How to tackle the complex problem of merging two or more Salesforce.com instances. The challenges and benefits of a single org. Establishing the right project team. Systems review, data considerations, migration strategy, migration tools. When to use the data loader, metadata API. How to handle duplicate records. Post go-live clean up.
Considering an org merge in your company? We've implemented multiple complex org merges with one of Salesforce's largest customers, so join us to learn best practices for merging two Salesforce orgs into one. We'll cover both the business and technical challenges, including a demo of the Force.com Migration Tool.
15 Tips on Salesforce Data Migration - Naveen Gabrani & Jonathan OsgoodSalesforce Admins
Data Migration is an extremely important aspect of setting up a Salesforce instance. It is critical that the sanctity of data is maintained. Join us to hear fifteen tips based on learnings from different types of data migration projects.
When you need to deliver fast, shortcuts will be taken. This is a fact when it comes to software development, and Salesforce is no different.
This is how technical debt is created. It’s a costly side effect of growth, and it cannot be ignored! Just like financial debt, if you don’t address it in time, it will accumulate and over time your teams will find themselves addressing issues with the platform instead of supporting customers and developing revenue opportunities – and this will have a direct impact on your ROI.
You have lots of customer data and you need to ensure that it’s readily available to all of those who need it to drive business results across sales, service and customer engagement.
This presentation discusses how easy it is to migrate your critical data into Salesforce and how it will immediately benefit the different areas of your business. Our speakers will demonstrate how simple and seamless it is for you to transfer your customer data into Salesforce from different external sources such as; text files, another CRM, or homegrown systems.
What you will learn:
-How to migrate data to salesforce from a variety of endpoints to create a complete customer view
-How a single integration solution can bring together multiple data sources to provide rapid time to value
"We'll need an Apex trigger to do that." Sound familiar? Take your advanced Admin skills to the next level by developing Apex triggers to solve complex business requirements that can't be implemented using just the configuration-driven features of Force.com. Join us to learn when and how to write your first Apex trigger, and some best practices for making them effective.
Manage Development in Your Org with Salesforce Governance FrameworkSalesforce Developers
As your team creates more apps in your Salesforce Org, you're faced with a new set of challenges: managing a well-designed org. Join us to learn about using the practices defined in the Salesforce Governance framework, and the set of tools available for managing issues such as security, coding standards, decisions over declarative verses Apex apps, design standards, overall Org strategy, and change control. By applying these best practices, your team can continue to grow your apps to meet the continuing challenges of your company.
Master data management (mdm) & plm in context of enterprise product managementTata Consultancy Services
The presentation discusses the classical features and advantages of Master Data Management (MDM) system along with appropriate situations to use it. How do companies apply MDM who design, manufacture and sell their products in several geographies facing challenges in making appropriate decisions on their investment in PLM & MDM space?
Another important aspect covers the comparison/relation between a MDM system (or Product Master System) and Enterprise PLM system. How can you maximize your ROI on both PLM and MDM investments? With examples from different industries the key takeaways include whether your organization requires an MDM solution or not.
Did you inherit a cluttered org with no documentation? Are you trying to figure out why you have 500 fields on an object? Join this session and collaboratively learn from other customers about the most common traits of a messy implementation, and how you can untangle yours.
Considering an org merge in your company? We've implemented multiple complex org merges with one of Salesforce's largest customers, so join us to learn best practices for merging two Salesforce orgs into one. We'll cover both the business and technical challenges, including a demo of the Force.com Migration Tool.
15 Tips on Salesforce Data Migration - Naveen Gabrani & Jonathan OsgoodSalesforce Admins
Data Migration is an extremely important aspect of setting up a Salesforce instance. It is critical that the sanctity of data is maintained. Join us to hear fifteen tips based on learnings from different types of data migration projects.
When you need to deliver fast, shortcuts will be taken. This is a fact when it comes to software development, and Salesforce is no different.
This is how technical debt is created. It’s a costly side effect of growth, and it cannot be ignored! Just like financial debt, if you don’t address it in time, it will accumulate and over time your teams will find themselves addressing issues with the platform instead of supporting customers and developing revenue opportunities – and this will have a direct impact on your ROI.
You have lots of customer data and you need to ensure that it’s readily available to all of those who need it to drive business results across sales, service and customer engagement.
This presentation discusses how easy it is to migrate your critical data into Salesforce and how it will immediately benefit the different areas of your business. Our speakers will demonstrate how simple and seamless it is for you to transfer your customer data into Salesforce from different external sources such as; text files, another CRM, or homegrown systems.
What you will learn:
-How to migrate data to salesforce from a variety of endpoints to create a complete customer view
-How a single integration solution can bring together multiple data sources to provide rapid time to value
"We'll need an Apex trigger to do that." Sound familiar? Take your advanced Admin skills to the next level by developing Apex triggers to solve complex business requirements that can't be implemented using just the configuration-driven features of Force.com. Join us to learn when and how to write your first Apex trigger, and some best practices for making them effective.
Manage Development in Your Org with Salesforce Governance FrameworkSalesforce Developers
As your team creates more apps in your Salesforce Org, you're faced with a new set of challenges: managing a well-designed org. Join us to learn about using the practices defined in the Salesforce Governance framework, and the set of tools available for managing issues such as security, coding standards, decisions over declarative verses Apex apps, design standards, overall Org strategy, and change control. By applying these best practices, your team can continue to grow your apps to meet the continuing challenges of your company.
Master data management (mdm) & plm in context of enterprise product managementTata Consultancy Services
The presentation discusses the classical features and advantages of Master Data Management (MDM) system along with appropriate situations to use it. How do companies apply MDM who design, manufacture and sell their products in several geographies facing challenges in making appropriate decisions on their investment in PLM & MDM space?
Another important aspect covers the comparison/relation between a MDM system (or Product Master System) and Enterprise PLM system. How can you maximize your ROI on both PLM and MDM investments? With examples from different industries the key takeaways include whether your organization requires an MDM solution or not.
Did you inherit a cluttered org with no documentation? Are you trying to figure out why you have 500 fields on an object? Join this session and collaboratively learn from other customers about the most common traits of a messy implementation, and how you can untangle yours.
Organisations using Salesforce will inevitably accumulate technical debt over time. It’s a costly side effect of growth, and to manage it successfully, these organisations need to not only remove their existing debt but also understand its causes and develop a plan to manage it in the future.
To find out more about the key areas you need to cover to carry out a successful technical debt assessment in the Salesforce platform watch our on-demand webinar:
https://www.whishworks.com/event/recording-performing-a-successful-technical-debt-assessment-in-salesforce/
Key topics
– What is technical debt
– Causes of technical debt in Salesforce
– Key areas to assess
– Common tools for diagnosis
– Technical debt assessment results & reporting
The slides give the introduction to CPQ and provide more details about Steelbrick CPQ which is acquired by Salesforce. Its features and how it will be helful for your orgnization.
Every organization would like to sell to its maximum potential. Problem is, most businesses are still selling through outdated methods, like paper order forms and spreadsheets. Learn how to attract new customers, nurture them via traditional and social channels, and close deals faster with this Sales Process Map.
SteelBrick CPQ helps sales reps do their job more efficiently and accurately. By automatically generating the right mix of products and services for each customer and providing an accurate quote, CPQ allows your sales reps to concentrate on customer relationship building and contacting their next lead.
Why is Org Strategy important, what are the possible org patterns and what are some of the benefits and challenges to consider? This 12-page long white paper describes different org existence models, trade-offs, design best practices, and assessment approach. Please leave your comments.
Salesforce Release Management - Best Practices and Tools for DeploymentSalesforce Developers
Join us to learn how EMC?s Isilon Storage Division has adopted salesforce.com best practices to better manage deployments on the Force.com platform. We'll also introduce the ?SfOpticon? tool, a custom-built, open-source solution which uses the Force.com Metadata API and Github to monitor, track, branch, package and deploy changes to our salesforce.com environments.
Maximizing Salesforce Lightning Experience and Lightning Component PerformanceSalesforce Developers
We all want the Salesforce Lightning Experience to be fast- but how do we define fast, and how do we make it even faster? When you’re building a UI, everything you add to the page affects performance, and to make load times faster and perform the way users expect, we need to treat speed as an essential design feature. In this presentation, you’ll learn how to measure performance, learn a few tips on how to maximize performance, and take responsibility for your feature’s performance from design to production.
Planning Your Migration to the Lightning ExperienceShell Black
Learn how to migrate to the Salesforce Lighting UI in four steps. Shell Black in this presentation discusses how to make the business case to justify the costs to moving to the Lightning Experience (LEX) from Classic. In the four steps Shell covers how to assess the current state of your org, plan out the migration, manage your build sprints and UAT (User Acceptance Testing), and train your end users. He also covers the factors that drive the time needed to complete the project. As you will find, the biggest hurdle to migrating to Lightning is not a missing feature, but Admin knowledge. Click the link on Slide 2 to watch a video of this presentation!
Case Study: Salesforce CPQ (Configure Price Quote) for Software as a Service ...Jade Global
Salesforce CPQ Case Study:
Business Requirements
Migrate all quote templates from existing tools to Salesforce CPQ as the main tool for the booking and Sales process
Support project lifecycle activities, including Requirement Gathering, Design, Development, Testing and Deployment
Configure Products based on business needs
An adaptable configuration of validation and pricing rules to prevent booking errors
Upgrade User Experience with guided flow
Enable core CPQ functions on mobile platforms
Business Challenges
OOTB functionality did not meet certain business requirements
Business changed requirements frequently causing rework
Business testing was not completed as quickly as items were being developed
Not able to properly format quotes Formatting of quote generation
Products being selected together incorrectly
Long list of products without any groupings - poor user experience
Approvals were not tracked, Lack of mobile approvals
Solution – Salesforce CPQ (Steelbrick)
Customizable quote templates
Validations to prevent users from selecting products that shouldn’t be selected together
Prompts to guide the user to review products before continuing with product selection
Enabled approvals with mobile capabilities
Connect with us:
Info@jadeglobal.com 1 877-523-3448
Website: http://www.jadeglobal.com
LinkedIn: http://www.linkedin.com/company/jade-...
Facebook: https://www.facebook.com/jadeglobal/
Twitter: https://twitter.com/JadeGlobal
The Salesforce platform offers system as well as application level security capabilities for building robust and secure applications. Join us as we introduce the system-level security features of Salesforce, like authentication and authorization mechanisms that include various Single Sign-On and OAuth flows. We'll also cover declarative application-level security features, like user profiles, roles and permissions, and how an Organization Wide Security and record-sharing model enforces a finer level of access control over the data.
Take control of your Salesforce application with a governance process! Establishing a governance process helps us sort change requests and work with all of our stakeholders, from end users to developers. Join us as we teach you how to manage your entire application lifecycle process by instituting a governance process for your business.
From Sandbox To Production: An Introduction to Salesforce Release ManagementSalesforce Developers
Wondering how to manage multiple Salesforce environments for managing your release? Join us as our Architects show how large enterprises manage Sandbox environments. Learn some of the key considerations in picking sandbox types and migration tools to lay out a process to manage an effective Release Management.
When building an enterprise solution or creating an app, data often comes from multiple systems, and business processes frequently cross application boundaries.
Salesforce offers a rich library of programmatic and point-and-click integration tools to customize business processes that span multiple application systems. In this webinar, we will survey the many integration options and technologies available in Salesforce, including newer API and integration features.
This webinar is the first in a series that will explore several ways to integrate systems and services with Salesforce.
Are your business partners asking to be able to create their own applications? Are you asked to share development environments with other teams? Join us to learn considerations and best practices for making shared development in a single org a success. We'll cover process management, development methodology, release processes, and apps life cycle maintenance.
Five Pain Points of Agile Development (And How Software Version Management Ca...Perforce
The latest research on Software Configuration Management suggests that developers are struggling in five key areas: latency, far-flung teams, ad-hoc workflows, administrative overhead, and integration nightmares.
This webcast will help you understand how these five factors are undermining developer productivity and performance.
As modern practices strain some tools to their limits, companies are revisiting their approaches to version management. We will share with you...
* How the market is evolving to address these critical issues
* How innovative SCM tools can take your versioning to new levels.
Organisations using Salesforce will inevitably accumulate technical debt over time. It’s a costly side effect of growth, and to manage it successfully, these organisations need to not only remove their existing debt but also understand its causes and develop a plan to manage it in the future.
To find out more about the key areas you need to cover to carry out a successful technical debt assessment in the Salesforce platform watch our on-demand webinar:
https://www.whishworks.com/event/recording-performing-a-successful-technical-debt-assessment-in-salesforce/
Key topics
– What is technical debt
– Causes of technical debt in Salesforce
– Key areas to assess
– Common tools for diagnosis
– Technical debt assessment results & reporting
The slides give the introduction to CPQ and provide more details about Steelbrick CPQ which is acquired by Salesforce. Its features and how it will be helful for your orgnization.
Every organization would like to sell to its maximum potential. Problem is, most businesses are still selling through outdated methods, like paper order forms and spreadsheets. Learn how to attract new customers, nurture them via traditional and social channels, and close deals faster with this Sales Process Map.
SteelBrick CPQ helps sales reps do their job more efficiently and accurately. By automatically generating the right mix of products and services for each customer and providing an accurate quote, CPQ allows your sales reps to concentrate on customer relationship building and contacting their next lead.
Why is Org Strategy important, what are the possible org patterns and what are some of the benefits and challenges to consider? This 12-page long white paper describes different org existence models, trade-offs, design best practices, and assessment approach. Please leave your comments.
Salesforce Release Management - Best Practices and Tools for DeploymentSalesforce Developers
Join us to learn how EMC?s Isilon Storage Division has adopted salesforce.com best practices to better manage deployments on the Force.com platform. We'll also introduce the ?SfOpticon? tool, a custom-built, open-source solution which uses the Force.com Metadata API and Github to monitor, track, branch, package and deploy changes to our salesforce.com environments.
Maximizing Salesforce Lightning Experience and Lightning Component PerformanceSalesforce Developers
We all want the Salesforce Lightning Experience to be fast- but how do we define fast, and how do we make it even faster? When you’re building a UI, everything you add to the page affects performance, and to make load times faster and perform the way users expect, we need to treat speed as an essential design feature. In this presentation, you’ll learn how to measure performance, learn a few tips on how to maximize performance, and take responsibility for your feature’s performance from design to production.
Planning Your Migration to the Lightning ExperienceShell Black
Learn how to migrate to the Salesforce Lighting UI in four steps. Shell Black in this presentation discusses how to make the business case to justify the costs to moving to the Lightning Experience (LEX) from Classic. In the four steps Shell covers how to assess the current state of your org, plan out the migration, manage your build sprints and UAT (User Acceptance Testing), and train your end users. He also covers the factors that drive the time needed to complete the project. As you will find, the biggest hurdle to migrating to Lightning is not a missing feature, but Admin knowledge. Click the link on Slide 2 to watch a video of this presentation!
Case Study: Salesforce CPQ (Configure Price Quote) for Software as a Service ...Jade Global
Salesforce CPQ Case Study:
Business Requirements
Migrate all quote templates from existing tools to Salesforce CPQ as the main tool for the booking and Sales process
Support project lifecycle activities, including Requirement Gathering, Design, Development, Testing and Deployment
Configure Products based on business needs
An adaptable configuration of validation and pricing rules to prevent booking errors
Upgrade User Experience with guided flow
Enable core CPQ functions on mobile platforms
Business Challenges
OOTB functionality did not meet certain business requirements
Business changed requirements frequently causing rework
Business testing was not completed as quickly as items were being developed
Not able to properly format quotes Formatting of quote generation
Products being selected together incorrectly
Long list of products without any groupings - poor user experience
Approvals were not tracked, Lack of mobile approvals
Solution – Salesforce CPQ (Steelbrick)
Customizable quote templates
Validations to prevent users from selecting products that shouldn’t be selected together
Prompts to guide the user to review products before continuing with product selection
Enabled approvals with mobile capabilities
Connect with us:
Info@jadeglobal.com 1 877-523-3448
Website: http://www.jadeglobal.com
LinkedIn: http://www.linkedin.com/company/jade-...
Facebook: https://www.facebook.com/jadeglobal/
Twitter: https://twitter.com/JadeGlobal
The Salesforce platform offers system as well as application level security capabilities for building robust and secure applications. Join us as we introduce the system-level security features of Salesforce, like authentication and authorization mechanisms that include various Single Sign-On and OAuth flows. We'll also cover declarative application-level security features, like user profiles, roles and permissions, and how an Organization Wide Security and record-sharing model enforces a finer level of access control over the data.
Take control of your Salesforce application with a governance process! Establishing a governance process helps us sort change requests and work with all of our stakeholders, from end users to developers. Join us as we teach you how to manage your entire application lifecycle process by instituting a governance process for your business.
From Sandbox To Production: An Introduction to Salesforce Release ManagementSalesforce Developers
Wondering how to manage multiple Salesforce environments for managing your release? Join us as our Architects show how large enterprises manage Sandbox environments. Learn some of the key considerations in picking sandbox types and migration tools to lay out a process to manage an effective Release Management.
When building an enterprise solution or creating an app, data often comes from multiple systems, and business processes frequently cross application boundaries.
Salesforce offers a rich library of programmatic and point-and-click integration tools to customize business processes that span multiple application systems. In this webinar, we will survey the many integration options and technologies available in Salesforce, including newer API and integration features.
This webinar is the first in a series that will explore several ways to integrate systems and services with Salesforce.
Are your business partners asking to be able to create their own applications? Are you asked to share development environments with other teams? Join us to learn considerations and best practices for making shared development in a single org a success. We'll cover process management, development methodology, release processes, and apps life cycle maintenance.
Five Pain Points of Agile Development (And How Software Version Management Ca...Perforce
The latest research on Software Configuration Management suggests that developers are struggling in five key areas: latency, far-flung teams, ad-hoc workflows, administrative overhead, and integration nightmares.
This webcast will help you understand how these five factors are undermining developer productivity and performance.
As modern practices strain some tools to their limits, companies are revisiting their approaches to version management. We will share with you...
* How the market is evolving to address these critical issues
* How innovative SCM tools can take your versioning to new levels.
Patching is Your Friend in the New World Order of EPM and ERP CloudDatavail
Historically, patching was an IT effort to stay on the support path or remove vulnerabilities. Today, in the EPM Cloud market, patching is so much more. This presentation will review several case studies of how clients received free capacities in their patches. Be a hero and make business change.
Enterprise system implementation strategies and phasesJohn Cachat
Implementation Strategies
Full blown
Staggered or Phased
Implementation Phases
Project planning
Application exploration
System design
System testing
System activation – “go live”
johncachat@hotmail.com
www.peproso.com
This session will explore both the strategic and practical aspects of how the DBA role is impacted with the adoption of DevOps. Firsthand experiences from a DBA and the organizational learning gained during these transitions will be featured during the presentation.
Scaling Application Development & Delivery across the EnterpriseCollabNet
Software and applications are core to your business. Agile project planning and management have gone mainstream and the rest of the delivery chain has yet to catch up. According to Forrester 87% of organizations have not connected their Agile project planning to their downstream delivery processes. Organizations who are successful at the workgroup level are further challenged with scaling these successes across an entire enterprise.
Oracle Fusion Applications promises a lot of business benefits, but should existing users of Oracle E-Business Suite rush to go to Fusion? How will maintenance, costs and standardization practices be affected by implementing Fusion? This session compares a Fusion and an Oracle E-Business Suite Release 12 strategy while considering common concerns, challenges, complexities and alternatives.
Website: www.eprentise.com
Twitter: @eprentise
Google+: https://plus.google.com/u/0/+Eprentise/posts
Facebook: https://www.facebook.com/eprentise
How can Oracle Forms (or other legacy) applications be modernized to fit in a contemporary IT architecture? Trends, concepts and technologies are discussed.
Moving Oracle Applications to the Cloud - Which Cloud is Right for Me?Datavail
We have all heard about the cloud and we are told we should be moving there. Are you aware there are different types of cloud? Moving an application to the cloud can be a lot of work, disrupt your business and cost a lot of money. Moving to Infrastructure as a Service however, allows you to keep your customizations, keep the look and feel your users are accustomed to, but also be able to leverage a highly scalable, robust environment.
Moving to SaaS means you can leverage the latest technologies and best practices, and focus on your business. If you chose IaaS or SaaS, testing is a common strategic differentiator. Which Cloud is right for you? OCI, AWS, Azure. Let’s look at how the right cloud can move your company forward. This applies to Oracle: JDE, Peoplesoft, Hyperion, OBIEE, and EBS.
ALM with TFS: From the Drawing Board to the CloudJeremy Likness
Managing the lifecycle of software development can be a daunting task, especially after having adopted an Agile methodology that has you moving faster than ever. That is why it is more important than ever to have the right tools in place that allow you to effectively manage all facets of your SDLC from requirements gathering to testing and deployment. In the suite of tools available in the space of Application Lifecycle Management (ALM), Team Foundation Server (TFS) is a stand out. Let us show you how your organization can benefit from the advanced capabilities and unique configurability of TFS to successfully deliver your software development projects on time and on budget.
Transition to the Lightning Experience: Pro Tips, Tools and a Transition Stra...Shell Black
2018 Dreamforce - How much does migrating to the Salesforce Lightning Experience cost? What’s the ROI? What’s the big driver of expense and project time – number of users or org complexity? This presentation covers migration tools, tips, best practices, as well as the hurdles you’ll experience when transitioning to LEX from Classic.
Brand U - Learn How To Create Your Personal BrandShell Black
Texas Dreamin' 2017 presentation by two Salesforce MVPs Shell Black and Brent Downey from ShellBlack.com. Connect, curate, contribute – become a community rockstar! Learn pro tips from two Salesforce MVPs who built their own personal brands – which ultimately put them in control of their careers. We'll start with the basics such as selecting your primary social channels and finding your "voice." Then we'll cover the value of creating consistent quality content and how to market yourself. By recounting their own journeys, looking at examples of personal brands that work (and a few that don't), you'll leave feeling inspired and armed with a plan.
Introduction to Campaigns in Salesforce - Create, Manage, Launch, and MeasureShell Black
This introduction to Salesforce Campaigns is targeted for Salesforce Administrators and Marketing Professionals who want to know more about how Campaigns in Salesforce.com. The presentation covers the mechanics of creating a Campaign, determining Campaign Member Status, methods to associate Leads and Contacts to a Campaign, as well as launching and measuring the results. Includes Campaign ROI calculation, tracking response rates, and limits. Use Campaigns to track marketing initiatives such as email, direct mail, outdoor advertising, and events.
Best Practices for Managing Inside Sales with Salesforce.comShell Black
Best practices for managing an inside sales team with Salesforce.com. Call strategy, lead scoring, using a console or a dialer, management and measurement tips and tricks. Know when to call, how many times, how to disposition call attempts, and call scripts. Learn the importance of dialing from a local number and having a direct number for your contact.
Attending a job Interview for B1 and B2 Englsih learnersErika906060
It is a sample of an interview for a business english class for pre-intermediate and intermediate english students with emphasis on the speking ability.
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
"𝑩𝑬𝑮𝑼𝑵 𝑾𝑰𝑻𝑯 𝑻𝑱 𝑰𝑺 𝑯𝑨𝑳𝑭 𝑫𝑶𝑵𝑬"
𝐓𝐉 𝐂𝐨𝐦𝐬 (𝐓𝐉 𝐂𝐨𝐦𝐦𝐮𝐧𝐢𝐜𝐚𝐭𝐢𝐨𝐧𝐬) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
𝐓𝐉 𝐂𝐨𝐦𝐬 provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
⭐ 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐝 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬:
➢ 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
➢ SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
➢FreenBecky 1st Fan Meeting in Vietnam
➢CHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
➢ WOW K-Music Festival 2023
➢ Winner [CROSS] Tour in HCM
➢ Super Show 9 in HCM with Super Junior
➢ HCMC - Gyeongsangbuk-do Culture and Tourism Festival
➢ Korean Vietnam Partnership - Fair with LG
➢ Korean President visits Samsung Electronics R&D Center
➢ Vietnam Food Expo with Lotte Wellfood
"𝐄𝐯𝐞𝐫𝐲 𝐞𝐯𝐞𝐧𝐭 𝐢𝐬 𝐚 𝐬𝐭𝐨𝐫𝐲, 𝐚 𝐬𝐩𝐞𝐜𝐢𝐚𝐥 𝐣𝐨𝐮𝐫𝐧𝐞𝐲. 𝐖𝐞 𝐚𝐥𝐰𝐚𝐲𝐬 𝐛𝐞𝐥𝐢𝐞𝐯𝐞 𝐭𝐡𝐚𝐭 𝐬𝐡𝐨𝐫𝐭𝐥𝐲 𝐲𝐨𝐮 𝐰𝐢𝐥𝐥 𝐛𝐞 𝐚 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐨𝐮𝐫 𝐬𝐭𝐨𝐫𝐢𝐞𝐬."
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxmy Pandit
Explore the world of the Taurus zodiac sign. Learn about their stability, determination, and appreciation for beauty. Discover how Taureans' grounded nature and hardworking mindset define their unique personality.
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...Kumar Satyam
According to TechSci Research report, “India Orthopedic Devices Market -Industry Size, Share, Trends, Competition Forecast & Opportunities, 2030”, the India Orthopedic Devices Market stood at USD 1,280.54 Million in 2024 and is anticipated to grow with a CAGR of 7.84% in the forecast period, 2026-2030F. The India Orthopedic Devices Market is being driven by several factors. The most prominent ones include an increase in the elderly population, who are more prone to orthopedic conditions such as osteoporosis and arthritis. Moreover, the rise in sports injuries and road accidents are also contributing to the demand for orthopedic devices. Advances in technology and the introduction of innovative implants and prosthetics have further propelled the market growth. Additionally, government initiatives aimed at improving healthcare infrastructure and the increasing prevalence of lifestyle diseases have led to an upward trend in orthopedic surgeries, thereby fueling the market demand for these devices.
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
Unveiling the Secrets How Does Generative AI Work.pdfSam H
At its core, generative artificial intelligence relies on the concept of generative models, which serve as engines that churn out entirely new data resembling their training data. It is like a sculptor who has studied so many forms found in nature and then uses this knowledge to create sculptures from his imagination that have never been seen before anywhere else. If taken to cyberspace, gans work almost the same way.