SlideShare a Scribd company logo
1
RESUME
Name : Syed Mahdar B. Mohamed Almashoor
Date of Birth : 16th June 1953
Nationality : Singaporean
Marital Status : Married with two daughters 16yrs and 12yrs
Passport no : S0082676F
Address : Blk 710, Bedok Reservoir Road, #05-3124
Singapore 470710
Driving License : Valid class 3 and own a car
Contact no. : +65-9728-9472 (Hp) / +65-6449-6533 (Res)
Computer Literate : AutoCAD R2014 2D & 3D & Microsoft Office 2013
Email : mahdar@singnet.com.sg
_________________________________________________________________________________
EDUCATION
School Subject Certificate/Year
Geylang Vocational Institute Mech. Engineering NTC 2 / 1972
Dunman Sec. School Academic Sec 3 / 1970
Language Conversation Writing Reading
English Fluent Fluent Fluent
Malay Fluent Fluent Fluent
________________________________________________________________________________
OBJECTIVE
Experiences in Marine, Offshore Topside, Jack-up Rig, Subsea construction, Petrochemical and Chemical plant,
Microelectronic (clean room) in specialtygases,Pharmaceutical industries.Design CAD draftingin mechanical. Process
Piping,Pipeline,structural,wellhead, Sub Sea,coordinatedand siteworked. Worked andtraveledaround SoutheastAsia
region.I’m fastlearned;createnewideas andproblem solver.Ihave experiencein settingup thedrawing office.Lead the
team of draftsmen and standards.
EXPERIENCE AND RESPONSIBILITIES:
Feb.2016 – April 2016 (contract)
Process Designer with BW Offshore Pte Ltd
Report to Lead Process Engineer
 Attached at Process piping department.
 Prepared revision and updated CAD drawings of Process P&ID.
 Checked pipe line interface connection.
 Project for Petroleo Brasilero S.A. FPSO - repair and refurbishment.
Aug. 2015 – Nov. 2015 (contract)
Offshore Pipeline Drafter with PAPE Engineering Pte Ltd (Swiber Offshore Pte Ltd)
Report to Project Manager/ Engineer
 Involved in Project ONGC R-353 C26 Cluster Pipeline.
 Prepared key plan and Riser assembly drawing.
 Location and details of Riser drawings.
 Alignment sheet drawing.
 Including Riser clamp layout and details.
 Worked with the Engineers
2
Oct. 2013 – July 2015
Senior Designer with Calm Oceans Pte Ltd
Report to Director
• New designofMono Column Platform (MCP) OffshoreJack-upRig.
• We are Owner,Charter,build and designofMCP.
• Prepared drawingfor R&D structuralto developa newconcept.
• Worked together with myDirectorwithhis newideainnovation.
 Prepared layoutand details ofMain/Mat deck c/w legcolumnandJackHouse.
 Prepared tender/presentationdrawings for various type of (MCP) Jack upRig.
 Prepared PipingP&ID,Structural details,Mechanical and Electricaldrawings,including 3Ddrawing.
 In chargedof LivingQuarters andHelideck included liaisewithvendors/builder.
 In-charge ofdrawings documentand administrative.OperatedAutoCAD 2014.
Sept. 2012 – Sept. 2013 (Contract)
Senior Designer with Orwell Offshore Pte Ltd
Report to Engineering Manager
Orwell Offshore offers Naval Architecture services to all sectors of the marine industry.The companyhas grown
consistentlysince its inception sixyears ago with offices in UK and Singapore providing services around the
world.The core services the Companyprovides include Mooring systems for FPSO/FSO, vessel conversion
engineering,offshore installation engineering and general marine consultancyand operations supportfor the
marine,oil,gas and renewable energyindustries.
 Prepared proposal drawing for various client on new Turret and SPM mooring system.
 Prepared drawing for R&D work like Swivel stack 6” inlet mechanical drawing.
 Prepared mechanical drawing for 20” Calm Buoy Fluid Swivel.
 Prepared pipework for in and outboard c/w pipe support details and material take off.
 Assist Project Engineer in sourcing out contractors and vendor for project quotation.
 Worked with Engineering Manager, Project Engineer and Design Engineer.
 Operated AutoCAD 2011.
 Project: Rubicon – Galoc Phase 2 Field Development.
Jul 2010 – Aug 2012:
Design Draftsman with DOFSubsea Pte Ltd
Report to Lead Draftsman (Perth Office)
 DOF Subsea is an engineering and design for Subsea Oil n Gas package.
 Base in Singapore office prepared tender drawings and figures for various projects.
 Prepared general arrangement drawing, figure and story board for procedure.
 Prepared engineering construction detail drawings related to Oil & Gas Offshore Subsea packages.
 Layout and details of flow lines, Umbilical, mooring chains and vessel positioning.
 Travel to Perth office for further training in Cad Vault and drawing standard.
 Coordinate my work in Perth as well in Singapore office.
 Coordinate with Project/ Design Engineers and Drafting department in Perth office.
 Attend site work on board various vessels for mobilized.
 Included site inspection of equipment and take as -built dimensions.
 Operated AutoCAD 2010/ 2011.
 Project TGT Phase1/2, Stybarrow and many more.
Jan 2010 – Jul 2010:
Senior Draftsman with UMW Deepnautic Pte Ltd (Joint Venture SWGOffshore Pte Ltd)
Report to Project Manager
 Prepared drawing, figure and story board for procedure.
 Study process lay, routing, profile and details of Flow lines &Umbilical connection.
 Prepared engineering Cad drawings related to Oil & Gas Offshore Subseapackages.
 Layout and details of flow lines, mooring chains and vessel positioning.
 Prepared isometric pipeline spool with lifting slings point.
 Detail fabrication drawing structure module.
 Responsible for drawings and sketches register for outgoing drawings.
3
 Checked drawing details and standard before handover to the Project Engineers.
 Coordinates with Project Engineer related drawings in Australia Perth office.
 Prepared new Tender project drawing and figure.
 Operate AutoCAD 2010 & 3D.
 Project Ruby Phase II FPSO Installation - Vietnam.
 UMW was bought over by DOFSubsea, UMW is closed down on 16.Jul.2010.
 I was transfer to DOFSubsea new office job.
June 2009 – Jan 2010: (Contract)
Lead Draftsman with Kim Heng Marine and Oilfield Pte Ltd
Report to Project Manager
Responsibilities:
 Attached at shipyard site office for the new building of Pipe Lay Barge LB-32 for McDermott.
 Troubleshootandverifiedsite problem such as structural,mechanical,piping, ducting and etc.
 Prepared shop drawing for the fabrication in structural outfitting, mechanical, piping and AHU duct.
 Liaise with the owner representative regards modification and proposed better engineering solution.
 Assist the production supervisors and sub-contractors in engineering drawing on site verification.
 Trouble shoot site problem and rectified immediately.
 Checked all services for clashing at accommodation area, engine room, and Aux machinery room and ramp
enclosure area.
 Attended site meetingwithproduction.
 Operated AutoCAD 2008.
Jul 2006 – May 2009:
Senior Designer with Technip Subsea7 Asia Pacific Pte Ltd
Report to Technical Engineering Manager
Responsibilities:
 Prepared engineering Cad drawings relatedto Oil & Gas OffshoreSubseapackages.Layoutand details of flow
lines, umbilical routing and vessel positioning.
 In-charge of two Designers and Jr. Designer under my supervision.
 Study process lay, routing, profile and details of Flow lines &Umbilical connection.
 Prepared Deck and equipment’s layout for support vessel load-out.
 Prepared study various steel structure assembly design arrangement and details.
 Prepared installation procedure drawing and sketch.
 Prepared isometric pipeline spool with lifting slings point.
 Responsible for drawings and sketches register for outgoing drawings.
 Checked drawing details and standard before handover to the Engineers .
 Developed 3D modeling for rigging and others structure assembly drawings.
 Coordinates related drawings with Australia office in Perth.
 Site visit at yard for drawing As-Built and modification of equipment and structural skid.
 Project TUI Area Development project (NZOP), Woolly butt Development project.
 Project Donghae-1 Gas Field Tie Back Project (Korea)
Aug 2005 – Jun 2006:
Lead Draftsman with Acergy Limited (Formerly Stolt Offshore Pte Ltd)
Report to Technical Engineering Manager
Responsibilities:
 Prepared engineering Cad drawings related to Oil & Gas Offshore Subsea packages.
 Layout and details of flow lines and umbilical routing from wellheads.
 In-charge of two Draftsmen under my supervision and job distribution.
 Study process lay, profile, routing and details of flow lines & umbilical connection.
 Prepared FPU-Semi-rig-AFT & FWD pull-in structure assembly arrangement and details.
 Prepared installation procedure drawing and sketch.
 Work with vary engineers.
 Responsible for drawings and sketches register for outgoing drawings.
 Prepare for Asia Pacific Region drawing standard procedure and guide line.
 Project Dai Hung Field Development project-Flow lines & Umbilical (PVEP)
May 2004 – Aug 2005: (Contract)
MECHANICAL DESIGNER with Oakwell Engineering International Pte Ltd
Reportto Design Engineer
Responsibilities:
 Prepared engineering Cad drawings related to Oil & Gas offshoreplatform packages.
4
 Design,layoutanddetails of equipment’s andprocess pipingpackages system.
 Studyprocess piping routing,details ofpumps connection.
 Prepared P & ID’s andisometricdrawings for pipingtie-in.
 Prepared steelstructural,tanks, pressure vessel,skid layoutand detaildrawings.
 Coordinateatsites w/ varies sub-contractors in mechanicalinspection.
 Prepared billofmaterialandManualDataBook for projectengineer.
 Liaisew/Clientregards thesite modificationandclarification.
 Used AutoCAD2002 & CadWorks3D.
 Project:ChemicalInjectionSkid,PressureReductionSkid,Closed drainVessel.
Dec 2003 – Apr 2004:(Contract)
MECHANICAL DESIGNER with Ionics Asia-PacificPte Ltd
Reportto Project/Construction Manager
Responsibilities:
In-charge ofengineeringCaddrawings & documents control baseatsiteoffice.DetailandDesign,layoutofequipment’s
and process piping system.
 Studyprocess piping plantrouting,details oftransition and pumps connection.
 Prepared P & ID’s andisometricdrawings for pipingtie-in.
 Prepared tanks modification detail drawings.
 Coordinateatsites w/varies sub-contractors in mechanical,pipingandtank.
 Prepared Ultrafilter skid,HeatExchanger,R.O.skid c/w-piping arrangement.
 Liaisew/Clientregards thesite modification.
 UsedAutoCAD LT2004
 Projects:S.TMicroelectronic – AmK8-Phase IIExpansion Ultra-PureWaterProject.
Jul’2002 – Nov 2003:
DESIGNER/ DRAFTSMAN with Meridionale Impianti Singapore Pte Ltd/
SOXAL-M.I. Technologies PTE LTD (Joined Venture Company)
Report to Assistant Project Manager
Responsibilities:
 In-charge engineering departmentincluding control Caddrawingsystem & documents control.
 Coordinateofvarious engineeringprojects.
 Design,layoutanddetails of equipment’s andpipingsystem.
 Studypipingrouting,detailoftransitionandequipmentlayout.
 Prepared P & ID’s andisometricdrawingfor pipingandequipment’s.
 Coordinateatsites w/varies sub-contractors in mechanical, piping,supports andcontrol.
 Liaisew/ConstructionManager for the detail or changedpipingrouting.
 Liaisew/Clientregards theworkorder or sitevariation.
 Used AutoCAD R2002
 Projects:S.TMicroelectronic – AmK6-Phase IIIFit-up,Amk8-Fit-upExpansion,
Amk5 - Fit-up Expansion.
Feb’2002– Jul’2002: (Contract)
Piping DesignDraftsman withJGC(S) PTE LTD
Reportto Piping Head
Responsibilities:
 Prepared piping layout/detail drawingfor GlaxoSmithKline revampproject.
 Prepared isometric piping detail drawingandmaterialtake-off.
 Site checked and measuredfor modification work at Syngas PteLtd.
 Prepared and designpipinglayoutandisomericdrawings for modification.
 Project:SRC,GlaxoSmithKline,Syngas and Power gas.
Dec’2001–Feb’02:(Contract)
Piping Designer/Draftsman with THAMES WATER PROJECT (S) PTE LTD
Reportto ProjectEngineer
The companydoes Water-watertreatmentandprocess system project.
Responsibilities:
 Prepared proposalP & ID’s,pipingandequipment’s layoutandisometric drawings.
 Prepared skid piping layoutanddetails.
 Assistin preparation ofprojectfile for SerayaChemical project.
5
 Prepared operation manualfor Perlis– Power Plantproject.
Jul’2001– Dec’01:(Contract)
Project Engineer/CoordinatorwithChiles Offshore Inc. Owner Rep.(BaseinSingapore officeat
KeppelFels yard.)
(ProjectBasis) - Reportto ProjectManager
Responsibilities:
 Work with ownerrepresentative for the new constructionofthe Jack-upRigMod v Class B.Projectfor
Phillips Petroleum – Bayu-UndanGas Recycle.
 AssistProjectManager in engineeringandconstruction work related.
 Overseas thenewconstructionprojectincludingengineering,workprogress,site queries,weeklymeeting,
equipment’s,vendor and etc.
 Liaised w/RigEngineer,CommissioningManager,Materialcontrollerandetc.
 Liaised and coordinatew/mechanical/structureandpainterinspectors
 Prepared dailyactivities progressreportandtroubleshootproblems.
 Coordinated between Australia and Brownsville offices.
 In-charge ofengineeringdepartmentand documentcontrol.
 Site checked for theconstructionworkprogressin piping,structure,mechanical, equipment’s,outfitting,
wellhead and etc.
 Liaised w/main contractor siteandengineeringofficefor details or information.
 Inspectedallnewequipmentfrom vendor arrivedandcheckeddefect.
 ReviewedallApproval drawings w/comments,prepared inAutoCAD drawing.
 Attended weeklyprogress andinternalmeeting.
Feb’00 – Jul’2001:
DESIGNER/DRAFTSMAN with Meridionale Impianti Singapore Pte Ltd/
SOXAL-M.I. Technologies PTE LTD (Joined Venture)
Report to Assistant Project Manager
New set-upItalian engineering companydealingincleanroom (Microelectronicindustry) for itspecialtygases technology,
before joined venture with Soxal Pte Ltd.
Responsibilities:
Set-up and organized an engineering department including control cad drawing system – create Cad library and
documents control.
 Coordinateofvaries engineeringprojects on site.Design,layoutand details of equipment’s and piping system.
 Study piping routing, detail of transition and equipment layout.
 Prepared P & ID’s, isometric drawing for piping and equipment’s.
 Seconded to ST in Tuas plant for Clean room class 10,000 projects.
 Coordinate w/varies sub-contractors in M&E, builders, sprinkler and control.
 Prepared layout and detail of clean room drawings.
 Used AutoCAD R14andR2000
 Projects:S.TMicroelectronic – Ang Mo Kio 6-PhaseIFit-up,Amk6-PhaseII Tool Hook-up,Amk 8-Fit-up
and Tuas Plant(CleanRoom)
Mar’99- Feb2000:(Contract)
SITE ENGINEER with EC ChemicalTechnologies PteLtd
Reportto Project Manager
EC Chemicalis a consultantandEPC contractor for the project.
Responsibilities:
 Station atsite Pulau Seraya – JurongIsland.
 Supervised theconstructionanderectionofprocess/ utilities piping,storage tanks,pressure vessel,
equipment’s,piping/tanks insulation,steelstructuralerection, civil works andetc.
 Checkedpipingspoolandwitness hydro-testingaccordingto the specification.
 Liaiseandcoordinatewiththe client,main and sub-contractors.
 Planningfor works schedulefor varies disciplines.
 Prepared siteinstruction,checked P & ID’s andIsometric drawings.
 Managed and answercontractor’s sitequeries andvariationorder.
 Involved in commissioning/testing ofequipment’s,mechanical,piping and pumps.
 Prepared sketches for somemodification works to suiton sitesituation.
 Attended weekly,monthlyand commissioningmeeting.
 Project – Croda SingaporePte Ltd [New Plant]TurnkeyProject
 SpecialtyChemicals Complex(Pulau Seraya)
6
Jul1997–Feb1999:
CAD DESIGNER with EC Chemical TechnologiesPte Ltd
Reportto Senior ProjectEngineer
Responsibilities:
 To set-upnew engineeringdepartment anddrawingstandard.
 Includingsetup a Cadlibraryfor quick reference.
 To manageddrawing register andprogress.
 Take-charge ofengineeringdrawingdepartmentandCaddraftsmen.
 Prepared P & ID’s,plantlayout,civilandmechanical,piping drawings.
 Prepared processpipingroutingplanandequipment’s,tanks,vessels layout.
 Liaisewithclient,architectand various consultants.
 Coordinatewithconstructionmanagerfor technical support.
 Included checkingalldrawings relatedto work progress.
 Prepared proposalP&ID drawing for managing director.
 Companyused PDSIntergraph andAutoCAD 2000.
 Basic trainingin PDS Intergraph/Micro station.
 Project – Croda SingaporePte Ltd [New Plant]
 SpecialtyChemicals Complex(Pulau Seraya)
Jan1997 – Jun1997: (Contract)
DESIGNER/ DRAFTSMAN with OffshoreEngineeringDesignPte Ltd
Reportto ManagingDirector
OED is a small engineering consultantcompanyprovidedtechnicalsupportto offshoremarine industry.
Take up various type ofsmallprojectconcerning OffshoreDrillingPlatform and supportmarinevesselfor newand
retrofit.
Responsibilities:
 Prepared shopanddetails ofvarious steelstructures drawingfor fabricator.
 Prepared scheduleandplanningfor the contractors.
 Liaisewithclientandvaries contractors includesitecoordination.
 Prepared purchaseorder and source/purchase ofmaterial.
 Coordinatethe materialandfinishedproductdeliveryto site.
 Involved in installationandsupervisethe contractor.
Dec’94 – Dec1996:
PROJECT ENGINEER with Astratech Pte Ltd.
Report to Director/Senior Project Engineer
Astratech is design/engineering,procurementandconstruction dealingin Marineoffshoretopsides fixed platform
construction relatedto Oil andGas andpetrochemical/chemicalindustry.
Responsibilities:
 Duties include take charges of Total-Exploration Production of Thailand in Songkla - Bongkot Gas
Compression field offshore fixed platform.
 Take-charge ofengineeringdepartmentand Draftsmen.
 Prepared quotation, material take-off, planning and schedule.
 Prepared sketches andlists ofmaterialfor source and purchase.
 Co-ordinates with the prefabrication shop floor, in-house fabrication.
 Involved in load-out of equipment’s and materials for shipment.
 Prefab piping spool, skid, platform, container workshop and etc.
 Hands-on type of working environment supervised and travel to offshore site.
 Prepared engineering, shop drawings and checked before construction
 Liaise with client, QC dept., sub-contractor vendor & surveyor.
 Operated AutoCAD R12, Computer Literate in Microsoft Excel/Word.
 Other project involved in AutoChem Chemical Plant.(Jurong)
 Fabricating and installed of new Hopper structural and piping system in stainless steel A316L material.
 Modification of double jacket piping system stainless steel.
 Company closed down.
7
Apr 1991 - Nov1994:
STRUCTURAL DESIGNER / CHECKER with ComprimoPte Ltd
Reportto Head ofDepartment
Responsibilities:
 SecondedtoShellEastern PulauBukom for period of5 months as a Line Checker- Piping.New
Constructionof"Plat former4 andG.O. HDS” in oil and gas petrochemical processplant.Duties included
checking onOn-Plot,Off-Plot,Utilities and processline.Witness HydroandAir Test.
 Liaiseandco-ordinate with the mainandsub-contractors.
 Designlayoutanddetails ofsteelstructuralrelatedto Oil andGas petrochemical /Offshore Platform
Topside module.
 In-charge team ofdesign draftsman’s including checkingofdrawings,prepareddrawinglists andstandard
drawings.
 Went toMyanmar for project surveyinOnshore DrillingGas Pipeline project – 50Km.
 Co-ordinatewithProjectEngineer and otherdepartmentrelatedto work.
 Attend meetingwithclientandcoordinatesitework.
 OperatedAutoCADRelease 10 /11.
 Projects:
 BruneiShellPetroleum – Ampa-9Gas CompressionTopsides Platform
 ShellEasternPetroleum- PulauBukom (Island)
 SRU, Super Claus & CogenerationPlant - ShellPulauBukom
EXPERIENCE OBTAINED PRIOR TO JOINING COMPRIMO:
1990 –April1991 :
DESIGNER DRAFTMAN with MEI Project Engineer Pte Ltd
Reportto Engineering Manager.
Responsibilities:
 Designlayoutanddetails for process piping relatedto chemicalplant.
 Prepared isometric,development,support,tanks,details andmaterial-take-Off.
 SecondedtoIndonesia,West Java - Merakfor 8 months as a Site Construction Engineer/Manager
Responsibilities:
 To manage,superviseandcoordinatethe sitework for newconstruction for the EDC ChemicalPlant.
 The constructionanderectionofsteel structural,processpiping,tanks,pressurevessel,pipeline,M&E,
instrumentation,painting,Civiland etc.
 Coordinatewithallsub-contractors jobto relate.
 RepresentedClientas CONSULTANTto in-charge thevarious contractors
 Attend weeklymeeting with clientandsub-contractors for work progress.
 Prepareprogresspayment andvariation claimed for contractors.
 Troubleshoots and solvedvarious problems onsite.
 Answer alltechnicalqueries and verificationworks.
Jan 1990 – Dec1990:
ENGINEERING DESIGNER with VetcoGrayPetroleumEquipment (S) Pte Ltd
Reportto Engineering Manager
Responsibilities:
 Vetco Gray manufacturingofWellheadsUnit andDrillpipes.
 Developmentnewdesignofequipmentthatis requiredbySales orders.
 Preparedesign sketches and gave to the Draftsman to completethe details.
 Includethe supervisionofmechanicalandCadDraftsmen.
 Developing new conceptand detaildesign to improve the system.
 Bills ofmaterial for new designcomplywithAPI6ASpecification.
 In-house training for productknowledge base onAPI6Aspecification.
 Coordinatewiththe machineshopfloor and testing department.
 Relatedto Oil fielddrillingWellhead(Christmastree) equipmentfor surface and subseac/w casing(Landand
Offshore) andpreparedtesting procedure after individual projectcompleted.
 Designon manualdrafting.
8
Mar 1989 -Dec1989:[Contract for 10 months]
DRAFTSMAN SUPERVISOR withComex Services (Singapore) /PT.Komaritim (Indonesia)
Reportto BaseManager/ProjectManager
Secondedto Balikpapan - Indonesia atHandilII- marineBasefor construction of Gas ProductionPlatform for
TotalIndonesia.( Fabricate ofTop Structure for shallowwater andpipeline)
Responsibilities:
 To set upa new drawingoffice and in-chargeoffive localDraftsmen.
 To set-up engineering drawing officeanddrafting standard.
 Prepared shops andcuttingdrawings for steelstructuralfor fabrication.
 Prepared processisometric pipingspooldrawingsfor fabrication.
 6” pipeline crossing involvedin fabrication spool drawings.
 To supervise and checkedengineeringproductionshop drawings.
 Trouble shoots some difficultiesengineeringdesignwork.
 Involved in daily meeting withalldepartmentheads for work progress.
 Performedphotographyon work progress andsitechecked.
 LiaisewithClient,ProjectManager,Superintendent andSupervisors.
 Work closelywith QA/QC dept.for materialsite inspection.
 Project:TunuGas Field for TotalIndonesia.
Jan 1986 - Feb 1989:
ENGINEERING COORDINATOR / DRAFTSMAN with AssuredSafetyTechnology(Asia) PteLtd/ Nexus Holding
Pte LtdOil IndustryServices A/S /LAMPARA PTE LTD
Reportto Engineer and ManagingDirector
Responsibilities:
 Companyinvolvedin designand engineering ofAluminum Helideck.
 Preparationofproposalandconstructiondrawings for onshoreand offshoredrilling/production
(SemiandJack-upRigs) platformmodule andmarine vessel.
 Layoutdetail and designofaluminum structures accordanceto specs.
 Prepared billofmaterialandtake-offandresourcefor purchase.
 Site coordination,prepared quotationandR&Dwork.
 Liaisewithclientandcontractorincludingpurchasingofequipment’s.
 Site supervision ofconstructionand photographywork for progress ofallprojects undertakenbythe
company.
 Builta proto-type ofHelideckand testing for experiment.
 Projects:
 Supplied13mx13m SteelHelideck for FrenchVessel
 12mx12m OctagonHelideck c/w supportstructureon top ofliving Quarters for Trainingbarge
(Batam InternationalTrainingCentre)
1980 – Dec 1985:
DETAILED DRAFTSMAN with IpcomarinePte Ltd
Reportto Engineering Manager /Senior Engineer
Responsibilities:
 Stationed atOffshoredivision withProjectteam from Houston.
 Prepared ofdetail drawings for Jacket modulusandTopside offshore Drillingplatform,relatedto process
oil and gas offshoreindustry.
 Detailedsteelstructuralandrevisioninclude instrumentation layoutand isometric piping.(ManualDrafting)
 Involved in load-out of Topside/Jacketmodule,prepared layoutdrawing.
 As-built of piping layout anddetailingof marine jettyincluding
 Material-take-off andrevision
 Perform photographyworkatsiteprogressofall projects
 Detailedincludes marinedolphin,walkway,lightingpoles c/w platform,pier-head,trestle,piles andfenders
mounting c/w M.T.O.
 Prepared pipinglayout anddetails,isometric,development andsupport.
 Involved in layoutof pipeline lay36" diameteronshoretooffshore.(Emergencyloading terminal)to SBM
 Preparedgeological/geophysicalmappingof pipeline routing.
 Constructedpipeline profileandlayout planfor surveyor.
Project:
 IranianGovernment Project – Nosrat - OffshoreTopside & Jacket legPlatform.
 IranianGovernment Project – Pipelinefrom main landto Offshore Island.
 Jetty& Road- Sipitang– Sabah
 Jetty- Johor Port PasirGudang
9
After completedmyengineering school,Iworkedas a PipeWelder (grade 1)
(SubseaPipeweldfrom 24”– 48” Dia) for about4 years.
I was offeredto jointhe same companyas a JuniorDraftsman from thereI was givena trainingand work for two
years.
Later Iexploredmycareerin differentvarious fieldto gainmore engineeringexperienceand takemorechallenging
career.
Work andTravel
 To BalikpapanIndonesiain Handil2 (remote areain Kalimantan)Rigconstructionfor sallowwater.
 To WestJava in Merak,new buildChemicalplantconstructionsite.
 To Thailand Songkla – Offshore work with Total
 To Myanmar,gas field for surveyofpipeline.
 To AustraliaPerth– attached at DOFofficeworkingfor 2 months
I have attendedAutoCADsoftwaretraining:
 3D Inventor for 5 days (2007)more onmanufacturingindustry.
 3D Plantfor 3 daycourse(2014) butnotapplicablefor the offshoreindustry.
 Hand on CAD works 3D for 1 month.

More Related Content

What's hot

EDUARDO H. PARE CV
EDUARDO H. PARE CVEDUARDO H. PARE CV
EDUARDO H. PARE CV
Eduardo H. Pare
 
Structural ENgineer (Civil)
Structural ENgineer (Civil)Structural ENgineer (Civil)
Structural ENgineer (Civil)
Phani Krisha
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designerbharath kumar
 
Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerWan Sazali
 
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGERCV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
AZHAR QAZI
 
Hamdy hussien cv resident engineer
Hamdy hussien cv resident engineerHamdy hussien cv resident engineer
Hamdy hussien cv resident engineerhamdyhussien
 
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS ExperienceCV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS ExperienceSameh Sameh
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 
CV-Mechanical Engineer.
CV-Mechanical Engineer.CV-Mechanical Engineer.
CV-Mechanical Engineer.AZHAR QAZI
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_VEERAKAMU C
 
CIVIL / STRUCTURAL DESIGN ENGINEER
CIVIL / STRUCTURAL DESIGN ENGINEERCIVIL / STRUCTURAL DESIGN ENGINEER
CIVIL / STRUCTURAL DESIGN ENGINEER
Vinobha K
 
Ahmed hussain draftsman_cv_
Ahmed hussain draftsman_cv_Ahmed hussain draftsman_cv_
Ahmed hussain draftsman_cv_
Ahmed Hussain Syed
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah
 

What's hot (20)

EDUARDO H. PARE CV
EDUARDO H. PARE CVEDUARDO H. PARE CV
EDUARDO H. PARE CV
 
Structural ENgineer (Civil)
Structural ENgineer (Civil)Structural ENgineer (Civil)
Structural ENgineer (Civil)
 
Nirmal_Resume
Nirmal_ResumeNirmal_Resume
Nirmal_Resume
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
 
Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping Designer
 
Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)
 
Abdullah's Resume
Abdullah's ResumeAbdullah's Resume
Abdullah's Resume
 
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGERCV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
 
Hamdy hussien cv resident engineer
Hamdy hussien cv resident engineerHamdy hussien cv resident engineer
Hamdy hussien cv resident engineer
 
updated CV
updated CVupdated CV
updated CV
 
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS ExperienceCV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
 
ARafer Resume
ARafer ResumeARafer Resume
ARafer Resume
 
Chakradhara Rao_CV
Chakradhara Rao_CVChakradhara Rao_CV
Chakradhara Rao_CV
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
CV-Mechanical Engineer.
CV-Mechanical Engineer.CV-Mechanical Engineer.
CV-Mechanical Engineer.
 
NAEEM CV
NAEEM CVNAEEM CV
NAEEM CV
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
 
CIVIL / STRUCTURAL DESIGN ENGINEER
CIVIL / STRUCTURAL DESIGN ENGINEERCIVIL / STRUCTURAL DESIGN ENGINEER
CIVIL / STRUCTURAL DESIGN ENGINEER
 
Ahmed hussain draftsman_cv_
Ahmed hussain draftsman_cv_Ahmed hussain draftsman_cv_
Ahmed hussain draftsman_cv_
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
 

Viewers also liked

Riding a moonbeam into a year of hope
Riding a moonbeam into a year of hopeRiding a moonbeam into a year of hope
Riding a moonbeam into a year of hope
Saxbee Consultants
 
Andrographis 穿心莲
Andrographis 穿心莲Andrographis 穿心莲
Andrographis 穿心莲
S6830739B
 
Séance 1 Who are you?
Séance 1 Who are you?Séance 1 Who are you?
Séance 1 Who are you?
Sarah Padlock
 
Word Fun1t+What is this? คำศัพท์เกี่ยวกับสัตว์ต่างๆ1+ป.1+110+dltvengp1+54word...
Word Fun1t+What is this? คำศัพท์เกี่ยวกับสัตว์ต่างๆ1+ป.1+110+dltvengp1+54word...Word Fun1t+What is this? คำศัพท์เกี่ยวกับสัตว์ต่างๆ1+ป.1+110+dltvengp1+54word...
Word Fun1t+What is this? คำศัพท์เกี่ยวกับสัตว์ต่างๆ1+ป.1+110+dltvengp1+54word...
Prachoom Rangkasikorn
 
5 growth stocks 24-04-16
5 growth stocks 24-04-165 growth stocks 24-04-16
5 growth stocks 24-04-16
sublimefinancialadvisory
 
Structure of Transmission System in India
Structure of Transmission System in IndiaStructure of Transmission System in India
Structure of Transmission System in India
Himanshu Pathak
 
Trichomoniasis
TrichomoniasisTrichomoniasis
Trichomoniasislrnzwmal
 

Viewers also liked (8)

Riding a moonbeam into a year of hope
Riding a moonbeam into a year of hopeRiding a moonbeam into a year of hope
Riding a moonbeam into a year of hope
 
Andrographis 穿心莲
Andrographis 穿心莲Andrographis 穿心莲
Andrographis 穿心莲
 
Séance 1 Who are you?
Séance 1 Who are you?Séance 1 Who are you?
Séance 1 Who are you?
 
Word Fun1t+What is this? คำศัพท์เกี่ยวกับสัตว์ต่างๆ1+ป.1+110+dltvengp1+54word...
Word Fun1t+What is this? คำศัพท์เกี่ยวกับสัตว์ต่างๆ1+ป.1+110+dltvengp1+54word...Word Fun1t+What is this? คำศัพท์เกี่ยวกับสัตว์ต่างๆ1+ป.1+110+dltvengp1+54word...
Word Fun1t+What is this? คำศัพท์เกี่ยวกับสัตว์ต่างๆ1+ป.1+110+dltvengp1+54word...
 
5 growth stocks 24-04-16
5 growth stocks 24-04-165 growth stocks 24-04-16
5 growth stocks 24-04-16
 
Structure of Transmission System in India
Structure of Transmission System in IndiaStructure of Transmission System in India
Structure of Transmission System in India
 
CA fishkeeping
CA fishkeepingCA fishkeeping
CA fishkeeping
 
Trichomoniasis
TrichomoniasisTrichomoniasis
Trichomoniasis
 

Similar to SM CV2016

Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerNazrul Mokhtar
 
EZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEloisa Zuniga-Bonavente
 
Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Pintu Darji
 
Mvcv v10
Mvcv v10Mvcv v10
Mvcv v10
Michael Vaux
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian Rowell
 
RESUME Updated - with photo
RESUME Updated - with photoRESUME Updated - with photo
RESUME Updated - with photoronnie luneta
 
Vinod kumar senior structural lead engineer
Vinod kumar  senior structural lead  engineerVinod kumar  senior structural lead  engineer
Vinod kumar senior structural lead engineer
Vinodh Kumar
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
MohamedZidan85
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M RicoRene Rico
 
Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea
 

Similar to SM CV2016 (20)

Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping Designer
 
EZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural Engineer
 
RESUME DJT van der Merwe
RESUME DJT van der MerweRESUME DJT van der Merwe
RESUME DJT van der Merwe
 
john jacob cv
john jacob cvjohn jacob cv
john jacob cv
 
AL-WarrenCV2016
AL-WarrenCV2016AL-WarrenCV2016
AL-WarrenCV2016
 
Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.
 
Amitava_resume
Amitava_resumeAmitava_resume
Amitava_resume
 
Mvcv v10
Mvcv v10Mvcv v10
Mvcv v10
 
Derek Pattison CV1
Derek Pattison CV1Derek Pattison CV1
Derek Pattison CV1
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015
 
RESUME Updated - with photo
RESUME Updated - with photoRESUME Updated - with photo
RESUME Updated - with photo
 
Vinod kumar senior structural lead engineer
Vinod kumar  senior structural lead  engineerVinod kumar  senior structural lead  engineer
Vinod kumar senior structural lead engineer
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
 
LEE CV
LEE CVLEE CV
LEE CV
 
niladri-2014
niladri-2014niladri-2014
niladri-2014
 
Bassam Shamkhi - UAE
Bassam Shamkhi - UAEBassam Shamkhi - UAE
Bassam Shamkhi - UAE
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea. CV October 2016
Richard Kildea. CV October 2016
 
Amar Updated CV
Amar Updated CVAmar Updated CV
Amar Updated CV
 

SM CV2016

  • 1. 1 RESUME Name : Syed Mahdar B. Mohamed Almashoor Date of Birth : 16th June 1953 Nationality : Singaporean Marital Status : Married with two daughters 16yrs and 12yrs Passport no : S0082676F Address : Blk 710, Bedok Reservoir Road, #05-3124 Singapore 470710 Driving License : Valid class 3 and own a car Contact no. : +65-9728-9472 (Hp) / +65-6449-6533 (Res) Computer Literate : AutoCAD R2014 2D & 3D & Microsoft Office 2013 Email : mahdar@singnet.com.sg _________________________________________________________________________________ EDUCATION School Subject Certificate/Year Geylang Vocational Institute Mech. Engineering NTC 2 / 1972 Dunman Sec. School Academic Sec 3 / 1970 Language Conversation Writing Reading English Fluent Fluent Fluent Malay Fluent Fluent Fluent ________________________________________________________________________________ OBJECTIVE Experiences in Marine, Offshore Topside, Jack-up Rig, Subsea construction, Petrochemical and Chemical plant, Microelectronic (clean room) in specialtygases,Pharmaceutical industries.Design CAD draftingin mechanical. Process Piping,Pipeline,structural,wellhead, Sub Sea,coordinatedand siteworked. Worked andtraveledaround SoutheastAsia region.I’m fastlearned;createnewideas andproblem solver.Ihave experiencein settingup thedrawing office.Lead the team of draftsmen and standards. EXPERIENCE AND RESPONSIBILITIES: Feb.2016 – April 2016 (contract) Process Designer with BW Offshore Pte Ltd Report to Lead Process Engineer  Attached at Process piping department.  Prepared revision and updated CAD drawings of Process P&ID.  Checked pipe line interface connection.  Project for Petroleo Brasilero S.A. FPSO - repair and refurbishment. Aug. 2015 – Nov. 2015 (contract) Offshore Pipeline Drafter with PAPE Engineering Pte Ltd (Swiber Offshore Pte Ltd) Report to Project Manager/ Engineer  Involved in Project ONGC R-353 C26 Cluster Pipeline.  Prepared key plan and Riser assembly drawing.  Location and details of Riser drawings.  Alignment sheet drawing.  Including Riser clamp layout and details.  Worked with the Engineers
  • 2. 2 Oct. 2013 – July 2015 Senior Designer with Calm Oceans Pte Ltd Report to Director • New designofMono Column Platform (MCP) OffshoreJack-upRig. • We are Owner,Charter,build and designofMCP. • Prepared drawingfor R&D structuralto developa newconcept. • Worked together with myDirectorwithhis newideainnovation.  Prepared layoutand details ofMain/Mat deck c/w legcolumnandJackHouse.  Prepared tender/presentationdrawings for various type of (MCP) Jack upRig.  Prepared PipingP&ID,Structural details,Mechanical and Electricaldrawings,including 3Ddrawing.  In chargedof LivingQuarters andHelideck included liaisewithvendors/builder.  In-charge ofdrawings documentand administrative.OperatedAutoCAD 2014. Sept. 2012 – Sept. 2013 (Contract) Senior Designer with Orwell Offshore Pte Ltd Report to Engineering Manager Orwell Offshore offers Naval Architecture services to all sectors of the marine industry.The companyhas grown consistentlysince its inception sixyears ago with offices in UK and Singapore providing services around the world.The core services the Companyprovides include Mooring systems for FPSO/FSO, vessel conversion engineering,offshore installation engineering and general marine consultancyand operations supportfor the marine,oil,gas and renewable energyindustries.  Prepared proposal drawing for various client on new Turret and SPM mooring system.  Prepared drawing for R&D work like Swivel stack 6” inlet mechanical drawing.  Prepared mechanical drawing for 20” Calm Buoy Fluid Swivel.  Prepared pipework for in and outboard c/w pipe support details and material take off.  Assist Project Engineer in sourcing out contractors and vendor for project quotation.  Worked with Engineering Manager, Project Engineer and Design Engineer.  Operated AutoCAD 2011.  Project: Rubicon – Galoc Phase 2 Field Development. Jul 2010 – Aug 2012: Design Draftsman with DOFSubsea Pte Ltd Report to Lead Draftsman (Perth Office)  DOF Subsea is an engineering and design for Subsea Oil n Gas package.  Base in Singapore office prepared tender drawings and figures for various projects.  Prepared general arrangement drawing, figure and story board for procedure.  Prepared engineering construction detail drawings related to Oil & Gas Offshore Subsea packages.  Layout and details of flow lines, Umbilical, mooring chains and vessel positioning.  Travel to Perth office for further training in Cad Vault and drawing standard.  Coordinate my work in Perth as well in Singapore office.  Coordinate with Project/ Design Engineers and Drafting department in Perth office.  Attend site work on board various vessels for mobilized.  Included site inspection of equipment and take as -built dimensions.  Operated AutoCAD 2010/ 2011.  Project TGT Phase1/2, Stybarrow and many more. Jan 2010 – Jul 2010: Senior Draftsman with UMW Deepnautic Pte Ltd (Joint Venture SWGOffshore Pte Ltd) Report to Project Manager  Prepared drawing, figure and story board for procedure.  Study process lay, routing, profile and details of Flow lines &Umbilical connection.  Prepared engineering Cad drawings related to Oil & Gas Offshore Subseapackages.  Layout and details of flow lines, mooring chains and vessel positioning.  Prepared isometric pipeline spool with lifting slings point.  Detail fabrication drawing structure module.  Responsible for drawings and sketches register for outgoing drawings.
  • 3. 3  Checked drawing details and standard before handover to the Project Engineers.  Coordinates with Project Engineer related drawings in Australia Perth office.  Prepared new Tender project drawing and figure.  Operate AutoCAD 2010 & 3D.  Project Ruby Phase II FPSO Installation - Vietnam.  UMW was bought over by DOFSubsea, UMW is closed down on 16.Jul.2010.  I was transfer to DOFSubsea new office job. June 2009 – Jan 2010: (Contract) Lead Draftsman with Kim Heng Marine and Oilfield Pte Ltd Report to Project Manager Responsibilities:  Attached at shipyard site office for the new building of Pipe Lay Barge LB-32 for McDermott.  Troubleshootandverifiedsite problem such as structural,mechanical,piping, ducting and etc.  Prepared shop drawing for the fabrication in structural outfitting, mechanical, piping and AHU duct.  Liaise with the owner representative regards modification and proposed better engineering solution.  Assist the production supervisors and sub-contractors in engineering drawing on site verification.  Trouble shoot site problem and rectified immediately.  Checked all services for clashing at accommodation area, engine room, and Aux machinery room and ramp enclosure area.  Attended site meetingwithproduction.  Operated AutoCAD 2008. Jul 2006 – May 2009: Senior Designer with Technip Subsea7 Asia Pacific Pte Ltd Report to Technical Engineering Manager Responsibilities:  Prepared engineering Cad drawings relatedto Oil & Gas OffshoreSubseapackages.Layoutand details of flow lines, umbilical routing and vessel positioning.  In-charge of two Designers and Jr. Designer under my supervision.  Study process lay, routing, profile and details of Flow lines &Umbilical connection.  Prepared Deck and equipment’s layout for support vessel load-out.  Prepared study various steel structure assembly design arrangement and details.  Prepared installation procedure drawing and sketch.  Prepared isometric pipeline spool with lifting slings point.  Responsible for drawings and sketches register for outgoing drawings.  Checked drawing details and standard before handover to the Engineers .  Developed 3D modeling for rigging and others structure assembly drawings.  Coordinates related drawings with Australia office in Perth.  Site visit at yard for drawing As-Built and modification of equipment and structural skid.  Project TUI Area Development project (NZOP), Woolly butt Development project.  Project Donghae-1 Gas Field Tie Back Project (Korea) Aug 2005 – Jun 2006: Lead Draftsman with Acergy Limited (Formerly Stolt Offshore Pte Ltd) Report to Technical Engineering Manager Responsibilities:  Prepared engineering Cad drawings related to Oil & Gas Offshore Subsea packages.  Layout and details of flow lines and umbilical routing from wellheads.  In-charge of two Draftsmen under my supervision and job distribution.  Study process lay, profile, routing and details of flow lines & umbilical connection.  Prepared FPU-Semi-rig-AFT & FWD pull-in structure assembly arrangement and details.  Prepared installation procedure drawing and sketch.  Work with vary engineers.  Responsible for drawings and sketches register for outgoing drawings.  Prepare for Asia Pacific Region drawing standard procedure and guide line.  Project Dai Hung Field Development project-Flow lines & Umbilical (PVEP) May 2004 – Aug 2005: (Contract) MECHANICAL DESIGNER with Oakwell Engineering International Pte Ltd Reportto Design Engineer Responsibilities:  Prepared engineering Cad drawings related to Oil & Gas offshoreplatform packages.
  • 4. 4  Design,layoutanddetails of equipment’s andprocess pipingpackages system.  Studyprocess piping routing,details ofpumps connection.  Prepared P & ID’s andisometricdrawings for pipingtie-in.  Prepared steelstructural,tanks, pressure vessel,skid layoutand detaildrawings.  Coordinateatsites w/ varies sub-contractors in mechanicalinspection.  Prepared billofmaterialandManualDataBook for projectengineer.  Liaisew/Clientregards thesite modificationandclarification.  Used AutoCAD2002 & CadWorks3D.  Project:ChemicalInjectionSkid,PressureReductionSkid,Closed drainVessel. Dec 2003 – Apr 2004:(Contract) MECHANICAL DESIGNER with Ionics Asia-PacificPte Ltd Reportto Project/Construction Manager Responsibilities: In-charge ofengineeringCaddrawings & documents control baseatsiteoffice.DetailandDesign,layoutofequipment’s and process piping system.  Studyprocess piping plantrouting,details oftransition and pumps connection.  Prepared P & ID’s andisometricdrawings for pipingtie-in.  Prepared tanks modification detail drawings.  Coordinateatsites w/varies sub-contractors in mechanical,pipingandtank.  Prepared Ultrafilter skid,HeatExchanger,R.O.skid c/w-piping arrangement.  Liaisew/Clientregards thesite modification.  UsedAutoCAD LT2004  Projects:S.TMicroelectronic – AmK8-Phase IIExpansion Ultra-PureWaterProject. Jul’2002 – Nov 2003: DESIGNER/ DRAFTSMAN with Meridionale Impianti Singapore Pte Ltd/ SOXAL-M.I. Technologies PTE LTD (Joined Venture Company) Report to Assistant Project Manager Responsibilities:  In-charge engineering departmentincluding control Caddrawingsystem & documents control.  Coordinateofvarious engineeringprojects.  Design,layoutanddetails of equipment’s andpipingsystem.  Studypipingrouting,detailoftransitionandequipmentlayout.  Prepared P & ID’s andisometricdrawingfor pipingandequipment’s.  Coordinateatsites w/varies sub-contractors in mechanical, piping,supports andcontrol.  Liaisew/ConstructionManager for the detail or changedpipingrouting.  Liaisew/Clientregards theworkorder or sitevariation.  Used AutoCAD R2002  Projects:S.TMicroelectronic – AmK6-Phase IIIFit-up,Amk8-Fit-upExpansion, Amk5 - Fit-up Expansion. Feb’2002– Jul’2002: (Contract) Piping DesignDraftsman withJGC(S) PTE LTD Reportto Piping Head Responsibilities:  Prepared piping layout/detail drawingfor GlaxoSmithKline revampproject.  Prepared isometric piping detail drawingandmaterialtake-off.  Site checked and measuredfor modification work at Syngas PteLtd.  Prepared and designpipinglayoutandisomericdrawings for modification.  Project:SRC,GlaxoSmithKline,Syngas and Power gas. Dec’2001–Feb’02:(Contract) Piping Designer/Draftsman with THAMES WATER PROJECT (S) PTE LTD Reportto ProjectEngineer The companydoes Water-watertreatmentandprocess system project. Responsibilities:  Prepared proposalP & ID’s,pipingandequipment’s layoutandisometric drawings.  Prepared skid piping layoutanddetails.  Assistin preparation ofprojectfile for SerayaChemical project.
  • 5. 5  Prepared operation manualfor Perlis– Power Plantproject. Jul’2001– Dec’01:(Contract) Project Engineer/CoordinatorwithChiles Offshore Inc. Owner Rep.(BaseinSingapore officeat KeppelFels yard.) (ProjectBasis) - Reportto ProjectManager Responsibilities:  Work with ownerrepresentative for the new constructionofthe Jack-upRigMod v Class B.Projectfor Phillips Petroleum – Bayu-UndanGas Recycle.  AssistProjectManager in engineeringandconstruction work related.  Overseas thenewconstructionprojectincludingengineering,workprogress,site queries,weeklymeeting, equipment’s,vendor and etc.  Liaised w/RigEngineer,CommissioningManager,Materialcontrollerandetc.  Liaised and coordinatew/mechanical/structureandpainterinspectors  Prepared dailyactivities progressreportandtroubleshootproblems.  Coordinated between Australia and Brownsville offices.  In-charge ofengineeringdepartmentand documentcontrol.  Site checked for theconstructionworkprogressin piping,structure,mechanical, equipment’s,outfitting, wellhead and etc.  Liaised w/main contractor siteandengineeringofficefor details or information.  Inspectedallnewequipmentfrom vendor arrivedandcheckeddefect.  ReviewedallApproval drawings w/comments,prepared inAutoCAD drawing.  Attended weeklyprogress andinternalmeeting. Feb’00 – Jul’2001: DESIGNER/DRAFTSMAN with Meridionale Impianti Singapore Pte Ltd/ SOXAL-M.I. Technologies PTE LTD (Joined Venture) Report to Assistant Project Manager New set-upItalian engineering companydealingincleanroom (Microelectronicindustry) for itspecialtygases technology, before joined venture with Soxal Pte Ltd. Responsibilities: Set-up and organized an engineering department including control cad drawing system – create Cad library and documents control.  Coordinateofvaries engineeringprojects on site.Design,layoutand details of equipment’s and piping system.  Study piping routing, detail of transition and equipment layout.  Prepared P & ID’s, isometric drawing for piping and equipment’s.  Seconded to ST in Tuas plant for Clean room class 10,000 projects.  Coordinate w/varies sub-contractors in M&E, builders, sprinkler and control.  Prepared layout and detail of clean room drawings.  Used AutoCAD R14andR2000  Projects:S.TMicroelectronic – Ang Mo Kio 6-PhaseIFit-up,Amk6-PhaseII Tool Hook-up,Amk 8-Fit-up and Tuas Plant(CleanRoom) Mar’99- Feb2000:(Contract) SITE ENGINEER with EC ChemicalTechnologies PteLtd Reportto Project Manager EC Chemicalis a consultantandEPC contractor for the project. Responsibilities:  Station atsite Pulau Seraya – JurongIsland.  Supervised theconstructionanderectionofprocess/ utilities piping,storage tanks,pressure vessel, equipment’s,piping/tanks insulation,steelstructuralerection, civil works andetc.  Checkedpipingspoolandwitness hydro-testingaccordingto the specification.  Liaiseandcoordinatewiththe client,main and sub-contractors.  Planningfor works schedulefor varies disciplines.  Prepared siteinstruction,checked P & ID’s andIsometric drawings.  Managed and answercontractor’s sitequeries andvariationorder.  Involved in commissioning/testing ofequipment’s,mechanical,piping and pumps.  Prepared sketches for somemodification works to suiton sitesituation.  Attended weekly,monthlyand commissioningmeeting.  Project – Croda SingaporePte Ltd [New Plant]TurnkeyProject  SpecialtyChemicals Complex(Pulau Seraya)
  • 6. 6 Jul1997–Feb1999: CAD DESIGNER with EC Chemical TechnologiesPte Ltd Reportto Senior ProjectEngineer Responsibilities:  To set-upnew engineeringdepartment anddrawingstandard.  Includingsetup a Cadlibraryfor quick reference.  To manageddrawing register andprogress.  Take-charge ofengineeringdrawingdepartmentandCaddraftsmen.  Prepared P & ID’s,plantlayout,civilandmechanical,piping drawings.  Prepared processpipingroutingplanandequipment’s,tanks,vessels layout.  Liaisewithclient,architectand various consultants.  Coordinatewithconstructionmanagerfor technical support.  Included checkingalldrawings relatedto work progress.  Prepared proposalP&ID drawing for managing director.  Companyused PDSIntergraph andAutoCAD 2000.  Basic trainingin PDS Intergraph/Micro station.  Project – Croda SingaporePte Ltd [New Plant]  SpecialtyChemicals Complex(Pulau Seraya) Jan1997 – Jun1997: (Contract) DESIGNER/ DRAFTSMAN with OffshoreEngineeringDesignPte Ltd Reportto ManagingDirector OED is a small engineering consultantcompanyprovidedtechnicalsupportto offshoremarine industry. Take up various type ofsmallprojectconcerning OffshoreDrillingPlatform and supportmarinevesselfor newand retrofit. Responsibilities:  Prepared shopanddetails ofvarious steelstructures drawingfor fabricator.  Prepared scheduleandplanningfor the contractors.  Liaisewithclientandvaries contractors includesitecoordination.  Prepared purchaseorder and source/purchase ofmaterial.  Coordinatethe materialandfinishedproductdeliveryto site.  Involved in installationandsupervisethe contractor. Dec’94 – Dec1996: PROJECT ENGINEER with Astratech Pte Ltd. Report to Director/Senior Project Engineer Astratech is design/engineering,procurementandconstruction dealingin Marineoffshoretopsides fixed platform construction relatedto Oil andGas andpetrochemical/chemicalindustry. Responsibilities:  Duties include take charges of Total-Exploration Production of Thailand in Songkla - Bongkot Gas Compression field offshore fixed platform.  Take-charge ofengineeringdepartmentand Draftsmen.  Prepared quotation, material take-off, planning and schedule.  Prepared sketches andlists ofmaterialfor source and purchase.  Co-ordinates with the prefabrication shop floor, in-house fabrication.  Involved in load-out of equipment’s and materials for shipment.  Prefab piping spool, skid, platform, container workshop and etc.  Hands-on type of working environment supervised and travel to offshore site.  Prepared engineering, shop drawings and checked before construction  Liaise with client, QC dept., sub-contractor vendor & surveyor.  Operated AutoCAD R12, Computer Literate in Microsoft Excel/Word.  Other project involved in AutoChem Chemical Plant.(Jurong)  Fabricating and installed of new Hopper structural and piping system in stainless steel A316L material.  Modification of double jacket piping system stainless steel.  Company closed down.
  • 7. 7 Apr 1991 - Nov1994: STRUCTURAL DESIGNER / CHECKER with ComprimoPte Ltd Reportto Head ofDepartment Responsibilities:  SecondedtoShellEastern PulauBukom for period of5 months as a Line Checker- Piping.New Constructionof"Plat former4 andG.O. HDS” in oil and gas petrochemical processplant.Duties included checking onOn-Plot,Off-Plot,Utilities and processline.Witness HydroandAir Test.  Liaiseandco-ordinate with the mainandsub-contractors.  Designlayoutanddetails ofsteelstructuralrelatedto Oil andGas petrochemical /Offshore Platform Topside module.  In-charge team ofdesign draftsman’s including checkingofdrawings,prepareddrawinglists andstandard drawings.  Went toMyanmar for project surveyinOnshore DrillingGas Pipeline project – 50Km.  Co-ordinatewithProjectEngineer and otherdepartmentrelatedto work.  Attend meetingwithclientandcoordinatesitework.  OperatedAutoCADRelease 10 /11.  Projects:  BruneiShellPetroleum – Ampa-9Gas CompressionTopsides Platform  ShellEasternPetroleum- PulauBukom (Island)  SRU, Super Claus & CogenerationPlant - ShellPulauBukom EXPERIENCE OBTAINED PRIOR TO JOINING COMPRIMO: 1990 –April1991 : DESIGNER DRAFTMAN with MEI Project Engineer Pte Ltd Reportto Engineering Manager. Responsibilities:  Designlayoutanddetails for process piping relatedto chemicalplant.  Prepared isometric,development,support,tanks,details andmaterial-take-Off.  SecondedtoIndonesia,West Java - Merakfor 8 months as a Site Construction Engineer/Manager Responsibilities:  To manage,superviseandcoordinatethe sitework for newconstruction for the EDC ChemicalPlant.  The constructionanderectionofsteel structural,processpiping,tanks,pressurevessel,pipeline,M&E, instrumentation,painting,Civiland etc.  Coordinatewithallsub-contractors jobto relate.  RepresentedClientas CONSULTANTto in-charge thevarious contractors  Attend weeklymeeting with clientandsub-contractors for work progress.  Prepareprogresspayment andvariation claimed for contractors.  Troubleshoots and solvedvarious problems onsite.  Answer alltechnicalqueries and verificationworks. Jan 1990 – Dec1990: ENGINEERING DESIGNER with VetcoGrayPetroleumEquipment (S) Pte Ltd Reportto Engineering Manager Responsibilities:  Vetco Gray manufacturingofWellheadsUnit andDrillpipes.  Developmentnewdesignofequipmentthatis requiredbySales orders.  Preparedesign sketches and gave to the Draftsman to completethe details.  Includethe supervisionofmechanicalandCadDraftsmen.  Developing new conceptand detaildesign to improve the system.  Bills ofmaterial for new designcomplywithAPI6ASpecification.  In-house training for productknowledge base onAPI6Aspecification.  Coordinatewiththe machineshopfloor and testing department.  Relatedto Oil fielddrillingWellhead(Christmastree) equipmentfor surface and subseac/w casing(Landand Offshore) andpreparedtesting procedure after individual projectcompleted.  Designon manualdrafting.
  • 8. 8 Mar 1989 -Dec1989:[Contract for 10 months] DRAFTSMAN SUPERVISOR withComex Services (Singapore) /PT.Komaritim (Indonesia) Reportto BaseManager/ProjectManager Secondedto Balikpapan - Indonesia atHandilII- marineBasefor construction of Gas ProductionPlatform for TotalIndonesia.( Fabricate ofTop Structure for shallowwater andpipeline) Responsibilities:  To set upa new drawingoffice and in-chargeoffive localDraftsmen.  To set-up engineering drawing officeanddrafting standard.  Prepared shops andcuttingdrawings for steelstructuralfor fabrication.  Prepared processisometric pipingspooldrawingsfor fabrication.  6” pipeline crossing involvedin fabrication spool drawings.  To supervise and checkedengineeringproductionshop drawings.  Trouble shoots some difficultiesengineeringdesignwork.  Involved in daily meeting withalldepartmentheads for work progress.  Performedphotographyon work progress andsitechecked.  LiaisewithClient,ProjectManager,Superintendent andSupervisors.  Work closelywith QA/QC dept.for materialsite inspection.  Project:TunuGas Field for TotalIndonesia. Jan 1986 - Feb 1989: ENGINEERING COORDINATOR / DRAFTSMAN with AssuredSafetyTechnology(Asia) PteLtd/ Nexus Holding Pte LtdOil IndustryServices A/S /LAMPARA PTE LTD Reportto Engineer and ManagingDirector Responsibilities:  Companyinvolvedin designand engineering ofAluminum Helideck.  Preparationofproposalandconstructiondrawings for onshoreand offshoredrilling/production (SemiandJack-upRigs) platformmodule andmarine vessel.  Layoutdetail and designofaluminum structures accordanceto specs.  Prepared billofmaterialandtake-offandresourcefor purchase.  Site coordination,prepared quotationandR&Dwork.  Liaisewithclientandcontractorincludingpurchasingofequipment’s.  Site supervision ofconstructionand photographywork for progress ofallprojects undertakenbythe company.  Builta proto-type ofHelideckand testing for experiment.  Projects:  Supplied13mx13m SteelHelideck for FrenchVessel  12mx12m OctagonHelideck c/w supportstructureon top ofliving Quarters for Trainingbarge (Batam InternationalTrainingCentre) 1980 – Dec 1985: DETAILED DRAFTSMAN with IpcomarinePte Ltd Reportto Engineering Manager /Senior Engineer Responsibilities:  Stationed atOffshoredivision withProjectteam from Houston.  Prepared ofdetail drawings for Jacket modulusandTopside offshore Drillingplatform,relatedto process oil and gas offshoreindustry.  Detailedsteelstructuralandrevisioninclude instrumentation layoutand isometric piping.(ManualDrafting)  Involved in load-out of Topside/Jacketmodule,prepared layoutdrawing.  As-built of piping layout anddetailingof marine jettyincluding  Material-take-off andrevision  Perform photographyworkatsiteprogressofall projects  Detailedincludes marinedolphin,walkway,lightingpoles c/w platform,pier-head,trestle,piles andfenders mounting c/w M.T.O.  Prepared pipinglayout anddetails,isometric,development andsupport.  Involved in layoutof pipeline lay36" diameteronshoretooffshore.(Emergencyloading terminal)to SBM  Preparedgeological/geophysicalmappingof pipeline routing.  Constructedpipeline profileandlayout planfor surveyor. Project:  IranianGovernment Project – Nosrat - OffshoreTopside & Jacket legPlatform.  IranianGovernment Project – Pipelinefrom main landto Offshore Island.  Jetty& Road- Sipitang– Sabah  Jetty- Johor Port PasirGudang
  • 9. 9 After completedmyengineering school,Iworkedas a PipeWelder (grade 1) (SubseaPipeweldfrom 24”– 48” Dia) for about4 years. I was offeredto jointhe same companyas a JuniorDraftsman from thereI was givena trainingand work for two years. Later Iexploredmycareerin differentvarious fieldto gainmore engineeringexperienceand takemorechallenging career. Work andTravel  To BalikpapanIndonesiain Handil2 (remote areain Kalimantan)Rigconstructionfor sallowwater.  To WestJava in Merak,new buildChemicalplantconstructionsite.  To Thailand Songkla – Offshore work with Total  To Myanmar,gas field for surveyofpipeline.  To AustraliaPerth– attached at DOFofficeworkingfor 2 months I have attendedAutoCADsoftwaretraining:  3D Inventor for 5 days (2007)more onmanufacturingindustry.  3D Plantfor 3 daycourse(2014) butnotapplicablefor the offshoreindustry.  Hand on CAD works 3D for 1 month.