SlideShare a Scribd company logo
Running head: NEW INTERNET PROTOCOL PAPER1
NEW INTERNET PROTOCOL PAPER2
New Internet Protocol Paper
Tharun Gopal
IST 7040
Wilmington University
Introduction
Internet Protocol from 6 (IPv6) is the late conformity of the
Internet convention and the fundamental model of the
convention will be thoroughly utilized. IPv6 is genuinely a new
drawing nearer closer tradition made to join all the possible
needs associated with prospective web that apparent as Internet
shape 2. This convention has its herald IPv4, limits for the
framework level .3. In addition to their giving of a huge amount
of sensible location region, this protocol offers sufficient
attributes to address the disadvantage of IPv4.
As of recently, IPv4 has confirmed independent from anyone
else like a capable routable tending to convention and offered
every one of us for a long time upon their best-exertion
conveyance framework. It had been produced in the before 80s
and would not acquire any imperative alteration later. Amid the
season of their introduction to the world web has been confined
essentially to some instructive establishments for their
examination and to the division of assurance. Alongside IPv4's
location zone weakness, IPv6 is as of now tackling the
administration or supervision of web, which is some of the time
called Internet form 2. On June 06, 2012 the web organization
formally discharged IPv6. Today numerous ISPs have been
giving IPv6 upon open site and need to keep up this executed.
Each of the device makers likewise partook to give IPv6
naturally permitted on items. This is a stage to persuade web
organization to move to IPv6.
IPv6 Variations
· By completing this new tradition the area degrees get
extended, which can help to convey plus or minus three hundred
and forty trillion stand-out IP addresses.
· To grow the guiding efficiency the header is more made
strides.
· Extension and decisions support are fused to engage all around
sorted out sending.
· Also develop the affirmation and payload embodiment.
Why is IPv6 Required?
As everyone is careful that the IPv4 convention is missing the
mark on its area space. Since one another day over the world,
there is an augmentation in the use of PC's, mobile phones,
tablets, gaming structures, and diverse machines which expected
to join with the web. With its 128-bit area position, IPv6 can
reinforce 3.4 x 1038 or
341,283,365,92,1938,464,465,372,608,432,764,212,459 novel
IP addresses. Moreover, differentiating and the IPv4 convention
the area range is adequately broad to plan an intriguing area on
every contraption.
Impact of Migrating to IPv6
The move has begun in perspective of the essential and the
requirement for improvement of area space for inevitable
applications. Fig.2 identifies with the development-organizing
model. Early on step is to get ready for IPv6 to ensure business
movement. Game plan step should be all that much organized,
so that layout and assembling doesn't end up being pointlessly
excessive. Taking after to it should in like manner get prepared
for, framework and create for IPv6 & IPv4 convention. Its
affiliation commitment to confirm that the framework,
assembling and development should be expert with immaterial
impact (Wipro, n.d).
Fig.2 IPv6 Migration planning model.
The following are the problems influenced the transition
energy:
· The web protocol (IP) version of the vehicle framework must
be determined eventually as of late.
· The end-customer location appropriation and middle person
exposure instrument must have the ability to make sense of if to
default to IPv6 or IPv4 for access.
Expense Estimates
Moving to new convention (IPv6), every organization supplier
ought to upgrade most of the hardware and programming
utilized as a part of their web provisioning frameworks and
furthermore they’re inside frameworks. Fig. 3 identifies with
the diagram showing assessed cost for IPv6 development cost.
The costs for ISP are to upgrade their frameworks for both
external and inside joins (Marson, 2006).
· Training 34.6%
· Network Management Software 20.5%
· Network testing 19.5%
· Maintaining framework execution 13.1%
· Installation effort 12.3%
Fig.3 Estimated IPv6 technological cost.
A powerful divide of the ISP's are not considered for IPv6, as a
consequence of its cost gages. Yet, soon every ISP needs to
move to IPv6 and end customers close by couple of affiliations
are readied to place assets into executing it, which can reduce
the cost impact to redesign. Thusly in not a lot of years ISP's
tend to move to IPv6 convention in perspective of lack of area
space.
Is IPv6 worth the Effort?
As we all careful about the use of contraptions that requires to
unite with web are extending orderly. Likewise, for each one of
the contraptions, which requires to connect with the web
requires an IP address. Remembering the final objective to
reinforce the sudden augmentation in the amount of joined
contraptions per individual IPv4 wouldn't be satisfactory to
administer the areas. By then to move to the IPv6 benefits
considering in these circumstances.
Conclusion
At last, executing IPv6 has formally started besides in headway
in couple of affiliations. Affiliations can upgrade their
arrangements of activity as they are constantly in need to join
with web and reliably needs to incorporate new contraptions
within the affiliation. Business movement organizing can help
affiliations arrangement, layout, fabricate and complete the
IPv6. In addition, the accompanying step is to gage the cost for
both hardware and programming updates. In my point of view,
as there is insufficiency of area space with IPv4 and there are
various contraptions to join with web, it is worth to select IPv6.
References
Arifin, H., Abdullah, D., Berhan, M. S., &Budiarto, R.
(2006,November). An Economical IPv4-to-IPv6 Transition
model: A case study for university network. International
Journal of Computer Science and Network Security, 6(11).
Retrieved from
http://paper.ijcsns.org/07_book/200611/200611B05.pdf
Choi, D., Fischer, C., Lee, A. Y., Lou, E., Chung-Zin, L.,
&Hsien-Chuen,Y. (2006). Transition to IPv6 and support for
IPv4/IPv6 interoperability in IMS.Bell Labs Technical Journal,
10(4), 261-270. Retrieved from
http://mylibrary.wilmu.edu:6609/ehost/pdfviewer/pdfviewer?sid
=cbeeb2a3-65f3-4a06-a4b0-
9eccefcfc397%40sessionmgr114&vid=0&hid=101
Marson, D.C. (2006, March 8). IPv6 cost estimates for
ISP’s.NetworkWorld. Retrieved from
http://www.networkworld.com/article/2308953/servers/ipv6-
cost-estimates-for-isps--part-2.html
Wipro.(n.d). IPv6
Solution
s. Retrieved from
http://www.wipro.com/industries/communication-service-
providers-solutions/ipv6-solution.aspx
Project Management Case
You are working for a large, apparel design and manufacturing
company, Trillo Apparel Company (TAC), headquartered in
Albuquerque, New Mexico. TAC employs around 3000 people
and has remained profitable through tough economic times. The
operations are divided into 4 districts; District 1 – North,
District 2 – South, District 3 – West and District 4 – East. The
company sets strategic goals at the beginning of each year and
operates with priorities to reach those goals.Trillo Apparel
Company Current Year Priorities
· Increase Sales and Distribution in the East
· Improve Product Quality
· Improve Production in District 4
· Increase Brand Recognition
· Increase RevenuesCompany Details
Company Name: Trillo Apparel Company (TAC)
Company Type: Apparel design and production
Company Size: 3000 employees
Position
# Employees
Owner/CEO
1
Vice President
4
Chief Operating Officer
1
Chief Financial Officer
1
Chief Information Officer
1
IT Department
38
District Manager
4
Sales Team
30
Accountant
12
Administrative Assistant
7
Order Fullfilment
45
Customer Service
57
Designer
24
Project Manager
10
Maintenance
25
Operations
2500
Shipping Department
240
Total Employees
3000
Products: Various Apparel
Corporate Location: Albuquerque, New MexicoTAC
Organization Chart
District 4 Production Warehouse Move Project Details
The business has expanded considerably over the past few years
and District 4 in the East has outgrown its current production
facility. Because of this growth the executives want to expand
the current facility, moving the whole facility 10 miles away.
The location selected has enough room for the production and
the shipping department. However, the current warehouse needs
some renovation to accommodate the district’s operational
needs.
The VP of Operations estimates the production and shipping
warehouse move for District 4 will provide room required to
generate the additional $1 million/year product revenues to
meet the current demand due to the expanded production
capacity. Daily production generates $50,000 revenue so a week
of downtime will cost $250,000 in lost revenues.
The move must be completed in 4 months.
Mileage between the old and new facilities is 10 miles.
Bids have been received from contractors to build out the new
office space and production floor and have signed contracts for
work as follows:
Activity
Company Providing Services
Total Contract
Supplies
Time Needed
Pack, move and unpack production equipment
City Equipment Movers
$150,000
n/a
5 Days
Move non-production equipment and materials
Express Moving Company
$125,000
n/a
5 Days
Framing
East Side Framing & Drywall
$121,000
$125,000
15 Days
Electrical
Sparks Electrical
$18,000
$12,000
10 Days
Plumbing
Waterworks Plumbing
$15,000
$13,000
10 Days
Drywall
East Side Framing & Drywall
$121,000
$18,000
15 Days
Finish Work
Woodcraft Carpentry
$115,000
$15,000
15 Days
Build work benches for production floor
Student Workers Carpentry
$112,000
$110,000
15 Days
Production workdays are Monday through Saturday. The actual
move must be completed in 5 days for as little disruption to
production activities as possible. All contractors are on other
projects but have been booked in advance. The contractors will
gain the necessary permits and schedule city and county
inspections but these tasks need to be identified separately due
to the length of time it can take. Permitting and inspections can
take from one to three weeks, depending upon schedule and the
flexibility of the inspector. The new warehouse is empty and
can be accessed immediately. Framing cannot start until the
permits are received. Electrical and plumbing can begin as soon
as the framing is finished. Drywall cannot start until the
electrical and plumbing inspections are complete. After the
drywall is completed, final inspections will be completed by the
county and city. After both the county and city have passed the
new construction, finish work can begin. Building the product
floor work benches can occur at any time before the move
occurs.
Chief Executive
Officer
Chief Operating
Officer
Chief Financial
Officer
VP Sales &
Marketing
Chief Information
Officer
Executive
Assistant
VP
Operations
VP Customer
Service
Inbound Call
Manager
Outbound Call
Manager
Outbound Call
Team (20)
Inbound Call
Team (35)
IT
Manager
IT Staff
(37)
Sales Team
(30)
Accountants
(12)
District2
Manager
District 3
Manager
District1
Manager
District 4
Manager
D1 Operations
(500)
D1 Operations
(650)
D3 Operations
(450)
D4 Operations
(900)
Administrative
Assistant
Administrative
Assistant
Administrative
Assistant
Administrative
Assistant
Administrative
Assistant
Administrative
Assistant
Order Fulfillment
(45)
Shipping
(50)
Shipping
(50)
Shipping
(50)
Shipping
(90)
Maintenance
(5)
Maintenance
(5)
Maintenance
(5)
Maintenance
(10)
Project Managers
(10)
VP
Design
Design Team
(24)
Trillo Apparel Company
Chief Executive
Officer
Chief Operating
Officer �
Chief Financial
Officer�
VP Sales &
Marketing �
Executive
Assistant�
Chief Information
Officer�
VP
Operations�
VP Customer
Service �
Inbound Call
Manager�
Outbound Call
Team (20)�
Outbound Call
Manager�
Inbound Call
Team (35)�
IT
Manager�
IT Staff
(37)�
Sales Team
(30)
Accountants
(12)�
District2
Manager�
District 3
Manager�
District1
Manager�
District 4
Manager�
D1 Operations
(500)�
D1 Operations
(650)�
D3 Operations
(450)�
D4 Operations
(900)�
Administrative
Assistant �
Administrative
Assistant �
Administrative
Assistant �
Administrative
Assistant �
Administrative
Assistant �
Administrative
Assistant�
Shipping
(50)�
Order Fulfillment
(45)�
Shipping
(50)�
Shipping
(50)�
Shipping
(90)�
Maintenance
(5)�
Maintenance
(5)�
Maintenance
(5)�
Maintenance
(10)�
Project Managers
(10)�
VP
Design�
Design Team
(24)�
Trillo Apparel Company
Running head NEW INTERNET PROTOCOL PAPER1NEW INTERNET PROTOC.docx

More Related Content

Similar to Running head NEW INTERNET PROTOCOL PAPER1NEW INTERNET PROTOC.docx

Biz case IPv6 in mobile networks
Biz case IPv6 in mobile networksBiz case IPv6 in mobile networks
Biz case IPv6 in mobile networks
Pranav Dharwadkar
 
You are a well-known expert in the design and security of corpor.docx
You are a well-known expert in the design and security of corpor.docxYou are a well-known expert in the design and security of corpor.docx
You are a well-known expert in the design and security of corpor.docx
avaforman16457
 
Part 2 (80 points) 3–5 pagesYou are a well-known expert in .docx
Part 2 (80 points) 3–5 pagesYou are a well-known expert in .docxPart 2 (80 points) 3–5 pagesYou are a well-known expert in .docx
Part 2 (80 points) 3–5 pagesYou are a well-known expert in .docx
ssuser562afc1
 
openstackreferencearchitecturewhitepaper
openstackreferencearchitecturewhitepaperopenstackreferencearchitecturewhitepaper
openstackreferencearchitecturewhitepaper
Richard Haigh
 
CaseStudy_4_Master
CaseStudy_4_MasterCaseStudy_4_Master
CaseStudy_4_Master
Brian Lawson
 

Similar to Running head NEW INTERNET PROTOCOL PAPER1NEW INTERNET PROTOC.docx (20)

Biz case IPv6 in mobile networks
Biz case IPv6 in mobile networksBiz case IPv6 in mobile networks
Biz case IPv6 in mobile networks
 
You are a well-known expert in the design and security of corpor.docx
You are a well-known expert in the design and security of corpor.docxYou are a well-known expert in the design and security of corpor.docx
You are a well-known expert in the design and security of corpor.docx
 
Part 2 (80 points) 3–5 pagesYou are a well-known expert in .docx
Part 2 (80 points) 3–5 pagesYou are a well-known expert in .docxPart 2 (80 points) 3–5 pagesYou are a well-known expert in .docx
Part 2 (80 points) 3–5 pagesYou are a well-known expert in .docx
 
IPv6
IPv6IPv6
IPv6
 
SCaLE Talk - John Curran
SCaLE Talk - John CurranSCaLE Talk - John Curran
SCaLE Talk - John Curran
 
IPv6: the what, why and how
IPv6: the what, why and howIPv6: the what, why and how
IPv6: the what, why and how
 
Appl 1278
Appl 1278Appl 1278
Appl 1278
 
V4 Deplete V6 Adopt
V4 Deplete V6 AdoptV4 Deplete V6 Adopt
V4 Deplete V6 Adopt
 
Implementation of “Traslator Strategy” For Migration of Ipv4 to Ipv6
Implementation of “Traslator Strategy” For Migration of Ipv4 to Ipv6Implementation of “Traslator Strategy” For Migration of Ipv4 to Ipv6
Implementation of “Traslator Strategy” For Migration of Ipv4 to Ipv6
 
IRJET- Evaluating the Impact of IPv4 to IPv6 Tunneling with MPLS on VOIP
IRJET-  	  Evaluating the Impact of IPv4 to IPv6 Tunneling with MPLS on VOIPIRJET-  	  Evaluating the Impact of IPv4 to IPv6 Tunneling with MPLS on VOIP
IRJET- Evaluating the Impact of IPv4 to IPv6 Tunneling with MPLS on VOIP
 
openstackreferencearchitecturewhitepaper
openstackreferencearchitecturewhitepaperopenstackreferencearchitecturewhitepaper
openstackreferencearchitecturewhitepaper
 
Ipv6 Advantages And Disadvantages
Ipv6 Advantages And DisadvantagesIpv6 Advantages And Disadvantages
Ipv6 Advantages And Disadvantages
 
A Survey On Next Generation Internet Protocol IPv6
A Survey On Next Generation Internet Protocol  IPv6A Survey On Next Generation Internet Protocol  IPv6
A Survey On Next Generation Internet Protocol IPv6
 
CaseStudy_4_Master
CaseStudy_4_MasterCaseStudy_4_Master
CaseStudy_4_Master
 
National IPv6 Strategies and Migration Plans - ITU Telecom World, Doha 7 Dece...
National IPv6 Strategies and Migration Plans - ITU Telecom World, Doha 7 Dece...National IPv6 Strategies and Migration Plans - ITU Telecom World, Doha 7 Dece...
National IPv6 Strategies and Migration Plans - ITU Telecom World, Doha 7 Dece...
 
Ipv4 To Ipv6 Transition
Ipv4 To Ipv6 TransitionIpv4 To Ipv6 Transition
Ipv4 To Ipv6 Transition
 
On the migration of a large scale network from i pv4 to ipv6 environment
On the migration of a large scale network from i pv4 to ipv6 environmentOn the migration of a large scale network from i pv4 to ipv6 environment
On the migration of a large scale network from i pv4 to ipv6 environment
 
Deploying IPv6 Technology
Deploying IPv6 TechnologyDeploying IPv6 Technology
Deploying IPv6 Technology
 
C017623133
C017623133C017623133
C017623133
 
ION Malta - Seeweb Thoughts on IPv6 Transition
ION Malta - Seeweb Thoughts on IPv6 TransitionION Malta - Seeweb Thoughts on IPv6 Transition
ION Malta - Seeweb Thoughts on IPv6 Transition
 

More from toltonkendal

Elementary CurriculaBoth articles highlight the fact that middle.docx
Elementary CurriculaBoth articles highlight the fact that middle.docxElementary CurriculaBoth articles highlight the fact that middle.docx
Elementary CurriculaBoth articles highlight the fact that middle.docx
toltonkendal
 
Elementary Statistics (MATH220)Assignment Statistic.docx
Elementary Statistics (MATH220)Assignment Statistic.docxElementary Statistics (MATH220)Assignment Statistic.docx
Elementary Statistics (MATH220)Assignment Statistic.docx
toltonkendal
 
Elements of MusicPitch- relative highness or lowness that we .docx
Elements of MusicPitch-  relative highness or lowness that we .docxElements of MusicPitch-  relative highness or lowness that we .docx
Elements of MusicPitch- relative highness or lowness that we .docx
toltonkendal
 
Elevated Blood Lead Levels in Children AssociatedWith the Fl.docx
Elevated Blood Lead Levels in Children AssociatedWith the Fl.docxElevated Blood Lead Levels in Children AssociatedWith the Fl.docx
Elevated Blood Lead Levels in Children AssociatedWith the Fl.docx
toltonkendal
 
Elev ent h EDIT IONREAL ESTATE PRINCIPLESCHARLES F. .docx
Elev ent h EDIT IONREAL ESTATE PRINCIPLESCHARLES F. .docxElev ent h EDIT IONREAL ESTATE PRINCIPLESCHARLES F. .docx
Elev ent h EDIT IONREAL ESTATE PRINCIPLESCHARLES F. .docx
toltonkendal
 
Elements of Music #1 Handout1. Rhythm the flow of music in te.docx
Elements of Music #1 Handout1. Rhythm  the flow of music in te.docxElements of Music #1 Handout1. Rhythm  the flow of music in te.docx
Elements of Music #1 Handout1. Rhythm the flow of music in te.docx
toltonkendal
 
Elements of DesignDuring the process of envisioning and designing .docx
Elements of DesignDuring the process of envisioning and designing .docxElements of DesignDuring the process of envisioning and designing .docx
Elements of DesignDuring the process of envisioning and designing .docx
toltonkendal
 
Elements of Critical Thinking [WLOs 2, 3, 4] [CLOs 2, 3, 4]P.docx
Elements of Critical Thinking [WLOs 2, 3, 4] [CLOs 2, 3, 4]P.docxElements of Critical Thinking [WLOs 2, 3, 4] [CLOs 2, 3, 4]P.docx
Elements of Critical Thinking [WLOs 2, 3, 4] [CLOs 2, 3, 4]P.docx
toltonkendal
 
Elements of DesignDuring the process of envisioning and design.docx
Elements of DesignDuring the process of envisioning and design.docxElements of DesignDuring the process of envisioning and design.docx
Elements of DesignDuring the process of envisioning and design.docx
toltonkendal
 
Elements of a contact due 16 OctRead the Case Campbell Soup Co. v..docx
Elements of a contact due 16 OctRead the Case Campbell Soup Co. v..docxElements of a contact due 16 OctRead the Case Campbell Soup Co. v..docx
Elements of a contact due 16 OctRead the Case Campbell Soup Co. v..docx
toltonkendal
 
Elements for analyzing mise en sceneIdentify the components of.docx
Elements for analyzing mise en sceneIdentify the components of.docxElements for analyzing mise en sceneIdentify the components of.docx
Elements for analyzing mise en sceneIdentify the components of.docx
toltonkendal
 
ELEG 421 Control Systems Transient and Steady State .docx
ELEG 421 Control Systems  Transient and Steady State .docxELEG 421 Control Systems  Transient and Steady State .docx
ELEG 421 Control Systems Transient and Steady State .docx
toltonkendal
 
Element 010 ASSIGNMENT 3000 WORDS (100)Task Individual assign.docx
Element 010 ASSIGNMENT 3000 WORDS (100)Task Individual assign.docxElement 010 ASSIGNMENT 3000 WORDS (100)Task Individual assign.docx
Element 010 ASSIGNMENT 3000 WORDS (100)Task Individual assign.docx
toltonkendal
 
ELEG 320L – Signals & Systems Laboratory Dr. Jibran Khan Yous.docx
ELEG 320L – Signals & Systems Laboratory Dr. Jibran Khan Yous.docxELEG 320L – Signals & Systems Laboratory Dr. Jibran Khan Yous.docx
ELEG 320L – Signals & Systems Laboratory Dr. Jibran Khan Yous.docx
toltonkendal
 

More from toltonkendal (20)

Elementary CurriculaBoth articles highlight the fact that middle.docx
Elementary CurriculaBoth articles highlight the fact that middle.docxElementary CurriculaBoth articles highlight the fact that middle.docx
Elementary CurriculaBoth articles highlight the fact that middle.docx
 
Elementary Statistics (MATH220)Assignment Statistic.docx
Elementary Statistics (MATH220)Assignment Statistic.docxElementary Statistics (MATH220)Assignment Statistic.docx
Elementary Statistics (MATH220)Assignment Statistic.docx
 
Elements of Religious Traditions PaperWritea 700- to 1,050-word .docx
Elements of Religious Traditions PaperWritea 700- to 1,050-word .docxElements of Religious Traditions PaperWritea 700- to 1,050-word .docx
Elements of Religious Traditions PaperWritea 700- to 1,050-word .docx
 
Elements of MusicPitch- relative highness or lowness that we .docx
Elements of MusicPitch-  relative highness or lowness that we .docxElements of MusicPitch-  relative highness or lowness that we .docx
Elements of MusicPitch- relative highness or lowness that we .docx
 
Elevated Blood Lead Levels in Children AssociatedWith the Fl.docx
Elevated Blood Lead Levels in Children AssociatedWith the Fl.docxElevated Blood Lead Levels in Children AssociatedWith the Fl.docx
Elevated Blood Lead Levels in Children AssociatedWith the Fl.docx
 
Elev ent h EDIT IONREAL ESTATE PRINCIPLESCHARLES F. .docx
Elev ent h EDIT IONREAL ESTATE PRINCIPLESCHARLES F. .docxElev ent h EDIT IONREAL ESTATE PRINCIPLESCHARLES F. .docx
Elev ent h EDIT IONREAL ESTATE PRINCIPLESCHARLES F. .docx
 
Elements of the Communication ProcessIn Chapter One, we learne.docx
Elements of the Communication ProcessIn Chapter One, we learne.docxElements of the Communication ProcessIn Chapter One, we learne.docx
Elements of the Communication ProcessIn Chapter One, we learne.docx
 
Elements of Music #1 Handout1. Rhythm the flow of music in te.docx
Elements of Music #1 Handout1. Rhythm  the flow of music in te.docxElements of Music #1 Handout1. Rhythm  the flow of music in te.docx
Elements of Music #1 Handout1. Rhythm the flow of music in te.docx
 
Elements of Music Report InstrumentsFor the assignment on the el.docx
Elements of Music Report InstrumentsFor the assignment on the el.docxElements of Music Report InstrumentsFor the assignment on the el.docx
Elements of Music Report InstrumentsFor the assignment on the el.docx
 
Elements of GenreAfter watching three of the five .docx
Elements of GenreAfter watching three of the five .docxElements of GenreAfter watching three of the five .docx
Elements of GenreAfter watching three of the five .docx
 
Elements of DesignDuring the process of envisioning and designing .docx
Elements of DesignDuring the process of envisioning and designing .docxElements of DesignDuring the process of envisioning and designing .docx
Elements of DesignDuring the process of envisioning and designing .docx
 
Elements of Critical Thinking [WLOs 2, 3, 4] [CLOs 2, 3, 4]P.docx
Elements of Critical Thinking [WLOs 2, 3, 4] [CLOs 2, 3, 4]P.docxElements of Critical Thinking [WLOs 2, 3, 4] [CLOs 2, 3, 4]P.docx
Elements of Critical Thinking [WLOs 2, 3, 4] [CLOs 2, 3, 4]P.docx
 
Elements of DesignDuring the process of envisioning and design.docx
Elements of DesignDuring the process of envisioning and design.docxElements of DesignDuring the process of envisioning and design.docx
Elements of DesignDuring the process of envisioning and design.docx
 
Elements of a contact due 16 OctRead the Case Campbell Soup Co. v..docx
Elements of a contact due 16 OctRead the Case Campbell Soup Co. v..docxElements of a contact due 16 OctRead the Case Campbell Soup Co. v..docx
Elements of a contact due 16 OctRead the Case Campbell Soup Co. v..docx
 
Elements for analyzing mise en sceneIdentify the components of.docx
Elements for analyzing mise en sceneIdentify the components of.docxElements for analyzing mise en sceneIdentify the components of.docx
Elements for analyzing mise en sceneIdentify the components of.docx
 
Elements in the same row have the same number of () levelsWhi.docx
Elements in the same row have the same number of () levelsWhi.docxElements in the same row have the same number of () levelsWhi.docx
Elements in the same row have the same number of () levelsWhi.docx
 
ELEG 421 Control Systems Transient and Steady State .docx
ELEG 421 Control Systems  Transient and Steady State .docxELEG 421 Control Systems  Transient and Steady State .docx
ELEG 421 Control Systems Transient and Steady State .docx
 
Element 010 ASSIGNMENT 3000 WORDS (100)Task Individual assign.docx
Element 010 ASSIGNMENT 3000 WORDS (100)Task Individual assign.docxElement 010 ASSIGNMENT 3000 WORDS (100)Task Individual assign.docx
Element 010 ASSIGNMENT 3000 WORDS (100)Task Individual assign.docx
 
ELEG 320L – Signals & Systems Laboratory Dr. Jibran Khan Yous.docx
ELEG 320L – Signals & Systems Laboratory Dr. Jibran Khan Yous.docxELEG 320L – Signals & Systems Laboratory Dr. Jibran Khan Yous.docx
ELEG 320L – Signals & Systems Laboratory Dr. Jibran Khan Yous.docx
 
Electronic Media PresentationChoose two of the following.docx
Electronic Media PresentationChoose two of the following.docxElectronic Media PresentationChoose two of the following.docx
Electronic Media PresentationChoose two of the following.docx
 

Recently uploaded

Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
Avinash Rai
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 

Recently uploaded (20)

UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
Benefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational ResourcesBenefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational Resources
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
 
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptxSolid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
 
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptxMatatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
 
B.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdfB.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdf
 

Running head NEW INTERNET PROTOCOL PAPER1NEW INTERNET PROTOC.docx

  • 1. Running head: NEW INTERNET PROTOCOL PAPER1 NEW INTERNET PROTOCOL PAPER2 New Internet Protocol Paper Tharun Gopal IST 7040 Wilmington University Introduction Internet Protocol from 6 (IPv6) is the late conformity of the Internet convention and the fundamental model of the convention will be thoroughly utilized. IPv6 is genuinely a new drawing nearer closer tradition made to join all the possible needs associated with prospective web that apparent as Internet shape 2. This convention has its herald IPv4, limits for the framework level .3. In addition to their giving of a huge amount of sensible location region, this protocol offers sufficient attributes to address the disadvantage of IPv4. As of recently, IPv4 has confirmed independent from anyone
  • 2. else like a capable routable tending to convention and offered every one of us for a long time upon their best-exertion conveyance framework. It had been produced in the before 80s and would not acquire any imperative alteration later. Amid the season of their introduction to the world web has been confined essentially to some instructive establishments for their examination and to the division of assurance. Alongside IPv4's location zone weakness, IPv6 is as of now tackling the administration or supervision of web, which is some of the time called Internet form 2. On June 06, 2012 the web organization formally discharged IPv6. Today numerous ISPs have been giving IPv6 upon open site and need to keep up this executed. Each of the device makers likewise partook to give IPv6 naturally permitted on items. This is a stage to persuade web organization to move to IPv6. IPv6 Variations · By completing this new tradition the area degrees get extended, which can help to convey plus or minus three hundred and forty trillion stand-out IP addresses. · To grow the guiding efficiency the header is more made strides. · Extension and decisions support are fused to engage all around sorted out sending. · Also develop the affirmation and payload embodiment. Why is IPv6 Required? As everyone is careful that the IPv4 convention is missing the mark on its area space. Since one another day over the world, there is an augmentation in the use of PC's, mobile phones, tablets, gaming structures, and diverse machines which expected to join with the web. With its 128-bit area position, IPv6 can reinforce 3.4 x 1038 or 341,283,365,92,1938,464,465,372,608,432,764,212,459 novel IP addresses. Moreover, differentiating and the IPv4 convention the area range is adequately broad to plan an intriguing area on every contraption. Impact of Migrating to IPv6
  • 3. The move has begun in perspective of the essential and the requirement for improvement of area space for inevitable applications. Fig.2 identifies with the development-organizing model. Early on step is to get ready for IPv6 to ensure business movement. Game plan step should be all that much organized, so that layout and assembling doesn't end up being pointlessly excessive. Taking after to it should in like manner get prepared for, framework and create for IPv6 & IPv4 convention. Its affiliation commitment to confirm that the framework, assembling and development should be expert with immaterial impact (Wipro, n.d). Fig.2 IPv6 Migration planning model. The following are the problems influenced the transition energy: · The web protocol (IP) version of the vehicle framework must be determined eventually as of late. · The end-customer location appropriation and middle person exposure instrument must have the ability to make sense of if to default to IPv6 or IPv4 for access. Expense Estimates Moving to new convention (IPv6), every organization supplier ought to upgrade most of the hardware and programming utilized as a part of their web provisioning frameworks and furthermore they’re inside frameworks. Fig. 3 identifies with the diagram showing assessed cost for IPv6 development cost. The costs for ISP are to upgrade their frameworks for both external and inside joins (Marson, 2006). · Training 34.6% · Network Management Software 20.5% · Network testing 19.5% · Maintaining framework execution 13.1% · Installation effort 12.3%
  • 4. Fig.3 Estimated IPv6 technological cost. A powerful divide of the ISP's are not considered for IPv6, as a consequence of its cost gages. Yet, soon every ISP needs to move to IPv6 and end customers close by couple of affiliations are readied to place assets into executing it, which can reduce the cost impact to redesign. Thusly in not a lot of years ISP's tend to move to IPv6 convention in perspective of lack of area space. Is IPv6 worth the Effort? As we all careful about the use of contraptions that requires to unite with web are extending orderly. Likewise, for each one of the contraptions, which requires to connect with the web requires an IP address. Remembering the final objective to reinforce the sudden augmentation in the amount of joined contraptions per individual IPv4 wouldn't be satisfactory to administer the areas. By then to move to the IPv6 benefits considering in these circumstances. Conclusion At last, executing IPv6 has formally started besides in headway in couple of affiliations. Affiliations can upgrade their arrangements of activity as they are constantly in need to join with web and reliably needs to incorporate new contraptions within the affiliation. Business movement organizing can help affiliations arrangement, layout, fabricate and complete the IPv6. In addition, the accompanying step is to gage the cost for both hardware and programming updates. In my point of view, as there is insufficiency of area space with IPv4 and there are various contraptions to join with web, it is worth to select IPv6.
  • 5. References Arifin, H., Abdullah, D., Berhan, M. S., &Budiarto, R. (2006,November). An Economical IPv4-to-IPv6 Transition model: A case study for university network. International Journal of Computer Science and Network Security, 6(11). Retrieved from http://paper.ijcsns.org/07_book/200611/200611B05.pdf Choi, D., Fischer, C., Lee, A. Y., Lou, E., Chung-Zin, L., &Hsien-Chuen,Y. (2006). Transition to IPv6 and support for IPv4/IPv6 interoperability in IMS.Bell Labs Technical Journal, 10(4), 261-270. Retrieved from http://mylibrary.wilmu.edu:6609/ehost/pdfviewer/pdfviewer?sid =cbeeb2a3-65f3-4a06-a4b0- 9eccefcfc397%40sessionmgr114&vid=0&hid=101 Marson, D.C. (2006, March 8). IPv6 cost estimates for ISP’s.NetworkWorld. Retrieved from http://www.networkworld.com/article/2308953/servers/ipv6- cost-estimates-for-isps--part-2.html Wipro.(n.d). IPv6 Solution s. Retrieved from http://www.wipro.com/industries/communication-service- providers-solutions/ipv6-solution.aspx
  • 6. Project Management Case You are working for a large, apparel design and manufacturing company, Trillo Apparel Company (TAC), headquartered in Albuquerque, New Mexico. TAC employs around 3000 people and has remained profitable through tough economic times. The operations are divided into 4 districts; District 1 – North, District 2 – South, District 3 – West and District 4 – East. The company sets strategic goals at the beginning of each year and operates with priorities to reach those goals.Trillo Apparel Company Current Year Priorities · Increase Sales and Distribution in the East · Improve Product Quality · Improve Production in District 4 · Increase Brand Recognition · Increase RevenuesCompany Details Company Name: Trillo Apparel Company (TAC) Company Type: Apparel design and production Company Size: 3000 employees Position # Employees Owner/CEO 1
  • 7. Vice President 4 Chief Operating Officer 1 Chief Financial Officer 1 Chief Information Officer 1 IT Department 38 District Manager 4 Sales Team 30 Accountant 12 Administrative Assistant 7 Order Fullfilment 45 Customer Service 57 Designer 24 Project Manager
  • 8. 10 Maintenance 25 Operations 2500 Shipping Department 240 Total Employees 3000 Products: Various Apparel Corporate Location: Albuquerque, New MexicoTAC Organization Chart District 4 Production Warehouse Move Project Details The business has expanded considerably over the past few years and District 4 in the East has outgrown its current production facility. Because of this growth the executives want to expand the current facility, moving the whole facility 10 miles away. The location selected has enough room for the production and the shipping department. However, the current warehouse needs some renovation to accommodate the district’s operational
  • 9. needs. The VP of Operations estimates the production and shipping warehouse move for District 4 will provide room required to generate the additional $1 million/year product revenues to meet the current demand due to the expanded production capacity. Daily production generates $50,000 revenue so a week of downtime will cost $250,000 in lost revenues. The move must be completed in 4 months. Mileage between the old and new facilities is 10 miles. Bids have been received from contractors to build out the new office space and production floor and have signed contracts for work as follows: Activity Company Providing Services Total Contract Supplies Time Needed Pack, move and unpack production equipment City Equipment Movers $150,000 n/a 5 Days Move non-production equipment and materials Express Moving Company $125,000
  • 10. n/a 5 Days Framing East Side Framing & Drywall $121,000 $125,000 15 Days Electrical Sparks Electrical $18,000 $12,000 10 Days Plumbing Waterworks Plumbing $15,000 $13,000 10 Days Drywall East Side Framing & Drywall $121,000 $18,000 15 Days Finish Work Woodcraft Carpentry $115,000
  • 11. $15,000 15 Days Build work benches for production floor Student Workers Carpentry $112,000 $110,000 15 Days Production workdays are Monday through Saturday. The actual move must be completed in 5 days for as little disruption to production activities as possible. All contractors are on other projects but have been booked in advance. The contractors will gain the necessary permits and schedule city and county inspections but these tasks need to be identified separately due to the length of time it can take. Permitting and inspections can take from one to three weeks, depending upon schedule and the flexibility of the inspector. The new warehouse is empty and can be accessed immediately. Framing cannot start until the permits are received. Electrical and plumbing can begin as soon as the framing is finished. Drywall cannot start until the electrical and plumbing inspections are complete. After the drywall is completed, final inspections will be completed by the county and city. After both the county and city have passed the new construction, finish work can begin. Building the product floor work benches can occur at any time before the move
  • 12. occurs. Chief Executive Officer Chief Operating Officer Chief Financial Officer VP Sales & Marketing Chief Information Officer Executive Assistant VP Operations VP Customer Service Inbound Call Manager Outbound Call Manager Outbound Call Team (20) Inbound Call Team (35)
  • 13. IT Manager IT Staff (37) Sales Team (30) Accountants (12) District2 Manager District 3 Manager District1 Manager District 4 Manager D1 Operations (500) D1 Operations (650) D3 Operations (450) D4 Operations (900) Administrative
  • 15. Maintenance (5) Maintenance (10) Project Managers (10) VP Design Design Team (24) Trillo Apparel Company Chief Executive Officer Chief Operating Officer � Chief Financial Officer� VP Sales & Marketing � Executive Assistant� Chief Information Officer� VP
  • 16. Operations� VP Customer Service � Inbound Call Manager� Outbound Call Team (20)� Outbound Call Manager� Inbound Call Team (35)� IT Manager� IT Staff (37)� Sales Team (30) Accountants (12)� District2 Manager� District 3 Manager� District1
  • 17. Manager� District 4 Manager� D1 Operations (500)� D1 Operations (650)� D3 Operations (450)� D4 Operations (900)� Administrative Assistant � Administrative Assistant � Administrative Assistant � Administrative Assistant � Administrative Assistant � Administrative Assistant� Shipping (50)�