TRANSFORM YOUR PROJECTS INTO SUCCESS
JOULEHUB ELECTRONICS
JOULEHUB GMBH
TRANSFORM YOUR PROJECTS INTO SUCCESS
© JOULEHUB GmbH – info@joulehub.com
Agenda
• JOULEHUB
• JOULEHUB MEDITERRANEAN
• ELECTRONICS SERVICES
• ELECTRONICS PROTOTYPING
• ELECTRONICS DESIGN
• PRODUCTION
• TESTING
TRANSFORM YOUR PROJECTS INTO SUCCESS
© JOULEHUB GmbH – info@joulehub.com
Facts and Figures
 Microsoft Dynamics since 2004
 Robotics and Electronics projects
 Automotive, Packaging, Avio, Energy markets
 Electronics equipment mass production
 Switzerland:
Luzern
(Headquarters)
 Italy:
Bologna - Taranto
 Australia:
Melbourne
Company Locations
Core Business
 Digital Transformation: 4.0
 Integrators
 Electronics
 Robotics
 Mechatronics
 R&D
TRANSFORM YOUR PROJECTS INTO SUCCESS
© JOULEHUB GmbH – info@joulehub.com
JOULEHUB MEDITERRANEAN
ITALIAN COMPANY
DESIGN, PRODUCTION IN
ELECTRONICS
MOUNTING IN SMT AND THT
PROTOTYPING
TESTING
TRANSFORM YOUR PROJECTS INTO SUCCESS
© JOULEHUB GmbH – info@joulehub.com
OUR SERVICES
PROTOTYPING DESIGN PRODUCTION TEST
TRANSFORM YOUR PROJECTS INTO SUCCESS
© JOULEHUB GmbH – info@joulehub.com
1 2 3 4
IDENTIFICATIONPROTOTYPINGDEVELOPERSPRODUCTIONIDEA SOLUTIO
NS
PROTOTYPING PROCESS
TRANSFORM YOUR PROJECTS INTO SUCCESS
© JOULEHUB GmbH – info@joulehub.com
PROTOTYPING
Our engineering team consists of well-educated
professionals with a manufacturing background. Most of
our engineers have over 10 years experience. When we
receive your enquiry and 3D CAD file, we will review each
of your parts carefully and verify the manufacturability.
Based on our knowledge and experience, we will assist
you in selecting the best prototype method to meet your
quality expectations and budget needs.
Electronic system design is essential for crafting an
electronics prototype and documenting the business logic
of the solution assembly process. Our clients receive a
detailed vision of their project through a single product
requirements document. The document specifies the
project plan and budget, product requirements, solution
architecture, CPU characteristics, memory interfaces and
communication protocols, and estimated cost of
manufacturing.
TRANSFORM YOUR PROJECTS INTO SUCCESS
© JOULEHUB GmbH – info@joulehub.com
DESIGN
Thanks to the internal technical department, it develops
a project (whether or not derived from a feasibility
study), using an always updated CAD design system,
with unraveling of wiring diagrams and 3D projections,
in order to achieve the best layout of the printed circuit
board of the future product.
We are also able to design and develop
both the software and the firmware of the
product, thanks to the use of all the most
advanced development systems in the
industry.
TRANSFORM YOUR PROJECTS INTO SUCCESS
© JOULEHUB GmbH – info@joulehub.com
PRODUCTION
For the production of boards with components
in through-hole technology (Through Hole
Technology), both manual and with automatic
welding machines, the assembly stations are
all composed of the latest generation
equipment, pre-forming machines for both
taped and loose components, automatic and
semi-automatic assembly systems.
The internal department of SMT (Surface Mount
Technology) is made up of highly qualified personnel and
the latest technology machinery: fully automated systems
that allow maximum precision and process repetitiveness
with a production capacity of over 20,000
components/hour.
Lead free and tin lead processing.
The SMT line used allows the production of boards with
SMD components of any size and type according to the
IPC-A-610E standard: resistors and capacitors up to
01005, BGA (Ball Grid Array) and µBGA, QFP, TSOP,
SSOP, SOJ, PLCC, QFN, Pin-In-Paste components.
THT SMT
TRANSFORM YOUR PROJECTS INTO SUCCESS
© JOULEHUB GmbH – info@joulehub.com
TEST
JOULEHUB’s highly specialized technical staff, is able to perform any kind of functional test required, both using
the specifications and equipment provided by the customer, and independently developing special equipment able
to perform the different types of tests required. In this way JOULEHUB guarantees the design of the test machine,
the development of the necessary SW, the realization of the HW and the setting up of the testing machine. In the
hypothesis of high production, JOULEHUB realizes automatic test benches that use needle beds for both effective
and efficient testing. The instrumentation used also has an adequate fleet of instruments (oscilloscopes, digital
multimeters, waveform generators, etc.) managed under periodic scheduled maintenance.
TRANSFORM YOUR PROJECTS INTO SUCCESS
© JOULEHUB GmbH – info@joulehub.com
Q&A
TRANSFORM YOUR PROJECTS INTO SUCCESS
© JOULEHUB GmbH – info@joulehub.com
TRANSFORM YOUR PROJECTS INTO SUCCESS
© JOULEHUB GmbH – info@joulehub.com
JOULEHUB
info@joulehub.com
https://www.joulehub.com
SWITZERLAND
Schädrütihalde 16 – 6006 Luzern
ITALY
via Mori 6 40054 Budrio - Bologna
via Dante 205 74121 Taranto
AUSTRALIA
Suite 10, 3 Albert Coates Lane Melbourne, VIC 3000

JOULEHUB ELECTRONICS

  • 1.
    TRANSFORM YOUR PROJECTSINTO SUCCESS JOULEHUB ELECTRONICS JOULEHUB GMBH
  • 2.
    TRANSFORM YOUR PROJECTSINTO SUCCESS © JOULEHUB GmbH – info@joulehub.com Agenda • JOULEHUB • JOULEHUB MEDITERRANEAN • ELECTRONICS SERVICES • ELECTRONICS PROTOTYPING • ELECTRONICS DESIGN • PRODUCTION • TESTING
  • 3.
    TRANSFORM YOUR PROJECTSINTO SUCCESS © JOULEHUB GmbH – info@joulehub.com Facts and Figures  Microsoft Dynamics since 2004  Robotics and Electronics projects  Automotive, Packaging, Avio, Energy markets  Electronics equipment mass production  Switzerland: Luzern (Headquarters)  Italy: Bologna - Taranto  Australia: Melbourne Company Locations Core Business  Digital Transformation: 4.0  Integrators  Electronics  Robotics  Mechatronics  R&D
  • 4.
    TRANSFORM YOUR PROJECTSINTO SUCCESS © JOULEHUB GmbH – info@joulehub.com JOULEHUB MEDITERRANEAN ITALIAN COMPANY DESIGN, PRODUCTION IN ELECTRONICS MOUNTING IN SMT AND THT PROTOTYPING TESTING
  • 5.
    TRANSFORM YOUR PROJECTSINTO SUCCESS © JOULEHUB GmbH – info@joulehub.com OUR SERVICES PROTOTYPING DESIGN PRODUCTION TEST
  • 6.
    TRANSFORM YOUR PROJECTSINTO SUCCESS © JOULEHUB GmbH – info@joulehub.com 1 2 3 4 IDENTIFICATIONPROTOTYPINGDEVELOPERSPRODUCTIONIDEA SOLUTIO NS PROTOTYPING PROCESS
  • 7.
    TRANSFORM YOUR PROJECTSINTO SUCCESS © JOULEHUB GmbH – info@joulehub.com PROTOTYPING Our engineering team consists of well-educated professionals with a manufacturing background. Most of our engineers have over 10 years experience. When we receive your enquiry and 3D CAD file, we will review each of your parts carefully and verify the manufacturability. Based on our knowledge and experience, we will assist you in selecting the best prototype method to meet your quality expectations and budget needs. Electronic system design is essential for crafting an electronics prototype and documenting the business logic of the solution assembly process. Our clients receive a detailed vision of their project through a single product requirements document. The document specifies the project plan and budget, product requirements, solution architecture, CPU characteristics, memory interfaces and communication protocols, and estimated cost of manufacturing.
  • 8.
    TRANSFORM YOUR PROJECTSINTO SUCCESS © JOULEHUB GmbH – info@joulehub.com DESIGN Thanks to the internal technical department, it develops a project (whether or not derived from a feasibility study), using an always updated CAD design system, with unraveling of wiring diagrams and 3D projections, in order to achieve the best layout of the printed circuit board of the future product. We are also able to design and develop both the software and the firmware of the product, thanks to the use of all the most advanced development systems in the industry.
  • 9.
    TRANSFORM YOUR PROJECTSINTO SUCCESS © JOULEHUB GmbH – info@joulehub.com PRODUCTION For the production of boards with components in through-hole technology (Through Hole Technology), both manual and with automatic welding machines, the assembly stations are all composed of the latest generation equipment, pre-forming machines for both taped and loose components, automatic and semi-automatic assembly systems. The internal department of SMT (Surface Mount Technology) is made up of highly qualified personnel and the latest technology machinery: fully automated systems that allow maximum precision and process repetitiveness with a production capacity of over 20,000 components/hour. Lead free and tin lead processing. The SMT line used allows the production of boards with SMD components of any size and type according to the IPC-A-610E standard: resistors and capacitors up to 01005, BGA (Ball Grid Array) and µBGA, QFP, TSOP, SSOP, SOJ, PLCC, QFN, Pin-In-Paste components. THT SMT
  • 10.
    TRANSFORM YOUR PROJECTSINTO SUCCESS © JOULEHUB GmbH – info@joulehub.com TEST JOULEHUB’s highly specialized technical staff, is able to perform any kind of functional test required, both using the specifications and equipment provided by the customer, and independently developing special equipment able to perform the different types of tests required. In this way JOULEHUB guarantees the design of the test machine, the development of the necessary SW, the realization of the HW and the setting up of the testing machine. In the hypothesis of high production, JOULEHUB realizes automatic test benches that use needle beds for both effective and efficient testing. The instrumentation used also has an adequate fleet of instruments (oscilloscopes, digital multimeters, waveform generators, etc.) managed under periodic scheduled maintenance.
  • 11.
    TRANSFORM YOUR PROJECTSINTO SUCCESS © JOULEHUB GmbH – info@joulehub.com Q&A
  • 12.
    TRANSFORM YOUR PROJECTSINTO SUCCESS © JOULEHUB GmbH – info@joulehub.com
  • 13.
    TRANSFORM YOUR PROJECTSINTO SUCCESS © JOULEHUB GmbH – info@joulehub.com JOULEHUB info@joulehub.com https://www.joulehub.com SWITZERLAND Schädrütihalde 16 – 6006 Luzern ITALY via Mori 6 40054 Budrio - Bologna via Dante 205 74121 Taranto AUSTRALIA Suite 10, 3 Albert Coates Lane Melbourne, VIC 3000