Rules
• ROI=
𝑃𝑟𝑜𝑓𝑖𝑡
𝑇𝑜𝑡𝑎𝑙 𝐶𝑎𝑝𝑖𝑡𝑎𝑙 𝐼𝑛𝑣𝑒𝑠𝑡𝑚𝑒𝑛𝑡
• ROII=
𝑖𝑛𝑐𝑟𝑒𝑚𝑒𝑛𝑡𝑎𝑙 𝑃𝑟𝑜𝑓𝑖𝑡
𝑑𝑖𝑓𝑓𝑒𝑟𝑒𝑛𝑐𝑒 𝑖𝑛 𝐶𝑎𝑝𝑖𝑡𝑎𝑙 𝐼𝑛𝑣𝑒𝑠𝑡𝑚𝑒𝑛𝑡
• Minimum Payout Period =
𝐷𝑒𝑝𝑟𝑒𝑐𝑖𝑎𝑏𝑙𝑒 𝐹𝑖𝑥𝑒𝑑 𝐼𝑛𝑣𝑒𝑠𝑡𝑚𝑒𝑛𝑡
𝑁𝑒𝑡 𝑐𝑎𝑠ℎ 𝑓𝑙𝑜𝑤
• Capitalized cost=
𝐶𝑅 1+𝑖 𝑛
1+𝑖 𝑛−1
+ 𝑉𝑠 +
𝑎𝑛𝑛𝑢𝑎𝑙 𝑐𝑎𝑠ℎ 𝑒𝑥𝑝𝑒𝑛𝑠𝑒𝑠
𝑖
+ 𝑤𝑜𝑟𝑘𝑖𝑛𝑔
Question 1
• An existing plant has been operating in such a way that a large
amount of heat is being lost in the waste gases. It has been proposed
to save money by recovering the heat that is now being lost. Four
different heat exchangers have been designed to recover the heat,
and all prices, costs, and savings have been calculated for each of the
designs. The results of these calculations are presented in the
following:
Design No. 1 No. 2 No. 3 No. 4
Total initial installed cost 10000 16000 20000 26000
Operating cost $/yr 100 100 100 100
Fixed charges, % of initial cost/yr 20 20 20 20
Value of heat saved $/year 4100 6000 6900 8850
• Annual saving= heat saved – operating cost – fixed cost
• For No.1: annual saving = 4100- 100 – (0.2*10000) = 2000$
• For No.2: annual saving = 6000 – 100- (0.2*16000) = 2700$
• For No.3: annual saving = 6900 – 100- (0.2*20000) = 2800$
• For No.4: annual saving = 8850 – 100 – (0.2*26000) = 3550$
Design No. 1 No. 2 No. 3 No. 4
Total initial installed cost 10000 16000 20000 26000
Operating cost $/yr 100 100 100 100
Fixed charges, % of initial cost/yr 20 20 20 20
Value of heat saved $/year 4100 6000 6900 8850
• Return on incremental investment can be calculated by dividing the
additional profit from the new method by the increase in cost to get
the new method.
• Return on incremental investment from 1 to 2
• (2700-2000)/ (16000-10000) = 11.7% (accepted)
• From 2 to 3 = 2.5% (refused)
• From 2 to 4 = 850/10000 = 8.5% (refused)
Question 2
• A company has two alternative investments which are being
considered Company policies, based on the current economic
situation, dictate a minimum annual return on the original investment
of 13% after taxes must be predicted for any unnecessary investment
with interest on investment not included as a cost. Company policies
also dictate that, where applicable, straight-line depreciation is used,
for time-value of money interpretation, end of year and profit analysis
is used in land value and prestart up costs can be ignored. Given the
following data:
Question 2
• Determine and comment which investment, if any, should be made by
alternative –analysis profitability- evaluation methods of:
• (i) Rate of return on initial investment
(ii) Minimum payout period with no interest charge
(iii)Capitalized cost
Investment Inintial cost
$
Working
cost. $
Salvage
Value $
Service life
years
Anuual cash
flow $
Annual
Expenses $
1 360,000 24,000 32,000 7 110,000 60,000
2 450,000 40,000 50,000 8 120,000 44,000
Answer - Rate of return on investment
ROII=
𝑃𝑟𝑜𝑓𝑖𝑡
𝑇𝑜𝑡𝑎𝑙 𝐶𝑎𝑝𝑖𝑡𝑎𝑙 𝐼𝑛𝑣𝑒𝑠𝑡𝑚𝑒𝑛𝑡
Profit= cash flow –depreciation = 110000-[(360000-32000)/7] = 63142.9$
First investment:
63142.9
360000+24000
=16%
Second investment : 14.3%
Investment Inintial cost
$
Working
cost. $
Salvage
Value $
Service life
years
Anuual cash
flow $
Annual
Expenses $
1 360,000 24,000 32,000 7 110,000 60,000
2 450,000 40,000 50,000 8 120,000 44,000
Answer - Minimum payout period with no
interest charge
• First alternative:
360000−32000
110000
= 2.98 𝑦𝑒𝑎𝑟𝑠
• Second alternative:
450000−50000
120000
= 3.33
• First option is better
Minimum Payout Period =
𝐷𝑒𝑝𝑟𝑒𝑐𝑖𝑎𝑏𝑙𝑒 𝐹𝑖𝑥𝑒𝑑 𝐼𝑛𝑣𝑒𝑠𝑡𝑚𝑒𝑛𝑡
𝑁𝑒𝑡 𝑐𝑎𝑠ℎ 𝑓𝑙𝑜𝑤
Investment Inintial cost
$
Working
cost. $
Salvage
Value $
Service life
years
Anuual cash
flow $
Annual
Expenses $
1 360,000 24,000 32,000 7 110,000 60,000
2 450,000 40,000 50,000 8 120,000 44,000
Answer – Capitalized cost
• 1st: capitalized=
328000 1+0.13 7
1+0.13 7−1
+32000 +
60000
0.13
+ 24000 =1088033.4$
• 2nd: capitalized=
400000 1+0.13 8
1+0.13 8−1
+50000 +
44000
0.13
+ 40000 =1069651.4$
Capitalized cost=
𝐶𝑅 1+1 𝑛
1+𝑖 𝑛−1
+ 𝑉𝑠 +
𝑎𝑛𝑛𝑢𝑎𝑙 𝑐𝑎𝑠ℎ 𝑒𝑥𝑝𝑒𝑛𝑠𝑒𝑠
𝑖
+ 𝑤𝑜𝑟𝑘𝑖𝑛𝑔
Question 3
• Two reactors are considered for a company as shown below, for an
effictive annual intrest of 20%, analyze which one of the two reactors
should be bought to fullfill the ROI conditions and maximum payback
time of 3 years
Item Reactor 1 Reactor 2
Initial Cost 25000 15000
Maintenance 2000 4000
Salvage value 3000 -
Sevice Time 4 6
Yield 70% 50%
Feed amount 100 Kg
Pricing of product
300 $
Question 3
• Reactor 1:
• Profit = 21000- [2000+((25000-3000)/4)] = 13500$
• ROI = 54%
• Reactor 2:
• Profit = 15000 - [4000+(15000/6)] = 8500$
• ROI = 56%
• Both reactors fulfills the ROI conditions
• ROII: 50% so Reactor one is better in case of return on incremental
investment
• The pay back of both reactors is less than 3 years
• So reactor one is better
Question 4
• A plant needs to increase its production by either of two alternatives,
expansion or building a new facility.
• The expansion would cost 130000$, labor cost will increase to
150000$, and regarding the overheads, taxes, depreciation and
insurance will be 60000$ per year.
• Second Alternative will have an initial cost of 200000, labor cost of
120000 and overheads of 70000, the annual insurance and taxes
would be 2% of the initial investment, all other costs except
depreciation is equal. For ROII of minimum 9%, what is the minimum
service life of the new plant to meet this ROII.
Question 5
• A plant is producing 20000 t/y of a product. The overall yield is 70% on a
mass basis (kg of product per kg raw materials). The raw material costs
$20/t and the product sell for $38/t. A process modification has been
advised that will increase the yield 80% of the original value. The additional
investment required is $3,000,000, the additional costs are negligible, and
the salvage value is 100,000$
• a) If the same amount of raw material will be used a. Determine ROII and
payback time? b. Is the modification worth making?
• b) If the second investment will increase the raw material consumption by
50% a. Determine ROII and payback time?
b. Is the modification worth making?
• Minimum ROII % is 19%
• A] In the case of additional investment
• Production= 20000 * 1.8 = 36000 t/y
A) ROII = profit/ additional investment = [(36000-20000)*38]/ 3000000
= 20 %
• Pay back time = (3000000-100,000)/796571.4 = 3.64 year
• B) Yes it is worth making as ROII > 19%
• B] A) ROII = profit/ additional investment = [(36000-20000)*38]-
[0.5*(36000/0.7)*20]/ 3,000,000= 18.3
• Pay back Time= 2900000/ 757142.8571 = 8.54 years
Be prepared for a quiz next time
Section 8.pptx

More Related Content

Similar to Section 8.pptx

Topic 6 f fc(1)
Topic 6 f fc(1)Topic 6 f fc(1)
Topic 6 f fc(1)
fahimkhan65
 
ipptchap008.ppt
ipptchap008.pptipptchap008.ppt
ipptchap008.ppt
GautamVerma78
 
CBA.pptx
CBA.pptxCBA.pptx
CBA.pptx
pragyaprada
 
Lecture 07 returns to scale
Lecture 07   returns to scaleLecture 07   returns to scale
Lecture 07 returns to scale
B SWAMINATHAN
 
Process costing
Process costingProcess costing
Process costing
sigh_baba
 
Management Of Inventories And Accounts Receivables Units 14 And 15
Management Of Inventories And Accounts Receivables Units 14 And 15Management Of Inventories And Accounts Receivables Units 14 And 15
Management Of Inventories And Accounts Receivables Units 14 And 15
Augustin Bangalore
 
SE 307-CHAPTER_9_PROJECT_CASH_FLOW_ANALYSIS.ppt
SE 307-CHAPTER_9_PROJECT_CASH_FLOW_ANALYSIS.pptSE 307-CHAPTER_9_PROJECT_CASH_FLOW_ANALYSIS.ppt
SE 307-CHAPTER_9_PROJECT_CASH_FLOW_ANALYSIS.ppt
AishaKhan527933
 
Aggregate Planning for industrial engineering
Aggregate Planning for industrial engineeringAggregate Planning for industrial engineering
Aggregate Planning for industrial engineering
ashaby
 
CEE 8.pptx
CEE 8.pptxCEE 8.pptx
CEE 8.pptx
PradeepTalwelkar
 
Depreciation & preparation of Financial Statements.pdf
Depreciation & preparation of Financial Statements.pdfDepreciation & preparation of Financial Statements.pdf
Depreciation & preparation of Financial Statements.pdf
HemanthKumar142811
 
ACCT 505 Education Organization / snaptutorial.com
ACCT 505 Education Organization / snaptutorial.comACCT 505 Education Organization / snaptutorial.com
ACCT 505 Education Organization / snaptutorial.com
McdonaldRyan31
 
Inventory Management of Electronic Industry
Inventory Management of Electronic IndustryInventory Management of Electronic Industry
Inventory Management of Electronic Industry
Md. Mehadi Hassan Bappy
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
Rashedur Rahman
 
Acct 505 Teaching Effectively--tutorialrank.com
Acct 505 Teaching Effectively--tutorialrank.comAcct 505 Teaching Effectively--tutorialrank.com
Acct 505 Teaching Effectively--tutorialrank.com
Soaps71
 
ACCT 505 Enhance teaching - snaptutorial.com
ACCT 505 Enhance teaching - snaptutorial.comACCT 505 Enhance teaching - snaptutorial.com
ACCT 505 Enhance teaching - snaptutorial.com
donaldzs49
 
Acct 505 Inspiring Innovation--tutorialrank.com
Acct 505  Inspiring Innovation--tutorialrank.comAcct 505  Inspiring Innovation--tutorialrank.com
Acct 505 Inspiring Innovation--tutorialrank.com
PrescottLunt360
 
Inventory mgmt. in scm
Inventory mgmt. in scmInventory mgmt. in scm
Inventory mgmt. in scm
Aashi Agarwal
 
Lecture 24 capital budgeting
Lecture 24 capital budgetingLecture 24 capital budgeting
Lecture 24 capital budgeting
Kritika Jain
 
Production and costs
Production and costsProduction and costs
Production and costs
Online
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
Sansar Birman
 

Similar to Section 8.pptx (20)

Topic 6 f fc(1)
Topic 6 f fc(1)Topic 6 f fc(1)
Topic 6 f fc(1)
 
ipptchap008.ppt
ipptchap008.pptipptchap008.ppt
ipptchap008.ppt
 
CBA.pptx
CBA.pptxCBA.pptx
CBA.pptx
 
Lecture 07 returns to scale
Lecture 07   returns to scaleLecture 07   returns to scale
Lecture 07 returns to scale
 
Process costing
Process costingProcess costing
Process costing
 
Management Of Inventories And Accounts Receivables Units 14 And 15
Management Of Inventories And Accounts Receivables Units 14 And 15Management Of Inventories And Accounts Receivables Units 14 And 15
Management Of Inventories And Accounts Receivables Units 14 And 15
 
SE 307-CHAPTER_9_PROJECT_CASH_FLOW_ANALYSIS.ppt
SE 307-CHAPTER_9_PROJECT_CASH_FLOW_ANALYSIS.pptSE 307-CHAPTER_9_PROJECT_CASH_FLOW_ANALYSIS.ppt
SE 307-CHAPTER_9_PROJECT_CASH_FLOW_ANALYSIS.ppt
 
Aggregate Planning for industrial engineering
Aggregate Planning for industrial engineeringAggregate Planning for industrial engineering
Aggregate Planning for industrial engineering
 
CEE 8.pptx
CEE 8.pptxCEE 8.pptx
CEE 8.pptx
 
Depreciation & preparation of Financial Statements.pdf
Depreciation & preparation of Financial Statements.pdfDepreciation & preparation of Financial Statements.pdf
Depreciation & preparation of Financial Statements.pdf
 
ACCT 505 Education Organization / snaptutorial.com
ACCT 505 Education Organization / snaptutorial.comACCT 505 Education Organization / snaptutorial.com
ACCT 505 Education Organization / snaptutorial.com
 
Inventory Management of Electronic Industry
Inventory Management of Electronic IndustryInventory Management of Electronic Industry
Inventory Management of Electronic Industry
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
 
Acct 505 Teaching Effectively--tutorialrank.com
Acct 505 Teaching Effectively--tutorialrank.comAcct 505 Teaching Effectively--tutorialrank.com
Acct 505 Teaching Effectively--tutorialrank.com
 
ACCT 505 Enhance teaching - snaptutorial.com
ACCT 505 Enhance teaching - snaptutorial.comACCT 505 Enhance teaching - snaptutorial.com
ACCT 505 Enhance teaching - snaptutorial.com
 
Acct 505 Inspiring Innovation--tutorialrank.com
Acct 505  Inspiring Innovation--tutorialrank.comAcct 505  Inspiring Innovation--tutorialrank.com
Acct 505 Inspiring Innovation--tutorialrank.com
 
Inventory mgmt. in scm
Inventory mgmt. in scmInventory mgmt. in scm
Inventory mgmt. in scm
 
Lecture 24 capital budgeting
Lecture 24 capital budgetingLecture 24 capital budgeting
Lecture 24 capital budgeting
 
Production and costs
Production and costsProduction and costs
Production and costs
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 

More from kareemhamad3

section 7 modified-2.pdf
section 7 modified-2.pdfsection 7 modified-2.pdf
section 7 modified-2.pdf
kareemhamad3
 
Section 4.pptx
Section 4.pptxSection 4.pptx
Section 4.pptx
kareemhamad3
 
Section 3-2.pptx
Section 3-2.pptxSection 3-2.pptx
Section 3-2.pptx
kareemhamad3
 
Section 9.pptx
Section 9.pptxSection 9.pptx
Section 9.pptx
kareemhamad3
 
Section 2.pptx
Section 2.pptxSection 2.pptx
Section 2.pptx
kareemhamad3
 
Section 1.pptx
Section 1.pptxSection 1.pptx
Section 1.pptx
kareemhamad3
 
section 6 .pptx
section 6 .pptxsection 6 .pptx
section 6 .pptx
kareemhamad3
 
section 1.pptx
section 1.pptxsection 1.pptx
section 1.pptx
kareemhamad3
 
section 4.pptx
section 4.pptxsection 4.pptx
section 4.pptx
kareemhamad3
 
section 2.pptx
section 2.pptxsection 2.pptx
section 2.pptx
kareemhamad3
 
section 5.pptx
section 5.pptxsection 5.pptx
section 5.pptx
kareemhamad3
 
section7.pptx
section7.pptxsection7.pptx
section7.pptx
kareemhamad3
 
section 9.pptx
section 9.pptxsection 9.pptx
section 9.pptx
kareemhamad3
 
section 8.pptx
section 8.pptxsection 8.pptx
section 8.pptx
kareemhamad3
 
section 6.pptx
section 6.pptxsection 6.pptx
section 6.pptx
kareemhamad3
 
section 3-2.pptx
section 3-2.pptxsection 3-2.pptx
section 3-2.pptx
kareemhamad3
 
material science 1 .pptx
material science 1 .pptxmaterial science 1 .pptx
material science 1 .pptx
kareemhamad3
 
material science 2 .pptx
material science 2 .pptxmaterial science 2 .pptx
material science 2 .pptx
kareemhamad3
 
Material 5.pptx
Material 5.pptxMaterial 5.pptx
Material 5.pptx
kareemhamad3
 
material 4.pptx
material 4.pptxmaterial 4.pptx
material 4.pptx
kareemhamad3
 

More from kareemhamad3 (20)

section 7 modified-2.pdf
section 7 modified-2.pdfsection 7 modified-2.pdf
section 7 modified-2.pdf
 
Section 4.pptx
Section 4.pptxSection 4.pptx
Section 4.pptx
 
Section 3-2.pptx
Section 3-2.pptxSection 3-2.pptx
Section 3-2.pptx
 
Section 9.pptx
Section 9.pptxSection 9.pptx
Section 9.pptx
 
Section 2.pptx
Section 2.pptxSection 2.pptx
Section 2.pptx
 
Section 1.pptx
Section 1.pptxSection 1.pptx
Section 1.pptx
 
section 6 .pptx
section 6 .pptxsection 6 .pptx
section 6 .pptx
 
section 1.pptx
section 1.pptxsection 1.pptx
section 1.pptx
 
section 4.pptx
section 4.pptxsection 4.pptx
section 4.pptx
 
section 2.pptx
section 2.pptxsection 2.pptx
section 2.pptx
 
section 5.pptx
section 5.pptxsection 5.pptx
section 5.pptx
 
section7.pptx
section7.pptxsection7.pptx
section7.pptx
 
section 9.pptx
section 9.pptxsection 9.pptx
section 9.pptx
 
section 8.pptx
section 8.pptxsection 8.pptx
section 8.pptx
 
section 6.pptx
section 6.pptxsection 6.pptx
section 6.pptx
 
section 3-2.pptx
section 3-2.pptxsection 3-2.pptx
section 3-2.pptx
 
material science 1 .pptx
material science 1 .pptxmaterial science 1 .pptx
material science 1 .pptx
 
material science 2 .pptx
material science 2 .pptxmaterial science 2 .pptx
material science 2 .pptx
 
Material 5.pptx
Material 5.pptxMaterial 5.pptx
Material 5.pptx
 
material 4.pptx
material 4.pptxmaterial 4.pptx
material 4.pptx
 

Recently uploaded

basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
enizeyimana36
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
mamamaam477
 

Recently uploaded (20)

basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
 

Section 8.pptx

  • 1. Economics of Chemical Plants Eng. Kareem H. Mokhtar
  • 2. Rules • ROI= 𝑃𝑟𝑜𝑓𝑖𝑡 𝑇𝑜𝑡𝑎𝑙 𝐶𝑎𝑝𝑖𝑡𝑎𝑙 𝐼𝑛𝑣𝑒𝑠𝑡𝑚𝑒𝑛𝑡 • ROII= 𝑖𝑛𝑐𝑟𝑒𝑚𝑒𝑛𝑡𝑎𝑙 𝑃𝑟𝑜𝑓𝑖𝑡 𝑑𝑖𝑓𝑓𝑒𝑟𝑒𝑛𝑐𝑒 𝑖𝑛 𝐶𝑎𝑝𝑖𝑡𝑎𝑙 𝐼𝑛𝑣𝑒𝑠𝑡𝑚𝑒𝑛𝑡 • Minimum Payout Period = 𝐷𝑒𝑝𝑟𝑒𝑐𝑖𝑎𝑏𝑙𝑒 𝐹𝑖𝑥𝑒𝑑 𝐼𝑛𝑣𝑒𝑠𝑡𝑚𝑒𝑛𝑡 𝑁𝑒𝑡 𝑐𝑎𝑠ℎ 𝑓𝑙𝑜𝑤 • Capitalized cost= 𝐶𝑅 1+𝑖 𝑛 1+𝑖 𝑛−1 + 𝑉𝑠 + 𝑎𝑛𝑛𝑢𝑎𝑙 𝑐𝑎𝑠ℎ 𝑒𝑥𝑝𝑒𝑛𝑠𝑒𝑠 𝑖 + 𝑤𝑜𝑟𝑘𝑖𝑛𝑔
  • 3. Question 1 • An existing plant has been operating in such a way that a large amount of heat is being lost in the waste gases. It has been proposed to save money by recovering the heat that is now being lost. Four different heat exchangers have been designed to recover the heat, and all prices, costs, and savings have been calculated for each of the designs. The results of these calculations are presented in the following:
  • 4. Design No. 1 No. 2 No. 3 No. 4 Total initial installed cost 10000 16000 20000 26000 Operating cost $/yr 100 100 100 100 Fixed charges, % of initial cost/yr 20 20 20 20 Value of heat saved $/year 4100 6000 6900 8850
  • 5. • Annual saving= heat saved – operating cost – fixed cost • For No.1: annual saving = 4100- 100 – (0.2*10000) = 2000$ • For No.2: annual saving = 6000 – 100- (0.2*16000) = 2700$ • For No.3: annual saving = 6900 – 100- (0.2*20000) = 2800$ • For No.4: annual saving = 8850 – 100 – (0.2*26000) = 3550$ Design No. 1 No. 2 No. 3 No. 4 Total initial installed cost 10000 16000 20000 26000 Operating cost $/yr 100 100 100 100 Fixed charges, % of initial cost/yr 20 20 20 20 Value of heat saved $/year 4100 6000 6900 8850
  • 6. • Return on incremental investment can be calculated by dividing the additional profit from the new method by the increase in cost to get the new method. • Return on incremental investment from 1 to 2 • (2700-2000)/ (16000-10000) = 11.7% (accepted) • From 2 to 3 = 2.5% (refused) • From 2 to 4 = 850/10000 = 8.5% (refused)
  • 7. Question 2 • A company has two alternative investments which are being considered Company policies, based on the current economic situation, dictate a minimum annual return on the original investment of 13% after taxes must be predicted for any unnecessary investment with interest on investment not included as a cost. Company policies also dictate that, where applicable, straight-line depreciation is used, for time-value of money interpretation, end of year and profit analysis is used in land value and prestart up costs can be ignored. Given the following data:
  • 8. Question 2 • Determine and comment which investment, if any, should be made by alternative –analysis profitability- evaluation methods of: • (i) Rate of return on initial investment (ii) Minimum payout period with no interest charge (iii)Capitalized cost Investment Inintial cost $ Working cost. $ Salvage Value $ Service life years Anuual cash flow $ Annual Expenses $ 1 360,000 24,000 32,000 7 110,000 60,000 2 450,000 40,000 50,000 8 120,000 44,000
  • 9. Answer - Rate of return on investment ROII= 𝑃𝑟𝑜𝑓𝑖𝑡 𝑇𝑜𝑡𝑎𝑙 𝐶𝑎𝑝𝑖𝑡𝑎𝑙 𝐼𝑛𝑣𝑒𝑠𝑡𝑚𝑒𝑛𝑡 Profit= cash flow –depreciation = 110000-[(360000-32000)/7] = 63142.9$ First investment: 63142.9 360000+24000 =16% Second investment : 14.3% Investment Inintial cost $ Working cost. $ Salvage Value $ Service life years Anuual cash flow $ Annual Expenses $ 1 360,000 24,000 32,000 7 110,000 60,000 2 450,000 40,000 50,000 8 120,000 44,000
  • 10. Answer - Minimum payout period with no interest charge • First alternative: 360000−32000 110000 = 2.98 𝑦𝑒𝑎𝑟𝑠 • Second alternative: 450000−50000 120000 = 3.33 • First option is better Minimum Payout Period = 𝐷𝑒𝑝𝑟𝑒𝑐𝑖𝑎𝑏𝑙𝑒 𝐹𝑖𝑥𝑒𝑑 𝐼𝑛𝑣𝑒𝑠𝑡𝑚𝑒𝑛𝑡 𝑁𝑒𝑡 𝑐𝑎𝑠ℎ 𝑓𝑙𝑜𝑤 Investment Inintial cost $ Working cost. $ Salvage Value $ Service life years Anuual cash flow $ Annual Expenses $ 1 360,000 24,000 32,000 7 110,000 60,000 2 450,000 40,000 50,000 8 120,000 44,000
  • 11. Answer – Capitalized cost • 1st: capitalized= 328000 1+0.13 7 1+0.13 7−1 +32000 + 60000 0.13 + 24000 =1088033.4$ • 2nd: capitalized= 400000 1+0.13 8 1+0.13 8−1 +50000 + 44000 0.13 + 40000 =1069651.4$ Capitalized cost= 𝐶𝑅 1+1 𝑛 1+𝑖 𝑛−1 + 𝑉𝑠 + 𝑎𝑛𝑛𝑢𝑎𝑙 𝑐𝑎𝑠ℎ 𝑒𝑥𝑝𝑒𝑛𝑠𝑒𝑠 𝑖 + 𝑤𝑜𝑟𝑘𝑖𝑛𝑔
  • 12. Question 3 • Two reactors are considered for a company as shown below, for an effictive annual intrest of 20%, analyze which one of the two reactors should be bought to fullfill the ROI conditions and maximum payback time of 3 years Item Reactor 1 Reactor 2 Initial Cost 25000 15000 Maintenance 2000 4000 Salvage value 3000 - Sevice Time 4 6 Yield 70% 50% Feed amount 100 Kg Pricing of product 300 $
  • 13. Question 3 • Reactor 1: • Profit = 21000- [2000+((25000-3000)/4)] = 13500$ • ROI = 54% • Reactor 2: • Profit = 15000 - [4000+(15000/6)] = 8500$ • ROI = 56% • Both reactors fulfills the ROI conditions • ROII: 50% so Reactor one is better in case of return on incremental investment • The pay back of both reactors is less than 3 years • So reactor one is better
  • 14. Question 4 • A plant needs to increase its production by either of two alternatives, expansion or building a new facility. • The expansion would cost 130000$, labor cost will increase to 150000$, and regarding the overheads, taxes, depreciation and insurance will be 60000$ per year. • Second Alternative will have an initial cost of 200000, labor cost of 120000 and overheads of 70000, the annual insurance and taxes would be 2% of the initial investment, all other costs except depreciation is equal. For ROII of minimum 9%, what is the minimum service life of the new plant to meet this ROII.
  • 15. Question 5 • A plant is producing 20000 t/y of a product. The overall yield is 70% on a mass basis (kg of product per kg raw materials). The raw material costs $20/t and the product sell for $38/t. A process modification has been advised that will increase the yield 80% of the original value. The additional investment required is $3,000,000, the additional costs are negligible, and the salvage value is 100,000$ • a) If the same amount of raw material will be used a. Determine ROII and payback time? b. Is the modification worth making? • b) If the second investment will increase the raw material consumption by 50% a. Determine ROII and payback time? b. Is the modification worth making? • Minimum ROII % is 19%
  • 16. • A] In the case of additional investment • Production= 20000 * 1.8 = 36000 t/y A) ROII = profit/ additional investment = [(36000-20000)*38]/ 3000000 = 20 % • Pay back time = (3000000-100,000)/796571.4 = 3.64 year • B) Yes it is worth making as ROII > 19% • B] A) ROII = profit/ additional investment = [(36000-20000)*38]- [0.5*(36000/0.7)*20]/ 3,000,000= 18.3 • Pay back Time= 2900000/ 757142.8571 = 8.54 years