AMITAVA CHOUDHURYAMITAVA CHOUDHURY
Seeking a position where my skills & experience can be effectively utilized in an organization which
offers a challenging environment along with scope for flexibility and innovation.
SUMMARY OF EXPERIENCE
Nine Plus years of professional experience in Marine/RIG Design, Oil and Gas industry,
excellent experience in handling Project, design, repair & maintenance.
ACADEMIC QUALIFICATIONS
 Diploma in Electrical & Instrumentation: Passed in year 2003, from Sumant Moolgaokar
Engineering Institute, Kymore (M.P)
 Pursuing B TECH from Karnataka State Open University.
 Pursuing Post Graduation Diploma in Business Administration from Welingkar Institute of
Management Development & research.
 Senior Secondary School (12th
) passed in 2000 from C.B.S.E. Board.
 Secondary School (10th
) passed in 1998 from C.B.S.E. Board.
PROJECT MANAGEMENT EXPERIANCE
 Design, Drafting, preparation of specifications as per system and client requirement.
 Preparing Project Plan Progress Schedule for new projects.
 Checking FDS ( Functional Design Studies) as per clients requirement.
 Preparing schedule for production drawing for smooth flow of project until delivery.
 Attending client meeting to understand their needs.
 Checking of VCD’s (vender certified Drawing) with respect to clients requirement &
Standard.
 Preparing Plan Change Memo schedule due to deviation caused by external factors.
 Meeting with other trades for interference check & integration of Electrical Equipments.
 Assigning correct person according to the job need.
 Finalising correct BOM (Bill of Material) as per client requirement & Standard.
 Inspection of materials received as per purchase order.
 Cable tray routing, Penetration details in SM3D (3D software).
 Preparing Schematic and Arrangement drawing ( Auto Cad).
 Checking 3D Modelling in SM3D & PDMS.
 Reviewing model in Navisworks.
ORGANIZATIONAL EXPERIENCE
KEPPEL FELS OFFSHORE & MARINE, MUMBAI
Position: Assistant Design Engineer. Duration: Nov-2008 –Oct 2010
Nov 2013 to Jun 2016
PROJECTS HANDLED
 Semi-Submersible Drilling Tender.
 B class Jack up rig for Astisor.
 Drill ship (Repair) (Nobel).
 Semi submersible Accommodation unit for Floatel.
 B class Jack up for Petro Vietnam.
 FLNG Carrier for GOLAR.
KEY RESPONSIBILITIES:
 Attending project meeting, model review meeting,
 Interference checks with other sections.
 Preparation of Bill Of Material.
 Preparing of Schematic & Arrangement for Main & Emergency generator control, HVAC,
Compressor, Bilge &Ballast control, Vessel monitoring system, Radio com, PAGA, Fire &
Gas detection, Lighting etc.
 Checking VCD’s of electrical equipments as per class, owner & contract requirement.
 Issuance of drawing on target dates..
 Preparation of cable schedule for pre cut cables.
 Solving site Issue.
 Preparation of As built drawings.
CONCEPTIA SOFTWARE TECHNOLOGIES PVT LTD
Worked in Directorate of Naval Design New Delhi for Indigenous Aircraft Carrier.
Position: DESIGN ENGINEER. Duration: Dec-2006 to Oct-2008
KEY RESPONSIBILITIES:
 Study of load distribution of the ship.
 Arrangement of Electrical Distribution
 Preparation of Schematic drawings.
 Preparation of lighting illumination Study.
 Preparation of BOM for material planning and purchase.
 Preparation of General Arrangement Drawing for electrical compartment
 Preparation of cable schedule.
OVERSEAS ASSIGNMENTS
KEPPEL FELS OFFSHORE & MARINE, SINGAPORE
Keppel offshore and marine Singapore is a largest leading marine group in the world. Keppel is
world leading designers, builders and repairers of mobile offshore rigs, especially in jack-up and
semi submersibles.
Position: Senior Design Engineer. Duration: Nov 2010 to Oct 2013.
Project: Seafox 5 & Floatel.
KEY RESPONSIBILITIES:
 Attending project engineering meeting, model review meeting,
 Checking of Schematic & Arrangement with VCD for Electrical systems like Main &
Emergency generator control, HVAC, Compressor, Bilge &Ballast control, Vessel
monitoring system, Radio com,PAGA,Fire & Gas detection, LAN ,Lighting etc.
 Checking Interference of Cable way with other section equipments.
 Attending meeting with Vendors.
 Co-ordination with purchasing, production & commissioning teams.
 Engineering progress reporting to Project Manager, Section Manager & Technical Managers.
 Resolving production (site) issues.
 Guiding overseas engineering team (Keppel FELS Mumbai).
KEPPEL FELS OFFSHORE & MARINE, SINGAPORE
Position: Electrical Commissioning Engineer. Duration: Nov-2010 to Jun 2011.
Project: Ensco 8504
.
KEY RESPONSIBILITIES:
 Attending project engineering meeting, model review meeting,
 Pre checks for installation done by production.
 Pre commissioning of electrical equipments.
 Commissioning of Electrical systems with Owner.
 Preparation of Bill Of material for production.
 Attending meeting with Vendors.
 Co-ordination with purchasing, production & commissioning teams.
 Engineering progress reporting to Project Manager, Section Manager & Technical Managers.
 Resolving production (site) issues.
 Guiding Overseas engineering team (Mumbai, China, Bulgaria)
PREVIOUS ELECTRICAL EXPERIENCE
 Worked as Service Engineer (SALES & SERVICE) with Scan-O-Plan Systems from April
06 to December 06).
 Worked as Site Engineer with Roto Power Projects Private Ltd from January 06 to April 06.
 Worked as Asst Mgr (tech) in Basundhara Properties Pvt Ltd from April 05 to December
2005.
 Completed one year in plant training in Associated Cement Company Ltd (Gagal) as E & I
Technician from Sept 03 to Oct 04.
PERSONAL DETAILS
Declaration
Date of birth
Sex
05 August 1981
Male
Martial status Married
Passport No H7606439
Mobile No
E mail
Present
address
Permanent
address
:
09769733832
ami.chd@gmail.com
ami_chd@rediffmail.com
Gaurav woods, Phase 1,Building No 2,
Flat No 1203,Beverly park
Mira road east,Mumbai 401107
Nabaghanti Road,PO Burnpur
Dist Burdwan
West Bengal, Pin 713325
Nationality Indian
I hereby declared that above written particulars are true to the best of my knowledge and belief. I
promise to work sincerely to the organisation.
Yours sincerely.
Amitava Choudhury.

Amitava_resume

  • 1.
    AMITAVA CHOUDHURYAMITAVA CHOUDHURY Seekinga position where my skills & experience can be effectively utilized in an organization which offers a challenging environment along with scope for flexibility and innovation. SUMMARY OF EXPERIENCE Nine Plus years of professional experience in Marine/RIG Design, Oil and Gas industry, excellent experience in handling Project, design, repair & maintenance. ACADEMIC QUALIFICATIONS  Diploma in Electrical & Instrumentation: Passed in year 2003, from Sumant Moolgaokar Engineering Institute, Kymore (M.P)  Pursuing B TECH from Karnataka State Open University.  Pursuing Post Graduation Diploma in Business Administration from Welingkar Institute of Management Development & research.  Senior Secondary School (12th ) passed in 2000 from C.B.S.E. Board.  Secondary School (10th ) passed in 1998 from C.B.S.E. Board. PROJECT MANAGEMENT EXPERIANCE  Design, Drafting, preparation of specifications as per system and client requirement.  Preparing Project Plan Progress Schedule for new projects.  Checking FDS ( Functional Design Studies) as per clients requirement.  Preparing schedule for production drawing for smooth flow of project until delivery.  Attending client meeting to understand their needs.  Checking of VCD’s (vender certified Drawing) with respect to clients requirement & Standard.  Preparing Plan Change Memo schedule due to deviation caused by external factors.  Meeting with other trades for interference check & integration of Electrical Equipments.  Assigning correct person according to the job need.  Finalising correct BOM (Bill of Material) as per client requirement & Standard.  Inspection of materials received as per purchase order.  Cable tray routing, Penetration details in SM3D (3D software).  Preparing Schematic and Arrangement drawing ( Auto Cad).  Checking 3D Modelling in SM3D & PDMS.  Reviewing model in Navisworks. ORGANIZATIONAL EXPERIENCE KEPPEL FELS OFFSHORE & MARINE, MUMBAI Position: Assistant Design Engineer. Duration: Nov-2008 –Oct 2010 Nov 2013 to Jun 2016 PROJECTS HANDLED  Semi-Submersible Drilling Tender.  B class Jack up rig for Astisor.  Drill ship (Repair) (Nobel).  Semi submersible Accommodation unit for Floatel.  B class Jack up for Petro Vietnam.  FLNG Carrier for GOLAR.
  • 2.
    KEY RESPONSIBILITIES:  Attendingproject meeting, model review meeting,  Interference checks with other sections.  Preparation of Bill Of Material.  Preparing of Schematic & Arrangement for Main & Emergency generator control, HVAC, Compressor, Bilge &Ballast control, Vessel monitoring system, Radio com, PAGA, Fire & Gas detection, Lighting etc.  Checking VCD’s of electrical equipments as per class, owner & contract requirement.  Issuance of drawing on target dates..  Preparation of cable schedule for pre cut cables.  Solving site Issue.  Preparation of As built drawings. CONCEPTIA SOFTWARE TECHNOLOGIES PVT LTD Worked in Directorate of Naval Design New Delhi for Indigenous Aircraft Carrier. Position: DESIGN ENGINEER. Duration: Dec-2006 to Oct-2008 KEY RESPONSIBILITIES:  Study of load distribution of the ship.  Arrangement of Electrical Distribution  Preparation of Schematic drawings.  Preparation of lighting illumination Study.  Preparation of BOM for material planning and purchase.  Preparation of General Arrangement Drawing for electrical compartment  Preparation of cable schedule. OVERSEAS ASSIGNMENTS KEPPEL FELS OFFSHORE & MARINE, SINGAPORE Keppel offshore and marine Singapore is a largest leading marine group in the world. Keppel is world leading designers, builders and repairers of mobile offshore rigs, especially in jack-up and semi submersibles. Position: Senior Design Engineer. Duration: Nov 2010 to Oct 2013. Project: Seafox 5 & Floatel. KEY RESPONSIBILITIES:  Attending project engineering meeting, model review meeting,  Checking of Schematic & Arrangement with VCD for Electrical systems like Main & Emergency generator control, HVAC, Compressor, Bilge &Ballast control, Vessel monitoring system, Radio com,PAGA,Fire & Gas detection, LAN ,Lighting etc.  Checking Interference of Cable way with other section equipments.  Attending meeting with Vendors.  Co-ordination with purchasing, production & commissioning teams.  Engineering progress reporting to Project Manager, Section Manager & Technical Managers.  Resolving production (site) issues.  Guiding overseas engineering team (Keppel FELS Mumbai).
  • 3.
    KEPPEL FELS OFFSHORE& MARINE, SINGAPORE Position: Electrical Commissioning Engineer. Duration: Nov-2010 to Jun 2011. Project: Ensco 8504 . KEY RESPONSIBILITIES:  Attending project engineering meeting, model review meeting,  Pre checks for installation done by production.  Pre commissioning of electrical equipments.  Commissioning of Electrical systems with Owner.  Preparation of Bill Of material for production.  Attending meeting with Vendors.  Co-ordination with purchasing, production & commissioning teams.  Engineering progress reporting to Project Manager, Section Manager & Technical Managers.  Resolving production (site) issues.  Guiding Overseas engineering team (Mumbai, China, Bulgaria) PREVIOUS ELECTRICAL EXPERIENCE  Worked as Service Engineer (SALES & SERVICE) with Scan-O-Plan Systems from April 06 to December 06).  Worked as Site Engineer with Roto Power Projects Private Ltd from January 06 to April 06.  Worked as Asst Mgr (tech) in Basundhara Properties Pvt Ltd from April 05 to December 2005.  Completed one year in plant training in Associated Cement Company Ltd (Gagal) as E & I Technician from Sept 03 to Oct 04. PERSONAL DETAILS Declaration Date of birth Sex 05 August 1981 Male Martial status Married Passport No H7606439 Mobile No E mail Present address Permanent address : 09769733832 ami.chd@gmail.com ami_chd@rediffmail.com Gaurav woods, Phase 1,Building No 2, Flat No 1203,Beverly park Mira road east,Mumbai 401107 Nabaghanti Road,PO Burnpur Dist Burdwan West Bengal, Pin 713325 Nationality Indian
  • 4.
    I hereby declaredthat above written particulars are true to the best of my knowledge and belief. I promise to work sincerely to the organisation. Yours sincerely. Amitava Choudhury.