have worked as a Project Engineer, Having more than 10 years’ experience in different organizations in INDIA”  Professional Exposure • 10 Year Experience, Results oriented, Customer focused, team player who can significantly reduce costs & improve Organizational efficiency using skills in Civil Engineering, Project Management. • Well - versed with quantity take off from drawings and site measurements • Preparation of Budgets for the projects • Preparation of interim valuations for client’s certification. • Measures and computes values to variations and prepares final accounts • Scrutinization of bills of sub-contractors and taking remedial measures • Establishes and operates cost and financial control systems. • Checks the allocation of resources and their productivity • Preparing estimates and costing of upcoming projects • Dealing with sub-contractors, consultants and site people to complete projects in time • Taking care for productivity, quality, safety, cleanliness and cost effective of projects. • Best handling the works for proper utilization of materials and equipment  Core Competencies  Process Improvement: • Minimizing/ eliminating repetitive nature of breakdowns through statistical control tools, root cause analysis. • Initiated processes to bring about drastic reduction in down time through facilitating the engineering department with preventive maintenance jobs.  Project management: • Spearheading end to end project planning, Co-ordination & execution • Ensuring timely co-ordination with various vendors and other support team
  • 2.
     Organizational Experience Ray Engineering India Ltd. Jan 2015 – Till Now •Designation : Senior Project Engineer (Quantity Surveyor & Planning) •Location : Bharuch (Dahej) Deepak phenolic (present), Petronet LNG (Previous) •Team :55  Job Profile • Preparing of running & final bills as per contract condition and checking through client. • Physical measurement of quantities and tracking the productivity. • Reconciliation of materials • Best handling the work proper utilization material and equips • Preparation of variations and final settlement of the projects. Coordination with client and site • Management for contractual issue  Responsibilities: • Quantities take off from drawings as well as from sites • Preparation of client valuations and sub- contractor’s payment certificates • Rate analysis and BOQ for the project. Making comparison of actual vs. theoretical quantities for the project completed • Best handling the work proper utilization material and equips • Preparation of variations and final settlement of the projects. Coordination with client and site management for contractual issue. • Negotiation with subcontractors and accepting the quotations and finalized the subcontractor orders etc. • Quantities take off from drawings as well as from sites Preparation monthly report and submitted to accounts dept. Plan for the procurement of resources. • Month wise plan, day wise plan for current and monthly along with manpower & equipment. • Daily, weekly, and monthly Report. • Preparing master plan for overall project
  • 3.
     Facilities &Building solutions March 2012 – Dec-2014 • www.fabs.co.in Facilities & Building solutions March 2012 - till now •Designation : Senior Project Engineer (Quantity Surveyor) •Location : Banglore •Team :45  COMPANY PROFILE: • Facilities And Building Solutions Pvt. Ltd. (FABS) was founded in February 2005 with the objective of providing world class Project and Construction Management services for projects in Industrial, Residential, IT, and Commercial project sectors in India and Asia.  Job Profile • Quantities take off from drawings as well as from sites, Preparation of valuations, Preparation of sub- contractor’s payment certificate • Preparing plans, contracts, budgets, bills of quantities and other documentation • Cost control • Arranging payments to suppliers and contractors • Providing advice and forecasts about costs • Supervising staff  Achievements: • Gained overall experience in Quantity Surveying and Project Management roles.  Responsibilities: • Preparation of estimates for Initial budget proposals for the cost of the project • Take of quantities of area from GFC drawings • Checking of site inspection reports for various works as per approved construction drawings and • Site verification works executed by the contractor • Preparation of rate analysis for variation orders. • Preparation of QS Report and Monthly Cash Flow.
  • 4.
    • Preparations scrutinizingcertifying and processing of contractor running and final account bills • This involves verification of contractor bills with the applicable terms and conditions certification and ensuring compliance to the statutory requirements like WCT and Service Tax • Preparation of final jobs close out report and analyzing with theoretical quantities verses actual quantities and preparation of as built drawings • Assist the client in drawing up list of contractors  SMP Construction Pvt. Ltd May 2011 - March 2012 • www.smpconstruction.com •Designation : Project Engineer (Billing) •Location : Bharuch •Team : : 50  COMPANY PROFILE: • Incorporated in 2002 as a company specialized in industrial and commercial construction, SMP Constructions Pvt. Ltd. has successfully defined its objectives & positioned itself as one of the swiftly developing organizations in the construction industry. Today, SMP Constructions Pvt. Ltd. has well equipped offices at all project locations to serve its customers spread across the nation, efficiently and effectively.  Job Profile • Preparing of running & final bills as per contract condition and checking through client. • Physical measurement of quantities and tracking the productivity. • Reconciliation of materials • Best handling the work proper utilization material and equips • Preparation of variations and final settlement of the projects. Coordination with client and site • Management for contractual issue. • Preparation of contract documents and letter of intent  Achievements: • Cost saving up to 15% from total cost of Project  Responsibilities: • Quantities take off from drawings as well as from sites • Preparation of client valuations and sub- contractor’s payment certificates
  • 5.
    • Rate analysisand BOQ for the project. Making comparison of actual vs. theoretical quantities for the project completed • Best handling the work proper utilization material and equips • Preparation of variations and final settlement of the projects. Coordination with client and site management for contractual issue. • Negotiation with subcontractors and accepting the quotations and finalized the subcontractor orders etc. • Quantities take off from drawings as well as from sites Preparation monthly report and submitted to accounts dept. Plan for the procurement of resources.  Desai Construction Private Limited May 2009 - April 2011 • www.desaiconstruction.com •Designation: Project Engineer (contract & Planning) •Location : valsad •Team: : 50  COMPANY PROFILE: • Desai Construction Pvt. Ltd. was formed over three decades ago, with a vision to achieve leadership in the field of civil construction, providing our best services to the satisfaction of all our clients. It was also the tenacity of a group of individuals fired by imagination and professionalism that sought for this envious position.  Job Profile • Project Engineer in Contract & planning • Quantities take off from drawings • Preparation of sub-contractors payment certificate Preparation rate analysis, BOQ for the project Reconciliation of Materials • Finalized the subcontractor orders etc.  Achievements: • Gain extra 20% from the Project cost due to the extra work  Responsibilities: • Monitoring day to day activities to achieve planned target. • Monitoring of all sub-contractors to increase the productivity and quality. • Preparing reconciliation statement of materials month wise, Sub contractor bill and Construction Schedule. • Preparing client bill every month & planed Target amount of month & report cluster
  • 6.
    office. Reporting thedaily progress to the cluster head. • Drawing issuing to the Site Engineers and controlling of the Drawings. • Preparing & submitting compliance report and Daily/monthly progress report to the client and cluster office  Toyo Engineering India Limited May 2007 - Dec 2007 • www. Toyoindia.com •Designation: Junior Engineer (Execution) •Location : Bombay •Team :100  COMPANY PROFILE: • For over three and a half decades, TOYO India has grown from strength to strength and is now an epitome of progress and quality. Today, TOYO India is a professionally managed corporate entity undertaking EPC, PMC or EPCM project assignments in diverse sectors such as Oil & Gas Refineries, Petrochemicals, and Fertilizers, Cryogenics, Infrastructure and Industrial solutions.  Job Profile • Junior Engineer (Execution) - site engineer • Involved in Project Co-ordination and Execution for the Construction of all kind of civil works • Plan and schedule the work and efficiently as per the Quality Norms. Supervise and monitor The Site activities • Oversee quality control and safety matters on the site • Oversee the selection and requisition of materials for use in the construction • Periodical reports on the progress of work.  Achievements: • Individually handle survey and construction infrastructure • Complete the 220 KV Switch yard with in three month  Responsibilities: • Deftly involved in conducting survey, planning and scheduling, quality control of material, execution supervision of all EPC work like Road drain, all Building work, Area grading and co- ordination for inspection with clients & consultants. • Contributed in site inspection and billing. • Managed & actively coordinating with sub-contractors for smooth flow of activities,
  • 7.
    Surveyed construction activitiesincluding providing technical inputs for methodologies of construction. • Effectively supervising and executing construction works, certification of bills while handling quality control, estimation, costing, checking of reinforcement etc. • Organized weekly site meetings at the projects and maintained daily progress report/ labor reports at the site. • Plan and schedule the work and efficiently organize the site/facilities in order to meet an agreed Programmed of deadlines. • Work Instructed & Monitor as per the Quality Norms. • Supervise and monitor the site activities force through foreman, monitoring the work of any subcontractors to complete the work as per customer's satisfaction. • Oversee quality control and safety matters on the site, and ensure that regulations are adhered to. Oversee the selection and requisition of materials for use in the construction / maintenance, to check whether the materials are as specified. • Supervise and ensure proper maintenance of materials and to advice on technology and modifications required for a simpler and cost saving mechanism • Planning & Project coordinating to complete the Project in the Schedule time.  Suresh & Co Jun 2006 - From Jun 2006 -2013 Apr Suresh & Co Jun 2006 •Designation: Project Engineer (Execution) •Location : Bharuch •Team :30  Job Profile: • Well - versed with quantity take off from drawings and site measurements • Responsible for site supervision of work. • Responsible of overall management of project from conception to completion. • Responsible for all engineering functions of work. • Scrutinization of bills of sub-contractors and taking remedial measures  Achievements: • Individually handled Residential Buildings, Underground Sewerage Systems Plant Successfully make the plan of residential plan of worth Rs. 50 Cr.  Responsibilities: • Responsible for site supervision of work. • Preparation of weekly and monthly reports to senior management. Review project plan and update on a regular basis. • Application and fixing of all type of Anchor Fixing System (anchor bolt) for construction industry. • Checked the site works for foundation and superstructure including water proofing
  • 8.
    treatments, concrete pouring,shuttering and formwork, production of concrete, precast elements, masonry construction and finishes. • Co-ordinate review of contractor’s submittals, job overall management of project from conception to completion. • Review variation schedules and assess entitlement and income. Preparation, Development and review of project Quality Plan. Ensure Compliance with client Quality objective • Responsible for all engineering functions of work. Preparation of sub- contractors R.A Bills effect close liaison with client reps. • Review project Program and update on a regular basis. Monitor safety and Quality of contractor’s efforts.  Academics • Diploma in civil - 74% --, Year 2006 • SECONDARY (10TH) Gujarat Secondary Education Board -64% --, Year 1993  KEY NOTES • Diploma in civil engineer • Microsoft Project - 2010 (MS-Project) • AutoCAD-2008 • REVIT 2012 (architectural) • PRMAVERA-7  KEY STRENGTH • Quality of motivating others • Team work • Dedicated hard working • Good communicating skill possessing great amount of patience with positive thinking • Believing in doing best to achieve best in life & ability to deliver the good with punctuality.  CORE STRENGTH • Project Management • Team Management • Quality Assurance • Material Management  Personal Details • Date of birth: 1978 • Marital Status: Married • Languages: Gujarati,Hindi,English • Addres: 791, muktinagar,nr.shaktinathcircle, Bharuch Gujarat