Trials and Triumphs of
Blogging Internationally:
Paige Vitulli, Ph.D.
   pvitulli@southalabama.edu
      Peggy Delmas, Ph.D.
  pdelmas@southalabama.edu
       Susan Santoli, Ph.D.
   ssantoli@southalabama.edu
Leadership and Teacher Education
      College of Education
  University of South Alabama
        Mobile, AL USA
This presentation examines the trials
 and triumphs of using social
 networking to collaboratively reflect
 and publically engage learners in
 international travel experiences,
 cultural awareness, and
 interdisciplinary content.
The authors are faculty in a college of
 education who used blogging as a
 reflective tool and form of
 communication before, during, and
 after professional international travel
 to China and Ireland.
These trips occurred between and during academic
 semesters, respectively, affording the educators
 with different levels of participation among
 graduate and undergraduate students. The three
 bloggers were all female and all faculty
 members in the same college of education of a
 state university in the southeastern U.S. Both
 blogs were created in Blogger, a free weblog
 publishing tool from Google.
The opportunity to join the China trip was rather
  unexpected, allowing little time for extensive
  planning. The spontaneity and playfulness of the title
  Paige and Peggy’s Excellent Chinese Adventure
  reflected the nature of the blog. It was not planned in
  advance, and in fact, one of the authors had never
  blogged before. However, the chance to share with
  students and colleagues observations, reflections,
  experiences, and pictures from China, a country
  neither author had previously visited, was too rich to
  be missed.
• The authors took copious notes during their time in
  China and transferred these to the blog using an iPad as
  time allowed. There was a division of labor as one
  author was primarily responsible for writing about the
  trip, while the other documented it through photographs.
  The authors traded the iPad back and forth, inputting
  their entries on the tour bus, in airports, at the breakfast
  table, and in hotel rooms late at night or early in the
  morning depending on the author and extent of her jet
  lag.
Paige and Peggy's Excellent Chinese Adventure
http://paigeandpeggy.blogspot.com/
Unlike the trip to China, which occurred between
academic semesters, the trip to Ireland occurred during
an academic semester. The authors were selected to
present at the Ireland International Conference on
Education in Dublin. Because the blog authors knew of
the trip before their classes began, assignments were
developed for their own classes, as well as for students
taking an undergraduate education media course. The
blog was planned, created, and initial author posts were
made well before the arrival in Ireland. Because one
author was a co-author of the China blog, experiences in
creating and using the China blog were called on in the
preparation of the Ireland blog.
Vitulli & Santoli: Eyes on Ireland
http://usaeyesonireland.blogspot.com/
• “After struggling with the Internet until 3:30 in
  the morning and figuring out how to post on
  Blogger, where it may still be blocked, I awoke
  to a magnificent breakfast buffet in the very
  nice Marriott in Shanghai. Omelet and waffle
  bar, breads, pastries, cheeses, Chinese
  noodles, and fried rice were just some of the
  many choices.”
http://paigeandpeggy.blogspot.com/2012/05/monday-in-
  china.html
“We are posting from smart phones, netbooks,
  and iPhones, so please bear with us through
  any kinks. Additionally we are at the mercy of
  Wi-Fi and power outages (I'm not making this
  up). Also, some of us (ahem) are learning the
  art of blogging on the fly -- literally. So, if
  some of the links are not live, just copy and
  paste to your browser.”
  http://paigeandpeggy.blogspot.com/2012/05/disclaim
  er.html
“Prior to traveling to China, Peggy and I set up this blog and began
   posting our pre-travel China-related activities and plans - we even
   posted from the first leg of the journey in Atlanta. Neither of us
   anticipated being unable to access Blogger once we arrived in China
   (and Facebook for me). We were extremely disappointed for the short
   period of time we thought our communication with family, friends,
   colleagues, and students through daily blog posts was blocked. As we
   continued to develop and save posts, I decided to try publishing again
   and quickly realized that although I could not view the blog, from my
   iPhone or iPad app, I could post. (I contacted my daughter back home
   to confirm the posts were being published.) Thankfully we were back
   in the business of sharing the photos and descriptions of the
   fascinating country.”
  http://paigeandpeggy.blogspot.com/2012_09_01_archive.h
  tml
• TRIAL: Posting a PowerPoint full of images
    to the blog…the file size was too large to
    upload to SlideShare.
•   TRIUMPH: Discovering we could save the
    slideshow as a smaller file size.

• http://usaeyesonireland.blogspot.com/2012
    /10/iice-conference-workshop-
    developing.html
• Sunday, Oct. 28:
 St. Patrick’s Day,
 At Least For Us

• Reflecting on our
 professional quests…        Dr. Fionnuala Waldron, Dr. Susan Santoli,
                             Dr. Daire Keogh, Dr. Paige Vitulli
  o http://usaeyesonirelan
    d.blogspot.com/2012/1
    0/st-patricks-day-at-
    least-for-us-st.html
The Meeting on the
  Turret Stairs
• Feedback from
  students
    o http://usaeyesonireland.
      blogspot.com/2012/10/t
      he-meeting-on-turret-
      stairs.html
SITE Blogging Internationally
SITE Blogging Internationally

SITE Blogging Internationally

  • 1.
    Trials and Triumphsof Blogging Internationally:
  • 2.
    Paige Vitulli, Ph.D. pvitulli@southalabama.edu Peggy Delmas, Ph.D. pdelmas@southalabama.edu Susan Santoli, Ph.D. ssantoli@southalabama.edu Leadership and Teacher Education College of Education University of South Alabama Mobile, AL USA
  • 3.
    This presentation examinesthe trials and triumphs of using social networking to collaboratively reflect and publically engage learners in international travel experiences, cultural awareness, and interdisciplinary content.
  • 4.
    The authors arefaculty in a college of education who used blogging as a reflective tool and form of communication before, during, and after professional international travel to China and Ireland.
  • 5.
    These trips occurredbetween and during academic semesters, respectively, affording the educators with different levels of participation among graduate and undergraduate students. The three bloggers were all female and all faculty members in the same college of education of a state university in the southeastern U.S. Both blogs were created in Blogger, a free weblog publishing tool from Google.
  • 6.
    The opportunity tojoin the China trip was rather unexpected, allowing little time for extensive planning. The spontaneity and playfulness of the title Paige and Peggy’s Excellent Chinese Adventure reflected the nature of the blog. It was not planned in advance, and in fact, one of the authors had never blogged before. However, the chance to share with students and colleagues observations, reflections, experiences, and pictures from China, a country neither author had previously visited, was too rich to be missed.
  • 8.
    • The authorstook copious notes during their time in China and transferred these to the blog using an iPad as time allowed. There was a division of labor as one author was primarily responsible for writing about the trip, while the other documented it through photographs. The authors traded the iPad back and forth, inputting their entries on the tour bus, in airports, at the breakfast table, and in hotel rooms late at night or early in the morning depending on the author and extent of her jet lag.
  • 9.
    Paige and Peggy'sExcellent Chinese Adventure http://paigeandpeggy.blogspot.com/
  • 10.
    Unlike the tripto China, which occurred between academic semesters, the trip to Ireland occurred during an academic semester. The authors were selected to present at the Ireland International Conference on Education in Dublin. Because the blog authors knew of the trip before their classes began, assignments were developed for their own classes, as well as for students taking an undergraduate education media course. The blog was planned, created, and initial author posts were made well before the arrival in Ireland. Because one author was a co-author of the China blog, experiences in creating and using the China blog were called on in the preparation of the Ireland blog.
  • 11.
    Vitulli & Santoli:Eyes on Ireland http://usaeyesonireland.blogspot.com/
  • 12.
    • “After strugglingwith the Internet until 3:30 in the morning and figuring out how to post on Blogger, where it may still be blocked, I awoke to a magnificent breakfast buffet in the very nice Marriott in Shanghai. Omelet and waffle bar, breads, pastries, cheeses, Chinese noodles, and fried rice were just some of the many choices.” http://paigeandpeggy.blogspot.com/2012/05/monday-in- china.html
  • 13.
    “We are postingfrom smart phones, netbooks, and iPhones, so please bear with us through any kinks. Additionally we are at the mercy of Wi-Fi and power outages (I'm not making this up). Also, some of us (ahem) are learning the art of blogging on the fly -- literally. So, if some of the links are not live, just copy and paste to your browser.” http://paigeandpeggy.blogspot.com/2012/05/disclaim er.html
  • 14.
    “Prior to travelingto China, Peggy and I set up this blog and began posting our pre-travel China-related activities and plans - we even posted from the first leg of the journey in Atlanta. Neither of us anticipated being unable to access Blogger once we arrived in China (and Facebook for me). We were extremely disappointed for the short period of time we thought our communication with family, friends, colleagues, and students through daily blog posts was blocked. As we continued to develop and save posts, I decided to try publishing again and quickly realized that although I could not view the blog, from my iPhone or iPad app, I could post. (I contacted my daughter back home to confirm the posts were being published.) Thankfully we were back in the business of sharing the photos and descriptions of the fascinating country.” http://paigeandpeggy.blogspot.com/2012_09_01_archive.h tml
  • 15.
    • TRIAL: Postinga PowerPoint full of images to the blog…the file size was too large to upload to SlideShare. • TRIUMPH: Discovering we could save the slideshow as a smaller file size. • http://usaeyesonireland.blogspot.com/2012 /10/iice-conference-workshop- developing.html
  • 16.
    • Sunday, Oct.28: St. Patrick’s Day, At Least For Us • Reflecting on our professional quests… Dr. Fionnuala Waldron, Dr. Susan Santoli, Dr. Daire Keogh, Dr. Paige Vitulli o http://usaeyesonirelan d.blogspot.com/2012/1 0/st-patricks-day-at- least-for-us-st.html
  • 17.
    The Meeting onthe Turret Stairs • Feedback from students o http://usaeyesonireland. blogspot.com/2012/10/t he-meeting-on-turret- stairs.html