SlideShare a Scribd company logo
Robert Airey, Parker Hannifin
Tobias Hammer, Parker Hannifin
Saving Money with Improved Asset Management
Offshore Europe 2017 Cinema Seminar
Speaker Biography
• Robert’s career spans general management, sales
development and marketing at international level. A
technology and market development for Parker’s UK
sales company, Robert has strong understanding of
the UK and global markets
• Tobias is highly experienced
in new product development,
operations management and
business development1
Frequent Asset Management Challenges
• Global – Norway to Namibia, Mexico to Mozambique
• Managing 10 to 100,000 assets
• Crane, valve, filter to a hose
• Recommissioning
2
Global –
Norway to
Namibia,
Mexico to
Mozambique
Managing
10 to 100,000+
assets
Crane, valve,
filter to a hose Recommissioning
Frequent Asset Management Challenges
• Effective maintenance schedules
• Lead time of OE spares and logistics
• Outsourcing of services & stock holding (on site product support)
• Specification and traceability
3
Outsourcing of
services & stock
holding (on site
product support)
Effective
maintenance
schedules
Lead time of
OE spares &
logistics
Specification and
traceability
Frequent Asset Management Challenges
• Downturn – less staff and resource
• Loss of knowledge and history
• Health and safety concerns
• Maintenance – man hour service costs
4
Downturn – less
staff and resource
Loss of
knowledge
and history
Health and
safety concerns
Maintenance –
man hour
service costs
Frequent Asset Management Challenges
• Costs – downtime
• Software of ‘management’ tools
compatibility
5
Frequent Asset Management Challenges
• Add it all up and asset management gets complicated
6
Asset
management
gets
complicated 6
Global –
Norway to
Namibia,
Mexico to
Mozambique
Managing
10 – 100’s
thousand
assets
Crane,
valve,
filter to a
hose
Recommissioning
Software of
‘management’
tools
compatibility
Costs -
downtime
Outsourcing
of services &
stock holding
(on site
product
support)
Effective
maintenance
schedules
Lead time
of OE
spares &
logistics
Specification
and
traceability
Downturn
– less staff
and
resource
Loss
knowledge
and history
Health
safety
concerns
Maintenance –
man hour
service costs
• Various options of asset management
7
Attempts to Deal With the Situation
Use Simple Hose as Example
• Inspect
• Decipher
• Remove
• Measure
• Cut
• Set up tooling
• Assemble
• Clean / flush
• Test
• Document
• Other – training / staff
• Other – tooling
Seems simple?
Cost per hour $60 and capital investment $250K minimum
8
Cost of Unscheduled Maintenance
• Impact of one hose failure
9
Even Scheduled Costs
• 3-4 containers
• Supervisors – extra staff
• Circa 3 months work – man hours
• Accommodation
10
$Millions + Prevent Injury, Loss of Life
• Attorney websites promote legal wins…
• Burns, blunt brain trauma, crush injuries etc.
• Compensation due to negotiations on one
settlement over $11 million (incl fees) before
trial
11
Feeds an Industry
Environmental,
human & legal consequences…
• Attorney websites
promote legal wins…
• Burns, blunt brain
trauma, crush
injuries etc.
• Compensation due
to negotiations on
one settlement over
$11 million (incl fees)
before trial
They WILL audit your
maintenance records
Asset Management – Typical ‘Wish List’
• Digital solution
• Quick and easy to use
• Accurate – less mistakes
• Global and easily accessible?
• Meet needs – specifier, engineer,
maintenance, legal, buyer, owner
• Drives improvements
12
Example of technology shift
Fleet drilling vessels – operate in several
countries
• Manual filing & storage held on the vessel
• Not always matched to asset
• Extensive time in port
• Poor tracking of life / failure
Additional risk
• Misplacement of documents
• Fines – documents vs inspections
13
Secure cloud-based documentation
Single source for record management
Accurate & available when needed
Reclassification every 5 years
• less time (man hours) in dock
Accommodation issues now relieved
Less risk to fines – quickly updated
14
Shift…
5 vessels = $10m on hoses alone
Example using scheduled costs
• Just hose replacement
circa $2 million (based
on 5,000 assemblies)
• 5 years later –
recommission?
Time?
• 3-4 containers
• Supervisors – extra staff
• Circa 3 months work –
man hours
• Accommodation
15
Example Using Scheduled Costs
$700K Saving
• Initial work/cost involved
 3 Containers
 4 Supervisors
 14 Weeks
• Hoses
 Measure
 Fabricate
 Pressure test
 Clean
 Document
 Tag – Parker PTS
$700K Saving on 5,000 Assemblies
16
Recommissioning Result
• 1st hose replacement circa $2
million
• 5 years later, 2nd time approx. $1.2
million
How / why?
• Produce hoses prior to the project
start date
• Reduced on-site labour - planned
• Possible to swap out hoses - vessel in
transit
5 vessels = $3.5m ($140 per hose!)
17
• Customer only needs to survey
once
• Maintain records for the full 5 years
THEN
• Accurate records to start from –
no guesswork
• know material needed, less
scrap, less rework, MUCH
less labour
• Also means knowing the root
causes = improvements
18
More Info on Drill Ship
Technology / Features Required
• Multiple options on market
• Software and tags of various forms
• Parker is one of them
• Operate multiple countries / markets
19
PTS – Key Features
• Technology
• Specification
• Supply chain
• Scale
• Safety
• Quality
20
Tags and Traceability
• Unique ID provides accurate traceability to specific location
or asset
• Assembly date provides time-based inspection or
replacement triggers
• Customer part numbers and bar codes enable link to back
office systems
• Custom label data displays instructions or contact
information
21
Point-and-Click Workflow
• (Bill of materials)
• Record creation (application use)
22
23
Sample Screen
Record creation
(application use)
Record creation
(bill of materials)
24
Point-and-Click Workflow
Inspection data Replacement
alerts
emailed
automatically
25
Tracking Asset Condition
26
Asset Management
27
Notifications
Documentation and Certification
• Customised data books
• Certification records
28
Customised
data books
Certification
records
Master Tags
• 1 Master Tag can equal Multiple Tagged Assets
• Fast and easy way to “reassemble” multiple records
in the field
• Copy on chassis, packing materials or paperwork
29
Parker® Tracking System
• 1 Master Tag can equal
Multiple Tagged Assets
• Fast and easy way to
“reassemble” multiple
records in the field
• Copy on chassis, packing
materials or paperwork
Leads to the Savings - $ and
Safety Improvements
• Produce hoses prior to the project start date
• Reduced on-site labour - planned
• Possible to swap out hoses - vessel in transit
30
31
Not Parker-Specific:
All Brands or Technologies
Questions and Discussion
32
Contacts for further information
Mick Perry or Anand Ramachandran
Parker UK sales company
T: +44 (0)1926 317878
www.parker.com/pts

More Related Content

What's hot

Cbn short presentation
Cbn short presentationCbn short presentation
Cbn short presentation
Phil Filkovsky
 
SFPUC and DataSplice Mobile for Maximo
SFPUC and DataSplice Mobile for MaximoSFPUC and DataSplice Mobile for Maximo
SFPUC and DataSplice Mobile for Maximo
DataSplice
 
Truck and Body Presentation
Truck and Body PresentationTruck and Body Presentation
Truck and Body PresentationCBN2014
 
CBN Supply Vending Presentation 7-13-17
CBN Supply Vending Presentation 7-13-17CBN Supply Vending Presentation 7-13-17
CBN Supply Vending Presentation 7-13-17
Jessica Caprilozzi
 
Planning and developing a records center
Planning and developing a records center Planning and developing a records center
Planning and developing a records center
Dhani Ahmad
 
Steam trap sizing, selection & quotation software
Steam trap sizing, selection & quotation softwareSteam trap sizing, selection & quotation software
Steam trap sizing, selection & quotation software
Sanjeev Nadkarni
 
Gilmours Inward Goods
Gilmours Inward GoodsGilmours Inward Goods
Gilmours Inward Goods
yakimenkodv
 
Emobility supply chain expansion case study
Emobility supply chain expansion case studyEmobility supply chain expansion case study
Emobility supply chain expansion case study
Cem Yurdum
 
ToolHound Roundtable Tool & Equipment Tracking Webinar
ToolHound Roundtable Tool & Equipment Tracking Webinar�ToolHound Roundtable Tool & Equipment Tracking Webinar�
ToolHound Roundtable Tool & Equipment Tracking Webinar
Kelly Stark
 
Microteam Presentation April 2009 V1.0
Microteam  Presentation April 2009 V1.0Microteam  Presentation April 2009 V1.0
Microteam Presentation April 2009 V1.0
Marky1969
 
Concept and terminology of records center and management
Concept and terminology of records center and managementConcept and terminology of records center and management
Concept and terminology of records center and management
Dhani Ahmad
 
Functional design of records center
Functional design of  records centerFunctional design of  records center
Functional design of records center
Dhani Ahmad
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1Dave Thompson
 
Engineered Servies
Engineered ServiesEngineered Servies
Engineered ServiesValveforce
 
ACME Case Study Description Jan 2016
ACME Case Study Description Jan 2016ACME Case Study Description Jan 2016
ACME Case Study Description Jan 2016Clint Hobbs
 
Managing records center
Managing records centerManaging records center
Managing records center
Dhani Ahmad
 
Digitechx Repair Division Presentation
Digitechx Repair Division PresentationDigitechx Repair Division Presentation
Digitechx Repair Division Presentation
Jean-Francois Cavelier
 

What's hot (17)

Cbn short presentation
Cbn short presentationCbn short presentation
Cbn short presentation
 
SFPUC and DataSplice Mobile for Maximo
SFPUC and DataSplice Mobile for MaximoSFPUC and DataSplice Mobile for Maximo
SFPUC and DataSplice Mobile for Maximo
 
Truck and Body Presentation
Truck and Body PresentationTruck and Body Presentation
Truck and Body Presentation
 
CBN Supply Vending Presentation 7-13-17
CBN Supply Vending Presentation 7-13-17CBN Supply Vending Presentation 7-13-17
CBN Supply Vending Presentation 7-13-17
 
Planning and developing a records center
Planning and developing a records center Planning and developing a records center
Planning and developing a records center
 
Steam trap sizing, selection & quotation software
Steam trap sizing, selection & quotation softwareSteam trap sizing, selection & quotation software
Steam trap sizing, selection & quotation software
 
Gilmours Inward Goods
Gilmours Inward GoodsGilmours Inward Goods
Gilmours Inward Goods
 
Emobility supply chain expansion case study
Emobility supply chain expansion case studyEmobility supply chain expansion case study
Emobility supply chain expansion case study
 
ToolHound Roundtable Tool & Equipment Tracking Webinar
ToolHound Roundtable Tool & Equipment Tracking Webinar�ToolHound Roundtable Tool & Equipment Tracking Webinar�
ToolHound Roundtable Tool & Equipment Tracking Webinar
 
Microteam Presentation April 2009 V1.0
Microteam  Presentation April 2009 V1.0Microteam  Presentation April 2009 V1.0
Microteam Presentation April 2009 V1.0
 
Concept and terminology of records center and management
Concept and terminology of records center and managementConcept and terminology of records center and management
Concept and terminology of records center and management
 
Functional design of records center
Functional design of  records centerFunctional design of  records center
Functional design of records center
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 
Engineered Servies
Engineered ServiesEngineered Servies
Engineered Servies
 
ACME Case Study Description Jan 2016
ACME Case Study Description Jan 2016ACME Case Study Description Jan 2016
ACME Case Study Description Jan 2016
 
Managing records center
Managing records centerManaging records center
Managing records center
 
Digitechx Repair Division Presentation
Digitechx Repair Division PresentationDigitechx Repair Division Presentation
Digitechx Repair Division Presentation
 

Similar to Saving Money with Improved Asset Management | Offshore Europe 2017

The Top 5 CTMS Enhancements You Can Make
The Top 5 CTMS Enhancements You Can MakeThe Top 5 CTMS Enhancements You Can Make
The Top 5 CTMS Enhancements You Can Make
Perficient, Inc.
 
Ch12 records management
Ch12 records managementCh12 records management
Ch12 records managementxtin101
 
TRAIL - Broadcast ERP
TRAIL - Broadcast ERPTRAIL - Broadcast ERP
TRAIL - Broadcast ERPRajiv Advani
 
Best Practices: Project Documentation and Construction Management
Best Practices: Project Documentation and Construction ManagementBest Practices: Project Documentation and Construction Management
Best Practices: Project Documentation and Construction Management
Smith Cashion & Orr PLC
 
ENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATA
ENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATAENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATA
ENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATA
wle-ss
 
Do a Safety Checkup for your Facility OSHA/EPA/DOT Minimum Program and Train...
Do a Safety Checkup for your Facility OSHA/EPA/DOT Minimum Program and  Train...Do a Safety Checkup for your Facility OSHA/EPA/DOT Minimum Program and  Train...
Do a Safety Checkup for your Facility OSHA/EPA/DOT Minimum Program and Train...
KPADealerWebinars
 
Innovative Inventory and Production Management Techniques
Innovative Inventory and  Production Management TechniquesInnovative Inventory and  Production Management Techniques
Innovative Inventory and Production Management Techniques
narman1402
 
Trs rt web-power_point
Trs rt web-power_pointTrs rt web-power_point
Trs rt web-power_point
Diane Norwood
 
inventory management and case studies
inventory management and case studies inventory management and case studies
inventory management and case studies
Chaudhry Zaghum Chahal
 
Transitioning from Rigid Fabricator to Flexible / Rigid-Flex PCB Fabrication
Transitioning from Rigid Fabricator to Flexible / Rigid-Flex PCB FabricationTransitioning from Rigid Fabricator to Flexible / Rigid-Flex PCB Fabrication
Transitioning from Rigid Fabricator to Flexible / Rigid-Flex PCB Fabrication
Domestic PCB Fabrication
 
Gerard Goldstein Resume 8-15-16
Gerard Goldstein Resume 8-15-16Gerard Goldstein Resume 8-15-16
Gerard Goldstein Resume 8-15-16Gerard Goldstein
 
PRESENTATION: Capture. Compliance. Centralization. How Advanced Rendering Del...
PRESENTATION: Capture. Compliance. Centralization. How Advanced Rendering Del...PRESENTATION: Capture. Compliance. Centralization. How Advanced Rendering Del...
PRESENTATION: Capture. Compliance. Centralization. How Advanced Rendering Del...
Adlib - The PDF Experts
 
Maintaining Business Continuity During Your Lab Relocation
Maintaining Business Continuity During Your Lab RelocationMaintaining Business Continuity During Your Lab Relocation
Maintaining Business Continuity During Your Lab Relocation
Triumvirate Environmental
 
LPO- all in one legitimate service Providers
LPO- all in one legitimate service ProvidersLPO- all in one legitimate service Providers
LPO- all in one legitimate service Providers
Deepika Ojha
 
Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Roger Boyette
 
Electronics recycling webinar final presentation
Electronics recycling webinar final presentationElectronics recycling webinar final presentation
Electronics recycling webinar final presentation
Nimonik
 

Similar to Saving Money with Improved Asset Management | Offshore Europe 2017 (20)

The Top 5 CTMS Enhancements You Can Make
The Top 5 CTMS Enhancements You Can MakeThe Top 5 CTMS Enhancements You Can Make
The Top 5 CTMS Enhancements You Can Make
 
Ch12 records management
Ch12 records managementCh12 records management
Ch12 records management
 
TRAIL - Broadcast ERP
TRAIL - Broadcast ERPTRAIL - Broadcast ERP
TRAIL - Broadcast ERP
 
Best Practices: Project Documentation and Construction Management
Best Practices: Project Documentation and Construction ManagementBest Practices: Project Documentation and Construction Management
Best Practices: Project Documentation and Construction Management
 
Resume - Ann Morouney
Resume - Ann MorouneyResume - Ann Morouney
Resume - Ann Morouney
 
ENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATA
ENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATAENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATA
ENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATA
 
Do a Safety Checkup for your Facility OSHA/EPA/DOT Minimum Program and Train...
Do a Safety Checkup for your Facility OSHA/EPA/DOT Minimum Program and  Train...Do a Safety Checkup for your Facility OSHA/EPA/DOT Minimum Program and  Train...
Do a Safety Checkup for your Facility OSHA/EPA/DOT Minimum Program and Train...
 
Innovative Inventory and Production Management Techniques
Innovative Inventory and  Production Management TechniquesInnovative Inventory and  Production Management Techniques
Innovative Inventory and Production Management Techniques
 
Trs rt web-power_point
Trs rt web-power_pointTrs rt web-power_point
Trs rt web-power_point
 
inventory management and case studies
inventory management and case studies inventory management and case studies
inventory management and case studies
 
CormanV5dates
CormanV5datesCormanV5dates
CormanV5dates
 
Transitioning from Rigid Fabricator to Flexible / Rigid-Flex PCB Fabrication
Transitioning from Rigid Fabricator to Flexible / Rigid-Flex PCB FabricationTransitioning from Rigid Fabricator to Flexible / Rigid-Flex PCB Fabrication
Transitioning from Rigid Fabricator to Flexible / Rigid-Flex PCB Fabrication
 
Gerard Goldstein Resume 8-15-16
Gerard Goldstein Resume 8-15-16Gerard Goldstein Resume 8-15-16
Gerard Goldstein Resume 8-15-16
 
PRESENTATION: Capture. Compliance. Centralization. How Advanced Rendering Del...
PRESENTATION: Capture. Compliance. Centralization. How Advanced Rendering Del...PRESENTATION: Capture. Compliance. Centralization. How Advanced Rendering Del...
PRESENTATION: Capture. Compliance. Centralization. How Advanced Rendering Del...
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
Maintaining Business Continuity During Your Lab Relocation
Maintaining Business Continuity During Your Lab RelocationMaintaining Business Continuity During Your Lab Relocation
Maintaining Business Continuity During Your Lab Relocation
 
LPO- all in one legitimate service Providers
LPO- all in one legitimate service ProvidersLPO- all in one legitimate service Providers
LPO- all in one legitimate service Providers
 
Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Current Capabilities Presentation 050416
Current Capabilities Presentation 050416
 
Electronics recycling webinar final presentation
Electronics recycling webinar final presentationElectronics recycling webinar final presentation
Electronics recycling webinar final presentation
 
Planning for Substation Maintenance and Reliability
Planning for Substation Maintenance and ReliabilityPlanning for Substation Maintenance and Reliability
Planning for Substation Maintenance and Reliability
 

More from Parker Hannifin Corporation

Explosion Proof Servo Motors | Parker Hannifin
Explosion Proof Servo Motors | Parker Hannifin Explosion Proof Servo Motors | Parker Hannifin
Explosion Proof Servo Motors | Parker Hannifin
Parker Hannifin Corporation
 
Коррозия: типы, причины, методы борьбы | Инфографика | Parker
Коррозия: типы, причины, методы борьбы | Инфографика | ParkerКоррозия: типы, причины, методы борьбы | Инфографика | Parker
Коррозия: типы, причины, методы борьбы | Инфографика | Parker
Parker Hannifin Corporation
 
Korroosion muodot, syyt ja käytännöt | Infografiikka |Parker
Korroosion muodot, syyt ja käytännöt | Infografiikka |ParkerKorroosion muodot, syyt ja käytännöt | Infografiikka |Parker
Korroosion muodot, syyt ja käytännöt | Infografiikka |Parker
Parker Hannifin Corporation
 
Tipi di corrosione, cause e pratiche | Infografica |Parker
Tipi di corrosione, cause e pratiche | Infografica |ParkerTipi di corrosione, cause e pratiche | Infografica |Parker
Tipi di corrosione, cause e pratiche | Infografica |Parker
Parker Hannifin Corporation
 
Soorten corrosie, oorzaken, best practices | Infographic |Parker
Soorten corrosie, oorzaken, best practices | Infographic |ParkerSoorten corrosie, oorzaken, best practices | Infographic |Parker
Soorten corrosie, oorzaken, best practices | Infographic |Parker
Parker Hannifin Corporation
 
Types de corrosion, causes et bonnes pratiques|Infographie|Parker
Types de corrosion, causes et bonnes pratiques|Infographie|ParkerTypes de corrosion, causes et bonnes pratiques|Infographie|Parker
Types de corrosion, causes et bonnes pratiques|Infographie|Parker
Parker Hannifin Corporation
 
Typy koroze, příčiny a osvědčené postupy | Infografika |Parker
Typy koroze, příčiny a osvědčené postupy | Infografika |ParkerTypy koroze, příčiny a osvědčené postupy | Infografika |Parker
Typy koroze, příčiny a osvědčené postupy | Infografika |Parker
Parker Hannifin Corporation
 
Korozja — typy, przyczyny, dobre praktyki | Infografika | Parker
Korozja — typy, przyczyny, dobre praktyki | Infografika | ParkerKorozja — typy, przyczyny, dobre praktyki | Infografika | Parker
Korozja — typy, przyczyny, dobre praktyki | Infografika | Parker
Parker Hannifin Corporation
 
Korrosionstyper, orsaker och bästa praxis | Infografik | Parker
Korrosionstyper, orsaker och bästa praxis | Infografik | ParkerKorrosionstyper, orsaker och bästa praxis | Infografik | Parker
Korrosionstyper, orsaker och bästa praxis | Infografik | Parker
Parker Hannifin Corporation
 
Korozyon: türler, sebepler, en iyi uygulama | Bilgi Grf. | Parker
Korozyon: türler, sebepler, en iyi uygulama | Bilgi Grf. | ParkerKorozyon: türler, sebepler, en iyi uygulama | Bilgi Grf. | Parker
Korozyon: türler, sebepler, en iyi uygulama | Bilgi Grf. | Parker
Parker Hannifin Corporation
 
Clean Transportation for a Sustainable Future | infographic Parker Hannifin
Clean Transportation for a Sustainable Future | infographic Parker HannifinClean Transportation for a Sustainable Future | infographic Parker Hannifin
Clean Transportation for a Sustainable Future | infographic Parker Hannifin
Parker Hannifin Corporation
 
Corrosion Types Causes and Best Practices - Parker ZA | Infographic
Corrosion Types Causes and Best Practices - Parker ZA | InfographicCorrosion Types Causes and Best Practices - Parker ZA | Infographic
Corrosion Types Causes and Best Practices - Parker ZA | Infographic
Parker Hannifin Corporation
 
Corrosion Types Causes and Best Practices - Parker UK | Infographic
Corrosion Types Causes and Best Practices - Parker UK | Infographic Corrosion Types Causes and Best Practices - Parker UK | Infographic
Corrosion Types Causes and Best Practices - Parker UK | Infographic
Parker Hannifin Corporation
 
The Benefits of PTFE Tubing Infographic | Parker Hannifin
The Benefits of PTFE Tubing Infographic | Parker HannifinThe Benefits of PTFE Tubing Infographic | Parker Hannifin
The Benefits of PTFE Tubing Infographic | Parker Hannifin
Parker Hannifin Corporation
 
How to Capitalize on HVAC/R Trends to Drive Business Growth | Infographic Pa...
How to Capitalize on HVAC/R Trends to Drive Business Growth | Infographic  Pa...How to Capitalize on HVAC/R Trends to Drive Business Growth | Infographic  Pa...
How to Capitalize on HVAC/R Trends to Drive Business Growth | Infographic Pa...
Parker Hannifin Corporation
 
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
Parker Hannifin Corporation
 
Improving Power Plant Gas Turbine Performance - Case Study | Parker Hannifin
Improving Power Plant Gas Turbine Performance - Case Study | Parker HannifinImproving Power Plant Gas Turbine Performance - Case Study | Parker Hannifin
Improving Power Plant Gas Turbine Performance - Case Study | Parker Hannifin
Parker Hannifin Corporation
 
Maszyny Budowlane Jutra | #Infografike Parker Hannifin
Maszyny Budowlane Jutra | #Infografike Parker HannifinMaszyny Budowlane Jutra | #Infografike Parker Hannifin
Maszyny Budowlane Jutra | #Infografike Parker Hannifin
Parker Hannifin Corporation
 
Morgondagens anläggningsmaskine | Infographic Sverige
Morgondagens anläggningsmaskine | Infographic SverigeMorgondagens anläggningsmaskine | Infographic Sverige
Morgondagens anläggningsmaskine | Infographic Sverige
Parker Hannifin Corporation
 
Parker Hannifin Corporation Annual Report 2018
Parker Hannifin Corporation Annual Report 2018 Parker Hannifin Corporation Annual Report 2018
Parker Hannifin Corporation Annual Report 2018
Parker Hannifin Corporation
 

More from Parker Hannifin Corporation (20)

Explosion Proof Servo Motors | Parker Hannifin
Explosion Proof Servo Motors | Parker Hannifin Explosion Proof Servo Motors | Parker Hannifin
Explosion Proof Servo Motors | Parker Hannifin
 
Коррозия: типы, причины, методы борьбы | Инфографика | Parker
Коррозия: типы, причины, методы борьбы | Инфографика | ParkerКоррозия: типы, причины, методы борьбы | Инфографика | Parker
Коррозия: типы, причины, методы борьбы | Инфографика | Parker
 
Korroosion muodot, syyt ja käytännöt | Infografiikka |Parker
Korroosion muodot, syyt ja käytännöt | Infografiikka |ParkerKorroosion muodot, syyt ja käytännöt | Infografiikka |Parker
Korroosion muodot, syyt ja käytännöt | Infografiikka |Parker
 
Tipi di corrosione, cause e pratiche | Infografica |Parker
Tipi di corrosione, cause e pratiche | Infografica |ParkerTipi di corrosione, cause e pratiche | Infografica |Parker
Tipi di corrosione, cause e pratiche | Infografica |Parker
 
Soorten corrosie, oorzaken, best practices | Infographic |Parker
Soorten corrosie, oorzaken, best practices | Infographic |ParkerSoorten corrosie, oorzaken, best practices | Infographic |Parker
Soorten corrosie, oorzaken, best practices | Infographic |Parker
 
Types de corrosion, causes et bonnes pratiques|Infographie|Parker
Types de corrosion, causes et bonnes pratiques|Infographie|ParkerTypes de corrosion, causes et bonnes pratiques|Infographie|Parker
Types de corrosion, causes et bonnes pratiques|Infographie|Parker
 
Typy koroze, příčiny a osvědčené postupy | Infografika |Parker
Typy koroze, příčiny a osvědčené postupy | Infografika |ParkerTypy koroze, příčiny a osvědčené postupy | Infografika |Parker
Typy koroze, příčiny a osvědčené postupy | Infografika |Parker
 
Korozja — typy, przyczyny, dobre praktyki | Infografika | Parker
Korozja — typy, przyczyny, dobre praktyki | Infografika | ParkerKorozja — typy, przyczyny, dobre praktyki | Infografika | Parker
Korozja — typy, przyczyny, dobre praktyki | Infografika | Parker
 
Korrosionstyper, orsaker och bästa praxis | Infografik | Parker
Korrosionstyper, orsaker och bästa praxis | Infografik | ParkerKorrosionstyper, orsaker och bästa praxis | Infografik | Parker
Korrosionstyper, orsaker och bästa praxis | Infografik | Parker
 
Korozyon: türler, sebepler, en iyi uygulama | Bilgi Grf. | Parker
Korozyon: türler, sebepler, en iyi uygulama | Bilgi Grf. | ParkerKorozyon: türler, sebepler, en iyi uygulama | Bilgi Grf. | Parker
Korozyon: türler, sebepler, en iyi uygulama | Bilgi Grf. | Parker
 
Clean Transportation for a Sustainable Future | infographic Parker Hannifin
Clean Transportation for a Sustainable Future | infographic Parker HannifinClean Transportation for a Sustainable Future | infographic Parker Hannifin
Clean Transportation for a Sustainable Future | infographic Parker Hannifin
 
Corrosion Types Causes and Best Practices - Parker ZA | Infographic
Corrosion Types Causes and Best Practices - Parker ZA | InfographicCorrosion Types Causes and Best Practices - Parker ZA | Infographic
Corrosion Types Causes and Best Practices - Parker ZA | Infographic
 
Corrosion Types Causes and Best Practices - Parker UK | Infographic
Corrosion Types Causes and Best Practices - Parker UK | Infographic Corrosion Types Causes and Best Practices - Parker UK | Infographic
Corrosion Types Causes and Best Practices - Parker UK | Infographic
 
The Benefits of PTFE Tubing Infographic | Parker Hannifin
The Benefits of PTFE Tubing Infographic | Parker HannifinThe Benefits of PTFE Tubing Infographic | Parker Hannifin
The Benefits of PTFE Tubing Infographic | Parker Hannifin
 
How to Capitalize on HVAC/R Trends to Drive Business Growth | Infographic Pa...
How to Capitalize on HVAC/R Trends to Drive Business Growth | Infographic  Pa...How to Capitalize on HVAC/R Trends to Drive Business Growth | Infographic  Pa...
How to Capitalize on HVAC/R Trends to Drive Business Growth | Infographic Pa...
 
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
 
Improving Power Plant Gas Turbine Performance - Case Study | Parker Hannifin
Improving Power Plant Gas Turbine Performance - Case Study | Parker HannifinImproving Power Plant Gas Turbine Performance - Case Study | Parker Hannifin
Improving Power Plant Gas Turbine Performance - Case Study | Parker Hannifin
 
Maszyny Budowlane Jutra | #Infografike Parker Hannifin
Maszyny Budowlane Jutra | #Infografike Parker HannifinMaszyny Budowlane Jutra | #Infografike Parker Hannifin
Maszyny Budowlane Jutra | #Infografike Parker Hannifin
 
Morgondagens anläggningsmaskine | Infographic Sverige
Morgondagens anläggningsmaskine | Infographic SverigeMorgondagens anläggningsmaskine | Infographic Sverige
Morgondagens anläggningsmaskine | Infographic Sverige
 
Parker Hannifin Corporation Annual Report 2018
Parker Hannifin Corporation Annual Report 2018 Parker Hannifin Corporation Annual Report 2018
Parker Hannifin Corporation Annual Report 2018
 

Recently uploaded

WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 

Recently uploaded (20)

WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 

Saving Money with Improved Asset Management | Offshore Europe 2017

  • 1. Robert Airey, Parker Hannifin Tobias Hammer, Parker Hannifin Saving Money with Improved Asset Management Offshore Europe 2017 Cinema Seminar
  • 2. Speaker Biography • Robert’s career spans general management, sales development and marketing at international level. A technology and market development for Parker’s UK sales company, Robert has strong understanding of the UK and global markets • Tobias is highly experienced in new product development, operations management and business development1
  • 3. Frequent Asset Management Challenges • Global – Norway to Namibia, Mexico to Mozambique • Managing 10 to 100,000 assets • Crane, valve, filter to a hose • Recommissioning 2 Global – Norway to Namibia, Mexico to Mozambique Managing 10 to 100,000+ assets Crane, valve, filter to a hose Recommissioning
  • 4. Frequent Asset Management Challenges • Effective maintenance schedules • Lead time of OE spares and logistics • Outsourcing of services & stock holding (on site product support) • Specification and traceability 3 Outsourcing of services & stock holding (on site product support) Effective maintenance schedules Lead time of OE spares & logistics Specification and traceability
  • 5. Frequent Asset Management Challenges • Downturn – less staff and resource • Loss of knowledge and history • Health and safety concerns • Maintenance – man hour service costs 4 Downturn – less staff and resource Loss of knowledge and history Health and safety concerns Maintenance – man hour service costs
  • 6. Frequent Asset Management Challenges • Costs – downtime • Software of ‘management’ tools compatibility 5
  • 7. Frequent Asset Management Challenges • Add it all up and asset management gets complicated 6 Asset management gets complicated 6 Global – Norway to Namibia, Mexico to Mozambique Managing 10 – 100’s thousand assets Crane, valve, filter to a hose Recommissioning Software of ‘management’ tools compatibility Costs - downtime Outsourcing of services & stock holding (on site product support) Effective maintenance schedules Lead time of OE spares & logistics Specification and traceability Downturn – less staff and resource Loss knowledge and history Health safety concerns Maintenance – man hour service costs
  • 8. • Various options of asset management 7 Attempts to Deal With the Situation
  • 9. Use Simple Hose as Example • Inspect • Decipher • Remove • Measure • Cut • Set up tooling • Assemble • Clean / flush • Test • Document • Other – training / staff • Other – tooling Seems simple? Cost per hour $60 and capital investment $250K minimum 8
  • 10. Cost of Unscheduled Maintenance • Impact of one hose failure 9
  • 11. Even Scheduled Costs • 3-4 containers • Supervisors – extra staff • Circa 3 months work – man hours • Accommodation 10
  • 12. $Millions + Prevent Injury, Loss of Life • Attorney websites promote legal wins… • Burns, blunt brain trauma, crush injuries etc. • Compensation due to negotiations on one settlement over $11 million (incl fees) before trial 11 Feeds an Industry Environmental, human & legal consequences… • Attorney websites promote legal wins… • Burns, blunt brain trauma, crush injuries etc. • Compensation due to negotiations on one settlement over $11 million (incl fees) before trial They WILL audit your maintenance records
  • 13. Asset Management – Typical ‘Wish List’ • Digital solution • Quick and easy to use • Accurate – less mistakes • Global and easily accessible? • Meet needs – specifier, engineer, maintenance, legal, buyer, owner • Drives improvements 12
  • 14. Example of technology shift Fleet drilling vessels – operate in several countries • Manual filing & storage held on the vessel • Not always matched to asset • Extensive time in port • Poor tracking of life / failure Additional risk • Misplacement of documents • Fines – documents vs inspections 13
  • 15. Secure cloud-based documentation Single source for record management Accurate & available when needed Reclassification every 5 years • less time (man hours) in dock Accommodation issues now relieved Less risk to fines – quickly updated 14 Shift…
  • 16. 5 vessels = $10m on hoses alone Example using scheduled costs • Just hose replacement circa $2 million (based on 5,000 assemblies) • 5 years later – recommission? Time? • 3-4 containers • Supervisors – extra staff • Circa 3 months work – man hours • Accommodation 15 Example Using Scheduled Costs
  • 17. $700K Saving • Initial work/cost involved  3 Containers  4 Supervisors  14 Weeks • Hoses  Measure  Fabricate  Pressure test  Clean  Document  Tag – Parker PTS $700K Saving on 5,000 Assemblies 16
  • 18. Recommissioning Result • 1st hose replacement circa $2 million • 5 years later, 2nd time approx. $1.2 million How / why? • Produce hoses prior to the project start date • Reduced on-site labour - planned • Possible to swap out hoses - vessel in transit 5 vessels = $3.5m ($140 per hose!) 17
  • 19. • Customer only needs to survey once • Maintain records for the full 5 years THEN • Accurate records to start from – no guesswork • know material needed, less scrap, less rework, MUCH less labour • Also means knowing the root causes = improvements 18 More Info on Drill Ship
  • 20. Technology / Features Required • Multiple options on market • Software and tags of various forms • Parker is one of them • Operate multiple countries / markets 19
  • 21. PTS – Key Features • Technology • Specification • Supply chain • Scale • Safety • Quality 20
  • 22. Tags and Traceability • Unique ID provides accurate traceability to specific location or asset • Assembly date provides time-based inspection or replacement triggers • Customer part numbers and bar codes enable link to back office systems • Custom label data displays instructions or contact information 21
  • 23. Point-and-Click Workflow • (Bill of materials) • Record creation (application use) 22
  • 25. Record creation (application use) Record creation (bill of materials) 24 Point-and-Click Workflow
  • 29. Documentation and Certification • Customised data books • Certification records 28 Customised data books Certification records
  • 30. Master Tags • 1 Master Tag can equal Multiple Tagged Assets • Fast and easy way to “reassemble” multiple records in the field • Copy on chassis, packing materials or paperwork 29 Parker® Tracking System • 1 Master Tag can equal Multiple Tagged Assets • Fast and easy way to “reassemble” multiple records in the field • Copy on chassis, packing materials or paperwork
  • 31. Leads to the Savings - $ and Safety Improvements • Produce hoses prior to the project start date • Reduced on-site labour - planned • Possible to swap out hoses - vessel in transit 30
  • 33. Questions and Discussion 32 Contacts for further information Mick Perry or Anand Ramachandran Parker UK sales company T: +44 (0)1926 317878 www.parker.com/pts