The document discusses preliminary design challenges for floatables control structures at combined sewer overflow sites in Terre Haute, Indiana. It outlines the city's long-term control plan and existing site conditions at two CSO locations. The document then describes the technology selection process, including evaluating screen technologies using a weighted scoring matrix. Based on the matrix, a rotary drum screen was recommended and a preliminary layout was presented.
Worth a staggering $842 million. The South Road Superway Project is South Australia’s most complex engineering road construction project to date. The South Road Superway Project is a stage two of the north-south transport corridor upgrade delivering a 4.8 km non-stop corridor comprising of a 2.8 km elevated roadway connecting the Port River Expressway to Regency Road.
The document outlines the design of a new office building for legal firms. It includes a schedule of accommodation and constraints of the site location. Laser scanning was used to capture data of the site and surrounding buildings to help model the context in Revit. An architectural model of the building was created with walls, floors, doors and windows. A structural model was also developed including the steel frame, concrete floors and pile foundations. The next steps will be to complete the structural and MEP models and then clash detect them in Navisworks to identify and resolve any issues.
Newton Santos-cv_ingles_2015_Project ManagerNewton Santos
This document contains a resume for Newton Santos, a 39-year-old project manager with over 20 years of experience in the telecommunications and energy industries. He has worked on projects for major companies like Telefonica Vivo, Embratel, and GVT. Newton is motivated by new challenges and has strong skills in project planning, coordination, documentation, and reporting. He holds a business administration degree and is fluent in Portuguese, English, and Spanish.
The document discusses space planning and analysis services provided by Glynn Williams, a chartered architect. Some key services mentioned include appraising existing space utilization, analyzing space efficiencies, validating and allocating space to groups, measuring furniture and implementing strategies like hot-desking to reduce costs. Previous projects involved restacking floors for companies like Henderson Investors and the Industrial Bank of Japan. Technology and infrastructure drawings are maintained to support future changes.
This document is a resume for Andrew Culpepper summarizing his experience and qualifications as a Project Manager for wireless network architecture projects. Over 16 years, he has managed projects involving Nokia and Ericsson UMTS/LTE infrastructure and technologies such as 1X-EVDO, UMTS, LTE, DAS, Small Cell and COWs. As a Senior Project Manager at AT&T Mobility from 2010-2015, he led installations and upgrades in Georgia, coordinating among various teams and vendors to meet milestones on schedule and on budget. Prior to that, from 2002-2010 at T-Mobile Miami, he managed cell site maintenance and upgrades as Operations Manager and Project Manager.
This document contains information about Amar El Tom H. Awad including his contact information and professional experience. It lists several architectural projects he has worked on, including redesigning elevations and offices for Al Ain Municipality, designing filling stations for ADNOC, and a civic center project for Western Region Municipality where his design received second prize. It also lists his BIM and Revit certification qualifications.
Ehab Mostafa has over 20 years of experience in project and construction management, planning, engineering, quality assurance, cost control, budgeting, safety, and marketing. He is currently the General Manager of Engineering Company for Contracting & Trading, where he has devised new business processes that have improved communication, reporting, and team development. Prior to his current role, he held several project management positions overseeing infrastructure, landscape, and irrigation projects in Egypt. He has a proven track record of developing winning strategies, meeting deadlines and budgets, and facilitating partnerships with clients and suppliers.
The document discusses preliminary design challenges for floatables control structures at combined sewer overflow sites in Terre Haute, Indiana. It outlines the city's long-term control plan and existing site conditions at two CSO locations. The document then describes the technology selection process, including evaluating screen technologies using a weighted scoring matrix. Based on the matrix, a rotary drum screen was recommended and a preliminary layout was presented.
Worth a staggering $842 million. The South Road Superway Project is South Australia’s most complex engineering road construction project to date. The South Road Superway Project is a stage two of the north-south transport corridor upgrade delivering a 4.8 km non-stop corridor comprising of a 2.8 km elevated roadway connecting the Port River Expressway to Regency Road.
The document outlines the design of a new office building for legal firms. It includes a schedule of accommodation and constraints of the site location. Laser scanning was used to capture data of the site and surrounding buildings to help model the context in Revit. An architectural model of the building was created with walls, floors, doors and windows. A structural model was also developed including the steel frame, concrete floors and pile foundations. The next steps will be to complete the structural and MEP models and then clash detect them in Navisworks to identify and resolve any issues.
Newton Santos-cv_ingles_2015_Project ManagerNewton Santos
This document contains a resume for Newton Santos, a 39-year-old project manager with over 20 years of experience in the telecommunications and energy industries. He has worked on projects for major companies like Telefonica Vivo, Embratel, and GVT. Newton is motivated by new challenges and has strong skills in project planning, coordination, documentation, and reporting. He holds a business administration degree and is fluent in Portuguese, English, and Spanish.
The document discusses space planning and analysis services provided by Glynn Williams, a chartered architect. Some key services mentioned include appraising existing space utilization, analyzing space efficiencies, validating and allocating space to groups, measuring furniture and implementing strategies like hot-desking to reduce costs. Previous projects involved restacking floors for companies like Henderson Investors and the Industrial Bank of Japan. Technology and infrastructure drawings are maintained to support future changes.
This document is a resume for Andrew Culpepper summarizing his experience and qualifications as a Project Manager for wireless network architecture projects. Over 16 years, he has managed projects involving Nokia and Ericsson UMTS/LTE infrastructure and technologies such as 1X-EVDO, UMTS, LTE, DAS, Small Cell and COWs. As a Senior Project Manager at AT&T Mobility from 2010-2015, he led installations and upgrades in Georgia, coordinating among various teams and vendors to meet milestones on schedule and on budget. Prior to that, from 2002-2010 at T-Mobile Miami, he managed cell site maintenance and upgrades as Operations Manager and Project Manager.
This document contains information about Amar El Tom H. Awad including his contact information and professional experience. It lists several architectural projects he has worked on, including redesigning elevations and offices for Al Ain Municipality, designing filling stations for ADNOC, and a civic center project for Western Region Municipality where his design received second prize. It also lists his BIM and Revit certification qualifications.
Ehab Mostafa has over 20 years of experience in project and construction management, planning, engineering, quality assurance, cost control, budgeting, safety, and marketing. He is currently the General Manager of Engineering Company for Contracting & Trading, where he has devised new business processes that have improved communication, reporting, and team development. Prior to his current role, he held several project management positions overseeing infrastructure, landscape, and irrigation projects in Egypt. He has a proven track record of developing winning strategies, meeting deadlines and budgets, and facilitating partnerships with clients and suppliers.
Jithin Jose is an experienced MEP engineer with expertise in designing, selecting, and executing various MEP services including mechanical, electrical, and plumbing systems. He has skills in areas such as HVAC and duct design, sizing and routing, electrical panel scheduling, plumbing pipe and pump sizing, and applying industry standards and computer programs like Revit, AutoCAD, Excel, and HAP.
The document provides information on the design of a new office building tailored for legal firms in Newcastle upon Tyne, England. It includes the site location and constraints, inspiration for the design, laser scanning of the site, architectural plans for each level, and details on the structural, architectural, and MEP (mechanical, electrical, plumbing) models created in Revit. Next steps include clash detection between models in Navisworks and construction animations.
The CV summarizes Joseph Rey C. Marilla's work experience in telecommunications engineering. He has over 15 years of experience in roles such as telecom engineer, project engineer, implementation engineer, and mechanical engineer. His responsibilities have included designing telecom systems, preparing construction documents, implementing projects, and providing technical expertise and training. He is proficient in various design software such as Revit, AutoCAD, and ArcGIS.
Michael Halsey has over 40 years of experience in instrumentation design and engineering. He currently works as an Instrument Designer and Project Engineer for ENG-CAD LTD, where he is responsible for design of control and instrument systems, carrying out site surveys, and producing technical documentation. Previously he held several roles with increasing responsibilities in instrumentation design, project engineering, and CAD operations for offshore oil and gas companies.
SurePoint’s BIM on Site solutions take the accuracy of BIM from the office to the Construction site.
Digital Construction tools replace strings and tape measures
Nashaat Sanad is a procurement manager for Assad Said Co. Ltd. in Riyadh, Saudi Arabia with over 15 years of experience in construction project management. He has a bachelor's degree in civil engineering from Helwan University in Cairo, Egypt. His responsibilities include contract negotiation, cost control, and overseeing the procurement process for construction projects. Prior to his current role, he held positions as a technical office manager, senior technical office engineer, and site civil engineer on projects in Egypt.
This document provides a summary of the qualifications and experience of Mohammed Sameer, a mechanical engineer with experience in HVAC system design, installation, and commissioning for residential and commercial projects. He has over 17 months of experience in HVAC site execution. His roles have included system design using HVAC software, procurement, coordinating installation, ensuring quality, and assisting with commissioning and handover. He holds a BTech in Mechanical Engineering and diploma in Mechanical Engineering and is proficient in AutoCAD, MS Office, and HVAC design software.
Amel Shareef has over 10 years of experience as an electrical engineer, project manager, and consultant in Iraq. He has managed large scale projects including the construction of over 50 electrical substations. He also led the digitization of maps for regional redevelopment plans. Currently based in Halifax, NS, he has extensive experience managing budgets, supervising teams, and acting as a liaison between government and private sector organizations on infrastructure projects.
The document describes three freelance jobs for bar detailing and bending schedules for steel reinforcement in concrete structures. The first job was for 24 layout drawings and schedules for a building in Cairo. The second was for 27 drawings and schedules for the reinforcement of extension units. The third job was for 7 drawings minimizing steel weight for a 960m2 slab by achieving a 0.3% reduction in total steel weight.
Franco Pezza is a mechanical engineer with over 25 years of experience in machine design, project management, and engineering management. He has extensive experience designing machinery for industries such as metal forming, plastic molding, packaging, and pharmaceuticals. Pezza is proficient in CAD software and has managed projects from concept to completion, including managing teams, developing budgets and schedules, and meeting with clients. He holds a Bachelor's degree in Mechanical Engineering and has been granted one patent.
Energy Sector Insight: AVEVA BoCAD Integration by Patrick Reilly, Vista Pro...AVEVA Group plc
Patrick Reilly, Managing Partner, Vista Projects, presents an ‘Insight from the Energy Sector’ at the AVEVA World Summit 2016, New Orleans. A modern approach was adopted to skip all unnecessary steps, produce only what is required for fabrication and output directly from 3D model.As a result, Vista Projects significantly reduced project life cycle costs using AVEVA Integrated Engineering and Design (IE&D) solution and Information Management processes.Find out more how AVEVA can transform your business >> www.aveva.com
Robert J. Bailey is a piping designer with over 30 years of experience in the design and modeling of industrial piping systems using CAD software such as Intergraph SmartPlant 3D, Intergraph PDS/Pelican Forge 3D, Intergraph Microstation V8, and AutoPlant 3D. He has worked on numerous industrial projects for companies such as AECOM, DuPont, Amoco, BP, and DTE, providing piping designs, construction support, and assisting with on-site problem solving. Prior to becoming a piping designer, Bailey worked as a mechanical technician, broadband technician, and machinist.
This document is a resume for Ricardo Schiesser, summarizing his professional experience in mechanical engineering and new product development across various industries. It details his roles and accomplishments at companies like Whirlpool, eSolar Corporation, Siemens, and Engesa Engineering. He has over 40 years of experience leading design teams and bringing new solutions from concept to production.
Hammed Barakat Ibrahim El Awady is a 46-year old Egyptian electrical engineer with over 25 years of experience in design, supervision, and maintenance of infrastructure projects in Egypt, KSA, and Qatar. He has worked on a variety of projects including power stations, hospitals, cities, and irrigation networks. Currently he is a lead electrical engineer at Al-Joaib Consulting Engineering Office in Dammam, KSA where he is responsible for design review and ensuring designs meet codes and regulations.
Joulehub is an electronics company that provides prototyping, design, production, and testing services. It has locations in Switzerland, Italy, and Australia. The company's services include electronics prototyping using various methods, electronic system design documentation, printed circuit board design and development, surface mount technology and through-hole component production, and functional testing using customer-provided specifications or custom-developed equipment. Joulehub aims to guide clients' projects from idea to production.
The document provides an overview of the design process for a new office building tailored for legal firms in three sentences:
It introduces the project brief to design new office spaces for legal firms and training at a site in Quayside, outlines the data acquisition of a city model and point cloud data of the site, and describes the initial design development phases focusing on architectural and structural concepts.
Mohammed Shifaa Mahmood is seeking a position utilizing his M.Sc. in Architecture and experience in architectural design and AutoCAD. He has over 10 years of experience working on projects in Iraq including the design of libraries, police stations, military camps, and universities. His experience includes project architecture, design, and AutoCAD drafting. He is proficient in Arabic, English, French, Kurdish, AutoCAD, and Microsoft Office.
The Bend-Tech Group offers cost effective risk management solutions through their CDEC process to eliminate, substitute, and engineer safety controls. Their process includes design, engineering, consultation, and construction services. They provide on-site assessments, recommendations, and remain in contact throughout to ensure effective solutions that keep sites safe while reducing operating budgets.
Muhammad Naveed Saeed has over 10 years of experience managing GIS operations and production departments. He has managed projects involving GIS development, research, administration and implementation of GIS technologies and processes. He ensures compliance with quality plans and has established procedures for document, change, and material control for inspection and testing.
This document discusses CBI-Electric Solutions' capabilities for manufacturing renewable energy projects. It outlines their 8000 square meter manufacturing facility, production capacity of 8 units per week, and stringent quality control procedures. It also details their technical expertise including engineers, design software, and approvals processes. Finally it provides examples of previous renewable energy projects delivered and its approach to managing risks for customers.
City Surveys is a leading UK firm providing structural monitoring, engineering surveys, and investigations. They offer a wide range of services including topographic surveys, utilities mapping, monitoring, concrete scanning, and ground investigations. Established in 2003, they have grown to be a highly capable firm providing innovative solutions using the latest technology to benefit clients across many industries.
This document discusses an engineering services company's safety program and global operations. It outlines the company's initiatives to reduce accidents, including regular training, audits, and safety measures. Charts show declining accident rates over time. The company has received numerous safety awards from customers in recognition of its strong safety record. Globally, it has nearly 20,000 employees and a presence in 14 countries across North America, South America, Asia, and Europe.
Jithin Jose is an experienced MEP engineer with expertise in designing, selecting, and executing various MEP services including mechanical, electrical, and plumbing systems. He has skills in areas such as HVAC and duct design, sizing and routing, electrical panel scheduling, plumbing pipe and pump sizing, and applying industry standards and computer programs like Revit, AutoCAD, Excel, and HAP.
The document provides information on the design of a new office building tailored for legal firms in Newcastle upon Tyne, England. It includes the site location and constraints, inspiration for the design, laser scanning of the site, architectural plans for each level, and details on the structural, architectural, and MEP (mechanical, electrical, plumbing) models created in Revit. Next steps include clash detection between models in Navisworks and construction animations.
The CV summarizes Joseph Rey C. Marilla's work experience in telecommunications engineering. He has over 15 years of experience in roles such as telecom engineer, project engineer, implementation engineer, and mechanical engineer. His responsibilities have included designing telecom systems, preparing construction documents, implementing projects, and providing technical expertise and training. He is proficient in various design software such as Revit, AutoCAD, and ArcGIS.
Michael Halsey has over 40 years of experience in instrumentation design and engineering. He currently works as an Instrument Designer and Project Engineer for ENG-CAD LTD, where he is responsible for design of control and instrument systems, carrying out site surveys, and producing technical documentation. Previously he held several roles with increasing responsibilities in instrumentation design, project engineering, and CAD operations for offshore oil and gas companies.
SurePoint’s BIM on Site solutions take the accuracy of BIM from the office to the Construction site.
Digital Construction tools replace strings and tape measures
Nashaat Sanad is a procurement manager for Assad Said Co. Ltd. in Riyadh, Saudi Arabia with over 15 years of experience in construction project management. He has a bachelor's degree in civil engineering from Helwan University in Cairo, Egypt. His responsibilities include contract negotiation, cost control, and overseeing the procurement process for construction projects. Prior to his current role, he held positions as a technical office manager, senior technical office engineer, and site civil engineer on projects in Egypt.
This document provides a summary of the qualifications and experience of Mohammed Sameer, a mechanical engineer with experience in HVAC system design, installation, and commissioning for residential and commercial projects. He has over 17 months of experience in HVAC site execution. His roles have included system design using HVAC software, procurement, coordinating installation, ensuring quality, and assisting with commissioning and handover. He holds a BTech in Mechanical Engineering and diploma in Mechanical Engineering and is proficient in AutoCAD, MS Office, and HVAC design software.
Amel Shareef has over 10 years of experience as an electrical engineer, project manager, and consultant in Iraq. He has managed large scale projects including the construction of over 50 electrical substations. He also led the digitization of maps for regional redevelopment plans. Currently based in Halifax, NS, he has extensive experience managing budgets, supervising teams, and acting as a liaison between government and private sector organizations on infrastructure projects.
The document describes three freelance jobs for bar detailing and bending schedules for steel reinforcement in concrete structures. The first job was for 24 layout drawings and schedules for a building in Cairo. The second was for 27 drawings and schedules for the reinforcement of extension units. The third job was for 7 drawings minimizing steel weight for a 960m2 slab by achieving a 0.3% reduction in total steel weight.
Franco Pezza is a mechanical engineer with over 25 years of experience in machine design, project management, and engineering management. He has extensive experience designing machinery for industries such as metal forming, plastic molding, packaging, and pharmaceuticals. Pezza is proficient in CAD software and has managed projects from concept to completion, including managing teams, developing budgets and schedules, and meeting with clients. He holds a Bachelor's degree in Mechanical Engineering and has been granted one patent.
Energy Sector Insight: AVEVA BoCAD Integration by Patrick Reilly, Vista Pro...AVEVA Group plc
Patrick Reilly, Managing Partner, Vista Projects, presents an ‘Insight from the Energy Sector’ at the AVEVA World Summit 2016, New Orleans. A modern approach was adopted to skip all unnecessary steps, produce only what is required for fabrication and output directly from 3D model.As a result, Vista Projects significantly reduced project life cycle costs using AVEVA Integrated Engineering and Design (IE&D) solution and Information Management processes.Find out more how AVEVA can transform your business >> www.aveva.com
Robert J. Bailey is a piping designer with over 30 years of experience in the design and modeling of industrial piping systems using CAD software such as Intergraph SmartPlant 3D, Intergraph PDS/Pelican Forge 3D, Intergraph Microstation V8, and AutoPlant 3D. He has worked on numerous industrial projects for companies such as AECOM, DuPont, Amoco, BP, and DTE, providing piping designs, construction support, and assisting with on-site problem solving. Prior to becoming a piping designer, Bailey worked as a mechanical technician, broadband technician, and machinist.
This document is a resume for Ricardo Schiesser, summarizing his professional experience in mechanical engineering and new product development across various industries. It details his roles and accomplishments at companies like Whirlpool, eSolar Corporation, Siemens, and Engesa Engineering. He has over 40 years of experience leading design teams and bringing new solutions from concept to production.
Hammed Barakat Ibrahim El Awady is a 46-year old Egyptian electrical engineer with over 25 years of experience in design, supervision, and maintenance of infrastructure projects in Egypt, KSA, and Qatar. He has worked on a variety of projects including power stations, hospitals, cities, and irrigation networks. Currently he is a lead electrical engineer at Al-Joaib Consulting Engineering Office in Dammam, KSA where he is responsible for design review and ensuring designs meet codes and regulations.
Joulehub is an electronics company that provides prototyping, design, production, and testing services. It has locations in Switzerland, Italy, and Australia. The company's services include electronics prototyping using various methods, electronic system design documentation, printed circuit board design and development, surface mount technology and through-hole component production, and functional testing using customer-provided specifications or custom-developed equipment. Joulehub aims to guide clients' projects from idea to production.
The document provides an overview of the design process for a new office building tailored for legal firms in three sentences:
It introduces the project brief to design new office spaces for legal firms and training at a site in Quayside, outlines the data acquisition of a city model and point cloud data of the site, and describes the initial design development phases focusing on architectural and structural concepts.
Mohammed Shifaa Mahmood is seeking a position utilizing his M.Sc. in Architecture and experience in architectural design and AutoCAD. He has over 10 years of experience working on projects in Iraq including the design of libraries, police stations, military camps, and universities. His experience includes project architecture, design, and AutoCAD drafting. He is proficient in Arabic, English, French, Kurdish, AutoCAD, and Microsoft Office.
The Bend-Tech Group offers cost effective risk management solutions through their CDEC process to eliminate, substitute, and engineer safety controls. Their process includes design, engineering, consultation, and construction services. They provide on-site assessments, recommendations, and remain in contact throughout to ensure effective solutions that keep sites safe while reducing operating budgets.
Muhammad Naveed Saeed has over 10 years of experience managing GIS operations and production departments. He has managed projects involving GIS development, research, administration and implementation of GIS technologies and processes. He ensures compliance with quality plans and has established procedures for document, change, and material control for inspection and testing.
This document discusses CBI-Electric Solutions' capabilities for manufacturing renewable energy projects. It outlines their 8000 square meter manufacturing facility, production capacity of 8 units per week, and stringent quality control procedures. It also details their technical expertise including engineers, design software, and approvals processes. Finally it provides examples of previous renewable energy projects delivered and its approach to managing risks for customers.
City Surveys is a leading UK firm providing structural monitoring, engineering surveys, and investigations. They offer a wide range of services including topographic surveys, utilities mapping, monitoring, concrete scanning, and ground investigations. Established in 2003, they have grown to be a highly capable firm providing innovative solutions using the latest technology to benefit clients across many industries.
This document discusses an engineering services company's safety program and global operations. It outlines the company's initiatives to reduce accidents, including regular training, audits, and safety measures. Charts show declining accident rates over time. The company has received numerous safety awards from customers in recognition of its strong safety record. Globally, it has nearly 20,000 employees and a presence in 14 countries across North America, South America, Asia, and Europe.
Jassera Engineering is a leading engineering services company in Saudi Arabia that utilizes advanced technologies like 3D laser scanning to provide innovative engineering solutions. Their vision is to deliver exceptional services to clients by leveraging cutting-edge technology. Their mission is to provide innovative and efficient engineering solutions through continuous innovation and a commitment to quality. Core services include 3D laser scanning, modeling, digital twins, and surveys.
The Drone Brothers Construction Playbook details our capabilities in the construction drone industry. Learn how we can help you with your next construction drone photography project to increase cost savings and safety and to improve team collaboration globally.
AGH SCS is a Dubai-based outsourcing and engineering services company that is part of the AGH Consulting Group. It provides outsourcing solutions in telecommunications, energy, banking/finance, and information technology. For telecommunications clients, it offers consultancy, network design, and rollout services. It also operates a design office for fiber optic and wireless networks. In energy, it works on smart city, smart meter, and renewable energy projects. For banking and finance, it focuses on compliance, finance, IT, operations, and risk management outsourcing. It also provides various IT outsourcing services including software development, infrastructure, and digital services. AGH SCS has experience working with telecom
This document provides an introduction to AAM's survey and BIM capabilities. AAM is an Australian company founded in 1959 that provides aerial mapping, survey, GIS, and BIM services. They have experience surveying and creating BIM models for many iconic construction projects in Australia and abroad. Their services include cadastral, engineering, and topographic surveying as well as scan-to-BIM capabilities. They have the expertise to deliver survey data and BIM models in various formats to support clients' projects.
Technology has significantly impacted the construction sector by making processes more efficient. Before technology, construction work was done manually and took longer to complete projects. Now, advanced technologies like 3D printing, drones, and robotics equipment have benefited the industry. Technologies have increased accuracy and precision, project speed, worker safety, and the ability to build more complex structures. The construction industry is continually adapting new software and technologies to improve quality, productivity, and sustainability.
Consolidated Gulf Company is a 190 million USD conglomerate providing technology and engineering solutions across several industries. It has over 600 employees and offices in multiple countries. Some of its notable past projects include laser scanning of oil and gas facilities for Qatar Petroleum and KNPC of Kuwait. It offers multi-disciplinary engineering services including process, piping, civil, electrical and instrumentation design. It is also expert in laser scanning, BIM, GIS and manpower outsourcing.
This document provides an introduction and overview of Industrial Motion Control, LLC (IMC), a leading manufacturer of precision cam-actuated index drives, parts handlers, in-line conveyors and custom cams. It discusses IMC's history, facilities, products, applications engineering support, and commitment to quality. The document also includes sections on cam engineering concepts, the advantages of cam-actuated indexing, types of indexing motions, and the different types of index drives manufactured by IMC.
The document discusses the PipeFab plugin for Revit, which automates pipe fabrication and drafting. It reduces production of installation drawings by 60%. The plugin lists pipes, exports data to Excel, and generates CNC files. It provides direction labels and exports cutting sheets to Excel for easier review. The document also discusses several other BIM projects for facilities in Saudi Arabia.
Need for As-built data
Safety is a major driving factor for maintaining as-built data. Hazardous Area Classifications and Escape route designations and plans can quickly become out of date and ineffective if not based on up to date as-built data.
Effective maintenance and management of plants/facilities cannot be undertaken without the latest as-built data and asset registers. Operating manuals, plans and preventive maintenance procedures must be constantly updated to remain useful.
EPC contractors require as-built data for retrofit and revamp projects in order to efficiently undertake FEED and design projects for the upgrade or modification of existing brown field facilities and to ensure a clash free design
Up to date as-built data is often a mandatory requirement for companies going for ISO 9000 status or for companies governed by regulatory bodies
Vern John Alway is a robotic system machine designer with over 25 years of experience in industrial automation system design. He has designed controls for mobile robots used to test wi-fi reception and navigation systems with lidar and sonar sensors. Alway has qualifications in software development, microcontroller design, algorithm design, CAD, and electrical engineering. He has worked as an independent consultant and principal engineer, designing systems such as load centering cranes, engine sound analyzers, and automatic guided vehicles.
GIS Engineering & Construction is an integrated engineering and construction services company that has been in business since 1948. They provide services across multiple sectors including upstream, midstream, and downstream oil and gas. GIS offers services from initial conceptual planning through construction, commissioning, and long-term asset maintenance. They have over 2,000 employees in 21 locations across the US, Trinidad, and Canada.
This document is a resume for Sam Devassy Chungath, a BMS design and commissioning professional with over 8 years of experience working on airport and luxury hotel building projects. It provides details of his employment history with Qatari and Indian companies, areas of expertise in BMS systems, software proficiencies, and achievements in successfully completing projects like at Hamad International Airport and luxury hotels in Qatar.
The document outlines the expertise of an individual in areas such as automated project management, IT monitoring projects, SCADA systems, and IT service management. It provides examples of projects implemented for government agencies and private companies involving network monitoring, IT infrastructure management, and automated reporting and dashboards. Screenshots are included from monitoring systems developed for various clients.
Fiatech 2014 - Big BIM Implementation, Zuhair HaddadCCT International
This document provides details on a big BIM implementation for the Abu Dhabi International Airport Midfield Terminal Building project. It outlines CCC's BIM strategy, which included employing additional BIM engineers well before the project award to allow proper training. CCC utilized established BIM tools and workflows to facilitate integration with project controls. Notable benefits realized through BIM implementation included significant cost and time savings through clash detection and material take-offs, as well as improved construction planning and coordination through use of 4D simulations and a progressive interface model.
Infotech Enterprises provides engineering solutions and services to oil and gas companies to help meet their process and efficiency needs. They have expertise in offshore structures, engineering design, and experience across the entire oil and gas value chain. Their goal is to help control costs, speed up time to market, and provide reliable aftermarket support.
Infotech Enterprises provides engineering solutions and services to oil and gas companies to help meet their process and efficiency needs. They have expertise in areas like offshore platform and rig design, pipeline management, and refinery engineering. Their goal is to help clients control costs, speed up project timelines, and provide reliable long-term support.
Infinity Design and Construction Group provides full-service engineering, design, construction layout, and construction management. They utilize 3D scanning, modeling, and robotic total stations to capture existing conditions, design projects virtually, and guide construction layout to reduce costs and improve quality. Their goal is to provide clients with superior service from project conception through turnover of a turn-key project.
Emineo Ltd is an engineering company based in Mauritius that provides engineering solutions and project services to the sugar industry. As a junior engineer, the author's duties included engineering flow diagrams, design calculations, structural design drawings, plant layouts, piping layouts, and other projects. They gained proficiency in AutoCAD and received praise from superiors and clients for the quality of their work.
Similar to S&L Digital Signage - Case Study - APN Digital Gantry Signs Relocation (20)
Technoblade The Legacy of a Minecraft Legend.Techno Merch
Technoblade, born Alex on June 1, 1999, was a legendary Minecraft YouTuber known for his sharp wit and exceptional PvP skills. Starting his channel in 2013, he gained nearly 11 million subscribers. His private battle with metastatic sarcoma ended in June 2022, but his enduring legacy continues to inspire millions.
Architectural and constructions management experience since 2003 including 18 years located in UAE.
Coordinate and oversee all technical activities relating to architectural and construction projects,
including directing the design team, reviewing drafts and computer models, and approving design
changes.
Organize and typically develop, and review building plans, ensuring that a project meets all safety and
environmental standards.
Prepare feasibility studies, construction contracts, and tender documents with specifications and
tender analyses.
Consulting with clients, work on formulating equipment and labor cost estimates, ensuring a project
meets environmental, safety, structural, zoning, and aesthetic standards.
Monitoring the progress of a project to assess whether or not it is in compliance with building plans
and project deadlines.
Attention to detail, exceptional time management, and strong problem-solving and communication
skills are required for this role.
Decormart Studio is widely recognized as one of the best interior designers in Bangalore, known for their exceptional design expertise and ability to create stunning, functional spaces. With a strong focus on client preferences and timely project delivery, Decormart Studio has built a solid reputation for their innovative and personalized approach to interior design.
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page pmgdscunsri
Figma is a cloud-based design tool widely used by designers for prototyping, UI/UX design, and real-time collaboration. With features such as precision pen tools, grid system, and reusable components, Figma makes it easy for teams to work together on design projects. Its flexibility and accessibility make Figma a top choice in the digital age.
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANEFebless Hernane
CapCut is an easy-to-use video editing app perfect for beginners. To start, download and open CapCut on your phone. Tap "New Project" and select the videos or photos you want to edit. You can trim clips by dragging the edges, add text by tapping "Text," and include music by selecting "Audio." Enhance your video with filters and effects from the "Effects" menu. When you're happy with your video, tap the export button to save and share it. CapCut makes video editing simple and fun for everyone!
Explore the essential graphic design tools and software that can elevate your creative projects. Discover industry favorites and innovative solutions for stunning design results.
PDF SubmissionDigital Marketing Institute in NoidaPoojaSaini954651
https://www.safalta.com/online-digital-marketing/advance-digital-marketing-training-in-noidaTop Digital Marketing Institute in Noida: Boost Your Career Fast
[3:29 am, 30/05/2024] +91 83818 43552: Safalta Digital Marketing Institute in Noida also provides advanced classes for individuals seeking to develop their expertise and skills in this field. These classes, led by industry experts with vast experience, focus on specific aspects of digital marketing such as advanced SEO strategies, sophisticated content creation techniques, and data-driven analytics.
ARENA - Young adults in the workplace (Knight Moves).pdfKnight Moves
Presentations of Bavo Raeymaekers (Project lead youth unemployment at the City of Antwerp), Suzan Martens (Service designer at Knight Moves) and Adriaan De Keersmaeker (Community manager at Talk to C)
during the 'Arena • Young adults in the workplace' conference hosted by Knight Moves.
Revolutionizing the Digital Landscape: Web Development Companies in Indiaamrsoftec1
Discover unparalleled creativity and technical prowess with India's leading web development companies. From custom solutions to e-commerce platforms, harness the expertise of skilled developers at competitive prices. Transform your digital presence, enhance the user experience, and propel your business to new heights with innovative solutions tailored to your needs, all from the heart of India's tech industry.
S&L Digital Signage - Case Study - APN Digital Gantry Signs Relocation
1. Digital Gantry Signs Re-loaction
at Perth Airport
S&L Digital SignageS&L Digital Signage
C A S E S T U D Y
2. S&L Digital SignageS&L Digital Signage
C A S E S T U D Y
Offering a turnkey solution enables clients to all “Operatives Tickets” the “Plant Hire
select from any combination of our digital Companies”;
signage services to create a premium, large • Installation of relocated gantry's completed
format billboard and advertising solutions. as night works to minimise disruption to
The APN Digital gantry signs needed to be airport users;
relocated from Brierley Ave to Airport Drive at • Removal of and reinstatement of the digital
Perth Airport. This was a light engineering hardware - consisting of the tiles on the two
project involving the movement of two large gantry signs – including recommissioning.
scale digital gantry signs – they didn't need
moving far but the complexity of the project The unique challenges of this project related in
was such that multiple high risk services part to the Airport environment which is a 24/7
needed to be co-ordinated to ensure smooth operation and performing major works on the
sailing on this project. main entry/exit road into and out of the
Airport required precision timing with limited
The key turnkey elements of this works room for error.
included:
Our workshop team manufactured the various
• Design & Engineering of each unique elements of the metal works such as rio cages
element of the project including bolt cages, rio and base plates. These followed stringent
cages, base plates, excavation, footings and Engineering guidelines with post installation
the sign super-structures; certifications. Our shop drawings paid careful
• Engineering and manufacture of the signs attention to the need to create items that
columns to extend the gantry leg dimensions could be transported and lifted into place on
by xx mm; site within the parameters of a busy road
• Three phase power cables (supplied by environment.
others) run into pits at the base of each
footing, on the outer footings; Involvement of traffic management to manage
• Lift Plans & Works Movement Plans project the high risk nature of working in a high
managed to precise timings during the night at volume, time critical environment, was
off-peak times at the Airport; essential.
• OH&S & SWMS documents including
“Plant Certificates of Fitness” for all plant and
Our turnkey solution includes:
• Content
• Hardware
• Design & Engineering
• Digital Care
• Software
• Hosting
• Manufacture
• Permits & Traffic Mngt
• Project Management
• Installation
• Maintenance
3. S&L Digital SignageS&L Digital Signage
C A S E S T U D Y
To discuss your own digital signage strategy
please don’t hesitate to get in touch.
Tel: 08 9274 5151
Email: tim@signsandlines.com
www.digitalsignagewa.com.au
S&L Digital Signage, 5 Meliador Way, Midvale, Perth WA 6056