Sales management

The only business function that
generates revenue.

1
sales management
 Planning, direction and control of personal

selling including recruiting, selecting,
training, equipping, assigning, supervising,
compensating and motivating as these
tasks apply to the personal sales force.

2
Sales management
 Management of the personal selling task.
 Is there anything like ‘impersonal selling’ or ‘non-

personal’ selling?
 Selling is an exchange transaction. Exchange of
Product or service for money
 Money is the revenue or the earnings of an
enterprise often called ‘turnover’ or ‘top line’
 Sales therefore is the only revenue generating
function in an enterprise.
3
Objectives of sales
management
 3 general underlying objectives:
1. SALES VOLUME
2. PROFITS
3. GROWTH

Sales – cost of sales = gross margin.
Gross margin – expenses =net profit.
4
Sales management: evolution
 Industrial Revolution – 1760
 Small home industries – Large scale

manufacturing –marketing – sales and
sales support
 Concept of hunters and farmers
 The modern day sales manager is both
an administrator in-charge of personal
selling activity and a member of the
group that makes marketing decisions of
all types.
5
The salesman
 …..they make more noise and more

mistakes, create more cheer, correct
more errors, adjust more differences,
spread more gossip, hear more
grievances, pacify more belligerence and
waste more time under pressure, all
without loosing their temper, than any
other class of professionals –including
politicians.
6
The salesman
 …they live in hotels, cabs and tents on

trains, buses, eat all kinds of food, drink
all kinds of liquids –good and bad- sleep
before, during and after business, with
no sympathy from the office.
 They draw and spend more money with
less effort, they come at the most
inopportune time, under the slightest
pretext, ask more personal questions.
 Yet they are a power in society…
7
The salesman
 With all their faults, they keep the wheels

of commerce turning, and the currents of
human emotions running. More cannot
be said any man. Be careful whom you
call a salesman, lest you flatter him.
-Donald Benenson in Ziglar on Selling

8
Sales Management
“QUALITIES THAT LEAD TO EFFECTIVE SALES MANAGEMENT
ARE OFTEN OPPOSITE THE ATTRIBUTES OF A SUCCESSFUL
SALES PERSON”
Sales organization
 With various tasks required to be

performed the enterprise had to create a
structure to ensure that work is done.
(the Sears story)
 Principles of structure: authority,
responsibility, performance, support/coordinate.

10
Sales organization
 Concept of organization: Group of

individuals working jointly to achieve a
defined goal and bearing formal and
informal relations with one another. An
organization is oriented towards and a
co-operative endeavor and a structure of
human relationships.

11
Purpose of organization
 Eliminate waste of effort
 Minimize friction
 Maximize co-operation
 Permit development of specialists
 Ensure that all activities get done
 Achieve co-ordination/balance
 Define authority
 Fix responsibility
12
Types of organization
structures
 Line organization: line managers

perform sales and sales management
activities.
 Line and staff organization: Staff
managers have advisory or support
responsibility. e.g.Market research
manager, Training manager.They are
not directly responsible for achieving
sales targets.
13
Organization structures
 Functional organization: focus is on

the principle of specialization. Each
specialist has a functional responsibility
and are permitted to direct and control
the salesperson thru their immediate
superior.

14
Organization structure
 Horizontal structure.
 Specialised structure:

Geographical;
Product;
Market or customer;
Combination of specialised structures.

15
Line Sales Organization structure
Head –Marketing

Sales Manager

Area Sales
Mgr

Area Sales Mgr

Area Sales
Mgr

Area Sales
Mgr

Sales Force

Sales Force

Sales Force

Sales Force

Clear authority & Responsibility
Quick response & Decision, Low Cost
Weak on marketing inputs
Sales manager controlled

16
Functional Sales Organization

Administrative Simplicity
Access to Specialists
Multiple reporting
HOD is Pressures to co-ordinate
17
Operations team
Production
QA
Engineering Systems

Research & Design team
Customer Research
Product / Service design

Planning Team
Strategy
Finance
HR
COO

Customer Support team
Service
Training
Information

Customer Satisfaction teams
Sales & Marketing
Pricing & Promotion
Channels
Logistics
18
Sales relation with marketing
activities
 Sales &Advertising: both stimulate

demand. They need to be blended.
Salespersons can improve advertising
effectiveness. Advertising needs to
support sales where and when they
need it most.
 Sales & Marketing information: data is
needed for analysis of sales problems,
for determining sales potential. Raw data
is collected by sales people.
19
relationships
 Sales and service: contributes to

strategy success.
 Sales and distribution: minimizes stock
out situation; improves inventory control;
helps sales to focus on demand
generation.
 Sales & Production:
 Sales and R&D
 Sales &Finance
20
SALES PLANNING
a managerial function
 EXISTING BUSINESS
LONG RANGE PLAN

3 TO 5 YEAR PROJECTIONS

ANNUAL OPERATING PLAN

REVISED YEAR TO YEAR

SEGMENTWISE PLAN

PAST TREND

GEOGRAPHICAL PLAN

PREVIOUS YEAR SALES

CUSTOMERWISE PLAN

CURRENT YEAR ACHIEVEMENT

PLAN BY VALUE

NEXT YEAR PLANS

PLAN BY VOLUME

ASSUMPTIONS
21
PLANNING FOCUS AREAS:
•

PROFITABILITY IMPROVEMENT

 A REGION OR TERRITORY CEASES TO

CONTRIBUTE

 DISCONTINUATION OF SALES TO AN ACCOUNT
 DE-EMPHASISING PRODUCTS
 ACCEPTING A PRIVATE BRAND ORDER


VARIANCE BETWEEN BUDGET AND ACTUAL
SALES

22
SALES PLANNING
 NEW BUSINESS
 VISION

MISSION

GOALS

 STRATEGY
 *ACTION PLANS

23
Key Deliverables of the Sales
function
 Planning
 Organizing
 Training
 Motivating
 Controlling
 Leading

24
Sales planning
 Forecasting a key planning tool

PRODUCT LEVEL –
total sales industry sales
company sales
product line sales
product variant sales
25
Time period forecast
 Long Range
 Medium range
 Short term (range)

26
Planning process
 Sales plan
 Capacity plan
 Production plan
 Cash flow plan
 Procurement plan

Human resource plan
27
Sales forecast
 Why forecast?

One of the keys to success in sales is
knowing where customers are located
and being able to predict how much they
will buy.

28
Sales forecasting;
Industry estimates
•

Objective definition

•

Identifying critical factors (assumptions)

•

Selecting method of forecasting

•

Collecting, analysing, interpreting data.

•

Concluding predictions.
29
Geographic Area forecast
 Nation
 Region ( REGION OR ZONE )
 Territory ( BRANCH / DISTRICT )
 Customer

30
Forecasting Approaches
 Top - down / Break –down approach

An SBU level forecast broken down to
region, district, territory, salesperson and
individual customer sales quotas
 Bottom –up / Build – up approach
Individual customer to branch to zone to
company level forecast

31
Methods of sales forecast
 Qualitative methods:

Executive opinion
Delphi method – prediction by a panel
Sales force composite – ‘grass roots’
approach.
Test marketing –controlled or simulated

32
Sales forecast methods
 Quantitative methods:

Moving averages
Exponential smoothing
Regression analysis
Econometric analysis

33
Selling situations
 Customer’s intention and expectation are








specific. (insurance, mobile service)
Customer is contacted over phone
Customer is an organizational buyer
Customer seeking service or solution
Customer in a retail store
Cold calling situation
Pharmaceutical selling
Creative selling ( ad.campaign)
34
The sales budget
 To the sales department, the budget is a

blue print for making sales. It involves
money invested in distribution facilities,
promotion efforts, and sales personnel. It
is the foundation on which to plan sales
objectives and the means of achieving
them during the coming year.

35
Sales budget
 A budget is a quantitative expression of plans.

Most well managed enterprises use a budget which
is a comprehensive and coordinated plan for the
operations and resources of the enterprise.
 It is a formal and intricate process
 Approaches are either incremental or zero based.
 In a volatile economic climate organizations
estimate optimistic, realistic and pessimistic
scenarios.

36
Sales budget
Critical factors considered:
1. past trends
2. Sales force estimates
3. Trade prospects
4. Present scenario
5. Customers: existing and potential
6. Government policies
7. Industry environment
37
Number of sales people
 Decision on the size of the sales force is

very complicated because structure of
the customers vary in each territory, the
level of competition varies across
territories, the connectivity for travel
varies etc.
 There are 3 generally accepted
approaches: affordability, incremental
and workload methods.
38
Sales territories
 Definition : A sales territory consists of

existing and potential customers
assigned to a sales person. The territory
may or may not have geographic
boundaries.

39
Reasons for territories
 Increase / improve customer coverage
 Control selling expenses
 Effective evaluation of salesman’s

performance.
 improve customer relations

40
Territory design
 Main procedural steps:
1. Selection of a basic geographical control

unit
2. Determination of sales potential present in
each unit
3. Combining the basic units into tentative
territories
4. Adjust for differences in coverage difficulty
and readjust the tentative territories ( build
up / break down method )
41
Territory design
 Build up method:

Decide call frequency
Calculate total no of calls in the unit
Estimate workload capacity of salesman
Make tentative territories
Develop final territories

42
Territory design
 Break down method:

Estimate company sales potential for
total market.
Forecast sales potential for each control
unit.
Estimate sales expected from each
salesman.
Make tentative territories.
Develop final territories.
43
Routing Scheduling and
control
 Reasons / advantages:
 Maintain lines of communication
 Improve territory coverage
 Minimize wasted time
 Closer scrutiny of sales force movement
 Journey plans for improving customer

satisfaction
44
Quotas
 Quotas are quantitative goals assigned

to individual sales persons for a
specified period of time.
 One of the most widely used tools in
sales management.
 Should not be confused with sales
potential or sales forecast.
 Quotas may be set equal to ,above or
below the sales forecast.

45
Why Quotas ?
 To help management motivate sales

people.
 To direct sales people where to put there
efforts.
 To provide standards of performance
evaluation

46
Types of Quotas
 Sales volume Quotas : Rupee volume /

Unit volume
 Profit based Quotas: contribution / gross
margin
 Activity Quotas: calls per day; sales
meetings; product demos; ( efforts =
results.)
 Expense Quotas
47
QUOTA SETTING
MECHANISM
 S-specific
 M-measurable
 A-achievable
 R-realistic
 T-time bound

48
What is Motivation??
 Drive to initiate an action.
 The intensity of effort in an action
 The persistence of effort over
49
Why motivation
 Frequent rejection
 Physical separation from company

support
 Direct influence on quality of sales

presentation
 Indirect influence on performance
50
Sales force motivation
 “the desire to make an effort to fulfill a

need is motivation”
 Motivation includes three dimensions:
Direction, Intensity and persistence.
 Motivation may also be Intrinsic or
extrinsic
 Maslow’s hierarchy of needs:

51
Maslow’s theory
Self
Actualisation
Esteem needs
Social needs
Safety needs
Physiological needs
Food, clothing, shelter, health
care
52
MASLOW’S HIERARCHY OF NEEDS
Intense job challenge, full potential, full
expression, creative expansion.
Achievement, respect, recognition,
responsibility, prestige, independence, attention,
importance, appreciation.
Belonging, acceptance, love, affection,
family
and group acceptance, friendships.
Security, stability, dependency, protection,
need for structure, order, law, tenure,
pension,
insurance.
Hunger, thirst, reproduction, shelter,
clothing,
air, rest.

53
Frederick Herzberg theory
 “Two factor theory” of motivation
 Hygiene ,maintenance, or job context

factors.( dis satisfiers )
 Achievement, challenge, advancement,
growth in the job. (satisfiers )

54
SELLING
THE WORD SELL IS DERIVED FROM A Norwegian WORD SELJE
WHICH MEANS TO SERVE
TO SERVE YOUR PROSPECTS YOU MUST UNDERSTAND THEIR
NEEDS.
PEOPLE INVARIABLY BUY WHAT THEY WANT, EVEN ABOVE
WHAT THEY NEED

55
The sales process
 Process: a sequential series of decisions

and or actions.
BUYING PROCESS

SELLING PROCESS

NEED
SEARCH
IDENTIFY
ISOLATE

PREPARE
FOCUS
DEFINE
PROPOSE/PRESENT

SELECT
BUY
CONSUME

HANDLE OBJECTIONS
CLOSE THE SALE
FOLLOW UP

56
The sales process
1.
2.
3.
4.
5.
6.
7.

Prospecting & Qualifying
Pre approach (pre call planning )
Approach
Presentation & Demonstration
Overcoming Objections
Trial close / Closing the sale
Follow –up and Service.
57
SELLING PROCESS
the Ziglar method
 Focus on Prospects NEEDS and

WANTS.
 Sell by design, not by chance.
Follow a proven 4 step formula:
NEED ANALYSIS
NEED AWARENESS
NEED SOLUTION
NEED SATISFACTION
58
Prospecting
 Process of identifying potential buyers.
 A prospect has a reasonable probability

of buying ,has sufficient need to justify a
profitable sale ,has financial resources to
buy and can be classified as ‘eligible to
buy’
MONEY? AUTHORITY? DESIRE?

59
Locating prospects
Lead generation – a three step process.
1. Defining the target market :what it
wants; what it buys; where and when it
buys; what it buys; how it buys;
2. Using communication tools to gather
leads –Advertising, Direct mail,
Telemarketing, Trade shows, buying
data
3. Qualifying the Leads.
60
Selling first time to Prospects
(pre sale planning)

 Adequate knowledge of the product to be sold, company

being represented, the market competition ,category or
segment of customers and selling techniques.
 Product knowledge: Evolution-Features-BenefitsUniqueness-Price
 Company knowledge: History-Values-AchievementsManagement-Policies

61
Pre sale plan
 Competitors knowledge :structure-share-

strategy-systems.
 Customer knowledge :attitudespreferences- behavioural habits
 Selling techniques :

62
Pre approach planning
 Focus on understanding customer needs and

characteristics and preparing a proposal on
how the product or service offered can satisfy
the need.
 Steps involved are:
Determining call objectives.
Development of customer profile.
Determine customer benefits.
Determine the flow and content of the
presentation.
63
Understanding buyer’s needs
 Situational questions: questions about

prospect’s current situation. (who will decide? is
it the first time ? Changing source ?
 Problem identification question: Questions to
uncover problems, difficulties or needs
( problems on quality, delivery ?)
 Problem impact questions: questions to make
the buyer realise the impact of the problem and
the need to solve it.( what will be the impact on
costs , on customer satisfaction ?)

64
 Solution value questions :questions to

help the buyer asses the value or
usefulness of the solution ( for x benefit
how much would you save ?
 Confirmation questions: (how would
an error free system help?)

65
Need awareness
 At this stage you need to THINK
 Prospect and Salesperson should both

be aware of the need. (remove blind
spots)

66
Need solution
 Present your product
 Time to stop asking questions and start

providing solutions.
 People don’t buy products, they buy
what the product does for them.

67
Questions are the answer
 Thinking vs. feeling questions.
 When you learn how the customer feels

you are more likely to find out what the
person thinks.( the seat belt case)
 Tying emotion to logic.

68
The questioning process
 Three basic types of questions enable us

to discover the needs of our potential
customers.
 1st The Open Door Questions.-allows the
prospect the freedom to go where ever
they like. the “who, what where ,when,
how and why” questions

69
Questioning …
 The closed door question: “would you

tell me more”; “what do you mean
by…Answers to these give you
information to helping the prospect
and building trust.

70
Questioning…
 “yes or no” questions demand a direct

response. “do you agree..” “would my
proposal..” “are we in agreement..”
 They allow you to check on your
progress on the sales process. “trial
close”

71
Presentation methods
 Stimulus response method: also called a

‘canned approach’, a memorised sales
presentation .It assumes that if a right stimuli is
made it will get a favourable response.
 Formula method: the AIDA process.
 Need-satisfaction method: an interactive
sales presentation. The most challenging and
creative method. The FAB way.
Features, Advantages, Benefits.
72
The presentation
 Attracting Attention
 Creating Interest
 Building Desire and conviction
 Initiate Action to buy.

73
Presentation methods
 Team selling method: a multi person sales

team deals with a multi person buying centre
(or buying committees)
Sales team consists of Account executive,
technical support engineer, logistics expert, IT
or systems executive and Finance executive.
Buying committee consists of materials exec.
manufacturing/operations exec. supply chain
exec. Materials manager and Finance exec.

74
Presentation methods
 Consultative selling method: problem-

solution method.
Requirements are:
Knowledge of the industry, clients
company, awareness of key members
needs,

75
Objections
 Objections , opposition , resistance to

the presentation typically happens during
the presentation or while asking for the
order.
 Objections should be welcomed.
 Objections indicate that the prospect is
involved and not indifferent.
 Objections reflect the prospect’s view.
76
Objections
Psychological ( hidden ) – includes predetermined ideas or beliefs, preference
for established brands, dislike of
making decisions , anxiety or
resistance to spend money , suspect
about quality etc.
2. Logical or practical or real –delivery
schedule, high price , product
availibility,
1.

77
Handling objections
 Listen
 Understand
 Negotiate

78
Methods of handling
objections
 Ask questions: listen, rephrase,

reconfirm the objection and explain.
 Turn objection into a benefit and trial
close.
 Deny objections tactfully. (arrogance and
sarcasm to be strictly avoided)
 Testimonials, referals
 Compensation for valid objections.
79
Negotiation
 Plan – pre determine ‘firm’ and ‘flexible’

factors; define limits.
 Ensure an atmosphere of trust ,

understanding and respect.
 Define purpose and objective.

80
Negotiation styles
 Win – loose
 Win – Win
 Loose - Loose

81
Closing the sale
 Summarize
 Advantage and disadvantage

comparison
 Opportunity benefit
 Emotional appeal
 Direct closure
A.A.F.T.O=Always Ask For The Order
82

Sales management

  • 1.
    Sales management The onlybusiness function that generates revenue. 1
  • 2.
    sales management  Planning,direction and control of personal selling including recruiting, selecting, training, equipping, assigning, supervising, compensating and motivating as these tasks apply to the personal sales force. 2
  • 3.
    Sales management  Managementof the personal selling task.  Is there anything like ‘impersonal selling’ or ‘non- personal’ selling?  Selling is an exchange transaction. Exchange of Product or service for money  Money is the revenue or the earnings of an enterprise often called ‘turnover’ or ‘top line’  Sales therefore is the only revenue generating function in an enterprise. 3
  • 4.
    Objectives of sales management 3 general underlying objectives: 1. SALES VOLUME 2. PROFITS 3. GROWTH Sales – cost of sales = gross margin. Gross margin – expenses =net profit. 4
  • 5.
    Sales management: evolution Industrial Revolution – 1760  Small home industries – Large scale manufacturing –marketing – sales and sales support  Concept of hunters and farmers  The modern day sales manager is both an administrator in-charge of personal selling activity and a member of the group that makes marketing decisions of all types. 5
  • 6.
    The salesman  …..theymake more noise and more mistakes, create more cheer, correct more errors, adjust more differences, spread more gossip, hear more grievances, pacify more belligerence and waste more time under pressure, all without loosing their temper, than any other class of professionals –including politicians. 6
  • 7.
    The salesman  …theylive in hotels, cabs and tents on trains, buses, eat all kinds of food, drink all kinds of liquids –good and bad- sleep before, during and after business, with no sympathy from the office.  They draw and spend more money with less effort, they come at the most inopportune time, under the slightest pretext, ask more personal questions.  Yet they are a power in society… 7
  • 8.
    The salesman  Withall their faults, they keep the wheels of commerce turning, and the currents of human emotions running. More cannot be said any man. Be careful whom you call a salesman, lest you flatter him. -Donald Benenson in Ziglar on Selling 8
  • 9.
    Sales Management “QUALITIES THATLEAD TO EFFECTIVE SALES MANAGEMENT ARE OFTEN OPPOSITE THE ATTRIBUTES OF A SUCCESSFUL SALES PERSON”
  • 10.
    Sales organization  Withvarious tasks required to be performed the enterprise had to create a structure to ensure that work is done. (the Sears story)  Principles of structure: authority, responsibility, performance, support/coordinate. 10
  • 11.
    Sales organization  Conceptof organization: Group of individuals working jointly to achieve a defined goal and bearing formal and informal relations with one another. An organization is oriented towards and a co-operative endeavor and a structure of human relationships. 11
  • 12.
    Purpose of organization Eliminate waste of effort  Minimize friction  Maximize co-operation  Permit development of specialists  Ensure that all activities get done  Achieve co-ordination/balance  Define authority  Fix responsibility 12
  • 13.
    Types of organization structures Line organization: line managers perform sales and sales management activities.  Line and staff organization: Staff managers have advisory or support responsibility. e.g.Market research manager, Training manager.They are not directly responsible for achieving sales targets. 13
  • 14.
    Organization structures  Functionalorganization: focus is on the principle of specialization. Each specialist has a functional responsibility and are permitted to direct and control the salesperson thru their immediate superior. 14
  • 15.
    Organization structure  Horizontalstructure.  Specialised structure: Geographical; Product; Market or customer; Combination of specialised structures. 15
  • 16.
    Line Sales Organizationstructure Head –Marketing Sales Manager Area Sales Mgr Area Sales Mgr Area Sales Mgr Area Sales Mgr Sales Force Sales Force Sales Force Sales Force Clear authority & Responsibility Quick response & Decision, Low Cost Weak on marketing inputs Sales manager controlled 16
  • 17.
    Functional Sales Organization AdministrativeSimplicity Access to Specialists Multiple reporting HOD is Pressures to co-ordinate 17
  • 18.
    Operations team Production QA Engineering Systems Research& Design team Customer Research Product / Service design Planning Team Strategy Finance HR COO Customer Support team Service Training Information Customer Satisfaction teams Sales & Marketing Pricing & Promotion Channels Logistics 18
  • 19.
    Sales relation withmarketing activities  Sales &Advertising: both stimulate demand. They need to be blended. Salespersons can improve advertising effectiveness. Advertising needs to support sales where and when they need it most.  Sales & Marketing information: data is needed for analysis of sales problems, for determining sales potential. Raw data is collected by sales people. 19
  • 20.
    relationships  Sales andservice: contributes to strategy success.  Sales and distribution: minimizes stock out situation; improves inventory control; helps sales to focus on demand generation.  Sales & Production:  Sales and R&D  Sales &Finance 20
  • 21.
    SALES PLANNING a managerialfunction  EXISTING BUSINESS LONG RANGE PLAN 3 TO 5 YEAR PROJECTIONS ANNUAL OPERATING PLAN REVISED YEAR TO YEAR SEGMENTWISE PLAN PAST TREND GEOGRAPHICAL PLAN PREVIOUS YEAR SALES CUSTOMERWISE PLAN CURRENT YEAR ACHIEVEMENT PLAN BY VALUE NEXT YEAR PLANS PLAN BY VOLUME ASSUMPTIONS 21
  • 22.
    PLANNING FOCUS AREAS: • PROFITABILITYIMPROVEMENT  A REGION OR TERRITORY CEASES TO CONTRIBUTE  DISCONTINUATION OF SALES TO AN ACCOUNT  DE-EMPHASISING PRODUCTS  ACCEPTING A PRIVATE BRAND ORDER  VARIANCE BETWEEN BUDGET AND ACTUAL SALES 22
  • 23.
    SALES PLANNING  NEWBUSINESS  VISION MISSION GOALS  STRATEGY  *ACTION PLANS 23
  • 24.
    Key Deliverables ofthe Sales function  Planning  Organizing  Training  Motivating  Controlling  Leading 24
  • 25.
    Sales planning  Forecastinga key planning tool PRODUCT LEVEL – total sales industry sales company sales product line sales product variant sales 25
  • 26.
    Time period forecast Long Range  Medium range  Short term (range) 26
  • 27.
    Planning process  Salesplan  Capacity plan  Production plan  Cash flow plan  Procurement plan Human resource plan 27
  • 28.
    Sales forecast  Whyforecast? One of the keys to success in sales is knowing where customers are located and being able to predict how much they will buy. 28
  • 29.
    Sales forecasting; Industry estimates • Objectivedefinition • Identifying critical factors (assumptions) • Selecting method of forecasting • Collecting, analysing, interpreting data. • Concluding predictions. 29
  • 30.
    Geographic Area forecast Nation  Region ( REGION OR ZONE )  Territory ( BRANCH / DISTRICT )  Customer 30
  • 31.
    Forecasting Approaches  Top- down / Break –down approach An SBU level forecast broken down to region, district, territory, salesperson and individual customer sales quotas  Bottom –up / Build – up approach Individual customer to branch to zone to company level forecast 31
  • 32.
    Methods of salesforecast  Qualitative methods: Executive opinion Delphi method – prediction by a panel Sales force composite – ‘grass roots’ approach. Test marketing –controlled or simulated 32
  • 33.
    Sales forecast methods Quantitative methods: Moving averages Exponential smoothing Regression analysis Econometric analysis 33
  • 34.
    Selling situations  Customer’sintention and expectation are        specific. (insurance, mobile service) Customer is contacted over phone Customer is an organizational buyer Customer seeking service or solution Customer in a retail store Cold calling situation Pharmaceutical selling Creative selling ( ad.campaign) 34
  • 35.
    The sales budget To the sales department, the budget is a blue print for making sales. It involves money invested in distribution facilities, promotion efforts, and sales personnel. It is the foundation on which to plan sales objectives and the means of achieving them during the coming year. 35
  • 36.
    Sales budget  Abudget is a quantitative expression of plans. Most well managed enterprises use a budget which is a comprehensive and coordinated plan for the operations and resources of the enterprise.  It is a formal and intricate process  Approaches are either incremental or zero based.  In a volatile economic climate organizations estimate optimistic, realistic and pessimistic scenarios. 36
  • 37.
    Sales budget Critical factorsconsidered: 1. past trends 2. Sales force estimates 3. Trade prospects 4. Present scenario 5. Customers: existing and potential 6. Government policies 7. Industry environment 37
  • 38.
    Number of salespeople  Decision on the size of the sales force is very complicated because structure of the customers vary in each territory, the level of competition varies across territories, the connectivity for travel varies etc.  There are 3 generally accepted approaches: affordability, incremental and workload methods. 38
  • 39.
    Sales territories  Definition: A sales territory consists of existing and potential customers assigned to a sales person. The territory may or may not have geographic boundaries. 39
  • 40.
    Reasons for territories Increase / improve customer coverage  Control selling expenses  Effective evaluation of salesman’s performance.  improve customer relations 40
  • 41.
    Territory design  Mainprocedural steps: 1. Selection of a basic geographical control unit 2. Determination of sales potential present in each unit 3. Combining the basic units into tentative territories 4. Adjust for differences in coverage difficulty and readjust the tentative territories ( build up / break down method ) 41
  • 42.
    Territory design  Buildup method: Decide call frequency Calculate total no of calls in the unit Estimate workload capacity of salesman Make tentative territories Develop final territories 42
  • 43.
    Territory design  Breakdown method: Estimate company sales potential for total market. Forecast sales potential for each control unit. Estimate sales expected from each salesman. Make tentative territories. Develop final territories. 43
  • 44.
    Routing Scheduling and control Reasons / advantages:  Maintain lines of communication  Improve territory coverage  Minimize wasted time  Closer scrutiny of sales force movement  Journey plans for improving customer satisfaction 44
  • 45.
    Quotas  Quotas arequantitative goals assigned to individual sales persons for a specified period of time.  One of the most widely used tools in sales management.  Should not be confused with sales potential or sales forecast.  Quotas may be set equal to ,above or below the sales forecast. 45
  • 46.
    Why Quotas ? To help management motivate sales people.  To direct sales people where to put there efforts.  To provide standards of performance evaluation 46
  • 47.
    Types of Quotas Sales volume Quotas : Rupee volume / Unit volume  Profit based Quotas: contribution / gross margin  Activity Quotas: calls per day; sales meetings; product demos; ( efforts = results.)  Expense Quotas 47
  • 48.
    QUOTA SETTING MECHANISM  S-specific M-measurable  A-achievable  R-realistic  T-time bound 48
  • 49.
    What is Motivation?? Drive to initiate an action.  The intensity of effort in an action  The persistence of effort over 49
  • 50.
    Why motivation  Frequentrejection  Physical separation from company support  Direct influence on quality of sales presentation  Indirect influence on performance 50
  • 51.
    Sales force motivation “the desire to make an effort to fulfill a need is motivation”  Motivation includes three dimensions: Direction, Intensity and persistence.  Motivation may also be Intrinsic or extrinsic  Maslow’s hierarchy of needs: 51
  • 52.
    Maslow’s theory Self Actualisation Esteem needs Socialneeds Safety needs Physiological needs Food, clothing, shelter, health care 52
  • 53.
    MASLOW’S HIERARCHY OFNEEDS Intense job challenge, full potential, full expression, creative expansion. Achievement, respect, recognition, responsibility, prestige, independence, attention, importance, appreciation. Belonging, acceptance, love, affection, family and group acceptance, friendships. Security, stability, dependency, protection, need for structure, order, law, tenure, pension, insurance. Hunger, thirst, reproduction, shelter, clothing, air, rest. 53
  • 54.
    Frederick Herzberg theory “Two factor theory” of motivation  Hygiene ,maintenance, or job context factors.( dis satisfiers )  Achievement, challenge, advancement, growth in the job. (satisfiers ) 54
  • 55.
    SELLING THE WORD SELLIS DERIVED FROM A Norwegian WORD SELJE WHICH MEANS TO SERVE TO SERVE YOUR PROSPECTS YOU MUST UNDERSTAND THEIR NEEDS. PEOPLE INVARIABLY BUY WHAT THEY WANT, EVEN ABOVE WHAT THEY NEED 55
  • 56.
    The sales process Process: a sequential series of decisions and or actions. BUYING PROCESS SELLING PROCESS NEED SEARCH IDENTIFY ISOLATE PREPARE FOCUS DEFINE PROPOSE/PRESENT SELECT BUY CONSUME HANDLE OBJECTIONS CLOSE THE SALE FOLLOW UP 56
  • 57.
    The sales process 1. 2. 3. 4. 5. 6. 7. Prospecting& Qualifying Pre approach (pre call planning ) Approach Presentation & Demonstration Overcoming Objections Trial close / Closing the sale Follow –up and Service. 57
  • 58.
    SELLING PROCESS the Ziglarmethod  Focus on Prospects NEEDS and WANTS.  Sell by design, not by chance. Follow a proven 4 step formula: NEED ANALYSIS NEED AWARENESS NEED SOLUTION NEED SATISFACTION 58
  • 59.
    Prospecting  Process ofidentifying potential buyers.  A prospect has a reasonable probability of buying ,has sufficient need to justify a profitable sale ,has financial resources to buy and can be classified as ‘eligible to buy’ MONEY? AUTHORITY? DESIRE? 59
  • 60.
    Locating prospects Lead generation– a three step process. 1. Defining the target market :what it wants; what it buys; where and when it buys; what it buys; how it buys; 2. Using communication tools to gather leads –Advertising, Direct mail, Telemarketing, Trade shows, buying data 3. Qualifying the Leads. 60
  • 61.
    Selling first timeto Prospects (pre sale planning)  Adequate knowledge of the product to be sold, company being represented, the market competition ,category or segment of customers and selling techniques.  Product knowledge: Evolution-Features-BenefitsUniqueness-Price  Company knowledge: History-Values-AchievementsManagement-Policies 61
  • 62.
    Pre sale plan Competitors knowledge :structure-share- strategy-systems.  Customer knowledge :attitudespreferences- behavioural habits  Selling techniques : 62
  • 63.
    Pre approach planning Focus on understanding customer needs and characteristics and preparing a proposal on how the product or service offered can satisfy the need.  Steps involved are: Determining call objectives. Development of customer profile. Determine customer benefits. Determine the flow and content of the presentation. 63
  • 64.
    Understanding buyer’s needs Situational questions: questions about prospect’s current situation. (who will decide? is it the first time ? Changing source ?  Problem identification question: Questions to uncover problems, difficulties or needs ( problems on quality, delivery ?)  Problem impact questions: questions to make the buyer realise the impact of the problem and the need to solve it.( what will be the impact on costs , on customer satisfaction ?) 64
  • 65.
     Solution valuequestions :questions to help the buyer asses the value or usefulness of the solution ( for x benefit how much would you save ?  Confirmation questions: (how would an error free system help?) 65
  • 66.
    Need awareness  Atthis stage you need to THINK  Prospect and Salesperson should both be aware of the need. (remove blind spots) 66
  • 67.
    Need solution  Presentyour product  Time to stop asking questions and start providing solutions.  People don’t buy products, they buy what the product does for them. 67
  • 68.
    Questions are theanswer  Thinking vs. feeling questions.  When you learn how the customer feels you are more likely to find out what the person thinks.( the seat belt case)  Tying emotion to logic. 68
  • 69.
    The questioning process Three basic types of questions enable us to discover the needs of our potential customers.  1st The Open Door Questions.-allows the prospect the freedom to go where ever they like. the “who, what where ,when, how and why” questions 69
  • 70.
    Questioning …  Theclosed door question: “would you tell me more”; “what do you mean by…Answers to these give you information to helping the prospect and building trust. 70
  • 71.
    Questioning…  “yes orno” questions demand a direct response. “do you agree..” “would my proposal..” “are we in agreement..”  They allow you to check on your progress on the sales process. “trial close” 71
  • 72.
    Presentation methods  Stimulusresponse method: also called a ‘canned approach’, a memorised sales presentation .It assumes that if a right stimuli is made it will get a favourable response.  Formula method: the AIDA process.  Need-satisfaction method: an interactive sales presentation. The most challenging and creative method. The FAB way. Features, Advantages, Benefits. 72
  • 73.
    The presentation  AttractingAttention  Creating Interest  Building Desire and conviction  Initiate Action to buy. 73
  • 74.
    Presentation methods  Teamselling method: a multi person sales team deals with a multi person buying centre (or buying committees) Sales team consists of Account executive, technical support engineer, logistics expert, IT or systems executive and Finance executive. Buying committee consists of materials exec. manufacturing/operations exec. supply chain exec. Materials manager and Finance exec. 74
  • 75.
    Presentation methods  Consultativeselling method: problem- solution method. Requirements are: Knowledge of the industry, clients company, awareness of key members needs, 75
  • 76.
    Objections  Objections ,opposition , resistance to the presentation typically happens during the presentation or while asking for the order.  Objections should be welcomed.  Objections indicate that the prospect is involved and not indifferent.  Objections reflect the prospect’s view. 76
  • 77.
    Objections Psychological ( hidden) – includes predetermined ideas or beliefs, preference for established brands, dislike of making decisions , anxiety or resistance to spend money , suspect about quality etc. 2. Logical or practical or real –delivery schedule, high price , product availibility, 1. 77
  • 78.
    Handling objections  Listen Understand  Negotiate 78
  • 79.
    Methods of handling objections Ask questions: listen, rephrase, reconfirm the objection and explain.  Turn objection into a benefit and trial close.  Deny objections tactfully. (arrogance and sarcasm to be strictly avoided)  Testimonials, referals  Compensation for valid objections. 79
  • 80.
    Negotiation  Plan –pre determine ‘firm’ and ‘flexible’ factors; define limits.  Ensure an atmosphere of trust , understanding and respect.  Define purpose and objective. 80
  • 81.
    Negotiation styles  Win– loose  Win – Win  Loose - Loose 81
  • 82.
    Closing the sale Summarize  Advantage and disadvantage comparison  Opportunity benefit  Emotional appeal  Direct closure A.A.F.T.O=Always Ask For The Order 82