PROFESSIONAL EXPERIENCE
[ 10/2014 – Present ] NYC School Construction Authority Queens,
NY
Project Officer
Associated Projects: PS 313Q/PS 343Q, PS391Q
 Assisted with closeout document management, tracking, and expediting.
 Prepared and processed daily reports.
 Coordinated on a daily basis with the MEP trades, Architect, CM and Owner.
 Management of payment requisition documentation including preparation of and transmittals.
 Estimated contract costs and performed take-offs.
 Prepared and updated all contract documents with received addenda that associated with changes in scope of work, bids, scheduling, cost
analysis and proposal analysis.
 Attended and participated in progress meetings addressing scheduling issues, outstanding submittal items, design changes, and long lead items.
 Review of plans, specifications, and construction costs as well as other contract documents to identify errors.
[ 4/2014 – 6/2014 ] Ferreira Construction Brooklyn,
NY
Project Engineer
Associated Projects: Brooklyn Bridge Rehab
 Assisted site Superintendent coordinating with foreman crews.
 Provided end of shift work progress to Project Manager.
 Prepared T&M tickets and submitted to inspectors.
 Coordinated and managed weekly site safety meetings with the foreman crews.
 Reviewed foreman time sheets on daily basis for accuracy.
[ 2/2012 – 4/2014 ] On-Trac Construction Assoicates, Inc. Queens, NY / New York, NY
Project Manager – CM Projects / Asst. Project Manager – GC Projects
Associated Projects:
- Woolworth Building @ 233 Broadway Projects (CM) – Shop Architects 11th
Floor Renovation; Rainforest Alliance 28th
Floor Renovation;
NYPD DCAS 6th
& 7th
Floor Renovation, Cooling Tower @ 21 Barclay Street; Seaport Orthopedics 6th
Floor Renovation
- Verizon Projects (GC) – Fios Store @ 360 Bridge Street, Verizon Headquarters @ 140 West Street (Hurricane Sandy Rebuilds),
HVAC Upgrades @ 104 Broad Street,
- Tishman Projects (GC) – Port Authority Bus Terminal Control Center, CBS Control Room,
 Review of plans, specifications, and construction costs as well as other contract documents to identify errors.
 Prepared and updated all contract documents with received addenda that associated with changes in scope of work, bids, scheduling, cost
analysis and proposal analysis.
 Preparation and management of contracts/purchase orders documentation including preparation of logs, transmittals, and tracking.
 Attended and participated in progress meetings addressing scheduling issues, outstanding submittal items, design changes, and long lead items.
 Preparation of meeting minutes and distribution to all respective parties.
 Management of submittal documentation including preparation of logs, transmittals, and tracking.
 Preparation and management of change order documentation including preparation of logs, transmittals, and tracking.
 Management of payment requisition documentation including preparation of and transmittals.
 Estimated contract costs and performed take-offs.
 Coordinated on a daily basis with the MEP trades, Architect, and Owner.
[ 1/2011 – 9/23/2011 ] A. Ottavino Corp. Queens,
NY
Assistant Project Manager
Associated Projects: City Hall Interior Stone Renovation, Harry Winston Exterior Stone Restoration
 Review of plans, specifications, and construction costs as well as other contract documents to identify errors.
 Prepared and updated all contract documents with received addenda that associated with changes in scope of work, bids, scheduling, cost
analysis and proposal analysis.
 Management of submittal documentation including preparation of logs, transmittals, and tracking.
 Estimated contract costs and performed take-offs.
 Preparation of contracts and purchase orders to respective subcontractors and suppliers.
[ 9/2010 – 12/2010 ] BFC Partners Brooklyn, NY
Assistant Project Manager
 Management of expediting the repairs of condominium Owner’s homes.
 Management of repair documentation including preparation of logs, transmittals and tracking.
 Coordinated on a daily basis with the MEP trades, Developer and Owners.
 Attended and participated in progress meetings addressing scheduling issues and long lead items.
[ 6/2006 – 5/2010 ] C&L Contracting Corp. Queens, NY
Assistant Project Manager
Associated Projects: Central Park Police Precinct, Museum of the City of New York Addition, Engine Co. 239 & Engine Co. 259 Rehabilitations,
Queens Theatre in the Park Addition, Staten Island Zoo Reptile Wing Reconstruction
 Review of plans, specifications, and construction costs as well as other contract documents to identify errors.
 Prepared and updated all contract documents with received addenda that associated with changes in scope of work, bids, scheduling, cost
analysis and proposal analysis.
 Attended and participated in progress meetings addressing scheduling issues, outstanding submittal items, design changes, and long lead items.
 Management of submittal documentation including preparation of logs, transmittals, and tracking.
 Management of change order documentation including preparation of logs, transmittals, and tracking.
 Management of payment requisition documentation including preparation of and transmittals.
 Estimated contract costs and performed take-offs.
 Preparation of contracts and purchase orders to respective subcontractors and suppliers.
 Coordinated on a daily basis with the MEP trades, Construction Manager, Architect, and Owner.
EDUCATION
[ 8/04-5/06 ] SUNY Environmental Science & Forestry Syracuse, NY
Bachelor’s of Science in Construction Management
[ 8/02 – 5/04 ] SUNY Delhi Delhi, NY
Associates Degree in Construction Technology
LANGUAGES
 Spanish
CERTIFICATIONS
 30 Hour OSHA Safety Card
 10 Hour OSHA Safety Card
ACCREDITATIONS
 Associated General Contractors (AGC) chapter at SUNY Delhi, President (8/02 – 5/03) Vice President (8/03 – 5/04).
COMMUNITY ACTIVITIES
 Design and build of forms and placement of 18 concrete benches for SUNY Delhi campus through the AGC in winter of 2003.
 Design and build a sliding glass window office front for SUNY Delhi residence hall through the AGC in spring of 2004.
SKILLS AND AFFILIATIONS
 Microsoft Office Programs: Word, Excel, PowerPoint, Outlook
 Project/Construction Management: Oracle Primavera CM-13, Autodesk Constructware, Computer Ease

Scott Frisa Resume

  • 1.
    2 6 9E L I Z A B E T H A V E N U E , O C E A N S I D E , N Y 1 1 5 7 2 P H O N E 5 1 6 - 3 1 8 - 5 5 0 6 • E - M A I L S C O T T . F R I S A @ Y A H O O . C O M S C O T T F . F R I S A PROFESSIONAL EXPERIENCE [ 10/2014 – Present ] NYC School Construction Authority Queens, NY Project Officer Associated Projects: PS 313Q/PS 343Q, PS391Q  Assisted with closeout document management, tracking, and expediting.  Prepared and processed daily reports.  Coordinated on a daily basis with the MEP trades, Architect, CM and Owner.  Management of payment requisition documentation including preparation of and transmittals.  Estimated contract costs and performed take-offs.  Prepared and updated all contract documents with received addenda that associated with changes in scope of work, bids, scheduling, cost analysis and proposal analysis.  Attended and participated in progress meetings addressing scheduling issues, outstanding submittal items, design changes, and long lead items.  Review of plans, specifications, and construction costs as well as other contract documents to identify errors. [ 4/2014 – 6/2014 ] Ferreira Construction Brooklyn, NY Project Engineer Associated Projects: Brooklyn Bridge Rehab  Assisted site Superintendent coordinating with foreman crews.  Provided end of shift work progress to Project Manager.  Prepared T&M tickets and submitted to inspectors.  Coordinated and managed weekly site safety meetings with the foreman crews.  Reviewed foreman time sheets on daily basis for accuracy. [ 2/2012 – 4/2014 ] On-Trac Construction Assoicates, Inc. Queens, NY / New York, NY Project Manager – CM Projects / Asst. Project Manager – GC Projects Associated Projects: - Woolworth Building @ 233 Broadway Projects (CM) – Shop Architects 11th Floor Renovation; Rainforest Alliance 28th Floor Renovation; NYPD DCAS 6th & 7th Floor Renovation, Cooling Tower @ 21 Barclay Street; Seaport Orthopedics 6th Floor Renovation - Verizon Projects (GC) – Fios Store @ 360 Bridge Street, Verizon Headquarters @ 140 West Street (Hurricane Sandy Rebuilds), HVAC Upgrades @ 104 Broad Street, - Tishman Projects (GC) – Port Authority Bus Terminal Control Center, CBS Control Room,  Review of plans, specifications, and construction costs as well as other contract documents to identify errors.  Prepared and updated all contract documents with received addenda that associated with changes in scope of work, bids, scheduling, cost analysis and proposal analysis.  Preparation and management of contracts/purchase orders documentation including preparation of logs, transmittals, and tracking.  Attended and participated in progress meetings addressing scheduling issues, outstanding submittal items, design changes, and long lead items.  Preparation of meeting minutes and distribution to all respective parties.  Management of submittal documentation including preparation of logs, transmittals, and tracking.  Preparation and management of change order documentation including preparation of logs, transmittals, and tracking.  Management of payment requisition documentation including preparation of and transmittals.  Estimated contract costs and performed take-offs.
  • 2.
     Coordinated ona daily basis with the MEP trades, Architect, and Owner. [ 1/2011 – 9/23/2011 ] A. Ottavino Corp. Queens, NY Assistant Project Manager Associated Projects: City Hall Interior Stone Renovation, Harry Winston Exterior Stone Restoration  Review of plans, specifications, and construction costs as well as other contract documents to identify errors.  Prepared and updated all contract documents with received addenda that associated with changes in scope of work, bids, scheduling, cost analysis and proposal analysis.  Management of submittal documentation including preparation of logs, transmittals, and tracking.  Estimated contract costs and performed take-offs.  Preparation of contracts and purchase orders to respective subcontractors and suppliers. [ 9/2010 – 12/2010 ] BFC Partners Brooklyn, NY Assistant Project Manager  Management of expediting the repairs of condominium Owner’s homes.  Management of repair documentation including preparation of logs, transmittals and tracking.  Coordinated on a daily basis with the MEP trades, Developer and Owners.  Attended and participated in progress meetings addressing scheduling issues and long lead items. [ 6/2006 – 5/2010 ] C&L Contracting Corp. Queens, NY Assistant Project Manager Associated Projects: Central Park Police Precinct, Museum of the City of New York Addition, Engine Co. 239 & Engine Co. 259 Rehabilitations, Queens Theatre in the Park Addition, Staten Island Zoo Reptile Wing Reconstruction  Review of plans, specifications, and construction costs as well as other contract documents to identify errors.  Prepared and updated all contract documents with received addenda that associated with changes in scope of work, bids, scheduling, cost analysis and proposal analysis.  Attended and participated in progress meetings addressing scheduling issues, outstanding submittal items, design changes, and long lead items.  Management of submittal documentation including preparation of logs, transmittals, and tracking.  Management of change order documentation including preparation of logs, transmittals, and tracking.  Management of payment requisition documentation including preparation of and transmittals.  Estimated contract costs and performed take-offs.  Preparation of contracts and purchase orders to respective subcontractors and suppliers.  Coordinated on a daily basis with the MEP trades, Construction Manager, Architect, and Owner. EDUCATION [ 8/04-5/06 ] SUNY Environmental Science & Forestry Syracuse, NY Bachelor’s of Science in Construction Management [ 8/02 – 5/04 ] SUNY Delhi Delhi, NY Associates Degree in Construction Technology LANGUAGES  Spanish CERTIFICATIONS  30 Hour OSHA Safety Card  10 Hour OSHA Safety Card ACCREDITATIONS
  • 3.
     Associated GeneralContractors (AGC) chapter at SUNY Delhi, President (8/02 – 5/03) Vice President (8/03 – 5/04). COMMUNITY ACTIVITIES  Design and build of forms and placement of 18 concrete benches for SUNY Delhi campus through the AGC in winter of 2003.  Design and build a sliding glass window office front for SUNY Delhi residence hall through the AGC in spring of 2004. SKILLS AND AFFILIATIONS  Microsoft Office Programs: Word, Excel, PowerPoint, Outlook  Project/Construction Management: Oracle Primavera CM-13, Autodesk Constructware, Computer Ease