SlideShare a Scribd company logo
1 of 15
Download to read offline
LNG filling station
LNG filling station is an important part of the entire LNG industry chain. Its layout and
penetration rate is also one of the important factors that restrict the rapid promotion of LNG
vehicles. With the increasing use of LNG vehicles, LNG stations have been in recent years Blowout
development and construction.
LNG standard demonstration station
LNG filling stations generally can be divided into fixed standard station, skid simple station,
flow plus liquid car in three ways, of which the most representative of the fixed filling station.
There are not many opportunities to access and understand LNG filling stations for many
owners who use traditional fuels such as diesel. What is the difference between it and the
common gas station, the LNG car filling process and norms of what special requirements.
The core elements of gas station safety: fire safety
The main component of LNG is methane, which also has the risk of burning and explosion.
The first prerequisite for the safe operation of LNG filling stations is fire protection. Gas station
outside the huge anti-fire warning signs that this is flammable and explosive area.
There is a notice of the pit stop, because the LNG gas pipe with pressure for the ultra-low
temperature liquid, forced drag will lead to serious consequences of leakage, so LNG filling
stations than the ordinary gas station to increase the provisions of the station is: Gas process, is
strictly prohibited not to remove the pipe fittings forced outbound provisions. As the gas station
has just been delivered, the bill on the LNG temperament announcement data not yet
completed;
The area of 18 meters around the aerated platform is already in the safe area, the
passengers need to get off, the vehicle can enter the safe area for gas; into the gas station,
anywhere you can see "no smoking", " "Ban on mobile phone", "flame" warning signs;
In the air station office area, a variety of fire, safety, on - site management, frost prevention
measures of the system and regulations covered with walls;
LNG filling stations of the unloading, gas storage, gas and other three major data status and
information communication, real-time display and security monitoring.
● Operator: safety precautions and protective gear
LNG is -162 ° C ultra-low temperature liquid, the operator if the direct contact with liquid or
unseparated piping and accessories, will bring serious harm to the human body, very cold metal
will flesh and can also tear when opened The In the gas station, we see the operator has strict
protective measures and protective gear:
Protective helmets with large goggle covers
Sudden leakage of LNG instantaneous evaporation of the gas is also a low temperature gas,
if directly with the skin or eyes and other contact, it may lead to injury, the operator also has
facial protection measures;
Loose protective gloves
Special protective gloves, not only the role of isolation low temperature, wearing a very
loose in the hand, easy to quickly when the emergency off.
● LNG aerated operation flow: faster than CNG
The small series of knowledge is LNG conventional filling, that is, the normal operation of
the LNG car to add gas, cylinder liner has been in a low temperature state and the remaining part
of the liquid.
1. before the preparation of gas
Ground wire
In order to prevent the generation of static electricity, before filling to confirm the aerated
vehicle has been connected with a good grounding wire.
Ready before gasing
The aerobics operator wears uniforms and protective gear.
2. open the low temperature inlet and return port protection cap
The coarse joint is the air inlet for the air inlet
In the outside of the cylinder can see the intake, return two joints.
It can be seen that liquefied natural gas LNG cylinder pressure is about 1.4mpa, about 13
kilograms. Far less than the compressed gas CNG 20mpa.
3. clean the trachea interface and fill the gun
Water is the enemy of LNG, once into the water, will quickly freeze into hard ice. Easy to lead
to the entire LNG gas path in the clogging or valve parts and other parts of the phenomenon of
failure, must be strictly in the gas to prevent the entry of moisture or impurities.
The trachea interface and purge guns are cleaned with high pressure nitrogen
Make sure there are no moisture or impurities
The autoclave comes with a high pressure purge nozzle, which cleans the trachea and the air
gun with a dry, high pressure nitrogen. If the conditions are limited, you can use a clean, dry
cotton wipe.
4. connect the return air pipe and connector
Turn the air gun 90 ° to lock
LNG cylinders are in a low-temperature sealed state. When a large amount of LNG liquid is
injected, the gas in the bottle can be connected to the gas pipe in order to increase the filling
speed.
5.Filling up
Into the formal filling process, of course, have to first fill the gas flow meter cleared, and
then just clean the air gun connected to the cylinder low temperature inlet.
Liquid LNG into the lower part of the cylinder, the upper part of the gas at the same time in
the gas
It can be seen that the water vapor in the air forms a crest around the low temperature
aerosol
The filling pump stops and the actual filling takes less than two minutes. LNG's filling rate is
much faster than CNG.
After opening the valve, the filling station pump starts to start filling the cylinder.
6. close the valve, remove the air gun and return air gun
7. cover the low temperature inlet and return port of the protective cap, remove the ground clip
● LNG in the filling process of some small knowledge
Through this visit to the LNG filling station, Xiao Bian will LNG in the filling process of some
small knowledge to share with you
(1) before the gas must be checked in the low-temperature gas inside the water, impurities,
to ensure that when the moisture and impurities are completely cleared.
If there is moisture, ultra-low temperature of the LNG will lead to rapid condensation of water
into ice. Ice may block the intake check valve, air intake, resulting in lax or leakage. If the ice into
the cylinder inside, but also may cause poor air supply, so that the engine in the high-speed load
when the lack of power or even the engine can not start normally.
If there are impurities, not only can cause a variety of valves closed lax, but also lead to filters,
regulators and other clogging, there is insufficient gas supply. If the filter is not installed early gas
engine, impurities can even cause damage to the engine.
(2) a fully filled cylinder of its pressure is very fast, may lead to frequent opening of the
safety valve exhaust, not only caused a waste of natural gas, will also bring potential safety
problems. Therefore, fully filled with cylinders should be used as soon as possible, try not to store
for a long time.
(3) in the open return valve when the gas cylinder is deflated, it is best to recycle the air pipe
from the filling machine. If not in the filling station, the release of the gas should be brought to a
safe place, otherwise there will be a risk of fire and explosion.
(4) LNG not only has the characteristics of combustion and explosion, LNG is -162 ℃
ultra-low temperature liquid, fire and explosion at the same time, the use must also improve
safety awareness and protection measures to prevent it from low temperature burns. When the
skin and low temperature parts and contact with the adhesive, can not be simple and rude to pull,
can be 41 ~ 46 ℃ warm water heating method to defrost the flesh, and then remove the frozen
parts; such as frostbite should be immediately sent to the hospital for further treatment.

More Related Content

What's hot

Mine air sampling
Mine air samplingMine air sampling
Mine air samplingOmKaitade
 
anaesthesia Vaporizers tec1 to tec5
anaesthesia Vaporizers tec1 to tec5anaesthesia Vaporizers tec1 to tec5
anaesthesia Vaporizers tec1 to tec5Preeti Loona
 
Vaporizers dr. anju bhalotra
Vaporizers  dr. anju  bhalotraVaporizers  dr. anju  bhalotra
Vaporizers dr. anju bhalotraisakakinada
 
Anesthesia machine and equipment Q & A Part -I
Anesthesia machine and equipment  Q & A Part -IAnesthesia machine and equipment  Q & A Part -I
Anesthesia machine and equipment Q & A Part -ISelva Kumar
 
Throttling calorimeter
Throttling calorimeterThrottling calorimeter
Throttling calorimeterKishan Trivedi
 
Understanding Anesthesia Vaporizers
Understanding Anesthesia VaporizersUnderstanding Anesthesia Vaporizers
Understanding Anesthesia VaporizersSaneesh P J
 
Anaesthesia Vaporizers
Anaesthesia VaporizersAnaesthesia Vaporizers
Anaesthesia VaporizersRahul Varshney
 
Basics of anaesthetic vaporisers
Basics of anaesthetic vaporisersBasics of anaesthetic vaporisers
Basics of anaesthetic vaporisersSelva Kumar
 
Vaporizers
VaporizersVaporizers
VaporizersKIMS
 
BOILER MOUNTINGS AND ACCESSORIES
BOILER MOUNTINGS AND ACCESSORIESBOILER MOUNTINGS AND ACCESSORIES
BOILER MOUNTINGS AND ACCESSORIESDhananJayPatel27
 

What's hot (20)

Mine air sampling
Mine air samplingMine air sampling
Mine air sampling
 
anaesthesia Vaporizers tec1 to tec5
anaesthesia Vaporizers tec1 to tec5anaesthesia Vaporizers tec1 to tec5
anaesthesia Vaporizers tec1 to tec5
 
Throttling calorimeter
Throttling calorimeterThrottling calorimeter
Throttling calorimeter
 
Vaporizers 2015 spmc
Vaporizers 2015 spmcVaporizers 2015 spmc
Vaporizers 2015 spmc
 
Vaporizers dr. anju bhalotra
Vaporizers  dr. anju  bhalotraVaporizers  dr. anju  bhalotra
Vaporizers dr. anju bhalotra
 
Vaporizers Basics
Vaporizers BasicsVaporizers Basics
Vaporizers Basics
 
Vaporizers
VaporizersVaporizers
Vaporizers
 
Anesthesia machine and equipment Q & A Part -I
Anesthesia machine and equipment  Q & A Part -IAnesthesia machine and equipment  Q & A Part -I
Anesthesia machine and equipment Q & A Part -I
 
vaporizer(dr.s.p)
vaporizer(dr.s.p)vaporizer(dr.s.p)
vaporizer(dr.s.p)
 
Anaesthesia machine 2
Anaesthesia machine 2Anaesthesia machine 2
Anaesthesia machine 2
 
Throttling calorimeter
Throttling calorimeterThrottling calorimeter
Throttling calorimeter
 
Understanding Anesthesia Vaporizers
Understanding Anesthesia VaporizersUnderstanding Anesthesia Vaporizers
Understanding Anesthesia Vaporizers
 
Boiler mounting
Boiler mountingBoiler mounting
Boiler mounting
 
Anaesthesia Vaporizers
Anaesthesia VaporizersAnaesthesia Vaporizers
Anaesthesia Vaporizers
 
Basics of anaesthetic vaporisers
Basics of anaesthetic vaporisersBasics of anaesthetic vaporisers
Basics of anaesthetic vaporisers
 
Throttling Process
Throttling ProcessThrottling Process
Throttling Process
 
Cylinders
CylindersCylinders
Cylinders
 
Vaporizers anand ram final
Vaporizers anand ram finalVaporizers anand ram final
Vaporizers anand ram final
 
Vaporizers
VaporizersVaporizers
Vaporizers
 
BOILER MOUNTINGS AND ACCESSORIES
BOILER MOUNTINGS AND ACCESSORIESBOILER MOUNTINGS AND ACCESSORIES
BOILER MOUNTINGS AND ACCESSORIES
 

Similar to some Knowledge about Lng filling station from wenzhou bluesky energy co,ltd

lpg safety.pptx
lpg safety.pptxlpg safety.pptx
lpg safety.pptxsamygs1
 
INERT GAS SYSTEM(IG)
INERT GAS SYSTEM(IG)INERT GAS SYSTEM(IG)
INERT GAS SYSTEM(IG)nmahi96
 
Medical gas supply.pipelines and cylinders
Medical gas supply.pipelines and cylindersMedical gas supply.pipelines and cylinders
Medical gas supply.pipelines and cylindersdrsauravdas1977
 
V 1 presentation on safety aspects of lpg handling and storage
V 1 presentation on safety aspects of lpg handling  and storageV 1 presentation on safety aspects of lpg handling  and storage
V 1 presentation on safety aspects of lpg handling and storageImran Bokhari
 
Main air compressors PPT.pptx
Main air compressors PPT.pptxMain air compressors PPT.pptx
Main air compressors PPT.pptxdeepu501949
 
2015 drill-head vs piercing-plier
2015 drill-head vs piercing-plier2015 drill-head vs piercing-plier
2015 drill-head vs piercing-plierGerrie Leemput
 
2015 drill-head vs piercing-plier
2015 drill-head vs piercing-plier2015 drill-head vs piercing-plier
2015 drill-head vs piercing-plier❀Celina Knegt❀
 
Safety in welding
Safety in weldingSafety in welding
Safety in weldingIlhamR222
 
Sf6 handling procedure
Sf6 handling procedureSf6 handling procedure
Sf6 handling procedureKevin Ducusin
 
After the mold is finished, what is the correct first sample process -DGMF mo...
After the mold is finished, what is the correct first sample process -DGMF mo...After the mold is finished, what is the correct first sample process -DGMF mo...
After the mold is finished, what is the correct first sample process -DGMF mo...JasmineHL
 
Liquefied petroleum gas cylinder
Liquefied petroleum gas cylinderLiquefied petroleum gas cylinder
Liquefied petroleum gas cylinderVishnu RC Vijayan
 

Similar to some Knowledge about Lng filling station from wenzhou bluesky energy co,ltd (20)

lpg safety.pptx
lpg safety.pptxlpg safety.pptx
lpg safety.pptx
 
INERT GAS SYSTEM(IG)
INERT GAS SYSTEM(IG)INERT GAS SYSTEM(IG)
INERT GAS SYSTEM(IG)
 
Lpg safety
Lpg safetyLpg safety
Lpg safety
 
Standard practices r9
Standard practices r9Standard practices r9
Standard practices r9
 
CArgo tank atmosphere.ppt
CArgo tank atmosphere.pptCArgo tank atmosphere.ppt
CArgo tank atmosphere.ppt
 
Cylinders
CylindersCylinders
Cylinders
 
Cylinders
CylindersCylinders
Cylinders
 
Pressure Transmitter Daily Maintenance 14 Points Of Attention
Pressure Transmitter Daily Maintenance 14 Points Of AttentionPressure Transmitter Daily Maintenance 14 Points Of Attention
Pressure Transmitter Daily Maintenance 14 Points Of Attention
 
Medical gas supply.pipelines and cylinders
Medical gas supply.pipelines and cylindersMedical gas supply.pipelines and cylinders
Medical gas supply.pipelines and cylinders
 
Cylinders
CylindersCylinders
Cylinders
 
V 1 presentation on safety aspects of lpg handling and storage
V 1 presentation on safety aspects of lpg handling  and storageV 1 presentation on safety aspects of lpg handling  and storage
V 1 presentation on safety aspects of lpg handling and storage
 
Main air compressors PPT.pptx
Main air compressors PPT.pptxMain air compressors PPT.pptx
Main air compressors PPT.pptx
 
2015 drill-head vs piercing-plier
2015 drill-head vs piercing-plier2015 drill-head vs piercing-plier
2015 drill-head vs piercing-plier
 
2015 drill-head vs piercing-plier
2015 drill-head vs piercing-plier2015 drill-head vs piercing-plier
2015 drill-head vs piercing-plier
 
Safety in welding
Safety in weldingSafety in welding
Safety in welding
 
Pipeline drying
Pipeline dryingPipeline drying
Pipeline drying
 
Handling of Gases
Handling of GasesHandling of Gases
Handling of Gases
 
Sf6 handling procedure
Sf6 handling procedureSf6 handling procedure
Sf6 handling procedure
 
After the mold is finished, what is the correct first sample process -DGMF mo...
After the mold is finished, what is the correct first sample process -DGMF mo...After the mold is finished, what is the correct first sample process -DGMF mo...
After the mold is finished, what is the correct first sample process -DGMF mo...
 
Liquefied petroleum gas cylinder
Liquefied petroleum gas cylinderLiquefied petroleum gas cylinder
Liquefied petroleum gas cylinder
 

Recently uploaded

NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...Khaled Al Awadi
 
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwSCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwadimosmejiaslendon
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxtmthompson1
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsCaitlinCummins3
 
wagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIwagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIIRODORI inc.
 
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...BabaJohn3
 
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...prakheeshc
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312LR1709MUSIC
 
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxNetapsFoundationAdmi
 
Unlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsUnlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsYourLegal Accounting
 
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...ssuserf63bd7
 
Mental Health Issues of Graduate Students
Mental Health Issues of Graduate StudentsMental Health Issues of Graduate Students
Mental Health Issues of Graduate Studentsvineshkumarsajnani12
 
A DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptx
A DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptxA DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptx
A DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptxLokeshwariOrchid1
 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingYourLegal Accounting
 
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdfThe Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdfbelieveminhh
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证ogawka
 

Recently uploaded (20)

NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
 
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwSCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
 
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di PasuruanObat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
 
wagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIwagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORI
 
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Obat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di Surabaya
Obat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di SurabayaObat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di Surabaya
Obat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di Surabaya
 
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
 
Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
 
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
 
Unlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsUnlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA Firms
 
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
 
Mental Health Issues of Graduate Students
Mental Health Issues of Graduate StudentsMental Health Issues of Graduate Students
Mental Health Issues of Graduate Students
 
A DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptx
A DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptxA DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptx
A DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptx
 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic Accounting
 
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdfThe Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
 

some Knowledge about Lng filling station from wenzhou bluesky energy co,ltd

  • 1. LNG filling station LNG filling station is an important part of the entire LNG industry chain. Its layout and penetration rate is also one of the important factors that restrict the rapid promotion of LNG vehicles. With the increasing use of LNG vehicles, LNG stations have been in recent years Blowout development and construction. LNG standard demonstration station LNG filling stations generally can be divided into fixed standard station, skid simple station,
  • 2. flow plus liquid car in three ways, of which the most representative of the fixed filling station. There are not many opportunities to access and understand LNG filling stations for many owners who use traditional fuels such as diesel. What is the difference between it and the common gas station, the LNG car filling process and norms of what special requirements. The core elements of gas station safety: fire safety The main component of LNG is methane, which also has the risk of burning and explosion. The first prerequisite for the safe operation of LNG filling stations is fire protection. Gas station outside the huge anti-fire warning signs that this is flammable and explosive area. There is a notice of the pit stop, because the LNG gas pipe with pressure for the ultra-low
  • 3. temperature liquid, forced drag will lead to serious consequences of leakage, so LNG filling stations than the ordinary gas station to increase the provisions of the station is: Gas process, is strictly prohibited not to remove the pipe fittings forced outbound provisions. As the gas station has just been delivered, the bill on the LNG temperament announcement data not yet completed; The area of 18 meters around the aerated platform is already in the safe area, the passengers need to get off, the vehicle can enter the safe area for gas; into the gas station, anywhere you can see "no smoking", " "Ban on mobile phone", "flame" warning signs; In the air station office area, a variety of fire, safety, on - site management, frost prevention measures of the system and regulations covered with walls;
  • 4. LNG filling stations of the unloading, gas storage, gas and other three major data status and information communication, real-time display and security monitoring. ● Operator: safety precautions and protective gear LNG is -162 ° C ultra-low temperature liquid, the operator if the direct contact with liquid or unseparated piping and accessories, will bring serious harm to the human body, very cold metal will flesh and can also tear when opened The In the gas station, we see the operator has strict protective measures and protective gear: Protective helmets with large goggle covers
  • 5. Sudden leakage of LNG instantaneous evaporation of the gas is also a low temperature gas, if directly with the skin or eyes and other contact, it may lead to injury, the operator also has facial protection measures; Loose protective gloves Special protective gloves, not only the role of isolation low temperature, wearing a very loose in the hand, easy to quickly when the emergency off. ● LNG aerated operation flow: faster than CNG The small series of knowledge is LNG conventional filling, that is, the normal operation of the LNG car to add gas, cylinder liner has been in a low temperature state and the remaining part of the liquid. 1. before the preparation of gas
  • 6. Ground wire In order to prevent the generation of static electricity, before filling to confirm the aerated vehicle has been connected with a good grounding wire. Ready before gasing The aerobics operator wears uniforms and protective gear.
  • 7. 2. open the low temperature inlet and return port protection cap The coarse joint is the air inlet for the air inlet In the outside of the cylinder can see the intake, return two joints.
  • 8. It can be seen that liquefied natural gas LNG cylinder pressure is about 1.4mpa, about 13 kilograms. Far less than the compressed gas CNG 20mpa. 3. clean the trachea interface and fill the gun Water is the enemy of LNG, once into the water, will quickly freeze into hard ice. Easy to lead to the entire LNG gas path in the clogging or valve parts and other parts of the phenomenon of failure, must be strictly in the gas to prevent the entry of moisture or impurities.
  • 9. The trachea interface and purge guns are cleaned with high pressure nitrogen Make sure there are no moisture or impurities The autoclave comes with a high pressure purge nozzle, which cleans the trachea and the air gun with a dry, high pressure nitrogen. If the conditions are limited, you can use a clean, dry cotton wipe. 4. connect the return air pipe and connector
  • 10. Turn the air gun 90 ° to lock LNG cylinders are in a low-temperature sealed state. When a large amount of LNG liquid is injected, the gas in the bottle can be connected to the gas pipe in order to increase the filling speed.
  • 12. Into the formal filling process, of course, have to first fill the gas flow meter cleared, and then just clean the air gun connected to the cylinder low temperature inlet. Liquid LNG into the lower part of the cylinder, the upper part of the gas at the same time in the gas
  • 13. It can be seen that the water vapor in the air forms a crest around the low temperature aerosol The filling pump stops and the actual filling takes less than two minutes. LNG's filling rate is much faster than CNG. After opening the valve, the filling station pump starts to start filling the cylinder. 6. close the valve, remove the air gun and return air gun
  • 14. 7. cover the low temperature inlet and return port of the protective cap, remove the ground clip ● LNG in the filling process of some small knowledge Through this visit to the LNG filling station, Xiao Bian will LNG in the filling process of some small knowledge to share with you (1) before the gas must be checked in the low-temperature gas inside the water, impurities, to ensure that when the moisture and impurities are completely cleared. If there is moisture, ultra-low temperature of the LNG will lead to rapid condensation of water
  • 15. into ice. Ice may block the intake check valve, air intake, resulting in lax or leakage. If the ice into the cylinder inside, but also may cause poor air supply, so that the engine in the high-speed load when the lack of power or even the engine can not start normally. If there are impurities, not only can cause a variety of valves closed lax, but also lead to filters, regulators and other clogging, there is insufficient gas supply. If the filter is not installed early gas engine, impurities can even cause damage to the engine. (2) a fully filled cylinder of its pressure is very fast, may lead to frequent opening of the safety valve exhaust, not only caused a waste of natural gas, will also bring potential safety problems. Therefore, fully filled with cylinders should be used as soon as possible, try not to store for a long time. (3) in the open return valve when the gas cylinder is deflated, it is best to recycle the air pipe from the filling machine. If not in the filling station, the release of the gas should be brought to a safe place, otherwise there will be a risk of fire and explosion. (4) LNG not only has the characteristics of combustion and explosion, LNG is -162 ℃ ultra-low temperature liquid, fire and explosion at the same time, the use must also improve safety awareness and protection measures to prevent it from low temperature burns. When the skin and low temperature parts and contact with the adhesive, can not be simple and rude to pull, can be 41 ~ 46 ℃ warm water heating method to defrost the flesh, and then remove the frozen parts; such as frostbite should be immediately sent to the hospital for further treatment.