Scrum - Agile Model Under PRINCE 2
Agile is an iterative and incremental (evolutionary) approach to software development which is
performed in a highly collaborative manner by self-organizing teams with just enough
ceremony that produces high quality software in a cost effective and timely manner which
meets the changing needs of its stakeholders.




    •   Agile
              Principles of Agile Model
              Flavors of Agile Model
              SDLC Process Overview Under Agile
    •   Scrum - Agile Model
                Uderlying principles of Scrum
                Flow of activities in a Scrum
                Scrum SDLC Overview Under PRINCE2
                Scrum SDLC And Artefacts Under PRINCE2
    •   Demystifying Scrum SDLC Stages
                Project Approval
                Pre Analysis
                Initiating
                Execution
                Managing Stage Boundaries
                Closing
                Post Production
    •   Author



Agile
The modern definition of agile software development evolved in the mid 1990s as part of a
reaction against heavyweight methods, as typified by a heavily regulated, regimented, micro-
managed use of the waterfall model of development. The processes originating from this use of
the waterfall model were seen as bureaucratic, slow, demeaning, and inconsistent with the
ways that software engineers actually perform effective work. A case can be made that agile
and iterative development methods are a return to development practice seen early in the
history of software development.Initially, agile methods were called lightweight methods. In
2001, prominent members of the community met at Snowbird, Utah, and adopted the name
agile methods. Later, some of these people formed The Agile Alliance, a non-profit
organization that promotes agile development.

More on Agile can be found here


Principles of Agile Model

Agile Model is a family of various development processes, its not a single approach to software
development. These processes under agile umberella are driven by Agile Principles known as
Agile Manifesto, widely regarded as the canonical definition of agile development.




Some of the principles behind the Agile Manifesto are:

          •   Customer satisfaction by rapid, continuous delivery of useful software
          •   Working software is delivered frequently (weeks rather than months)
          •   Working software is the principal measure of progress
          •   Even late changes in requirements are welcomed
          •   Close, daily, cooperation between business people and developers
          •   Face-to-face conversation is the best form of communication
          •   Projects are built around motivated individuals, who should be trusted
          •   Continuous attention to technical excellence and good design
          •   Simplicity
          •   Self-organizing teams
          •   Regular adaptation to changing circumstances

More on Agile Manifesto can be found here


Flavors of Agile Model

Under this broad umbrella sits many more specific approaches such as

      Extreme Programming
      Scrum
      Lean Development
      Feature Driven Development
SDLC Process Overview Under Agile



Scrum - Agile Model
Scrum is a term which comes from the game of Rugby where high-performing teams form the
scrum.


Uderlying principles of Scrum

            A product backlog of prioritized work to be done;
            Completion of a fixed set of backlog items in a series of short iterations or sprints;
            A brief daily meeting or scrum, at which progress is explained, upcoming work is
            described and impediments are raised.
            A brief sprint planning session in which the backlog items for the sprint will be
            defined.
            A brief sprint retrospective, at which all team members reflect about the past
            sprint.


Flow of activities in a Scrum




Scrum is used as an Agile Model of Software Development. The governing process framework
around this development model is

a project management methodology known as Prince 2 - Projects in Controlled
Environments (PRINCE).

Under the PRINCE2 governing process framework SCRUM SDLC is defined in 7 Steps.
Scrum SDLC Overview Under PRINCE2

Following are the stages/steps :

    1.   Project Approval - Mandate
    2.   Pre Analysis
    3.   Initiating
    4.   Execution
    5.   Managing Stage Boundaries
    6.   Closing
    7.   Post Production


Scrum SDLC And Artefacts Under PRINCE2

Shown below is a full overview of all the stages and artefactes required.




Note: Processes are in yellow color and SDLC artefacts are in pink color.
Demystifying Scrum SDLC Stages

Project Approval


Pre Analysis


Initiating


Execution


Managing Stage Boundaries


Closing


Post Production




Project Approval
This stage is all about having a vision for what is to be achieved in coming years and how this
can be realized.




Note: Items in yellow are not artefacts, they represent the process which takes place during
this stage. Artefacts are the outcomes from these process. Item in orange is a Gate for Prince
2.

    •   Artefacts


Artefacts

No artefacts are required for this stage.
Pre Analysis
Pre Analysis is a stage to provide a full and firm foundation for the initiation of the project. The
contents of the Initiative Brief will be extended and refined into the Project Initiation Document
(PID), which is the working document for managing and directing a project. The Project Brief
contains the outline plan for the Initiation process and forms the basis of the schedule and
resource requirements for that process. The Project Brief is a document in its own right and is
the basis of the PID.




Note: Items in yellow are not artefacts, they represent the process which takes place during
this stage. Artefacts are the outcomes from these process. Artefacts marked as Mandatorty are
required from project management perspective. They are required under Prince 2 Governance
Framework, they are not SDLC deliverables. Item in orange is a Gate for Prince 2.

    •   Artefacts
               High Level Business Case/ Initiative Brief
                      Buisiness Case
                      Initiative Brief
               Project Approach Recommendation
               Risks Log




High Level Business Case/ Initiative Brief


Buisiness Case

A high level business case represents what benefits will the business get out of this project,
how much will it cost to the business and what are the risks associated with it. The business
case will forecast effort and time and whether it is worth the expenditure. This analysis is a part
of inititaive brief.


Initiative Brief

This is to provide a full and firm foundation for the initiation of the project. The contents of the
Project Brief will be extended and refined into next stage M2 - Project Initiation Document,
which is the working document for managing and directing a project. The Initiative brief
contains the outline plan for the Initiation process (M2) and forms the basis of the schedule and
resource requirements for that process. The Initiative brief is a document in its own right and is
the basis of Next Stage M2 (PID)

Both are mandatory artefacts produced by PMO.


Project Approach Recommendation

This is to define the type of solution (what) to be developed by the project and/or method of
delivering(how) that solution. It should also identify any environment into which the solution
must fit.

This is a mandatory artefact produced by PMO and is a part of Initiative
Brief/Project Breif.

Note: For smaller projects this may form part of the Project Brief. This needs to be agreed with
the Corporate Program Office when Starting Up a Project.


Risks Log

The purpose of the Risk Log is to contain all information about the risks, their analysis,
countermeasures and status. Risks should be considered during the creation of key documents.
There should be a check for new risks every time the Risk Log is reviewed, minimally at the end
of each stage. The Project Steering Committee has the responsibility to check external events
continually for external risks

This is a mandatory artefact produced by PMO and is a part of Initiative
Brief/Project Breif.




Initiating
To define the project, to form the basis for its management and the assessment of overall
success. The Project Initiation gives the direction and scope of the project and forms the
contract between the project management team and corporate program management. It is
essentially a compilation of key project information and documents to date, including the
detailed Business Case (evolved from initial Business Case); Product Backlog (evolved fom User
Stories), Risk ans Issues Log, Architecture Solution, Technology Used and Development
Roadmap
Note: Items in yellow are not artefacts, they represent the process which takes place during
this stage. Artefacts are the outcomes from these process. Artefacts marked as Mandatorty are
required from project management perspective. They are required under Prince 2 Governance
Framework, they are not SDLC deliverables. Item in orange is a Gate for Prince 2.

Note: SDLC deliverables are marked as non mandatory, this doesn't mean they are not be
produced. SDLC artefacts needs to be produced, only difference is their are no
standard templates required. Whatever can be adapted to deliver it will be fine.

    •   Artefacts
               Detaild Business Case
               Product Backlog/User stories
               Risk and Issues Log
               High Level Solution Architecture
               Technology Used
               Infrastrucure Requirements
               Development Roadmap
               Estimates


Artefacts


Detailed Business Case

The justification for undertaking the project based on the estimated cost of development and
implementation against the risks and the anticipated benefits. The total business change must
be considered, which may be much wider than just the project development cost. The Business
Case is used to say why the forecast effort and time will be worth the expenditure. The Project
Steering Committee will monitor the ongoing viability of the project against the Business Case.

This is a mandatory artefact produced by PMO and is part of Project Initiation
Document - PID.


Product Backlog/User stories

Products backlog is nothing but a collection of user Stories. This is equivalent of High Level
Buisness Requirement Specification (BRS)

This is a mandatory artefact
Risk and Issues Log

Risks Log The purpose of the Risk Log is to contain all information about the risks, their
analysis, countermeasures and status. Risks should be considered during the creation of key
documents. There should be a check for new risks every time the Risk Log is reviewed,
minimally at the end of each stage. The Project Steering Committee has the responsibility to
check external events continually for external risks

Project Issues A generic term for any matter that has to be bought to the attention of the
project team and requires an answer. After receiving a unique reference number, Project Issues
are evaluated in terms of impact on the product, effort, cost, risks, Project Plan and Business
Case. The Project Manager may make a decision on what action to take or the Project Issue
may be referred to the Project Steering Committee. A Project Issue may have a negative or
positive impact on the project.

Issue Log Project Issues are raised as required and are an input into / recorded in the Issue
Log.

This is a mandatory artefact produced by PMO and is part of Project Initiation
Document - PID.


High Level Solution Architecture

High level solution architecture comprises of high level view of componets interacting with each
other in a system (it can be a multiered, distributed, standalone.)

Note: SDLC Artefact - their is no standard template required for this. Agile is about being
adaptive, its upto you how you want to do it. As along as it is created in some form and
visible to all the team members its fine.

An example of High Level Solution Architecture can be found here ?


Technology Used

This is to describe in a system which component will be using what technoloy or its
implementaion framework/library.

Note: SDLC Artefact - their is no standard template required for this. Agile is about being
adaptive, its upto you how you want to do it. As along as it is created in some form and
visible to all the team members its fine.




Infrastrucure Requirements

It comprises of hardware, software required for development, testing and production. Is also
includes system security considerations, network, backup and disaster recovery plans.

Note: SDLC Artefact - their is no standard template required for this. Agile is about being
adaptive, its upto you how you want to do it. As along as it is created in some form and
visible to all the team members its fine.
An example of Infrastrucure Requirements can be found here ?


Development Roadmap

It describes how a product will be evolved dutring the project life cycle. It will lay out the road
map for the product life cycle pointing out when various functionalities or features will be
available.

Note: SDLC Artefact - their is no standard template required for this. Agile is about being
adaptive, its upto you how you want to do it. As along as it is created in some form and
visible to all the team members its fine.


Estimates

Estimates are carried out to identify how many man days will be required to undertake the
project. It is always a difficult execrice to predict the accurate number

Note: SDLC Artefact - their is no standard template required for this. Agile is about being
adaptive, its upto you how you want to do it. As along as it is created in some form and
visible to all the team members its fine.


Execution
At this stage development phse kicks in with planning and design for the sprint. Developemnt is
test driven (TDD) i;e - first write a test case and then develop the component until your tes
case passes. System Test and Fucnctional Test are executed in later part of sprint. In addition
to this a users guide or operations guide is prouced at end of the sprint/




Note: Items in yellow are not artefacts, they represent the process which takes place during
this stage. Artefacts are the outcomes from these process. Artefacts marked as Mandatorty are
required from project management perspective. They are required under Prince 2 Governance
Framework, they are not SDLC deliverables. Item in orange is a Gate for Prince 2.

Note: SDLC deliverables are marked as non mandatory, this doesn't mean they are not be
produced. SDLC artefacts needs to be produced, only difference is their are no
standard templates required. Whatever can be adapted to deliver it will be fine.
Artefacts


Sprint BackLog

The sprint backlog is the list of tasks that the Scrum team is committing that they will complete
in the current sprint. Items on the sprint backlog are drawn from the Product Backlog, by the
team based on the priorities set by the Product Owner and the team's perception of the time it
will take to complete the various features.

It is critical that the team selects the items and size of the sprint backlog. Because they are the
ones committing to completing the tasks they must be the ones to choose what they are
committing to.

The sprint backlog is very commonly maintained as an Excel spreadsheet but it is also possible
to use your defect tracking system or any of a number of software products designed
specifically for Scrum or agile.

During the Sprint the ScrumMaster maintains the sprint backlog by updating it to
reflect which tasks are completed and how long the team thinks it will take to
complete those that are not yet done. The estimated work remaining in the sprint is
calculated daily and graphed, resulting in a sprint burndown charrt.

Note: SDLC Artefact - their is no standard template required for this. Agile is about being
adaptive, its upto you how you want to do it. As along as it is created in some form and
visible to all the team members its fine.




Sprint Burn Down Chart

The Sprint Burndown chart gives the team a daily indication of their velocity and progress
against the work they have committed to for the current Sprint. Even early on in a Sprint, the
burndown chart gives the team a good idea of how they're progressing against their Sprint
tasks and whether they will complete them by the end of the Sprint. This both keeps up the
motivation to deliver on the work they have committed to and also provides a planning tool to
aid decisions. In simple terms it is graphical the representation of the total tasks undertaken for
the sprint versus sprint time.

Note: SDLC Artefact - their is no standard template required for this. Agile is about being
adaptive, its upto you how you want to do it. As along as it is created in some form and
visible to all the team members its fine.




Flow Diagrams, Schema Desgin, Screen Mock Ups

As a result of sprint design phase, flow diagram, class diagrams, schema design or sceen mock
ups are produced.These are produced in various forms and their is not a standard format or
template. As long as they are captured and made visible to team members its fine. Its all about
visibility and making sure we are getting on righ track (in design and solution terms).
Note: SDLC Artefact - their is no standard template required for this. Agile is about being
adaptive, its upto you how you want to do it. As along as it is created in some form and
visible to all the team members its fine.


Code Review Checklist

Code reviews are carried out to make sure that design mistakes are not carried, best practices
are used, components are extensible and robust. Some aspects of the code health check are
build into Conitnuous integration build tool used for the sprint.

Refactoring is mostly carried out after code reviews.

Note: SDLC Artefact - their is no standard template required for this. Agile is about being
adaptive, its upto you how you want to do it. As along as it is created in some form and
visible to all the team members its fine.


Unit Test Suite

Unit Test suite is a colloection of all unit tests created during the sprint. These unit tests are
automated test that ensures that the functionality required for a certain area of a project is
implemented, and that there are no breaking changes that have not been taken into
consideration Their is no tempalte for this, but it is a vital artefact for Test Driven Development
(TDD) approach.

Note: SDLC Artefact - their is no standard template required for this. Agile is about being
adaptive, its upto you how you want to do it. As along as it is created in some form and
visible to all the team members its fine.


System Test Cases

System test cases are mapped from Functional Specification.

Note: SDLC Artefact - their is no standard template required for this. Agile is about being
adaptive, its upto you how you want to do it. As along as it is created in some form and
visible to all the team members its fine.


UAT Cases

User acceptance test cases are mapped out of BRS. It is an exercise carried out by end
customer.

Note: SDLC Artefact - their is no standard template required for this. Agile is about being
adaptive, its upto you how you want to do it. As along as it is created in some form and
visible to all the team members its fine.

This artefact is maintained by a Business Analyst.

Example for UAT can found here.
Users/Operations Guide

Users or Operations Guide is a vital artefact delivered to end customer. It covers all the aspects
about product/system developed during execution phase. For customer its the only document
for them to guide, how to interact and use the product.

This is a mandatory artefact produced by PMO.




Managing Stage Boundaries
This is not a stage in SDLC, but it is a checkpoint in SDLC to make further decisions. It is run
just after finishing execution stage sprint and is considered part of execution stage. Once the
execution sprint is finished, busines case is analyzed again with its known risks, issues and cost
assocaited with it. Risk and Issue logs are updated in tandem with business case. Product
backlog is updated again from Initiating Stage to see what features are covered and what are
remaining. A new sprint backlog and burn down chart is created to , priortize tasks and see
what tasks can be covered in esitiamted time. From second Execution Sprint (i;e; 2.2 not 2.1))
onwards regression tests are created and updated from here onwards.

After analyzing all these artefacts a decision is made to continue the projcet or close the
projcet. If it continues then Execution Stage (M2.1) is repeated which becomes(M2.2),
otherwise project is closed, hence closing stage is reached.




Note: Items in yellow are not artefacts, they represent the process which takes place during
this stage. Artefacts are the outcomes from these process. Artefacts marked as Mandatorty are
required from project management perspective. They are required under Prince 2 Governance
Framework, they are not SDLC deliverables.

Note: SDLC deliverables are marked as non mandatory, this doesn't mean they are not be
produced. SDLC artefacts needs to be produced, only difference is their are no
standard templates required. Whatever can be adapted to deliver it will be fine. Item in
orange is a Gate for Prince 2.

    •   Artefacts
               Update Business Case
               Update Risk and Issues log
               Update Prodcut Backlog
               Create Sprint Backlog
               Create Burn Down Chart
               Add and Update Regression Tests
1.1 Artefacts


Update Business Case

Busines case created in Initiating Stage is updated to see whether the project is still beneficial
for the organization with its known risks, issues and cost assocaited with it.

This is a mandatory artefact produced by PMO.




Update Risk and Issues log

As the business case is updated, risk and issues log are updated which were created in
Initiating Stage.

This is a mandatory artefact produced by PMO.




Update Prodcut Backlog

Product Backlog created in Initiating Stage is updated to see what features are covered and
what are remaining.

This is a mandatory artefact produced by PMO.




Create Sprint Backlog

Their is no activity in SDLC which doesn't consume time and effort. In order to make a good
decision necessary artefacts are created to to make a decision. Creating these artefacts require
time and effort. So a new Sprint backlog is created for this stage to see what tasks are
remaining and what can be covered.

Note: SDLC Artefact - their is no standard template required for this. Agile is about being
adaptive, its upto you how you want to do it. As along as it is created in some form and
visible to all the team members its fine.


Create Burn Down Chart

A new Sprint Burn down chart is created for this stage to monitor the progress of the sprint.

Note: SDLC Artefact - their is no standard template required for this. Agile is about being
adaptive, its upto you how you want to do it. As along as it is created in some form and
visible to all the team members its fine.
Add and Update Regression Tests

Regression testing is any type of software testing which seeks to uncover regression bugs.
Regression bugs occur whenever software functionality that previously worked as desired, stops
working or no longer works in the same way that was previously planned. Typically regression
bugs occur as an unintended consequence of program changes.

Regression tests are added and updated further after executing Sprint 2 not Sprint 1, that is
after completing Execution Stage second time. Reason for that is; that at end of Sprint 1
(First Execution Stage)all tests were executed, but after completing Sprint 2 (Second Execution
Stage) only new functionality tests are executed. So to make sure that new features dont break
the old ones, regresion tests are carried out.

Note: SDLC Artefact - their is no standard template required for this. Agile is about being
adaptive, its upto you how you want to do it. As along as it is created in some form and
visible to all the team members its fine




Closing
This is where the projcet is closed after getting the sign off from custoner and warranty time
finishes. At this stage prouct goes in production environment and if support is in place than
support group enhances and maintains it.




Note: Items in yellow are not artefacts, they represent the process which takes place during
this stage. Artefacts are the outcomes from these process. Artefacts marked as Mandatorty are
required from project management perspective. They are required under Prince 2 Governance
Framework, they are not SDLC deliverables. Item in orange is a Gate for Prince 2.

    •   Artefacts
               Lessons Learned
               End Project Report


Artefacts


Lessons Learned

It is a repository of any lessons learned during the project that can be usefully applied to other
projects. The Lessons Learned Log is formally written up into the Lessons Learned Report at
project closure. The data in the report will be used by Corporate Program Management in order
to refine, change and improve the standards.

This is a mandatory artefact produced by PMO.


End Project Report

To report on how well the project has performed against its Project Initiation Document (PID),
including the original planned cost, schedule and tolerances, the Business Case and final version
of the Project Plan.

This is a mandatory artefact produced by PMO.




Post Production




Note: Items in yellow are not artefacts, they represent the process which takes place during
this stage. Artefacts are the outcomes from these process.


Artefcats

No artefacts are required for this stage.

More Related Content

What's hot

Free Agile in a Nutshell Slides
Free Agile in a Nutshell SlidesFree Agile in a Nutshell Slides
Free Agile in a Nutshell SlidesMia Kolmodin
 
A Product Manager's Place in a DevOps World
A Product Manager's Place in a DevOps WorldA Product Manager's Place in a DevOps World
A Product Manager's Place in a DevOps WorldAtlassian
 
Agile Scrum Presentation-Detailed
Agile Scrum Presentation-DetailedAgile Scrum Presentation-Detailed
Agile Scrum Presentation-DetailedPrashaanth T R
 
Scrum Master: Role or Responsibility?
Scrum Master: Role or Responsibility?Scrum Master: Role or Responsibility?
Scrum Master: Role or Responsibility?Mariya Breyter
 
Scrum master checklist
Scrum master checklistScrum master checklist
Scrum master checklistShaju Rasheed
 
New Agile Ways of Working Remotely
New Agile Ways of Working RemotelyNew Agile Ways of Working Remotely
New Agile Ways of Working RemotelyDipesh Pala
 
Collective code ownership in Extreme Programming
Collective code ownership in Extreme ProgrammingCollective code ownership in Extreme Programming
Collective code ownership in Extreme ProgrammingXPeppers
 
Agile knowledge check-up: Busting myths on core Agile concepts
Agile knowledge check-up: Busting myths on core Agile conceptsAgile knowledge check-up: Busting myths on core Agile concepts
Agile knowledge check-up: Busting myths on core Agile conceptsRowan Bunning
 
Building an Agile Culture
Building an Agile CultureBuilding an Agile Culture
Building an Agile CultureGunnar Jaschik
 
Lean UX: Getting out of the deliverables business
Lean UX: Getting out of the deliverables businessLean UX: Getting out of the deliverables business
Lean UX: Getting out of the deliverables businessJeff Gothelf
 
Introduction To Agile
Introduction To AgileIntroduction To Agile
Introduction To AgileKnoldus Inc.
 
The 12 Agile Principles
The 12 Agile PrinciplesThe 12 Agile Principles
The 12 Agile PrinciplesAgile201
 
Forecasting with Less Effort and More Accuracy (Agile Camp NY 2018)
Forecasting with Less Effort and More Accuracy (Agile Camp NY 2018)Forecasting with Less Effort and More Accuracy (Agile Camp NY 2018)
Forecasting with Less Effort and More Accuracy (Agile Camp NY 2018)Matthew Philip
 
Overview of Agile Methodology
Overview of Agile MethodologyOverview of Agile Methodology
Overview of Agile MethodologyHaresh Karkar
 
Scrum role introduction – the scrum master
Scrum role introduction – the scrum masterScrum role introduction – the scrum master
Scrum role introduction – the scrum masterLê Trọng-Hiệp
 

What's hot (20)

Free Agile in a Nutshell Slides
Free Agile in a Nutshell SlidesFree Agile in a Nutshell Slides
Free Agile in a Nutshell Slides
 
A Product Manager's Place in a DevOps World
A Product Manager's Place in a DevOps WorldA Product Manager's Place in a DevOps World
A Product Manager's Place in a DevOps World
 
Agile Scrum Presentation-Detailed
Agile Scrum Presentation-DetailedAgile Scrum Presentation-Detailed
Agile Scrum Presentation-Detailed
 
Scrum Master: Role or Responsibility?
Scrum Master: Role or Responsibility?Scrum Master: Role or Responsibility?
Scrum Master: Role or Responsibility?
 
Scrum master checklist
Scrum master checklistScrum master checklist
Scrum master checklist
 
Agile Business Value
Agile Business ValueAgile Business Value
Agile Business Value
 
New Agile Ways of Working Remotely
New Agile Ways of Working RemotelyNew Agile Ways of Working Remotely
New Agile Ways of Working Remotely
 
Agile – scrum 101 workshop deck
 Agile – scrum 101 workshop deck Agile – scrum 101 workshop deck
Agile – scrum 101 workshop deck
 
Collective code ownership in Extreme Programming
Collective code ownership in Extreme ProgrammingCollective code ownership in Extreme Programming
Collective code ownership in Extreme Programming
 
Agile knowledge check-up: Busting myths on core Agile concepts
Agile knowledge check-up: Busting myths on core Agile conceptsAgile knowledge check-up: Busting myths on core Agile concepts
Agile knowledge check-up: Busting myths on core Agile concepts
 
Building an Agile Culture
Building an Agile CultureBuilding an Agile Culture
Building an Agile Culture
 
Agile
AgileAgile
Agile
 
Agile Risk Management
Agile Risk ManagementAgile Risk Management
Agile Risk Management
 
Lean UX: Getting out of the deliverables business
Lean UX: Getting out of the deliverables businessLean UX: Getting out of the deliverables business
Lean UX: Getting out of the deliverables business
 
Introduction To Agile
Introduction To AgileIntroduction To Agile
Introduction To Agile
 
The 12 Agile Principles
The 12 Agile PrinciplesThe 12 Agile Principles
The 12 Agile Principles
 
Forecasting with Less Effort and More Accuracy (Agile Camp NY 2018)
Forecasting with Less Effort and More Accuracy (Agile Camp NY 2018)Forecasting with Less Effort and More Accuracy (Agile Camp NY 2018)
Forecasting with Less Effort and More Accuracy (Agile Camp NY 2018)
 
What is Scrum? SlideShare
What is Scrum? SlideShareWhat is Scrum? SlideShare
What is Scrum? SlideShare
 
Overview of Agile Methodology
Overview of Agile MethodologyOverview of Agile Methodology
Overview of Agile Methodology
 
Scrum role introduction – the scrum master
Scrum role introduction – the scrum masterScrum role introduction – the scrum master
Scrum role introduction – the scrum master
 

Viewers also liked

PRINCE2 and Agile Project Management - ProjectingIT APMG ATO
PRINCE2 and Agile Project Management - ProjectingIT APMG ATOPRINCE2 and Agile Project Management - ProjectingIT APMG ATO
PRINCE2 and Agile Project Management - ProjectingIT APMG ATOprojectingIT
 
Mix Agile with Prince 2 for rewarding results
Mix Agile with Prince 2 for rewarding resultsMix Agile with Prince 2 for rewarding results
Mix Agile with Prince 2 for rewarding resultsEdward Gould
 
Open Source Cyber Weaponry
Open Source Cyber WeaponryOpen Source Cyber Weaponry
Open Source Cyber WeaponryJoshua L. Davis
 
Nordic project zone talk on Agile and PRINCE2
Nordic project zone talk on Agile and PRINCE2Nordic project zone talk on Agile and PRINCE2
Nordic project zone talk on Agile and PRINCE2Martin Ellemann Olesen
 
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)projectingIT
 
A real life case study of using Agile and PRINCE2 together - AgilePM
A real life case study of using Agile and PRINCE2 together - AgilePMA real life case study of using Agile and PRINCE2 together - AgilePM
A real life case study of using Agile and PRINCE2 together - AgilePMTraining Bytesize
 
PRINCE2 Agile Guidance Preview
PRINCE2 Agile Guidance PreviewPRINCE2 Agile Guidance Preview
PRINCE2 Agile Guidance PreviewFrank Turley
 
PRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESSPRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESSJens Hoffmann
 
PRINCE2 Process Model
PRINCE2 Process ModelPRINCE2 Process Model
PRINCE2 Process ModelprojectingIT
 
Prince2 Agile Frukostmöte
Prince2 Agile FrukostmötePrince2 Agile Frukostmöte
Prince2 Agile FrukostmöteLars Lundgren
 
Discover how agile can enhance your organization’s project delivery
Discover how agile can enhance your organization’s project deliveryDiscover how agile can enhance your organization’s project delivery
Discover how agile can enhance your organization’s project deliveryAXELOS Global Best Practice
 

Viewers also liked (13)

PRINCE2 and Agile Project Management - ProjectingIT APMG ATO
PRINCE2 and Agile Project Management - ProjectingIT APMG ATOPRINCE2 and Agile Project Management - ProjectingIT APMG ATO
PRINCE2 and Agile Project Management - ProjectingIT APMG ATO
 
Mix Agile with Prince 2 for rewarding results
Mix Agile with Prince 2 for rewarding resultsMix Agile with Prince 2 for rewarding results
Mix Agile with Prince 2 for rewarding results
 
Open Source Cyber Weaponry
Open Source Cyber WeaponryOpen Source Cyber Weaponry
Open Source Cyber Weaponry
 
Nordic project zone talk on Agile and PRINCE2
Nordic project zone talk on Agile and PRINCE2Nordic project zone talk on Agile and PRINCE2
Nordic project zone talk on Agile and PRINCE2
 
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
 
A real life case study of using Agile and PRINCE2 together - AgilePM
A real life case study of using Agile and PRINCE2 together - AgilePMA real life case study of using Agile and PRINCE2 together - AgilePM
A real life case study of using Agile and PRINCE2 together - AgilePM
 
PRINCE2 Agile Guidance Preview
PRINCE2 Agile Guidance PreviewPRINCE2 Agile Guidance Preview
PRINCE2 Agile Guidance Preview
 
PRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESSPRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESS
 
PRINCE2 Process Model
PRINCE2 Process ModelPRINCE2 Process Model
PRINCE2 Process Model
 
AXELOS - PRINCE2 Agile® Practitioner
AXELOS - PRINCE2 Agile® PractitionerAXELOS - PRINCE2 Agile® Practitioner
AXELOS - PRINCE2 Agile® Practitioner
 
Prince2 Agile Frukostmöte
Prince2 Agile FrukostmötePrince2 Agile Frukostmöte
Prince2 Agile Frukostmöte
 
Discover how agile can enhance your organization’s project delivery
Discover how agile can enhance your organization’s project deliveryDiscover how agile can enhance your organization’s project delivery
Discover how agile can enhance your organization’s project delivery
 
Prince2 Methodology
Prince2 MethodologyPrince2 Methodology
Prince2 Methodology
 

Similar to Scrum under PRINCE 2

unit2.pdfJgkcGkgcjkGKCJGgscdGSADKJgjsdkgKJAGSDJK
unit2.pdfJgkcGkgcjkGKCJGgscdGSADKJgjsdkgKJAGSDJKunit2.pdfJgkcGkgcjkGKCJGgscdGSADKJgjsdkgKJAGSDJK
unit2.pdfJgkcGkgcjkGKCJGgscdGSADKJgjsdkgKJAGSDJKAvijitChaudhuri3
 
Project Management Methodologies Orangescrum Tutorial
Project Management Methodologies Orangescrum TutorialProject Management Methodologies Orangescrum Tutorial
Project Management Methodologies Orangescrum TutorialOrangescrum
 
SDLC Models and Their Implementation
SDLC Models and Their ImplementationSDLC Models and Their Implementation
SDLC Models and Their ImplementationSonal Tiwari
 
Scrum in IT Industry Part1
Scrum in IT Industry Part1Scrum in IT Industry Part1
Scrum in IT Industry Part1JayeshPatil149
 
SDLC Methodologies
SDLC MethodologiesSDLC Methodologies
SDLC MethodologiesRavikanth-BA
 
"Why Agile " by Swaminathan Nagarajan
"Why Agile " by Swaminathan Nagarajan"Why Agile " by Swaminathan Nagarajan
"Why Agile " by Swaminathan NagarajanSwaminathan Nagarajan
 
Project Requriement Management Vs Agile software development
Project Requriement Management Vs  Agile software developmentProject Requriement Management Vs  Agile software development
Project Requriement Management Vs Agile software developmentbizpresenter
 
REPORT IN SYSTEM INTEGRATION AND ARCHITECTURE.pptx
REPORT IN SYSTEM INTEGRATION AND ARCHITECTURE.pptxREPORT IN SYSTEM INTEGRATION AND ARCHITECTURE.pptx
REPORT IN SYSTEM INTEGRATION AND ARCHITECTURE.pptxESAChannel
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software EngineeringSaqib Raza
 
SDLC - Software Development Life Cycle
SDLC - Software Development Life CycleSDLC - Software Development Life Cycle
SDLC - Software Development Life CycleSaravanan Manoharan
 
IRJET- Study on Agile Management in Construction Project using Scrumban Metho...
IRJET- Study on Agile Management in Construction Project using Scrumban Metho...IRJET- Study on Agile Management in Construction Project using Scrumban Metho...
IRJET- Study on Agile Management in Construction Project using Scrumban Metho...IRJET Journal
 
Agile Project management
Agile Project managementAgile Project management
Agile Project managementPraveen Sidola
 
AGILE PROJECT MANAGEMENT
AGILE PROJECT MANAGEMENTAGILE PROJECT MANAGEMENT
AGILE PROJECT MANAGEMENTNat Rice
 
Agile project management using scrum
Agile project management using scrumAgile project management using scrum
Agile project management using scrumPrudentialSolutions
 
Scrum Framework in Agile
Scrum Framework in AgileScrum Framework in Agile
Scrum Framework in AgileWipro
 
Agile & SCRUM basics
Agile & SCRUM basicsAgile & SCRUM basics
Agile & SCRUM basicsArun R
 
Software Development Life Cycle – SDLC – Waterfall, Iterative, V, Spiral, and...
Software Development Life Cycle – SDLC – Waterfall, Iterative, V, Spiral, and...Software Development Life Cycle – SDLC – Waterfall, Iterative, V, Spiral, and...
Software Development Life Cycle – SDLC – Waterfall, Iterative, V, Spiral, and...Murageppa-QA
 

Similar to Scrum under PRINCE 2 (20)

unit2.pdfJgkcGkgcjkGKCJGgscdGSADKJgjsdkgKJAGSDJK
unit2.pdfJgkcGkgcjkGKCJGgscdGSADKJgjsdkgKJAGSDJKunit2.pdfJgkcGkgcjkGKCJGgscdGSADKJgjsdkgKJAGSDJK
unit2.pdfJgkcGkgcjkGKCJGgscdGSADKJgjsdkgKJAGSDJK
 
Metodologia scrum actualizada qa
Metodologia scrum actualizada qaMetodologia scrum actualizada qa
Metodologia scrum actualizada qa
 
Project Management Methodologies Orangescrum Tutorial
Project Management Methodologies Orangescrum TutorialProject Management Methodologies Orangescrum Tutorial
Project Management Methodologies Orangescrum Tutorial
 
SDLC Models and Their Implementation
SDLC Models and Their ImplementationSDLC Models and Their Implementation
SDLC Models and Their Implementation
 
Scrum in IT Industry Part1
Scrum in IT Industry Part1Scrum in IT Industry Part1
Scrum in IT Industry Part1
 
SDLC Methodologies
SDLC MethodologiesSDLC Methodologies
SDLC Methodologies
 
Why agile by Swaminathan Nagarajan
Why agile by Swaminathan Nagarajan Why agile by Swaminathan Nagarajan
Why agile by Swaminathan Nagarajan
 
"Why Agile " by Swaminathan Nagarajan
"Why Agile " by Swaminathan Nagarajan"Why Agile " by Swaminathan Nagarajan
"Why Agile " by Swaminathan Nagarajan
 
Project Requriement Management Vs Agile software development
Project Requriement Management Vs  Agile software developmentProject Requriement Management Vs  Agile software development
Project Requriement Management Vs Agile software development
 
REPORT IN SYSTEM INTEGRATION AND ARCHITECTURE.pptx
REPORT IN SYSTEM INTEGRATION AND ARCHITECTURE.pptxREPORT IN SYSTEM INTEGRATION AND ARCHITECTURE.pptx
REPORT IN SYSTEM INTEGRATION AND ARCHITECTURE.pptx
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software Engineering
 
SDLC - Software Development Life Cycle
SDLC - Software Development Life CycleSDLC - Software Development Life Cycle
SDLC - Software Development Life Cycle
 
IRJET- Study on Agile Management in Construction Project using Scrumban Metho...
IRJET- Study on Agile Management in Construction Project using Scrumban Metho...IRJET- Study on Agile Management in Construction Project using Scrumban Metho...
IRJET- Study on Agile Management in Construction Project using Scrumban Metho...
 
Agile Project management
Agile Project managementAgile Project management
Agile Project management
 
AGILE PROJECT MANAGEMENT
AGILE PROJECT MANAGEMENTAGILE PROJECT MANAGEMENT
AGILE PROJECT MANAGEMENT
 
Agile project management using scrum
Agile project management using scrumAgile project management using scrum
Agile project management using scrum
 
Agile Development Process
Agile Development ProcessAgile Development Process
Agile Development Process
 
Scrum Framework in Agile
Scrum Framework in AgileScrum Framework in Agile
Scrum Framework in Agile
 
Agile & SCRUM basics
Agile & SCRUM basicsAgile & SCRUM basics
Agile & SCRUM basics
 
Software Development Life Cycle – SDLC – Waterfall, Iterative, V, Spiral, and...
Software Development Life Cycle – SDLC – Waterfall, Iterative, V, Spiral, and...Software Development Life Cycle – SDLC – Waterfall, Iterative, V, Spiral, and...
Software Development Life Cycle – SDLC – Waterfall, Iterative, V, Spiral, and...
 

More from Vishal Sharma

Generative AI - The New Reality: How Key Players Are Progressing
Generative AI - The New Reality: How Key Players Are Progressing Generative AI - The New Reality: How Key Players Are Progressing
Generative AI - The New Reality: How Key Players Are Progressing Vishal Sharma
 
ABB Aus FY23 Results
ABB Aus FY23 ResultsABB Aus FY23 Results
ABB Aus FY23 ResultsVishal Sharma
 
Digital Transformation - M2M to IoT
Digital Transformation - M2M to IoTDigital Transformation - M2M to IoT
Digital Transformation - M2M to IoTVishal Sharma
 
Next Generation Digital Transformation
Next Generation Digital TransformationNext Generation Digital Transformation
Next Generation Digital TransformationVishal Sharma
 
Vodafone India - Why Govt. of India Intervened
Vodafone India - Why Govt. of India IntervenedVodafone India - Why Govt. of India Intervened
Vodafone India - Why Govt. of India IntervenedVishal Sharma
 
OPTUS Australia Dec 22 Results
OPTUS Australia Dec 22 ResultsOPTUS Australia Dec 22 Results
OPTUS Australia Dec 22 ResultsVishal Sharma
 
TPG Telecom Feb FY 23 Results
TPG Telecom Feb FY 23 Results TPG Telecom Feb FY 23 Results
TPG Telecom Feb FY 23 Results Vishal Sharma
 
State of Global IT Services and Software Industry - 2023
State of Global IT Services and Software Industry - 2023State of Global IT Services and Software Industry - 2023
State of Global IT Services and Software Industry - 2023Vishal Sharma
 
Global Telecom Industry Overview - 2023
Global Telecom Industry Overview - 2023 Global Telecom Industry Overview - 2023
Global Telecom Industry Overview - 2023 Vishal Sharma
 
Future of Cloud 2022 - Grow and Be Green
Future of Cloud 2022 - Grow and Be GreenFuture of Cloud 2022 - Grow and Be Green
Future of Cloud 2022 - Grow and Be GreenVishal Sharma
 
Future of Cloud 2022
Future of Cloud 2022Future of Cloud 2022
Future of Cloud 2022Vishal Sharma
 
NBN - Economies of Scale vs Scope
NBN - Economies of Scale vs ScopeNBN - Economies of Scale vs Scope
NBN - Economies of Scale vs ScopeVishal Sharma
 
NBN and 5G - Threat or Complement
NBN and 5G - Threat or Complement NBN and 5G - Threat or Complement
NBN and 5G - Threat or Complement Vishal Sharma
 
Inflation Impact on IT and Levers to Destress Balance Sheet
Inflation Impact on IT and Levers to Destress Balance SheetInflation Impact on IT and Levers to Destress Balance Sheet
Inflation Impact on IT and Levers to Destress Balance SheetVishal Sharma
 
Sales Trigger Spectrum with Cloud Adoption Curve
 Sales Trigger Spectrum with Cloud Adoption Curve Sales Trigger Spectrum with Cloud Adoption Curve
Sales Trigger Spectrum with Cloud Adoption CurveVishal Sharma
 
Telecom Industry - Revitalise for Revenue Generation
Telecom Industry -  Revitalise for Revenue GenerationTelecom Industry -  Revitalise for Revenue Generation
Telecom Industry - Revitalise for Revenue GenerationVishal Sharma
 
Post COVID B2B Sales Planning and Execution
Post COVID  B2B Sales Planning and Execution Post COVID  B2B Sales Planning and Execution
Post COVID B2B Sales Planning and Execution Vishal Sharma
 

More from Vishal Sharma (20)

Generative AI - The New Reality: How Key Players Are Progressing
Generative AI - The New Reality: How Key Players Are Progressing Generative AI - The New Reality: How Key Players Are Progressing
Generative AI - The New Reality: How Key Players Are Progressing
 
ABB Aus FY23 Results
ABB Aus FY23 ResultsABB Aus FY23 Results
ABB Aus FY23 Results
 
TPG H2 FY23 Results
TPG H2 FY23 ResultsTPG H2 FY23 Results
TPG H2 FY23 Results
 
Digital Transformation - M2M to IoT
Digital Transformation - M2M to IoTDigital Transformation - M2M to IoT
Digital Transformation - M2M to IoT
 
Next Generation Digital Transformation
Next Generation Digital TransformationNext Generation Digital Transformation
Next Generation Digital Transformation
 
Vodafone India - Why Govt. of India Intervened
Vodafone India - Why Govt. of India IntervenedVodafone India - Why Govt. of India Intervened
Vodafone India - Why Govt. of India Intervened
 
OPTUS Australia Dec 22 Results
OPTUS Australia Dec 22 ResultsOPTUS Australia Dec 22 Results
OPTUS Australia Dec 22 Results
 
TPG Telecom Feb FY 23 Results
TPG Telecom Feb FY 23 Results TPG Telecom Feb FY 23 Results
TPG Telecom Feb FY 23 Results
 
State of Global IT Services and Software Industry - 2023
State of Global IT Services and Software Industry - 2023State of Global IT Services and Software Industry - 2023
State of Global IT Services and Software Industry - 2023
 
Global Telecom Industry Overview - 2023
Global Telecom Industry Overview - 2023 Global Telecom Industry Overview - 2023
Global Telecom Industry Overview - 2023
 
Future of Cloud 2022 - Grow and Be Green
Future of Cloud 2022 - Grow and Be GreenFuture of Cloud 2022 - Grow and Be Green
Future of Cloud 2022 - Grow and Be Green
 
Future of Cloud 2022
Future of Cloud 2022Future of Cloud 2022
Future of Cloud 2022
 
NBN - Economies of Scale vs Scope
NBN - Economies of Scale vs ScopeNBN - Economies of Scale vs Scope
NBN - Economies of Scale vs Scope
 
Inflation Spectrum
Inflation SpectrumInflation Spectrum
Inflation Spectrum
 
NBN and 5G - Threat or Complement
NBN and 5G - Threat or Complement NBN and 5G - Threat or Complement
NBN and 5G - Threat or Complement
 
Digital vs IT
Digital vs IT Digital vs IT
Digital vs IT
 
Inflation Impact on IT and Levers to Destress Balance Sheet
Inflation Impact on IT and Levers to Destress Balance SheetInflation Impact on IT and Levers to Destress Balance Sheet
Inflation Impact on IT and Levers to Destress Balance Sheet
 
Sales Trigger Spectrum with Cloud Adoption Curve
 Sales Trigger Spectrum with Cloud Adoption Curve Sales Trigger Spectrum with Cloud Adoption Curve
Sales Trigger Spectrum with Cloud Adoption Curve
 
Telecom Industry - Revitalise for Revenue Generation
Telecom Industry -  Revitalise for Revenue GenerationTelecom Industry -  Revitalise for Revenue Generation
Telecom Industry - Revitalise for Revenue Generation
 
Post COVID B2B Sales Planning and Execution
Post COVID  B2B Sales Planning and Execution Post COVID  B2B Sales Planning and Execution
Post COVID B2B Sales Planning and Execution
 

Recently uploaded

My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embeddingZilliz
 
The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfSeasiaInfotech2
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 

Recently uploaded (20)

My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embedding
 
The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdf
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 

Scrum under PRINCE 2

  • 1. Scrum - Agile Model Under PRINCE 2 Agile is an iterative and incremental (evolutionary) approach to software development which is performed in a highly collaborative manner by self-organizing teams with just enough ceremony that produces high quality software in a cost effective and timely manner which meets the changing needs of its stakeholders. • Agile Principles of Agile Model Flavors of Agile Model SDLC Process Overview Under Agile • Scrum - Agile Model Uderlying principles of Scrum Flow of activities in a Scrum Scrum SDLC Overview Under PRINCE2 Scrum SDLC And Artefacts Under PRINCE2 • Demystifying Scrum SDLC Stages Project Approval Pre Analysis Initiating Execution Managing Stage Boundaries Closing Post Production • Author Agile The modern definition of agile software development evolved in the mid 1990s as part of a reaction against heavyweight methods, as typified by a heavily regulated, regimented, micro- managed use of the waterfall model of development. The processes originating from this use of the waterfall model were seen as bureaucratic, slow, demeaning, and inconsistent with the ways that software engineers actually perform effective work. A case can be made that agile and iterative development methods are a return to development practice seen early in the history of software development.Initially, agile methods were called lightweight methods. In 2001, prominent members of the community met at Snowbird, Utah, and adopted the name agile methods. Later, some of these people formed The Agile Alliance, a non-profit organization that promotes agile development. More on Agile can be found here Principles of Agile Model Agile Model is a family of various development processes, its not a single approach to software development. These processes under agile umberella are driven by Agile Principles known as
  • 2. Agile Manifesto, widely regarded as the canonical definition of agile development. Some of the principles behind the Agile Manifesto are: • Customer satisfaction by rapid, continuous delivery of useful software • Working software is delivered frequently (weeks rather than months) • Working software is the principal measure of progress • Even late changes in requirements are welcomed • Close, daily, cooperation between business people and developers • Face-to-face conversation is the best form of communication • Projects are built around motivated individuals, who should be trusted • Continuous attention to technical excellence and good design • Simplicity • Self-organizing teams • Regular adaptation to changing circumstances More on Agile Manifesto can be found here Flavors of Agile Model Under this broad umbrella sits many more specific approaches such as Extreme Programming Scrum Lean Development Feature Driven Development
  • 3. SDLC Process Overview Under Agile Scrum - Agile Model Scrum is a term which comes from the game of Rugby where high-performing teams form the scrum. Uderlying principles of Scrum A product backlog of prioritized work to be done; Completion of a fixed set of backlog items in a series of short iterations or sprints; A brief daily meeting or scrum, at which progress is explained, upcoming work is described and impediments are raised. A brief sprint planning session in which the backlog items for the sprint will be defined. A brief sprint retrospective, at which all team members reflect about the past sprint. Flow of activities in a Scrum Scrum is used as an Agile Model of Software Development. The governing process framework around this development model is a project management methodology known as Prince 2 - Projects in Controlled Environments (PRINCE). Under the PRINCE2 governing process framework SCRUM SDLC is defined in 7 Steps.
  • 4. Scrum SDLC Overview Under PRINCE2 Following are the stages/steps : 1. Project Approval - Mandate 2. Pre Analysis 3. Initiating 4. Execution 5. Managing Stage Boundaries 6. Closing 7. Post Production Scrum SDLC And Artefacts Under PRINCE2 Shown below is a full overview of all the stages and artefactes required. Note: Processes are in yellow color and SDLC artefacts are in pink color.
  • 5. Demystifying Scrum SDLC Stages Project Approval Pre Analysis Initiating Execution Managing Stage Boundaries Closing Post Production Project Approval This stage is all about having a vision for what is to be achieved in coming years and how this can be realized. Note: Items in yellow are not artefacts, they represent the process which takes place during this stage. Artefacts are the outcomes from these process. Item in orange is a Gate for Prince 2. • Artefacts Artefacts No artefacts are required for this stage.
  • 6. Pre Analysis Pre Analysis is a stage to provide a full and firm foundation for the initiation of the project. The contents of the Initiative Brief will be extended and refined into the Project Initiation Document (PID), which is the working document for managing and directing a project. The Project Brief contains the outline plan for the Initiation process and forms the basis of the schedule and resource requirements for that process. The Project Brief is a document in its own right and is the basis of the PID. Note: Items in yellow are not artefacts, they represent the process which takes place during this stage. Artefacts are the outcomes from these process. Artefacts marked as Mandatorty are required from project management perspective. They are required under Prince 2 Governance Framework, they are not SDLC deliverables. Item in orange is a Gate for Prince 2. • Artefacts High Level Business Case/ Initiative Brief Buisiness Case Initiative Brief Project Approach Recommendation Risks Log High Level Business Case/ Initiative Brief Buisiness Case A high level business case represents what benefits will the business get out of this project, how much will it cost to the business and what are the risks associated with it. The business case will forecast effort and time and whether it is worth the expenditure. This analysis is a part of inititaive brief. Initiative Brief This is to provide a full and firm foundation for the initiation of the project. The contents of the Project Brief will be extended and refined into next stage M2 - Project Initiation Document, which is the working document for managing and directing a project. The Initiative brief contains the outline plan for the Initiation process (M2) and forms the basis of the schedule and
  • 7. resource requirements for that process. The Initiative brief is a document in its own right and is the basis of Next Stage M2 (PID) Both are mandatory artefacts produced by PMO. Project Approach Recommendation This is to define the type of solution (what) to be developed by the project and/or method of delivering(how) that solution. It should also identify any environment into which the solution must fit. This is a mandatory artefact produced by PMO and is a part of Initiative Brief/Project Breif. Note: For smaller projects this may form part of the Project Brief. This needs to be agreed with the Corporate Program Office when Starting Up a Project. Risks Log The purpose of the Risk Log is to contain all information about the risks, their analysis, countermeasures and status. Risks should be considered during the creation of key documents. There should be a check for new risks every time the Risk Log is reviewed, minimally at the end of each stage. The Project Steering Committee has the responsibility to check external events continually for external risks This is a mandatory artefact produced by PMO and is a part of Initiative Brief/Project Breif. Initiating To define the project, to form the basis for its management and the assessment of overall success. The Project Initiation gives the direction and scope of the project and forms the contract between the project management team and corporate program management. It is essentially a compilation of key project information and documents to date, including the detailed Business Case (evolved from initial Business Case); Product Backlog (evolved fom User Stories), Risk ans Issues Log, Architecture Solution, Technology Used and Development Roadmap
  • 8. Note: Items in yellow are not artefacts, they represent the process which takes place during this stage. Artefacts are the outcomes from these process. Artefacts marked as Mandatorty are required from project management perspective. They are required under Prince 2 Governance Framework, they are not SDLC deliverables. Item in orange is a Gate for Prince 2. Note: SDLC deliverables are marked as non mandatory, this doesn't mean they are not be produced. SDLC artefacts needs to be produced, only difference is their are no standard templates required. Whatever can be adapted to deliver it will be fine. • Artefacts Detaild Business Case Product Backlog/User stories Risk and Issues Log High Level Solution Architecture Technology Used Infrastrucure Requirements Development Roadmap Estimates Artefacts Detailed Business Case The justification for undertaking the project based on the estimated cost of development and implementation against the risks and the anticipated benefits. The total business change must be considered, which may be much wider than just the project development cost. The Business Case is used to say why the forecast effort and time will be worth the expenditure. The Project Steering Committee will monitor the ongoing viability of the project against the Business Case. This is a mandatory artefact produced by PMO and is part of Project Initiation Document - PID. Product Backlog/User stories Products backlog is nothing but a collection of user Stories. This is equivalent of High Level Buisness Requirement Specification (BRS) This is a mandatory artefact
  • 9. Risk and Issues Log Risks Log The purpose of the Risk Log is to contain all information about the risks, their analysis, countermeasures and status. Risks should be considered during the creation of key documents. There should be a check for new risks every time the Risk Log is reviewed, minimally at the end of each stage. The Project Steering Committee has the responsibility to check external events continually for external risks Project Issues A generic term for any matter that has to be bought to the attention of the project team and requires an answer. After receiving a unique reference number, Project Issues are evaluated in terms of impact on the product, effort, cost, risks, Project Plan and Business Case. The Project Manager may make a decision on what action to take or the Project Issue may be referred to the Project Steering Committee. A Project Issue may have a negative or positive impact on the project. Issue Log Project Issues are raised as required and are an input into / recorded in the Issue Log. This is a mandatory artefact produced by PMO and is part of Project Initiation Document - PID. High Level Solution Architecture High level solution architecture comprises of high level view of componets interacting with each other in a system (it can be a multiered, distributed, standalone.) Note: SDLC Artefact - their is no standard template required for this. Agile is about being adaptive, its upto you how you want to do it. As along as it is created in some form and visible to all the team members its fine. An example of High Level Solution Architecture can be found here ? Technology Used This is to describe in a system which component will be using what technoloy or its implementaion framework/library. Note: SDLC Artefact - their is no standard template required for this. Agile is about being adaptive, its upto you how you want to do it. As along as it is created in some form and visible to all the team members its fine. Infrastrucure Requirements It comprises of hardware, software required for development, testing and production. Is also includes system security considerations, network, backup and disaster recovery plans. Note: SDLC Artefact - their is no standard template required for this. Agile is about being adaptive, its upto you how you want to do it. As along as it is created in some form and visible to all the team members its fine.
  • 10. An example of Infrastrucure Requirements can be found here ? Development Roadmap It describes how a product will be evolved dutring the project life cycle. It will lay out the road map for the product life cycle pointing out when various functionalities or features will be available. Note: SDLC Artefact - their is no standard template required for this. Agile is about being adaptive, its upto you how you want to do it. As along as it is created in some form and visible to all the team members its fine. Estimates Estimates are carried out to identify how many man days will be required to undertake the project. It is always a difficult execrice to predict the accurate number Note: SDLC Artefact - their is no standard template required for this. Agile is about being adaptive, its upto you how you want to do it. As along as it is created in some form and visible to all the team members its fine. Execution At this stage development phse kicks in with planning and design for the sprint. Developemnt is test driven (TDD) i;e - first write a test case and then develop the component until your tes case passes. System Test and Fucnctional Test are executed in later part of sprint. In addition to this a users guide or operations guide is prouced at end of the sprint/ Note: Items in yellow are not artefacts, they represent the process which takes place during this stage. Artefacts are the outcomes from these process. Artefacts marked as Mandatorty are required from project management perspective. They are required under Prince 2 Governance Framework, they are not SDLC deliverables. Item in orange is a Gate for Prince 2. Note: SDLC deliverables are marked as non mandatory, this doesn't mean they are not be produced. SDLC artefacts needs to be produced, only difference is their are no standard templates required. Whatever can be adapted to deliver it will be fine.
  • 11. Artefacts Sprint BackLog The sprint backlog is the list of tasks that the Scrum team is committing that they will complete in the current sprint. Items on the sprint backlog are drawn from the Product Backlog, by the team based on the priorities set by the Product Owner and the team's perception of the time it will take to complete the various features. It is critical that the team selects the items and size of the sprint backlog. Because they are the ones committing to completing the tasks they must be the ones to choose what they are committing to. The sprint backlog is very commonly maintained as an Excel spreadsheet but it is also possible to use your defect tracking system or any of a number of software products designed specifically for Scrum or agile. During the Sprint the ScrumMaster maintains the sprint backlog by updating it to reflect which tasks are completed and how long the team thinks it will take to complete those that are not yet done. The estimated work remaining in the sprint is calculated daily and graphed, resulting in a sprint burndown charrt. Note: SDLC Artefact - their is no standard template required for this. Agile is about being adaptive, its upto you how you want to do it. As along as it is created in some form and visible to all the team members its fine. Sprint Burn Down Chart The Sprint Burndown chart gives the team a daily indication of their velocity and progress against the work they have committed to for the current Sprint. Even early on in a Sprint, the burndown chart gives the team a good idea of how they're progressing against their Sprint tasks and whether they will complete them by the end of the Sprint. This both keeps up the motivation to deliver on the work they have committed to and also provides a planning tool to aid decisions. In simple terms it is graphical the representation of the total tasks undertaken for the sprint versus sprint time. Note: SDLC Artefact - their is no standard template required for this. Agile is about being adaptive, its upto you how you want to do it. As along as it is created in some form and visible to all the team members its fine. Flow Diagrams, Schema Desgin, Screen Mock Ups As a result of sprint design phase, flow diagram, class diagrams, schema design or sceen mock ups are produced.These are produced in various forms and their is not a standard format or template. As long as they are captured and made visible to team members its fine. Its all about visibility and making sure we are getting on righ track (in design and solution terms).
  • 12. Note: SDLC Artefact - their is no standard template required for this. Agile is about being adaptive, its upto you how you want to do it. As along as it is created in some form and visible to all the team members its fine. Code Review Checklist Code reviews are carried out to make sure that design mistakes are not carried, best practices are used, components are extensible and robust. Some aspects of the code health check are build into Conitnuous integration build tool used for the sprint. Refactoring is mostly carried out after code reviews. Note: SDLC Artefact - their is no standard template required for this. Agile is about being adaptive, its upto you how you want to do it. As along as it is created in some form and visible to all the team members its fine. Unit Test Suite Unit Test suite is a colloection of all unit tests created during the sprint. These unit tests are automated test that ensures that the functionality required for a certain area of a project is implemented, and that there are no breaking changes that have not been taken into consideration Their is no tempalte for this, but it is a vital artefact for Test Driven Development (TDD) approach. Note: SDLC Artefact - their is no standard template required for this. Agile is about being adaptive, its upto you how you want to do it. As along as it is created in some form and visible to all the team members its fine. System Test Cases System test cases are mapped from Functional Specification. Note: SDLC Artefact - their is no standard template required for this. Agile is about being adaptive, its upto you how you want to do it. As along as it is created in some form and visible to all the team members its fine. UAT Cases User acceptance test cases are mapped out of BRS. It is an exercise carried out by end customer. Note: SDLC Artefact - their is no standard template required for this. Agile is about being adaptive, its upto you how you want to do it. As along as it is created in some form and visible to all the team members its fine. This artefact is maintained by a Business Analyst. Example for UAT can found here.
  • 13. Users/Operations Guide Users or Operations Guide is a vital artefact delivered to end customer. It covers all the aspects about product/system developed during execution phase. For customer its the only document for them to guide, how to interact and use the product. This is a mandatory artefact produced by PMO. Managing Stage Boundaries This is not a stage in SDLC, but it is a checkpoint in SDLC to make further decisions. It is run just after finishing execution stage sprint and is considered part of execution stage. Once the execution sprint is finished, busines case is analyzed again with its known risks, issues and cost assocaited with it. Risk and Issue logs are updated in tandem with business case. Product backlog is updated again from Initiating Stage to see what features are covered and what are remaining. A new sprint backlog and burn down chart is created to , priortize tasks and see what tasks can be covered in esitiamted time. From second Execution Sprint (i;e; 2.2 not 2.1)) onwards regression tests are created and updated from here onwards. After analyzing all these artefacts a decision is made to continue the projcet or close the projcet. If it continues then Execution Stage (M2.1) is repeated which becomes(M2.2), otherwise project is closed, hence closing stage is reached. Note: Items in yellow are not artefacts, they represent the process which takes place during this stage. Artefacts are the outcomes from these process. Artefacts marked as Mandatorty are required from project management perspective. They are required under Prince 2 Governance Framework, they are not SDLC deliverables. Note: SDLC deliverables are marked as non mandatory, this doesn't mean they are not be produced. SDLC artefacts needs to be produced, only difference is their are no standard templates required. Whatever can be adapted to deliver it will be fine. Item in orange is a Gate for Prince 2. • Artefacts Update Business Case Update Risk and Issues log Update Prodcut Backlog Create Sprint Backlog Create Burn Down Chart Add and Update Regression Tests
  • 14. 1.1 Artefacts Update Business Case Busines case created in Initiating Stage is updated to see whether the project is still beneficial for the organization with its known risks, issues and cost assocaited with it. This is a mandatory artefact produced by PMO. Update Risk and Issues log As the business case is updated, risk and issues log are updated which were created in Initiating Stage. This is a mandatory artefact produced by PMO. Update Prodcut Backlog Product Backlog created in Initiating Stage is updated to see what features are covered and what are remaining. This is a mandatory artefact produced by PMO. Create Sprint Backlog Their is no activity in SDLC which doesn't consume time and effort. In order to make a good decision necessary artefacts are created to to make a decision. Creating these artefacts require time and effort. So a new Sprint backlog is created for this stage to see what tasks are remaining and what can be covered. Note: SDLC Artefact - their is no standard template required for this. Agile is about being adaptive, its upto you how you want to do it. As along as it is created in some form and visible to all the team members its fine. Create Burn Down Chart A new Sprint Burn down chart is created for this stage to monitor the progress of the sprint. Note: SDLC Artefact - their is no standard template required for this. Agile is about being adaptive, its upto you how you want to do it. As along as it is created in some form and visible to all the team members its fine.
  • 15. Add and Update Regression Tests Regression testing is any type of software testing which seeks to uncover regression bugs. Regression bugs occur whenever software functionality that previously worked as desired, stops working or no longer works in the same way that was previously planned. Typically regression bugs occur as an unintended consequence of program changes. Regression tests are added and updated further after executing Sprint 2 not Sprint 1, that is after completing Execution Stage second time. Reason for that is; that at end of Sprint 1 (First Execution Stage)all tests were executed, but after completing Sprint 2 (Second Execution Stage) only new functionality tests are executed. So to make sure that new features dont break the old ones, regresion tests are carried out. Note: SDLC Artefact - their is no standard template required for this. Agile is about being adaptive, its upto you how you want to do it. As along as it is created in some form and visible to all the team members its fine Closing This is where the projcet is closed after getting the sign off from custoner and warranty time finishes. At this stage prouct goes in production environment and if support is in place than support group enhances and maintains it. Note: Items in yellow are not artefacts, they represent the process which takes place during this stage. Artefacts are the outcomes from these process. Artefacts marked as Mandatorty are required from project management perspective. They are required under Prince 2 Governance Framework, they are not SDLC deliverables. Item in orange is a Gate for Prince 2. • Artefacts Lessons Learned End Project Report Artefacts Lessons Learned It is a repository of any lessons learned during the project that can be usefully applied to other
  • 16. projects. The Lessons Learned Log is formally written up into the Lessons Learned Report at project closure. The data in the report will be used by Corporate Program Management in order to refine, change and improve the standards. This is a mandatory artefact produced by PMO. End Project Report To report on how well the project has performed against its Project Initiation Document (PID), including the original planned cost, schedule and tolerances, the Business Case and final version of the Project Plan. This is a mandatory artefact produced by PMO. Post Production Note: Items in yellow are not artefacts, they represent the process which takes place during this stage. Artefacts are the outcomes from these process. Artefcats No artefacts are required for this stage.