Curriculum Vitae Page 1/7
POSITION APPLIED: Civil Project Engineer
PERSONAL INFORMATION:
Name : JAY PANGANIBAN DIAMANTE
Age : 38 years old
Nationality : Filipino
Marital Status : Married
Passport No. : EC 1857619
Email : jaydiamante1218@yahoo.com/ jaydiamante1218@gmail.com
Mobile No. : +971565019724/ +971565065049063
Visa Status :
Years of Experience: 14 years & 5 months
CAREER OBJECTIVE:
To be able to work in a reputed construction company where advancement and opportunities career is
imparted to its employees, which will be a vital tools to become a better, productive and highly qualified
employee.
PROFESSIONAL QUALIFICATION:
• Graduated in Bachelor of Science in CIVIL ENGINEER– March 2001 at Western Institute of
Technology ( WIT ), Iloilo City, Philippines
PROFESSIONAL EXPERIENCED:
Company : HADEED EMIRATES CONTRACTING
Client : Al Jabber Transport & General Contracting LLC & ABU DHABI
DISTRIBUTION COMPANY (ADDC)
Location : Office 02, 2nd
. Floor Al Umran Tower Hamdan St. Abu Dhabi, U.A.E
Designation : Project Engineer
Inclusive date : August 2016 – Present
PROJECT EXECUTED:
- Construction of 33/11KV, 3x20 MVA Primary Substations and Extension of Bahya Grid
- Shahama- 4, Abu Dhabi, U.A.E
Company : HADEED EMIRATES CONTRACTING
Client : Morgan Advanced Materials
Location : Office 02, 2nd
. Floor Al Umran Tower Hamdan St. Abu Dhabi, U.A.E
Designation : Project Engineer
Inclusive date : June 2015 – August 2016
Curriculum Vitae Page 2/7
PROJECT EXECUTED:
- Construction of Fibre Processing Facilities Industrial Plant & Warehouse + G +1 Office building +
External Works and Road Networks
- Taweelah, Kizad A4, Abu Dhabi, U.A.E
Company : HADEED EMIRATES CONTRACTING
Client : Polysis Additive Technologies MME
Location : Office 02, 2nd
. Floor Al Umran Tower Hamdan St. Abu Dhabi, U.A.E
Designation : Senior Site Engineer
Inclusive date : February 2015 – May 2015
PROJECT EXECUTED:
- Construction of 1 Packs System Industrial Plant & Warehouse + G + 1 Office building + External
Works and Road Networks
- Taweelah, Kizad A8, Abu Dhabi, U.A.E
JOB DUTIES AND RESPONSIBILITIES:
 In coordination with other company departments ,arranges to procure approvals for shop
drawings and construction, including inspections, from various sections of local municipality,
public works department, Etisalat, Water & Electricity Authorities, Civil defence at the
commencement stage and if required at subsequent intermittent stages of the project and at
project completion/commissioning and handover..
 Direct coordinates and monitors the day to day activities of the site supervision team.
 Maintains safe and clean working environment by enforcing procedures, rules & regulations.
 Prepares a comprehensive schedule using accepted tools of jobs, activities, tasks and
requirements at various stages of the project and conveys to relevant departments.
 Ensures that the construction works carried out, achieves the stages within reasonable time as
set to forth in the approved construction plan of the project.
 Coordinates and arranges with relevant company departments for timely allocation of
Labour, tools, equipment, machinery, materials, finance and other rersources.Ensures that the
A material is as per specifications, and contract.
 Arranges, assist and compiles the preparation of engineering plans and specifications, bidding
documents, request for proposals, cost estimates and contract documents. Evaluates the
competence of contractors and vendors list.
 Review proposals, bid packages and bid submittals to assure compliance with the required
specification, laws and applicable regulatory standards.
 Control and supervises through all phases of development to construction completion and
project close out. Provide leadership direction to the project team and other internal and
external intities.Ensures adherence to schedule, budget, productivity rates and established
financial controls.
 Monitors sub-contractors compliance with quality, time, and budget parameters for the
project.
 Resolves contract dispute, verifies work completion, finalises sub-contractor invoices and
recommends to the operation manager whether the contractor payment request should be
approved or denied. Provides periodical, structured & detailed information to Project
Manager/Accounts department on works progress in order for them to prepare and present
project related progress invoices to the client.
 Responsible to ensure safe construction practices in the storage and movement of tools,
equipment and materials, adoption of safe work practices by all supervised levels & visitors,
the implantation of safety policy as directed by the client/consultants/main contractor.
 Prepares and presents regular progress reports to the Project Manager .Arranges for
Information, reports, documents and clarification sought by the Project team and /or the
Curriculum Vitae Page 3/7
Client, Consultant, Main Contractor, Regulatory Authorities.
 Provides expert advice on engineering drawings, materials and equipment selection, cost
estimates, cost benefits when variations are proposed and guides in its suitable
implementation. Ensures that the variation orders are approved by concerned entities prior to
commencing the works.
 In the absence of the Project Manager on site, performs the role of a project manager and
serves as company representative during project construction and provides technical
assistance to Client, Consultant, Main Contractor, regulatory Authorities, Sub-Contractors and
suppliers.
 Attends evening and /or weekend meetings as required and makes public presentation as
required.
 Performs other duties as assigned by the Operation Manager.
 Prepared shop drawing submittals, request for information and
inspection request for consultant approval prior for commencing the works on site.
Company : SUMMIT PROJEKT LTD
Client : Ministry of Education and Sports & Ministry of Water & Environment
Location : Luzira road, Kampala, Uganda, East Africa
Designation : Project Engineer
Inclusive date : April 2012 – January 2015
PROJECT EXECUTED:
- Construction of GF + 4th
floor Bukedea Technical College (5 School Block)
- Construction of 44.0 meters long Doho – Lwoba Reinforced Concrete Bridge + Construction of
200,000 m2
, Water Reservoir DAM + Rehabilitation of 120 kms., Irrigation scheme + Road networks.
JOB DUTIES AND RESPONSIBILITIES:
 Site execution and supervision.
 Responsible for preparing steel bars cutting list schedule.
 Supervise all construction activities including quality assurance, handle special project from
execution, supervision and monitoring.
 Responsible for scheduling, conducting and coordinating the technical and management aspect
of project.
 Site survey & setting out.
 Prepares manpower allocation daily report.
 Prepares technical requirement for site operation (materials, schedule, shop drawing)
 Prepares project schedule, update and revise according to project requirement and parameters.
 Prepares weekly and monthly progress report.
 Take off bill of quantities when required.
 Maintains project schedule by monitoring project progress coordinating activities and resolving
problems.
 Prepares project status reports by collecting, analysing and summarizing information and
trends and recommending actions.
 Attending weekly and monthly progress meeting with the project consultant, client, architect
and project manager.
 Manage and control the overall construction supervision of the project effectively.
 Manage to implement the project within the required time, budget and at a high level of
technical quality.
 Supervision and monitoring of the construction duties on site such as civil, structural and
architectural to ensure that the works is progressing in accordance with the plans, specification,
schedule , budget and quality standard.
 Direct coordinates and monitors the day to day activities of the site supervision team.
Curriculum Vitae Page 4/7
Company : SHIMIZU CORPORATION
Incorporated in JAPAN, Dubai branch
Client : Al Nakheel Properties
Location : Al Bwardy Building, Bank Street, Bur Dubai, U.A.E
Designation : Site Engineer
Inclusive date : November 2007 – MAY 2011
PROJECT EXECUTED:
- Construction of 2B + GF + 17th
Floors + Mechanical Floor + Roof deck Slab, Dubai Marina
Apartment, Residential towers (1 tower)
- Palm Jumiera Island, Dubai, United Arab Emirates
- Total project in site – 6 towers + 40 units’ townhouses by 3 floors each + 6 units’ swimming pool
with Gyms + 3 floors podium car park + road network & landscaping.
JOB DUTIES AND RESPONSIBILITIES:
• Supervision of day to day operations of the site works.
• Supervise all construction activities including quality assurance, handle special project from
execution, supervision and monitoring.
• Assist and support the project engineer and site/project manager in handling and monitoring
the progress of project.
• Engineer in charge for preparing consultant/client inspection prior for apartment unit hand
over.
• In charge for preparing and encoding data report of incoming and approved defect liability
period (DLP) by client/consultant complaint for all towers.
• Engineer in charge for defect snagging rectification prior for client/consultant approval.
• Engineer in charge for request for inspection of finish snagging to the consultant.
• Attending daily and weekly progress meeting with the project consultant, client, project
managers, site managers, project engineers and electromechanical engineers.
• Conduct inspection and approval for sub-contractors work prior for final hand over.
• Prepares subcontractors progress report prior for payment purposes.
• Coordinates with the subcontractors such as electromechanical works.
• Coordination for verification of extra claims raised by the contractor.
• Implement technical safety requirements for the project.
• Prepares ahead for daily program of works for the site foremen and supervisor.
• Prepares for ordering of site materials requirements.
• Ensure that the main contractors HSE plan is being implemented and report all non-
conformance to the HSE manager.
• Ensure construction QA/QC process is being implemented by the contractor & sub-contractors.
• Interact with project/ site manager for clarification in design/RFI etc.
Company : BIN ISMAEL INTERIORS & DÉCOR
Client : Sub- Contracting Works
Location : Deira, Dubai, United Arab Emirates (UAE)
Designation : FINISHING SITE ENGINEER
Inclusive date : June 2006 – September 2007
PROJECT EXECUTED:
• Subcontracting in finishing works (marble, granite & ceramics fixing, false ceiling, partition
wall, wall paper fixation, waterproofing, painting)
Curriculum Vitae Page 5/7
JOB DUTIES AND RESPONSIBILITIES:
• Prepares subcontractors progress report.
• Coordinates with the main contractor such as electromechanical works.
• Prepares manpower allocation daily report and prepares daily/weekly progress report.
• Prepares technical requirement for site operation (materials schedule, shop drawing)
• Prepares accomplishment report for billing purposes and project assessment.
• Take off bill of quantities when required.
• Attending final inspection for hand over the project.
• Attending daily/weekly progress meeting and coordination meeting to the others
subcontractors, general contractor and electromechanical.
• Site execution and supervision.
• Ensure that communication regarding any changes in plan have reached the main contractors
representative.
• Meet with the general contractor to keep the project on time and on budget.
Company : E. BRAVO ENGINEERING CONSTRUCTION
Client : Boracay Eco Village Resort, Boracay West Resort
Location : Iloilo City, Philippines
Designation : SITE ENGINEER
Inclusive date : September 2003 – April 2006
PROJECT EXECUTED:
- Construction of Four (4) kilometers Concrete pavement road network & Construction of GF + 5th
floors Boracay West Resort Hotel and GF + 5th
floors Boracay Eco Village Resort Hotel.
- Boracay Island, Malay, Aklan, Philippines
JOB DUTIES AND RESPONSIBILITIES:
• Supervise all construction activities including quality assurance, handle special project from
execution, supervision and monitoring.
• Conduct inspection and approval for sub-contractors work prior for final hand over.
• Prepares subcontractors progress report.
• Site survey & setting out.
• Coordinates with the subcontractors such as electromechanical works.
• Prepares manpower allocation daily report.
• Prepares daily/ weekly progress report.
• Prepares technical requirement for site operation (materials schedule, shop drawing)
• Prepares ahead weekly programs for resources ( manpower, equipment & materials)
• Prepares accomplishment report for billing purposes and project assessment.
• Take off bill of quantities when required.
• Any additional task assigned by the Project Engineer.
• Conduct inspection for the subcontractors work.
• Conduct inspection for field density test (FDT) with the project consultant prior for approval
for road concreting.
• Conduct inspection and road survey before road clearing and start operations.
• Analyse survey reports, maps, drawing blue prints and others.
• Attending final inspection for hand over the project.
• Attending daily and weekly progress meeting with the project consultant, client, and project
managers.
Company : KRIS DB CONSTRUCTION & SUPPLY
Client : Grand Dame Hotel
Location : Iloilo City, Philippines
Designation : SITE ENGINEER
Inclusive date : June 2002 – August 2003
Curriculum Vitae Page 6/7
PROJECT EXECUTED:
• Construction of BM + GF + 6st Floors Grand Dame Hotel
• Luna St. Lapaz, Iloilo City, Philippines
JOB DUTIES AND RESPONSIBILITIES:
• Supervise all construction activities including quality assurance, handle special project from
execution, supervision and monitoring.
• Responsible for scheduling, conducting and coordinating the technical and management aspect
of project.
• Site supervision and execution.
• Responsible for making monthly progress billing certificate.
• Conduct inspection with the project consultant approval for monthly progress prior for
payment assessment.
• Actively monitor for environment hazard.
• Prepares subcontractors progress report.
• Coordinates with the subcontractors such as electromechanical works.
• Prepares manpower allocation daily report.
• Prepares ahead weekly programs for resources ( manpower, equipment & materials)
• Plans execution of all civil related works and coordinates the works to electrical and
mechanical groups.
• Monitors the actual physical work at site..
• Ensures that all the works done are in accordance with the approved construction drawings,
contract documents , project specification and all applicable standards whether local or national
or international standards.
Company : KRIS DB CONSTRUCTION & SUPPLY
Location : Iloilo City, Philippines
Designation : ESTIMATOR /COST ENGINEER
Inclusive date : June 2001 – MAY 2002
Estimator Job Purpose : Prepares cost estimates by analysing proposals and requirements
JOB DUTIES AND RESPONSIBILITIES:
• Prepares work to be estimated by gathering proposals, blueprints, specifications and related
documents.
• Presents prepared estimates by assembling and displaying numerical and descriptive
information.
• Prepares special report by collecting, analysing, and summarizing information and trends.
• Identifies labor, materials and time requirements by studying proposals, blueprints,
specification, and related documents.
• Computes cost by analysing labor, materials and time requirements.
• Maintains cost data base by entering and back up data.
TRAINING/ SEMINAR ATTENDED:
1. BASIC FIREFIGTHING & FIRST AID August 22, 2016 (by Tatweer Industrial Inspection
Services, Abu Dhabi, UAE)
List of Competencies
• Overview of first aid.
• The principles of first aid.
• How to use proper application of fire extinguisher.
• Important parts of fire extinguisher.
Curriculum Vitae Page 7/7
2. SCAFFOLDING INSPECTOR March 02, 2016 (conducted by Tatweer Industrial
Inspection services, Abu Dhabi UAE)
List of Competencies
• Proper installation and dismantling of scaffolding.
• Proper utilization and allocation of every part of scaffolding.
• Risk during working at height in installing and dismantling of scaffolding.
3. COST ENGINEERING June 31, 2015 – September 04, 2015
(Chicago Training & Consultancy, Abu Dhabi)
List of Competencies
• Cost and Cost Estimating.
• Planning and Scheduling.
• Progress and Cost Control.
• Project Management and Economic Analysis.
• Statistics, Probability and Risk.
4. MONOZUKURI June 15, 2010 – August 15, 2010
List of Competencies
• Project Construction Management Planning.
• Work Safety and Precautions.
• Proper Utilization of Manpower’s and Equipment’s.
• Proper Communications and Deliberations.
• Cost Savings and timeframe scheduling.
• Quality of Works.
• Handover the Project before time duration.
5. IRRIGATION ENGINEERING March 05 – 07, 2001
List of Competencies
• Project Construction Management Planning.
• Proper Utilization of Manpower’s and Equipment’s.
• How to handle land disputes and land valuables.
• Proper and correct land demarcations and land surveys.
• Cost saving and timeframe scheduling.
• Hand over the project before time duration.
• The importance of slope gradient.
Engineering Skills:
• Site management and supervision
• Site administration - quality, time, material, project schedules, safety and overall technical
supervision.
• Quantity Surveying
• Construction of Reinforced Concrete Skeleton
• Construction of Finishing Works
• Construction of Building Works
• Estimation of Materials
• Preparing of Tender or BOQ
OTHER SKILLS:
- Computer literate in Microsoft Windows (Words, Excel, Power Point)
REFERENCES:
UPON REQUEST

JAY CV 2016

  • 1.
    Curriculum Vitae Page1/7 POSITION APPLIED: Civil Project Engineer PERSONAL INFORMATION: Name : JAY PANGANIBAN DIAMANTE Age : 38 years old Nationality : Filipino Marital Status : Married Passport No. : EC 1857619 Email : jaydiamante1218@yahoo.com/ jaydiamante1218@gmail.com Mobile No. : +971565019724/ +971565065049063 Visa Status : Years of Experience: 14 years & 5 months CAREER OBJECTIVE: To be able to work in a reputed construction company where advancement and opportunities career is imparted to its employees, which will be a vital tools to become a better, productive and highly qualified employee. PROFESSIONAL QUALIFICATION: • Graduated in Bachelor of Science in CIVIL ENGINEER– March 2001 at Western Institute of Technology ( WIT ), Iloilo City, Philippines PROFESSIONAL EXPERIENCED: Company : HADEED EMIRATES CONTRACTING Client : Al Jabber Transport & General Contracting LLC & ABU DHABI DISTRIBUTION COMPANY (ADDC) Location : Office 02, 2nd . Floor Al Umran Tower Hamdan St. Abu Dhabi, U.A.E Designation : Project Engineer Inclusive date : August 2016 – Present PROJECT EXECUTED: - Construction of 33/11KV, 3x20 MVA Primary Substations and Extension of Bahya Grid - Shahama- 4, Abu Dhabi, U.A.E Company : HADEED EMIRATES CONTRACTING Client : Morgan Advanced Materials Location : Office 02, 2nd . Floor Al Umran Tower Hamdan St. Abu Dhabi, U.A.E Designation : Project Engineer Inclusive date : June 2015 – August 2016
  • 2.
    Curriculum Vitae Page2/7 PROJECT EXECUTED: - Construction of Fibre Processing Facilities Industrial Plant & Warehouse + G +1 Office building + External Works and Road Networks - Taweelah, Kizad A4, Abu Dhabi, U.A.E Company : HADEED EMIRATES CONTRACTING Client : Polysis Additive Technologies MME Location : Office 02, 2nd . Floor Al Umran Tower Hamdan St. Abu Dhabi, U.A.E Designation : Senior Site Engineer Inclusive date : February 2015 – May 2015 PROJECT EXECUTED: - Construction of 1 Packs System Industrial Plant & Warehouse + G + 1 Office building + External Works and Road Networks - Taweelah, Kizad A8, Abu Dhabi, U.A.E JOB DUTIES AND RESPONSIBILITIES:  In coordination with other company departments ,arranges to procure approvals for shop drawings and construction, including inspections, from various sections of local municipality, public works department, Etisalat, Water & Electricity Authorities, Civil defence at the commencement stage and if required at subsequent intermittent stages of the project and at project completion/commissioning and handover..  Direct coordinates and monitors the day to day activities of the site supervision team.  Maintains safe and clean working environment by enforcing procedures, rules & regulations.  Prepares a comprehensive schedule using accepted tools of jobs, activities, tasks and requirements at various stages of the project and conveys to relevant departments.  Ensures that the construction works carried out, achieves the stages within reasonable time as set to forth in the approved construction plan of the project.  Coordinates and arranges with relevant company departments for timely allocation of Labour, tools, equipment, machinery, materials, finance and other rersources.Ensures that the A material is as per specifications, and contract.  Arranges, assist and compiles the preparation of engineering plans and specifications, bidding documents, request for proposals, cost estimates and contract documents. Evaluates the competence of contractors and vendors list.  Review proposals, bid packages and bid submittals to assure compliance with the required specification, laws and applicable regulatory standards.  Control and supervises through all phases of development to construction completion and project close out. Provide leadership direction to the project team and other internal and external intities.Ensures adherence to schedule, budget, productivity rates and established financial controls.  Monitors sub-contractors compliance with quality, time, and budget parameters for the project.  Resolves contract dispute, verifies work completion, finalises sub-contractor invoices and recommends to the operation manager whether the contractor payment request should be approved or denied. Provides periodical, structured & detailed information to Project Manager/Accounts department on works progress in order for them to prepare and present project related progress invoices to the client.  Responsible to ensure safe construction practices in the storage and movement of tools, equipment and materials, adoption of safe work practices by all supervised levels & visitors, the implantation of safety policy as directed by the client/consultants/main contractor.  Prepares and presents regular progress reports to the Project Manager .Arranges for Information, reports, documents and clarification sought by the Project team and /or the
  • 3.
    Curriculum Vitae Page3/7 Client, Consultant, Main Contractor, Regulatory Authorities.  Provides expert advice on engineering drawings, materials and equipment selection, cost estimates, cost benefits when variations are proposed and guides in its suitable implementation. Ensures that the variation orders are approved by concerned entities prior to commencing the works.  In the absence of the Project Manager on site, performs the role of a project manager and serves as company representative during project construction and provides technical assistance to Client, Consultant, Main Contractor, regulatory Authorities, Sub-Contractors and suppliers.  Attends evening and /or weekend meetings as required and makes public presentation as required.  Performs other duties as assigned by the Operation Manager.  Prepared shop drawing submittals, request for information and inspection request for consultant approval prior for commencing the works on site. Company : SUMMIT PROJEKT LTD Client : Ministry of Education and Sports & Ministry of Water & Environment Location : Luzira road, Kampala, Uganda, East Africa Designation : Project Engineer Inclusive date : April 2012 – January 2015 PROJECT EXECUTED: - Construction of GF + 4th floor Bukedea Technical College (5 School Block) - Construction of 44.0 meters long Doho – Lwoba Reinforced Concrete Bridge + Construction of 200,000 m2 , Water Reservoir DAM + Rehabilitation of 120 kms., Irrigation scheme + Road networks. JOB DUTIES AND RESPONSIBILITIES:  Site execution and supervision.  Responsible for preparing steel bars cutting list schedule.  Supervise all construction activities including quality assurance, handle special project from execution, supervision and monitoring.  Responsible for scheduling, conducting and coordinating the technical and management aspect of project.  Site survey & setting out.  Prepares manpower allocation daily report.  Prepares technical requirement for site operation (materials, schedule, shop drawing)  Prepares project schedule, update and revise according to project requirement and parameters.  Prepares weekly and monthly progress report.  Take off bill of quantities when required.  Maintains project schedule by monitoring project progress coordinating activities and resolving problems.  Prepares project status reports by collecting, analysing and summarizing information and trends and recommending actions.  Attending weekly and monthly progress meeting with the project consultant, client, architect and project manager.  Manage and control the overall construction supervision of the project effectively.  Manage to implement the project within the required time, budget and at a high level of technical quality.  Supervision and monitoring of the construction duties on site such as civil, structural and architectural to ensure that the works is progressing in accordance with the plans, specification, schedule , budget and quality standard.  Direct coordinates and monitors the day to day activities of the site supervision team.
  • 4.
    Curriculum Vitae Page4/7 Company : SHIMIZU CORPORATION Incorporated in JAPAN, Dubai branch Client : Al Nakheel Properties Location : Al Bwardy Building, Bank Street, Bur Dubai, U.A.E Designation : Site Engineer Inclusive date : November 2007 – MAY 2011 PROJECT EXECUTED: - Construction of 2B + GF + 17th Floors + Mechanical Floor + Roof deck Slab, Dubai Marina Apartment, Residential towers (1 tower) - Palm Jumiera Island, Dubai, United Arab Emirates - Total project in site – 6 towers + 40 units’ townhouses by 3 floors each + 6 units’ swimming pool with Gyms + 3 floors podium car park + road network & landscaping. JOB DUTIES AND RESPONSIBILITIES: • Supervision of day to day operations of the site works. • Supervise all construction activities including quality assurance, handle special project from execution, supervision and monitoring. • Assist and support the project engineer and site/project manager in handling and monitoring the progress of project. • Engineer in charge for preparing consultant/client inspection prior for apartment unit hand over. • In charge for preparing and encoding data report of incoming and approved defect liability period (DLP) by client/consultant complaint for all towers. • Engineer in charge for defect snagging rectification prior for client/consultant approval. • Engineer in charge for request for inspection of finish snagging to the consultant. • Attending daily and weekly progress meeting with the project consultant, client, project managers, site managers, project engineers and electromechanical engineers. • Conduct inspection and approval for sub-contractors work prior for final hand over. • Prepares subcontractors progress report prior for payment purposes. • Coordinates with the subcontractors such as electromechanical works. • Coordination for verification of extra claims raised by the contractor. • Implement technical safety requirements for the project. • Prepares ahead for daily program of works for the site foremen and supervisor. • Prepares for ordering of site materials requirements. • Ensure that the main contractors HSE plan is being implemented and report all non- conformance to the HSE manager. • Ensure construction QA/QC process is being implemented by the contractor & sub-contractors. • Interact with project/ site manager for clarification in design/RFI etc. Company : BIN ISMAEL INTERIORS & DÉCOR Client : Sub- Contracting Works Location : Deira, Dubai, United Arab Emirates (UAE) Designation : FINISHING SITE ENGINEER Inclusive date : June 2006 – September 2007 PROJECT EXECUTED: • Subcontracting in finishing works (marble, granite & ceramics fixing, false ceiling, partition wall, wall paper fixation, waterproofing, painting)
  • 5.
    Curriculum Vitae Page5/7 JOB DUTIES AND RESPONSIBILITIES: • Prepares subcontractors progress report. • Coordinates with the main contractor such as electromechanical works. • Prepares manpower allocation daily report and prepares daily/weekly progress report. • Prepares technical requirement for site operation (materials schedule, shop drawing) • Prepares accomplishment report for billing purposes and project assessment. • Take off bill of quantities when required. • Attending final inspection for hand over the project. • Attending daily/weekly progress meeting and coordination meeting to the others subcontractors, general contractor and electromechanical. • Site execution and supervision. • Ensure that communication regarding any changes in plan have reached the main contractors representative. • Meet with the general contractor to keep the project on time and on budget. Company : E. BRAVO ENGINEERING CONSTRUCTION Client : Boracay Eco Village Resort, Boracay West Resort Location : Iloilo City, Philippines Designation : SITE ENGINEER Inclusive date : September 2003 – April 2006 PROJECT EXECUTED: - Construction of Four (4) kilometers Concrete pavement road network & Construction of GF + 5th floors Boracay West Resort Hotel and GF + 5th floors Boracay Eco Village Resort Hotel. - Boracay Island, Malay, Aklan, Philippines JOB DUTIES AND RESPONSIBILITIES: • Supervise all construction activities including quality assurance, handle special project from execution, supervision and monitoring. • Conduct inspection and approval for sub-contractors work prior for final hand over. • Prepares subcontractors progress report. • Site survey & setting out. • Coordinates with the subcontractors such as electromechanical works. • Prepares manpower allocation daily report. • Prepares daily/ weekly progress report. • Prepares technical requirement for site operation (materials schedule, shop drawing) • Prepares ahead weekly programs for resources ( manpower, equipment & materials) • Prepares accomplishment report for billing purposes and project assessment. • Take off bill of quantities when required. • Any additional task assigned by the Project Engineer. • Conduct inspection for the subcontractors work. • Conduct inspection for field density test (FDT) with the project consultant prior for approval for road concreting. • Conduct inspection and road survey before road clearing and start operations. • Analyse survey reports, maps, drawing blue prints and others. • Attending final inspection for hand over the project. • Attending daily and weekly progress meeting with the project consultant, client, and project managers. Company : KRIS DB CONSTRUCTION & SUPPLY Client : Grand Dame Hotel Location : Iloilo City, Philippines Designation : SITE ENGINEER Inclusive date : June 2002 – August 2003
  • 6.
    Curriculum Vitae Page6/7 PROJECT EXECUTED: • Construction of BM + GF + 6st Floors Grand Dame Hotel • Luna St. Lapaz, Iloilo City, Philippines JOB DUTIES AND RESPONSIBILITIES: • Supervise all construction activities including quality assurance, handle special project from execution, supervision and monitoring. • Responsible for scheduling, conducting and coordinating the technical and management aspect of project. • Site supervision and execution. • Responsible for making monthly progress billing certificate. • Conduct inspection with the project consultant approval for monthly progress prior for payment assessment. • Actively monitor for environment hazard. • Prepares subcontractors progress report. • Coordinates with the subcontractors such as electromechanical works. • Prepares manpower allocation daily report. • Prepares ahead weekly programs for resources ( manpower, equipment & materials) • Plans execution of all civil related works and coordinates the works to electrical and mechanical groups. • Monitors the actual physical work at site.. • Ensures that all the works done are in accordance with the approved construction drawings, contract documents , project specification and all applicable standards whether local or national or international standards. Company : KRIS DB CONSTRUCTION & SUPPLY Location : Iloilo City, Philippines Designation : ESTIMATOR /COST ENGINEER Inclusive date : June 2001 – MAY 2002 Estimator Job Purpose : Prepares cost estimates by analysing proposals and requirements JOB DUTIES AND RESPONSIBILITIES: • Prepares work to be estimated by gathering proposals, blueprints, specifications and related documents. • Presents prepared estimates by assembling and displaying numerical and descriptive information. • Prepares special report by collecting, analysing, and summarizing information and trends. • Identifies labor, materials and time requirements by studying proposals, blueprints, specification, and related documents. • Computes cost by analysing labor, materials and time requirements. • Maintains cost data base by entering and back up data. TRAINING/ SEMINAR ATTENDED: 1. BASIC FIREFIGTHING & FIRST AID August 22, 2016 (by Tatweer Industrial Inspection Services, Abu Dhabi, UAE) List of Competencies • Overview of first aid. • The principles of first aid. • How to use proper application of fire extinguisher. • Important parts of fire extinguisher.
  • 7.
    Curriculum Vitae Page7/7 2. SCAFFOLDING INSPECTOR March 02, 2016 (conducted by Tatweer Industrial Inspection services, Abu Dhabi UAE) List of Competencies • Proper installation and dismantling of scaffolding. • Proper utilization and allocation of every part of scaffolding. • Risk during working at height in installing and dismantling of scaffolding. 3. COST ENGINEERING June 31, 2015 – September 04, 2015 (Chicago Training & Consultancy, Abu Dhabi) List of Competencies • Cost and Cost Estimating. • Planning and Scheduling. • Progress and Cost Control. • Project Management and Economic Analysis. • Statistics, Probability and Risk. 4. MONOZUKURI June 15, 2010 – August 15, 2010 List of Competencies • Project Construction Management Planning. • Work Safety and Precautions. • Proper Utilization of Manpower’s and Equipment’s. • Proper Communications and Deliberations. • Cost Savings and timeframe scheduling. • Quality of Works. • Handover the Project before time duration. 5. IRRIGATION ENGINEERING March 05 – 07, 2001 List of Competencies • Project Construction Management Planning. • Proper Utilization of Manpower’s and Equipment’s. • How to handle land disputes and land valuables. • Proper and correct land demarcations and land surveys. • Cost saving and timeframe scheduling. • Hand over the project before time duration. • The importance of slope gradient. Engineering Skills: • Site management and supervision • Site administration - quality, time, material, project schedules, safety and overall technical supervision. • Quantity Surveying • Construction of Reinforced Concrete Skeleton • Construction of Finishing Works • Construction of Building Works • Estimation of Materials • Preparing of Tender or BOQ OTHER SKILLS: - Computer literate in Microsoft Windows (Words, Excel, Power Point) REFERENCES: UPON REQUEST