Duties & Responsibilities:
 Business administrator.
PRE-DESIGN PHASE
 Development of the program - States project objectives, develops master
schedule, and prepares budget. Determines space requirements, adjacency of
functions, expendability, constraints, and equipment.
 Selection of the site - Considers and selects a site such as constructability,
zoning, access, environmental contamination and cost.
 Site analysis - Identifies set backs, easements, boundaries, and elevations.
Allows the site tested and certified for contaminates. Geotechnical borings to
determine the structural and drainage capabilities of the soil.
 Selection of consultants – Selects consultants for accounting, legal and insurance
requirements for the project. Negotiates contracts with each of them.
 Appointment of an owner's representative for the project – Appoints someone as
my general agent to represent me in all matters relative to the project, including
oversight of the designer and construction.
DESIGN PHASE
 Design approval - Reviews and approves the plans and specifications at different
stages of completion.
 Budget approval - Approves professional cost estimate to ascertain whether the
proposed design will be within the original budget.
 Development of an FF&E (furniture, Fixture & Equipment) plan – Selects and
coordinates, space, pricing, procurement, storage, and installation.
 Making decisions on design options - Determines and selects colors and
textures, as well as making tough value engineering decisions.
 Creation of a project communications system - Opens timely communications
among the parties for a successful project.
 Development of a project financing and insurance program - Pays for the work
and makes sure the proper insurance coverage’s are in place before construction
begins.
 Establishment of allowances - Establishes cost allowances to be included in the
construction contract especially for the items of work that are not clearly defined
CONSTRUCTION PHASE
 Execution of the construction contract – Executes the contract with the contractor.
Requires the contractor to provide bonds and evidence of insurance before
mobilizing on the site. (If required)
 Approval of the construction schedule – Requires the contractor to provide a
comprehensive construction schedule soon after execution of the contract.
Reviews and approves the schedule, monitors the schedule during construction
and requires periodic updates from the contractor.
 Reconciliation of allowances - Finalizes the scope of the work for each cost
allowance and provides a change order to the contractor reconciling each
allowance as quickly as possible.
 Inspection and testing of the work - Continuously and comprehensively assists
the designer and contractor and inspects the work to insure compliance with the
contract documents.
 Project safety - Ensures that the contractor has a safety plan in place at the site.
 Approval of changes - Provides change orders and funds the cost of the
changes. Prepares and executes change orders promptly to keep the project on
schedule.
 Approval of colors and products - Approves colors to the outcome of the
scheduled end date.
 Monitoring subcontractors' and suppliers' payments –Programs and ensures that
all subcontractors and suppliers are being paid in a timely manner by the
contractor. (Lien waivers)
 Resolution of disputes - Resolves differences and conflicts quickly.
 Adjustment and administration of property insurance claims - Promptly
administers adjustment of the claim on behalf of all the covered parties of casualty
loss covered by property insurance, sometimes referred to as "builder's risk
insurance",
 Procurement and installation of FF&E - Administers in a timely manner.
 Development of an operations and maintenance staff - Hires staff in place prior
to operations and maintenance of the facility upon completion of the project and
turn over.
 Coordination of separate contractors - Decides to have more than one prime
contractor involved in the project such as kitchen equipment contractors or data
processing contractors. Coordinates the various prime contractors on the site.
 Conduct project meetings - Manages meetings and establishes both staff and
executive levels. Prepares agendas and minutes.
 Acceptance of the work - Authorizes and accepts certificate of acceptance from
the contractor.
 Establishment of a warranty program. Sets up a program, manages and
administers warranties.
POST CONSTRUCTION PHASE
 Creation of "as built' records – Requires the contractor the availability of a
complete "as built" set of plans for future remodeling, additions, and repairs.
 Administration of the warranty program - Oversees the warranty program after the
building is finished.
 Determination that everyone was paid - Ensures that the contractor has been
paid in full and has provided final lien releases.
 Facility operations and maintenance – Prepares and compiles comprehensive
operations and maintenance program to protect the investment made in the
building.
Hired as a Project Manager
Client : Arch. Francisco Manosa & Company
Project : 4 Storey Residential Building
Area : 1,500 m2
Address : Ayala Alabang, Muntinupa City

More Related Content

What's hot

2014-2015
2014-20152014-2015
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
juwes
 
Periodical meeting report and progress report
Periodical meeting report and progress reportPeriodical meeting report and progress report
Periodical meeting report and progress report
SANJEEV Wazir
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
Abdulaziz Kaya
 
Appli. for the Const. Mngr
Appli. for the Const. MngrAppli. for the Const. Mngr
Appli. for the Const. Mngr
ANSARI AFZAL افضل أنصاري
 
engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016
Mohamed Gamal
 
ZAKI Michael_CV 042014
ZAKI Michael_CV 042014ZAKI Michael_CV 042014
ZAKI Michael_CV 042014
Michael Khalil
 
Sachin parab
Sachin parabSachin parab
Sachin parab
SACHIN PARAB
 
ALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAHALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAH
Alaa Abughaidah
 
Kamal Farid CV
Kamal Farid CVKamal Farid CV
Kamal Farid CV
Kamal Farid
 
Responsibilities as vice president projects at jacobs 1.9.16
Responsibilities as vice president projects at jacobs 1.9.16Responsibilities as vice president projects at jacobs 1.9.16
Responsibilities as vice president projects at jacobs 1.9.16
Ravi Sharma
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
Tomy Pappu
 
Scott Frisa Resume
Scott Frisa ResumeScott Frisa Resume
Scott Frisa Resume
Scott Frisa
 
HARDEO SAFI Resume 1
HARDEO SAFI Resume 1HARDEO SAFI Resume 1
HARDEO SAFI Resume 1
hardeo safi
 
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz Ahmad
 
Killer Contract Provisions
Killer Contract ProvisionsKiller Contract Provisions
Killer Contract Provisions
Woods & Aitken LLP
 
Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)
Lee Maserian R.D.I.
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneering
Abdo Jamous El Jamous
 
Resume_JosephPirrone_11-2014
Resume_JosephPirrone_11-2014Resume_JosephPirrone_11-2014
Resume_JosephPirrone_11-2014
Joseph Pirrone
 

What's hot (19)

2014-2015
2014-20152014-2015
2014-2015
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
Periodical meeting report and progress report
Periodical meeting report and progress reportPeriodical meeting report and progress report
Periodical meeting report and progress report
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
 
Appli. for the Const. Mngr
Appli. for the Const. MngrAppli. for the Const. Mngr
Appli. for the Const. Mngr
 
engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016
 
ZAKI Michael_CV 042014
ZAKI Michael_CV 042014ZAKI Michael_CV 042014
ZAKI Michael_CV 042014
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
ALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAHALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAH
 
Kamal Farid CV
Kamal Farid CVKamal Farid CV
Kamal Farid CV
 
Responsibilities as vice president projects at jacobs 1.9.16
Responsibilities as vice president projects at jacobs 1.9.16Responsibilities as vice president projects at jacobs 1.9.16
Responsibilities as vice president projects at jacobs 1.9.16
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Scott Frisa Resume
Scott Frisa ResumeScott Frisa Resume
Scott Frisa Resume
 
HARDEO SAFI Resume 1
HARDEO SAFI Resume 1HARDEO SAFI Resume 1
HARDEO SAFI Resume 1
 
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
 
Killer Contract Provisions
Killer Contract ProvisionsKiller Contract Provisions
Killer Contract Provisions
 
Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneering
 
Resume_JosephPirrone_11-2014
Resume_JosephPirrone_11-2014Resume_JosephPirrone_11-2014
Resume_JosephPirrone_11-2014
 

Viewers also liked

Top 8 chief customer officer resume samples
Top 8 chief customer officer resume samplesTop 8 chief customer officer resume samples
Top 8 chief customer officer resume samples
davifumatti
 
Santiago. a. sandoval ppt
Santiago. a. sandoval pptSantiago. a. sandoval ppt
Santiago. a. sandoval ppt
Santiago Sandoval
 
Serba Serbi KPR
Serba Serbi KPRSerba Serbi KPR
Serba Serbi KPR
Meryana Tan
 
NOMBRES
NOMBRESNOMBRES
NOMBRES
duvael
 
Componentes de la sangre
Componentes de la sangreComponentes de la sangre
Componentes de la sangre
Lili Johanna
 
Analisisdelrenacimiento 160509010636
Analisisdelrenacimiento 160509010636Analisisdelrenacimiento 160509010636
Analisisdelrenacimiento 160509010636
yackelyn9
 
FloydBishopResume
FloydBishopResumeFloydBishopResume
FloydBishopResume
Floyd Bishop
 
Cross Platform Mobile Development in Denver, Colorado
Cross Platform Mobile Development in  Denver, ColoradoCross Platform Mobile Development in  Denver, Colorado
Cross Platform Mobile Development in Denver, Colorado
webprogr
 
Top 8 chief product officer resume samples
Top 8 chief product officer resume samplesTop 8 chief product officer resume samples
Top 8 chief product officer resume samples
davifumatti
 
Birlasoft_IBM_AIMS
Birlasoft_IBM_AIMSBirlasoft_IBM_AIMS
Birlasoft_IBM_AIMS
Rajat Khungar
 
Boardmaker pwrpt
Boardmaker pwrptBoardmaker pwrpt
Boardmaker pwrpt
donlisa
 
Cross Platform Mobile Development in Chicago, Illinois
Cross Platform Mobile Development in Chicago, IllinoisCross Platform Mobile Development in Chicago, Illinois
Cross Platform Mobile Development in Chicago, Illinois
webprogr
 
Tax workshop
Tax workshopTax workshop
Tax workshop
Abdullah Almuhana
 
How to build your own Cost Calculator with Excel and LeadDoubler
How to build your own Cost Calculator with Excel and LeadDoublerHow to build your own Cost Calculator with Excel and LeadDoubler
How to build your own Cost Calculator with Excel and LeadDoubler
LeadDoubler
 
Save costs leverage Mobile app Development Company -webprogr.com
Save costs leverage Mobile app Development Company -webprogr.comSave costs leverage Mobile app Development Company -webprogr.com
Save costs leverage Mobile app Development Company -webprogr.com
webprogr
 
POSICION INICIAL BASICA
POSICION INICIAL BASICAPOSICION INICIAL BASICA
POSICION INICIAL BASICA
Silvia053
 
Enfermedades inmunes
Enfermedades inmunesEnfermedades inmunes
Enfermedades inmunes
Lili Johanna
 
Manierismo
ManierismoManierismo
Manierismo
yackelyn9
 
Mapas 2 sivan
Mapas 2 sivanMapas 2 sivan
Mapas 2 sivan
Lili Johanna
 

Viewers also liked (19)

Top 8 chief customer officer resume samples
Top 8 chief customer officer resume samplesTop 8 chief customer officer resume samples
Top 8 chief customer officer resume samples
 
Santiago. a. sandoval ppt
Santiago. a. sandoval pptSantiago. a. sandoval ppt
Santiago. a. sandoval ppt
 
Serba Serbi KPR
Serba Serbi KPRSerba Serbi KPR
Serba Serbi KPR
 
NOMBRES
NOMBRESNOMBRES
NOMBRES
 
Componentes de la sangre
Componentes de la sangreComponentes de la sangre
Componentes de la sangre
 
Analisisdelrenacimiento 160509010636
Analisisdelrenacimiento 160509010636Analisisdelrenacimiento 160509010636
Analisisdelrenacimiento 160509010636
 
FloydBishopResume
FloydBishopResumeFloydBishopResume
FloydBishopResume
 
Cross Platform Mobile Development in Denver, Colorado
Cross Platform Mobile Development in  Denver, ColoradoCross Platform Mobile Development in  Denver, Colorado
Cross Platform Mobile Development in Denver, Colorado
 
Top 8 chief product officer resume samples
Top 8 chief product officer resume samplesTop 8 chief product officer resume samples
Top 8 chief product officer resume samples
 
Birlasoft_IBM_AIMS
Birlasoft_IBM_AIMSBirlasoft_IBM_AIMS
Birlasoft_IBM_AIMS
 
Boardmaker pwrpt
Boardmaker pwrptBoardmaker pwrpt
Boardmaker pwrpt
 
Cross Platform Mobile Development in Chicago, Illinois
Cross Platform Mobile Development in Chicago, IllinoisCross Platform Mobile Development in Chicago, Illinois
Cross Platform Mobile Development in Chicago, Illinois
 
Tax workshop
Tax workshopTax workshop
Tax workshop
 
How to build your own Cost Calculator with Excel and LeadDoubler
How to build your own Cost Calculator with Excel and LeadDoublerHow to build your own Cost Calculator with Excel and LeadDoubler
How to build your own Cost Calculator with Excel and LeadDoubler
 
Save costs leverage Mobile app Development Company -webprogr.com
Save costs leverage Mobile app Development Company -webprogr.comSave costs leverage Mobile app Development Company -webprogr.com
Save costs leverage Mobile app Development Company -webprogr.com
 
POSICION INICIAL BASICA
POSICION INICIAL BASICAPOSICION INICIAL BASICA
POSICION INICIAL BASICA
 
Enfermedades inmunes
Enfermedades inmunesEnfermedades inmunes
Enfermedades inmunes
 
Manierismo
ManierismoManierismo
Manierismo
 
Mapas 2 sivan
Mapas 2 sivanMapas 2 sivan
Mapas 2 sivan
 

Similar to Single Proprietorship JD

Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
Malik Ilyas KHATTAK
 
C4 - Scope of Work.pdf
C4 - Scope of Work.pdfC4 - Scope of Work.pdf
C4 - Scope of Work.pdf
DhilipKumar820864
 
MODULE 5.pptx
MODULE 5.pptxMODULE 5.pptx
MODULE 5.pptx
NithyaPotterhead
 
contract management, stages of contract management
 contract management, stages of contract management contract management, stages of contract management
contract management, stages of contract management
VISHAKA BOTHRA
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
Mohideen Sheik Asan
 
Project Manager Job Description
Project Manager Job DescriptionProject Manager Job Description
Project Manager Job Description
Trevor Rutter
 
Mar Dedal Portfolio
Mar Dedal PortfolioMar Dedal Portfolio
Mar Dedal Portfolio
eaglemhar
 
JAY CV 2016
JAY CV 2016JAY CV 2016
JAY CV 2016
Jay Diamante
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
Ayman Issa
 
Khaled Hubaisheh Resume
Khaled Hubaisheh ResumeKhaled Hubaisheh Resume
Khaled Hubaisheh Resume
Khaled Hbeisheh
 
COMPANY PORTFOLIO
COMPANY PORTFOLIOCOMPANY PORTFOLIO
COMPANY PORTFOLIO
Nols AD Greyling
 
Rev207 matrixexcelfile
Rev207 matrixexcelfileRev207 matrixexcelfile
Rev207 matrixexcelfile
jbonvier
 
Project Manager CV -Rev
Project Manager CV -RevProject Manager CV -Rev
Project Manager CV -Rev
Thanki M.L
 
Bonny Resume ( Proc)
Bonny Resume ( Proc)Bonny Resume ( Proc)
Bonny Resume ( Proc)
Bonny Sam
 
Green field making of production plant.ppt2
Green field making of production plant.ppt2Green field making of production plant.ppt2
Green field making of production plant.ppt2
LT COLONEL VIKRAM BAKSHI ( RETD)
 
Green field project making of production plant
Green field project making of production plantGreen field project making of production plant
Green field project making of production plant
Vikram Bakshi
 
CV (1)
CV (1)CV (1)
Project management
Project managementProject management
Project management
Benjamin Tan
 
Hammam Mostafa CV 2015 - Copy
Hammam Mostafa CV 2015 - CopyHammam Mostafa CV 2015 - Copy
Hammam Mostafa CV 2015 - Copy
Hammam solaiman
 
Moh CV Updated
Moh CV UpdatedMoh CV Updated
Moh CV Updated
Mohammad Khalaf
 

Similar to Single Proprietorship JD (20)

Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
 
C4 - Scope of Work.pdf
C4 - Scope of Work.pdfC4 - Scope of Work.pdf
C4 - Scope of Work.pdf
 
MODULE 5.pptx
MODULE 5.pptxMODULE 5.pptx
MODULE 5.pptx
 
contract management, stages of contract management
 contract management, stages of contract management contract management, stages of contract management
contract management, stages of contract management
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
Project Manager Job Description
Project Manager Job DescriptionProject Manager Job Description
Project Manager Job Description
 
Mar Dedal Portfolio
Mar Dedal PortfolioMar Dedal Portfolio
Mar Dedal Portfolio
 
JAY CV 2016
JAY CV 2016JAY CV 2016
JAY CV 2016
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
 
Khaled Hubaisheh Resume
Khaled Hubaisheh ResumeKhaled Hubaisheh Resume
Khaled Hubaisheh Resume
 
COMPANY PORTFOLIO
COMPANY PORTFOLIOCOMPANY PORTFOLIO
COMPANY PORTFOLIO
 
Rev207 matrixexcelfile
Rev207 matrixexcelfileRev207 matrixexcelfile
Rev207 matrixexcelfile
 
Project Manager CV -Rev
Project Manager CV -RevProject Manager CV -Rev
Project Manager CV -Rev
 
Bonny Resume ( Proc)
Bonny Resume ( Proc)Bonny Resume ( Proc)
Bonny Resume ( Proc)
 
Green field making of production plant.ppt2
Green field making of production plant.ppt2Green field making of production plant.ppt2
Green field making of production plant.ppt2
 
Green field project making of production plant
Green field project making of production plantGreen field project making of production plant
Green field project making of production plant
 
CV (1)
CV (1)CV (1)
CV (1)
 
Project management
Project managementProject management
Project management
 
Hammam Mostafa CV 2015 - Copy
Hammam Mostafa CV 2015 - CopyHammam Mostafa CV 2015 - Copy
Hammam Mostafa CV 2015 - Copy
 
Moh CV Updated
Moh CV UpdatedMoh CV Updated
Moh CV Updated
 

Single Proprietorship JD

  • 1. Duties & Responsibilities:  Business administrator. PRE-DESIGN PHASE  Development of the program - States project objectives, develops master schedule, and prepares budget. Determines space requirements, adjacency of functions, expendability, constraints, and equipment.  Selection of the site - Considers and selects a site such as constructability, zoning, access, environmental contamination and cost.  Site analysis - Identifies set backs, easements, boundaries, and elevations. Allows the site tested and certified for contaminates. Geotechnical borings to determine the structural and drainage capabilities of the soil.  Selection of consultants – Selects consultants for accounting, legal and insurance requirements for the project. Negotiates contracts with each of them.  Appointment of an owner's representative for the project – Appoints someone as my general agent to represent me in all matters relative to the project, including oversight of the designer and construction. DESIGN PHASE  Design approval - Reviews and approves the plans and specifications at different stages of completion.  Budget approval - Approves professional cost estimate to ascertain whether the proposed design will be within the original budget.  Development of an FF&E (furniture, Fixture & Equipment) plan – Selects and coordinates, space, pricing, procurement, storage, and installation.  Making decisions on design options - Determines and selects colors and textures, as well as making tough value engineering decisions.  Creation of a project communications system - Opens timely communications among the parties for a successful project.  Development of a project financing and insurance program - Pays for the work and makes sure the proper insurance coverage’s are in place before construction begins.  Establishment of allowances - Establishes cost allowances to be included in the construction contract especially for the items of work that are not clearly defined CONSTRUCTION PHASE  Execution of the construction contract – Executes the contract with the contractor. Requires the contractor to provide bonds and evidence of insurance before mobilizing on the site. (If required)
  • 2.  Approval of the construction schedule – Requires the contractor to provide a comprehensive construction schedule soon after execution of the contract. Reviews and approves the schedule, monitors the schedule during construction and requires periodic updates from the contractor.  Reconciliation of allowances - Finalizes the scope of the work for each cost allowance and provides a change order to the contractor reconciling each allowance as quickly as possible.  Inspection and testing of the work - Continuously and comprehensively assists the designer and contractor and inspects the work to insure compliance with the contract documents.  Project safety - Ensures that the contractor has a safety plan in place at the site.  Approval of changes - Provides change orders and funds the cost of the changes. Prepares and executes change orders promptly to keep the project on schedule.  Approval of colors and products - Approves colors to the outcome of the scheduled end date.  Monitoring subcontractors' and suppliers' payments –Programs and ensures that all subcontractors and suppliers are being paid in a timely manner by the contractor. (Lien waivers)  Resolution of disputes - Resolves differences and conflicts quickly.  Adjustment and administration of property insurance claims - Promptly administers adjustment of the claim on behalf of all the covered parties of casualty loss covered by property insurance, sometimes referred to as "builder's risk insurance",  Procurement and installation of FF&E - Administers in a timely manner.  Development of an operations and maintenance staff - Hires staff in place prior to operations and maintenance of the facility upon completion of the project and turn over.  Coordination of separate contractors - Decides to have more than one prime contractor involved in the project such as kitchen equipment contractors or data processing contractors. Coordinates the various prime contractors on the site.  Conduct project meetings - Manages meetings and establishes both staff and executive levels. Prepares agendas and minutes.  Acceptance of the work - Authorizes and accepts certificate of acceptance from the contractor.  Establishment of a warranty program. Sets up a program, manages and administers warranties. POST CONSTRUCTION PHASE
  • 3.  Creation of "as built' records – Requires the contractor the availability of a complete "as built" set of plans for future remodeling, additions, and repairs.  Administration of the warranty program - Oversees the warranty program after the building is finished.  Determination that everyone was paid - Ensures that the contractor has been paid in full and has provided final lien releases.  Facility operations and maintenance – Prepares and compiles comprehensive operations and maintenance program to protect the investment made in the building. Hired as a Project Manager Client : Arch. Francisco Manosa & Company Project : 4 Storey Residential Building Area : 1,500 m2 Address : Ayala Alabang, Muntinupa City