1. 1
RESUME
Name : Syed Mahdar B. Mohamed Almashoor
Date of Birth : 16th June 1953
Nationality : Singaporean
Marital Status : Married with two daughters 16yrs and 12yrs
Passport no : S0082676F
Address : Blk 710, Bedok Reservoir Road, #05-3124
Singapore 470710
Driving License : Valid class 3 and own a car
Contact no. : +65-9728-9472 (Hp) / +65-6449-6533 (Res)
Computer Literate : AutoCAD R2014 2D & 3D & Microsoft Office 2013
Email : mahdar@singnet.com.sg
_________________________________________________________________________________
EDUCATION
School Subject Certificate/Year
Geylang Vocational Institute Mech. Engineering NTC 2 / 1972
Dunman Sec. School Academic Sec 3 / 1970
Language Conversation Writing Reading
English Fluent Fluent Fluent
Malay Fluent Fluent Fluent
________________________________________________________________________________
OBJECTIVE
Experiences in Marine, Offshore Topside, Jack-up Rig, Subsea construction, Petrochemical and Chemical plant,
Microelectronic (clean room) in specialty gases, Pharmaceutical industries. Design CAD drafting in mechanical. Process
Piping, Pipeline, structural, wellhead, Sub Sea, coordinated and site worked. Worked and traveled around Southeast Asia
region. I’m fast learned; create new ideas and problem solver. I have experience in setting up the drawing office. Lead the
team of draftsmen and standards.
EXPERIENCE AND RESPONSIBILITIES:
Feb.2016 – Present (contract)
Process Designer with BW Offshore Pte Ltd
Report to Lead Process Engineer
Attached at Process piping department.
Prepared revision and updated CAD drawings of Process P&ID.
Checked pipe line interface connection.
Project for Petroleo Brasilero S.A. FPSO - repair and refurbishment.
Aug. 2015 – Nov. 2015 (contract)
Offshore Pipeline Drafter with PAPE Engineering Pte Ltd (Swiber Offshore Pte Ltd)
Report to Project Manager/ Engineer
Involved in Project ONGC R-353 C26 Cluster Pipeline.
Prepared key plan and Riser assembly drawing.
Location and details of Riser drawings.
Alignment sheet drawing.
Including Riser clamp layout and details.
Worked with the Engineers
2. 2
Oct. 2013 – July 2015
Senior Designer with Calm Oceans Pte Ltd
Report to Director
• New design of Mono Column Platform (MCP) Offshore Jack-up Rig.
• We are Owner, Charter, build and design of MCP.
• Prepared drawing for R&D structural to develop a new concept.
• Worked together with my Director with his new idea innovation.
Prepared layout and details of Main/ Mat deck c/w leg column and Jack House.
Prepared tender/ presentation drawings for various type of (MCP) Jack up Rig.
Prepared Piping P&ID, Structural details, Mechanical and Electrical drawings, including 3D drawing.
In charged of Living Quarters and Helideck included liaise with vendors/ builder.
In-charge of drawings document and administrative. Operated AutoCAD 2014.
Sept. 2012 – Sept. 2013 (Contract)
Senior Designer with Orwell Offshore Pte Ltd
Report to Engineering Manager
Orwell Offshore offers Naval Architecture services to all sectors of the marine industry. The company has grown
consistently since its inception six years ago with offices in UK and Singapore providing services around the
world. The core services the Company provides include Mooring systems for FPSO/FSO, vessel conversion
engineering, offshore installation engineering and general marine consultancy and operations support for the
marine, oil, gas and renewable energy industries.
Prepared proposal drawing for various client on new Turret and SPM mooring system.
Prepared drawing for R&D work like Swivel stack 6” inlet mechanical drawing.
Prepared mechanical drawing for 20” Calm Buoy Fluid Swivel.
Prepared pipework for in and outboard c/w pipe support details and material take off.
Assist Project Engineer in sourcing out contractors and vendor for project quotation.
Worked with Engineering Manager, Project Engineer and Design Engineer.
Operated AutoCAD 2011.
Project: Rubicon – Galoc Phase 2 Field Development.
Jul 2010 – Aug 2012:
Design Draftsman with DOF Subsea Pte Ltd
Report to Lead Draftsman (Perth Office)
DOF Subsea is an engineering and design for Subsea Oil n Gas package.
Base in Singapore office prepared tender drawings and figures for various projects.
Prepared general arrangement drawing, figure and story board for procedure.
Prepared engineering construction detail drawings related to Oil & Gas Offshore Subsea packages.
Layout and details of flow lines, Umbilical, mooring chains and vessel positioning.
Travel to Perth office for further training in Cad Vault and drawing standard.
Coordinate my work in Perth as well in Singapore office.
Coordinate with Project/ Design Engineers and Drafting department in Perth office.
Attend site work on board various vessels for mobilized.
Included site inspection of equipment and take as-built dimensions.
Operated AutoCAD 2010/ 2011.
Project TGT Phase1/2, Stybarrow and many more.
Jan 2010 – Jul 2010:
Senior Draftsman with UMW Deepnautic Pte Ltd (Joint Venture SWG Offshore Pte Ltd)
Report to Project Manager
Prepared drawing, figure and story board for procedure.
Study process lay, routing, profile and details of Flow lines &Umbilical connection.
Prepared engineering Cad drawings related to Oil & Gas Offshore Subsea packages.
Layout and details of flow lines, mooring chains and vessel positioning.
Prepared isometric pipeline spool with lifting slings point.
Detail fabrication drawing structure module.
Responsible for drawings and sketches register for outgoing drawings.
3. 3
Checked drawing details and standard before handover to the Project Engineers.
Coordinates with Project Engineer related drawings in Australia Perth office.
Prepared new Tender project drawing and figure.
Operate AutoCAD 2010 & 3D.
Project Ruby Phase II FPSO Installation - Vietnam.
UMW was bought over by DOF Subsea, UMW is closed down on 16.Jul.2010.
I was transfer to DOF Subsea new office job.
June 2009 – Jan 2010: (Contract)
Lead Draftsman with Kim Heng Marine and Oilfield Pte Ltd
Report to Project Manager
Responsibilities:
Attached at shipyard site office for the new building of Pipe Lay Barge LB-32 for McDermott.
Trouble shoot and verified site problem such as structural, mechanical, piping, ducting and etc.
Prepared shop drawing for the fabrication in structural outfitting, mechanical, piping and AHU duct.
Liaise with the owner representative regards modification and proposed better engineering solution.
Assist the production supervisors and sub-contractors in engineering drawing on site verification.
Trouble shoot site problem and rectified immediately.
Checked all services for clashing at accommodation area, engine room, and Aux machinery room and ramp
enclosure area.
Attended site meeting with production.
Operated AutoCAD 2008.
Jul 2006 – May 2009:
Senior Designer with Technip Subsea7 Asia Pacific Pte Ltd
Report to Technical Engineering Manager
Responsibilities:
Prepared engineering Cad drawings related to Oil & Gas Offshore Subsea packages. Layout and details of flow
lines, umbilical routing and vessel positioning.
In-charge of two Designers and Jr. Designer under my supervision.
Study process lay, routing, profile and details of Flow lines &Umbilical connection.
Prepared Deck and equipment’s layout for support vessel load-out.
Prepared study various steel structure assembly design arrangement and details.
Prepared installation procedure drawing and sketch.
Prepared isometric pipeline spool with lifting slings point.
Responsible for drawings and sketches register for outgoing drawings.
Checked drawing details and standard before handover to the Engineers.
Developed 3D modeling for rigging and others structure assembly drawings.
Coordinates related drawings with Australia office in Perth.
Site visit at yard for drawing As-Built and modification of equipment and structural skid.
Project TUI Area Development project (NZOP), Woolly butt Development project.
Project Donghae-1 Gas Field Tie Back Project (Korea)
Aug 2005 – Jun 2006:
Lead Draftsman with Acergy Limited (Formerly Stolt Offshore Pte Ltd)
Report to Technical Engineering Manager
Responsibilities:
Prepared engineering Cad drawings related to Oil & Gas Offshore Subsea packages.
Layout and details of flow lines and umbilical routing from wellheads.
In-charge of two Draftsmen under my supervision and job distribution.
Study process lay, profile, routing and details of flow lines & umbilical connection.
Prepared FPU-Semi-rig-AFT & FWD pull-in structure assembly arrangement and details.
Prepared installation procedure drawing and sketch.
Work with vary engineers.
Responsible for drawings and sketches register for outgoing drawings.
Prepare for Asia Pacific Region drawing standard procedure and guide line.
Project Dai Hung Field Development project-Flow lines & Umbilical (PVEP)
May 2004 – Aug 2005: (Contract)
MECHANICAL DESIGNER with Oakwell Engineering International Pte Ltd
Report to Design Engineer
Responsibilities:
Prepared engineering Cad drawings related to Oil & Gas offshore platform packages.
4. 4
Design, layout and details of equipment’s and process piping packages system.
Study process piping routing, details of pumps connection.
Prepared P & ID’s and isometric drawings for piping tie-in.
Prepared steel structural, tanks, pressure vessel, skid layout and detail drawings.
Coordinate at sites w/ varies sub-contractors in mechanical inspection.
Prepared bill of material and Manual Data Book for project engineer.
Liaise w/ Client regards the site modification and clarification.
Used AutoCAD 2002 & Cad Works 3D.
Project: Chemical Injection Skid, Pressure Reduction Skid, Closed drain Vessel.
Dec 2003 – Apr 2004: (Contract)
MECHANICAL DESIGNER with Ionics Asia-Pacific Pte Ltd
Report to Project/Construction Manager
Responsibilities:
In-charge of engineering Cad drawings & documents control base at site office. Detail and Design, layout of equipment’s
and process piping system.
Study process piping plant routing, details of transition and pumps connection.
Prepared P & ID’s and isometric drawings for piping tie-in.
Prepared tanks modification detail drawings.
Coordinate at sites w/varies sub-contractors in mechanical, piping and tank.
Prepared Ultra filter skid, Heat Exchanger, R.O. skid c/w-piping arrangement.
Liaise w/Client regards the site modification.
Used AutoCAD LT2004
Projects: S.T Microelectronic – AmK8-Phase II Expansion Ultra-Pure Water Project.
Jul’2002 – Nov 2003:
DESIGNER/ DRAFTSMAN with Meridionale Impianti Singapore Pte Ltd/
SOXAL-M.I. Technologies PTE LTD (Joined Venture Company)
Report to Assistant Project Manager
Responsibilities:
In-charge engineering department including control Cad drawing system & documents control.
Coordinate of various engineering projects.
Design, layout and details of equipment’s and piping system.
Study piping routing, detail of transition and equipment layout.
Prepared P & ID’s and isometric drawing for piping and equipment’s.
Coordinate at sites w/varies sub-contractors in mechanical, piping, supports and control.
Liaise w/Construction Manager for the detail or changed piping routing.
Liaise w/Client regards the work order or site variation.
Used AutoCAD R2002
Projects: S.T Microelectronic – AmK6-Phase III Fit-up, Amk8-Fit-up Expansion,
Amk5 - Fit-up Expansion.
Feb’2002– Jul’2002: (Contract)
Piping Design Draftsman with JGC (S) PTE LTD
Report to Piping Head
Responsibilities:
Prepared piping layout/detail drawing for Glaxo Smith Kline revamp project.
Prepared isometric piping detail drawing and material take-off.
Site checked and measured for modification work at Syngas Pte Ltd.
Prepared and design piping layout and isomeric drawings for modification.
Project: SRC, GlaxoSmithKline, Syngas and Power gas.
Dec’2001–Feb’02: (Contract)
Piping Designer/Draftsman with THAMES WATER PROJECT (S) PTE LTD
Report to Project Engineer
The company does Water-water treatment and process system project.
Responsibilities:
Prepared proposal P & ID’s, piping and equipment’s layout and isometric drawings.
Prepared skid piping layout and details.
Assist in preparation of project file for Seraya Chemical project.
5. 5
Prepared operation manual for Perlis – Power Plant project.
Jul’2001 – Dec’01: (Contract)
Project Engineer/Coordinator with Chiles Offshore Inc. Owner Rep. (Base in Singapore office at
KeppelFels yard.)
(Project Basis) - Report to Project Manager
Responsibilities:
Work with owner representative for the new construction of the Jack-up Rig Mod v Class B. Project for
Phillips Petroleum – Bayu-Undan Gas Recycle.
Assist Project Manager in engineering and construction work related.
Overseas the new construction project including engineering, work progress, site queries, weekly meeting,
equipment’s, vendor and etc.
Liaised w/Rig Engineer, Commissioning Manager, Material controller and etc.
Liaised and coordinate w/mechanical/structure and painter inspectors
Prepared daily activities progress report and trouble shoot problems.
Coordinated between Australia and Brownsville offices.
In-charge of engineering department and document control.
Site checked for the construction work progress in piping, structure, mechanical, equipment’s, outfitting,
wellhead and etc.
Liaised w/main contractor site and engineering office for details or information.
Inspected all new equipment from vendor arrived and checked defect.
Reviewed all Approval drawings w/comments, prepared in AutoCAD drawing.
Attended weekly progress and internal meeting.
Feb’00 – Jul’2001:
DESIGNER/DRAFTSMAN with Meridionale Impianti Singapore Pte Ltd/
SOXAL-M.I. Technologies PTE LTD (Joined Venture)
Report to Assistant Project Manager
New set-up Italian engineering company dealing in clean room (Microelectronic industry) for it specialty gases technology,
before joined venture with Soxal Pte Ltd.
Responsibilities:
Set-up and organized an engineering department including control cad drawing system – create Cad library and
documents control.
Coordinate of varies engineering projects on site. Design, layout and details of equipment’s and piping system.
Study piping routing, detail of transition and equipment layout.
Prepared P & ID’s, isometric drawing for piping and equipment’s.
Seconded to ST in Tuas plant for Clean room class 10,000 projects.
Coordinate w/varies sub-contractors in M&E, builders, sprinkler and control.
Prepared layout and detail of clean room drawings.
Used AutoCAD R14 and R2000
Projects: S.T Microelectronic – Ang Mo Kio 6-Phase I Fit-up, Amk6-Phase II Tool Hook-up, Amk 8-Fit-up
and Tuas Plant (Clean Room)
Mar’99- Feb2000: (Contract)
SITE ENGINEER with EC Chemical Technologies Pte Ltd
Report to Project Manager
EC Chemical is a consultant and EPC contractor for the project.
Responsibilities:
Station at site Pulau Seraya – Jurong Island.
Supervised the construction and erection of process/ utilities piping, storage tanks, pressure vessel,
equipment’s, piping/ tanks insulation, steel structural erection, civil works and etc.
Checked piping spool and witness hydro-testing according to the specification.
Liaise and coordinate with the client, main and sub-contractors.
Planning for works schedule for varies disciplines.
Prepared site instruction, checked P & ID’s and Isometric drawings.
Managed and answer contractor’s site queries and variation order.
Involved in commissioning/ testing of equipment’s, mechanical, piping and pumps.
Prepared sketches for some modification works to suit on site situation.
Attended weekly, monthly and commissioning meeting.
Project – Croda Singapore Pte Ltd [New Plant] Turnkey Project
Specialty Chemicals Complex (Pulau Seraya)
6. 6
Jul1997– Feb1999:
CAD DESIGNER with EC Chemical Technologies Pte Ltd
Report to Senior Project Engineer
Responsibilities:
To set-up new engineering department and drawing standard.
Including set up a Cad library for quick reference.
To managed drawing register and progress.
Take-charge of engineering drawing department and Cad draftsmen.
Prepared P & ID’s, plant layout, civil and mechanical, piping drawings.
Prepared process piping routing plan and equipment’s, tanks, vessels layout.
Liaise with client, architect and various consultants.
Coordinate with construction manager for technical support.
Included checking all drawings related to work progress.
Prepared proposal P&ID drawing for managing director.
Company used PDS Intergraph and AutoCAD 2000.
Basic training in PDS Intergraph/ Micro station.
Project – Croda Singapore Pte Ltd [New Plant]
Specialty Chemicals Complex (Pulau Seraya)
Jan1997 – Jun1997: (Contract)
DESIGNER/ DRAFTSMAN with Offshore Engineering Design Pte Ltd
Report to Managing Director
OED is a small engineering consultant company provided technical support to offshore marine industry.
Take up various type of small project concerning Offshore Drilling Platform and support marine vessel for new and
retrofit.
Responsibilities:
Prepared shop and details of various steel structures drawing for fabricator.
Prepared schedule and planning for the contractors.
Liaise with client and varies contractors include site coordination.
Prepared purchase order and source/purchase of material.
Coordinate the material and finished product delivery to site.
Involved in installation and supervise the contractor.
Dec’94 – Dec1996:
PROJECT ENGINEER with Astratech Pte Ltd.
Report to Director/Senior Project Engineer
Astratech is design/ engineering, procurement and construction dealing in Marine offshore topsides fixed platform
construction related to Oil and Gas and petrochemical/chemical industry.
Responsibilities:
Duties include take charges of Total-Exploration Production of Thailand in Songkla - Bongkot Gas
Compression field offshore fixed platform.
Take-charge of engineering department and Draftsmen.
Prepared quotation, material take-off, planning and schedule.
Prepared sketches and lists of material for source and purchase.
Co-ordinates with the prefabrication shop floor, in-house fabrication.
Involved in load-out of equipment’s and materials for shipment.
Prefab piping spool, skid, platform, container workshop and etc.
Hands-on type of working environment supervised and travel to offshore site.
Prepared engineering, shop drawings and checked before construction
Liaise with client, QC dept., sub-contractor vendor & surveyor.
Operated AutoCAD R12, Computer Literate in Microsoft Excel/Word.
Other project involved in AutoChem Chemical Plant.(Jurong)
Fabricating and installed of new Hopper structural and piping system in stainless steel A316L material.
Modification of double jacket piping system stainless steel.
Company closed down.
7. 7
Apr 1991 - Nov 1994:
STRUCTURAL DESIGNER / CHECKER with Comprimo Pte Ltd
Report to Head of Department
Responsibilities:
Seconded to Shell Eastern Pulau Bukom for period of 5 months as a Line Checker - Piping. New
Construction of "Plat former 4 and G.O. HDS” in oil and gas petrochemical process plant. Duties included
checking on On-Plot, Off-Plot, Utilities and process line. Witness Hydro and Air Test.
Liaise and co-ordinate with the main and sub-contractors.
Design layout and details of steel structural related to Oil and Gas petrochemical /Offshore Platform
Topside module.
In-charge team of design draftsman’s including checking of drawings, prepared drawing lists and standard
drawings.
Went to Myanmar for project survey in Onshore Drilling Gas Pipeline project – 50Km.
Co-ordinate with Project Engineer and other department related to work.
Attend meeting with client and coordinate site work.
Operated AutoCAD Release 10 / 11.
Projects:
Brunei Shell Petroleum – Ampa-9 Gas Compression Topsides Platform
Shell Eastern Petroleum - Pulau Bukom (Island)
SRU, Super Claus & Cogeneration Plant - Shell Pulau Bukom
EXPERIENCE OBTAINED PRIOR TO JOINING COMPRIMO:
1990 –April 1991 :
DESIGNER DRAFTMAN with MEI Project Engineer Pte Ltd
Report to Engineering Manager.
Responsibilities:
Design layout and details for process piping related to chemical plant.
Prepared isometric, development, support, tanks, details and material-take-Off.
Seconded to Indonesia, West Java - Merak for 8 months as a Site Construction Engineer / Manager
Responsibilities:
To manage, supervise and coordinate the site work for new construction for the EDC Chemical Plant.
The construction and erection of steel structural, process piping, tanks, pressure vessel, pipeline, M&E,
instrumentation, painting, Civil and etc.
Coordinate with all sub-contractors job to relate.
Represented Client as CONSULTANT to in-charge the various contractors
Attend weekly meeting with client and sub-contractors for work progress.
Prepare progress payment and variation claimed for contractors.
Troubleshoots and solved various problems on site.
Answer all technical queries and verification works.
Jan 1990 – Dec 1990:
ENGINEERING DESIGNER with Vetco Gray Petroleum Equipment (S) Pte Ltd
Report to Engineering Manager
Responsibilities:
Vetco Gray manufacturing of Wellheads Unit and Drill pipes.
Development new design of equipment that is required by Sales orders.
Prepare design sketches and gave to the Draftsman to complete the details.
Include the supervision of mechanical and Cad Draftsmen.
Developing new concept and detail design to improve the system.
Bills of material for new design comply with API 6A Specification.
In-house training for product knowledge base on API 6A specification.
Coordinate with the machine shop floor and testing department.
Related to Oil field drilling Wellhead (Christmas tree) equipment for surface and subsea c/w casing (Land and
Offshore) and prepared testing procedure after individual project completed.
Design on manual drafting.
8. 8
Mar 1989 -Dec1989: [Contract for 10 months]
DRAFTSMAN SUPERVISOR with Comex Services (Singapore) / PT. Komaritim (Indonesia)
Report to Base Manager/Project Manager
Seconded to Balikpapan - Indonesia at Handil II - marine Base for construction of Gas Production Platform for
Total Indonesia.( Fabricate of Top Structure for shallow water and pipeline)
Responsibilities:
To set up a new drawing office and in-charge of five local Draftsmen.
To set-up engineering drawing office and drafting standard.
Prepared shops and cutting drawings for steel structural for fabrication.
Prepared process isometric piping spool drawings for fabrication.
6” pipeline crossing involved in fabrication spool drawings.
To supervise and checked engineering production shop drawings.
Trouble shoots some difficulties engineering design work.
Involved in daily meeting with all department heads for work progress.
Performed photography on work progress and site checked.
Liaise with Client, Project Manager, Superintendent and Supervisors.
Work closely with QA/QC dept. for material site inspection.
Project: Tunu Gas Field for Total Indonesia.
Jan 1986 - Feb 1989:
ENGINEERING COORDINATOR / DRAFTSMAN with Assured Safety Technology (Asia) Pte Ltd / Nexus Holding
Pte Ltd Oil Industry Services A/S / LAMPARA PTE LTD
Report to Engineer and Managing Director
Responsibilities:
Company involved in design and engineering of Aluminum Helideck.
Preparation of proposal and construction drawings for onshore and offshore drilling/production
(Semi and Jack-up Rigs) platform module and marine vessel.
Layout detail and design of aluminum structures accordance to specs.
Prepared bill of material and take-off and resource for purchase.
Site coordination, prepared quotation and R&D work.
Liaise with client and contractor including purchasing of equipment’s.
Site supervision of construction and photography work for progress of all projects undertaken by the
company.
Built a proto-type of Helideck and testing for experiment.
Projects:
Supplied 13mx13m Steel Helideck for French Vessel
12mx12m Octagon Helideck c/w support structure on top of living Quarters for Training barge
(Batam International Training Centre)
1980 – Dec 1985:
DETAILED DRAFTSMAN with Ipcomarine Pte Ltd
Report to Engineering Manager / Senior Engineer
Responsibilities:
Stationed at Offshore division with Project team from Houston.
Prepared of detail drawings for Jacket modulus and Topside offshore Drilling platform, related to process
oil and gas offshore industry.
Detailed steel structural and revision include instrumentation layout and isometric piping. (Manual Drafting)
Involved in load-out of Topside/Jacket module, prepared layout drawing.
As-built of piping layout and detailing of marine jetty including
Material-take-off and revision
Perform photography work at site progress of all projects
Detailed includes marine dolphin, walkway, lighting poles c/w platform, pier-head, trestle, piles and fenders
mounting c/w M.T.O.
Prepared piping layout and details, isometric, development and support.
Involved in layout of pipeline lay 36" diameter onshore to offshore. (Emergency loading terminal) to SBM
Prepared geological/geophysical mapping of pipeline routing.
Constructed pipeline profile and layout plan for surveyor.
Project:
Iranian Government Project – Nosrat - Offshore Topside & Jacket leg Platform.
Iranian Government Project – Pipeline from main land to Offshore Island.
Jetty & Road - Sipitang – Sabah
Jetty- Johor Port Pasir Gudang
9. 9
After completed my engineering school, I worked as a Pipe Welder (grade 1)
(Subsea Pipe weld from 24” – 48” Dia) for about 4 years.
I was offered to join the same company as a Junior Draftsman from there I was given a training and work for two
years.
Later I explored my career in different various field to gain more engineering experience and take more challenging
career.
Work and Travel
To Balikpapan Indonesia in Handil 2 (remote area in Kalimantan) Rig construction for sallow water.
To West Java in Merak, new build Chemical plant construction site.
To Thailand Songkla – Offshore work with Total
To Myanmar, gas field for survey of pipeline.
To Australia Perth – attached at DOF office working for 2 months
I have attended AutoCAD software training:
3D Inventor for 5 days (2007) more on manufacturing industry.
3D Plant for 3 day course (2014) but not applicable for the offshore industry.
Hand on CAD works 3D for 1 month.