Roentgenometrics
                                             S.THIYAGARAJAN

       Application of standard lines and measurements to radiographs
       Allows the detection of subtle abnormalities
       Assists in avoiding misdiagnosis
       Comparison of studies is facilitated

        Basilar Angle
        Welcker’s basilar angle/Martin’s basilar angle / Sphenobasilar angle
       Lateral skull
       The Nasion(Frontal-nasal junction)
       The center of the Sella turcica
        (Midpoint between the clinoid
        processes)
       The Basion (Anterior margin of the
        foramen magnum)
       Index of the relationship between the
        anterior skull and its base
       >152° - Platybasia
            Congenital                                     AVERAGE       MINIMUM   MAXIMUM
                      Isolated impression                  137           123       152
                      Occipitalization
              Acquired
                      Paget’s disease
                      Rheumatoid arthritis
                      Fibrous dysplasia
       This may or may not be associated with basilar impression
        Chamberlain’s Line
       Palato-occipital line.
Projection: Lateral skull; lateral cervical spine.
       The posterior margin of the Hard palate
       The posterior aspect of the foramen magnum
        (OPISTHION)
       The relationship of this line to the tip of the
        odontoid process is then assessed
   Tip of the odontoid process should not project above this line
   Normal variation of 3 mm above this line may occur
   A measurement of ≥7 mm is definitely abnormal.
   An abnormal superior position of the odontoid
     Basilar impression
       Platybasia

       Atlas occipitalization

       Bone-softening diseases of the skull base
                 Paget’s disease
                 Osteomalacia
                 Fibrous dysplasia
          Rheumatoid arthritis

    McGregor’s Line (Basal line)
    Projection: Lateral skull; lateral cervical spine.
   Postero superior margin of the hard palate
   Most inferior surface of the occipital bone
   The relationship of the odontoid apex to this line
    is examined
   > 8 mm in males
   > 10 mm in females
   In children younger than 18 years, these maximum values diminish with
    decreasing chronologic age.
 McGregor’s line appears to be the most accurate and reproducible
   Abnormal superior position of the odontoid
     Basilar impression
    Macrae’s Line
   Foramen magnum line
   The Basion (anterior margin of the
    foramen magnum)
   Posterior (Opisthion) margins of the
    foramen magnum
   The inferior margin of the occipital bone
    should lie at or below this line
   In addition a perpendicular line drawn
    through the odontoid apex should intersect
    this line in its anterior quarter
   If the inferior margin of the occipital bone is
    convex in a superior direction and/or lies
    above this line, then basilar impression is
    present.
   If the odontoid apex does not lie in the
    ventral quarter of this line
          Dislocation of the atlanto-occipital joint
          Fracture
          Dysplasia of the dens

    Digastric Line (Biventer line)
    Projection: AP open mouth
   The digastric groove medial to the base of the mastoid process
   The vertical distance to the odontoid apex and atlanto occipital joints is
    measured
                  Measure                  Average (mm)   Minimum (mm)   Maximum (mm)

        Digastric line-odontoid apex            11             1              21
        Digastric line-atlanto-occipital        12             4              20
                      joint
   Both measurements will decrease in
    basilar impression
       • Platybasia
       • Atlas occipitalization
       • Bone-softening diseases of the
           skull base
              • Paget’s disease
              • Osteomalacia
              • Fibrous dysplasia
       • Rheumatoid arthritis

Occipitoatlantal alignment
   Projection: Lateral skull.
   Two lines are constructed
1.  Foramen magnum line (FML) is drawn along the inferior margin of the
          occiput (MACRAE’S LINE)
      2.  Atlas plane line (APL) is drawn
          through the center of the anterior
          tubercle and the narrowest portion of
          the posterior arch of atlas
     The FML and APL should be parallel.
     Divergence of the FML and APL
      anteriorly suggests anterior-superior
      malposition of the occiput
     Divergence of the lines posteriorly
      suggests posterior-superior malposition
      of the occiput

Other method
     The anterior margin of the foramen magnum should line up with the dens.
      A line projected downward from the dorsum sellae along the clivus to the
      basion should point to the dens.
      Wachenheim's line
     The posterior margin of foramen magnum
      should line up with the C1 spinolaminar
      line.
     Power ratio :The ratio of Basion -
      spinolaminar line of C1 to Opisthion -
      posterior cortex of C1 anterior arch
      normally ranges from 0.6 to 1.0, with the
      mean being 0.8. A ratio greater than 1.0
      implies anterior cranio-cervical dislocation.



Sella Turcica Size
The greatest AP diameter and the greatest vertical diameter
             Diameter        Average (mm)   Minimum (mm)   Maximum (mm)
           Anteroposterior        11              5             16
              Vertical             8              4             12
   Small sella
             Normal variant
             Hypopituitarism (long after Sheehan's)
             Microcephaly
             Myotonic dystrophy
             Prader-Willi-Lambert syndrome
             Cockayne syndrome
             Dystrophia myotonica
     Enlarged sella
             Pituitary neoplasm
             Empty sella syndrome
             Extrapituitary mass
                 Neoplasm

                 Aneurysm

             Normal variant
     J shaped sella
Elongated sella with shallow anterior
convexity which represents exaggerated of sulcus chiasmaticus
            Normal variant
            MPS
            Achondroplasia
            Chronic hydrocephalus
            Optic chiasmatic glioma
            Osteogenisis imperfecta
            Neurofibromatosis




      Atlantoaxial "overhang" sign
      AP open-mouth projection
     Lateral margin of the lateral masses of
      atlas should not appear more lateral than
      the superior articular processes of axis
     If the lateral margin of the atlas lateral mass lies
lateral to the lateral axis margin,
           Radiologic sign of

                   Jefferson’s fracture

                   Odontoid fracture

                   Alar ligament instability

                   Rotatory atlantoaxial

                     subluxation
      Mild degree of overhanging may be a
       normal variant

       Atlantodental Interspace
     Atlas-odontoid space, predental
     interspace, atlas-dens interval
   Projection: Lateral neutral; flexion-
     extension cervical
                                                      Age      Minimum   Maximum
     spine.                                                      (mm)     (mm)
   The distance measured is                         Adults        1        3
     between the posterior margin of
                                                    Children      1         5
     the
   anterior tubercle and the anterior

     surface of the odontoid
Decreased space
       Advancing age (Degenerative joint disease of the
       atlantodental joint)
Widened space with reduction in the neural
canal size
       Trauma
       Occipitalization
       Down’s syndrome
       Pharyngeal infections (Grisel’s disease)
       Inflammatory arthropathies
              Ankylosing spondylitis
              Rheumatoid arthritis
              Psoriatic arthritis
              Reiter’s syndrome

       Cervical Gravity Line
      A vertical line is drawn through the apex of
       the odontoid process
   This line should pass through the C7 body
     Gross assessment of where the
      gravitational stresses are acting at the
      cervicothoracic junction.

      Stress Lines of the Cervical
      Spine
     Ruth Jackson’s lines
     Projection: Lateral cervical spine (flexion,
      extension)
     Two lines are constructed on each film
             1) The first line is drawn along the
                  posterior surface of the axis
             2) The second line is drawn along
                  the posterior surface of the C7
                  body until it intersects the axis
                  line
     Normal Measurements
     Flexion - lines should intersect at the level
      of the C5-C6 disc or facet joints.
     Extension - lines should intersect at the
      level of the C4-C5 disc or facet joints.
     The intersection point represents the
      focus of stress when the cervical spine is
      placed in the respective positions
     The point of intersection does not appear
      to correlate with the level of degenerative
      disc disease
     Muscle spasm, joint fixation, and disc
      degeneration may alter the stress point.
      Cervical Lordosis
Visual assessment (Subjective)
    On the lateral cervical projection
            Well maintained anterior convexity
             is lordosis
            Exaggerated anterior convexity is hyperlordosis
  Slight anterior convexity hypolordosis
        Lack of curvature is alordosis
    Posterior convexity is kyphosis
   Altered cervical lordosis
          Trauma
          Degeneration
          Muscle spasm
          Aberrant inter-segmental mechanics
    Depth method
    Lateral cervical projection
   A line is drawn from the tip of the odontoid
    process to the posterior surface of C7
   A horizontal measure is taken from the
    vertical line to the posterior surface of the
    C4 body (X)
   The average depth is 12 mm
   Negative – Kyphosis
   Largest values – Hyperlordosis
   The depth method provides a more accurate assessment of cervical lordosis
    Angle of curve
    Lateral cervical projection
   A line is drawn connecting the anterior
    and posterior tubercles of the atlas
   Second line is drawn along the inferior
    endplate of C7
   Perpendicular lines are drawn from the
    atlas and C7 lines, and their angle of
    intersection is recorded as the cervical
    lordosis (X°)
   The average value is 40 degrees
   Negative – kyphosis
   Large – hyperlordosis
   Less accurate than the depth
    method. Because the measurements
    depend only on CI and C7
    Prevertebral Soft Tissues
   The soft tissue in front of the vertebral bodies and
    behind the air shadow of the pharynx, larynx, and
    trachea is measured
   The bony landmarks
          Anterior arch of the atlas
          Inferior corners of the axis & C3
          Superior corner of C4
          Inferior corners of C5, C6, and C7

   C2-C3 - RPI
   Behind the larynx (C4-C5) - RLI
   Behind the trachea (C5-C7) - RTI.

  Widening
 Post-traumatic hematoma
 Retropharyngeal abscess
 Neoplasm from the adjacent bone and soft tissue structures.
             Level           Flexion (mm)       Neutral (mm)    Extension (mm)

               C1                 11                10                8

               C2                  6                 5                6

               C3                  7                 7                6
               C4                  7                 7                8
               C5                 22                20               20
               C6                 20                20               19
               C7                 20                20               21

    Spinolaminar junction line
  Posterior Cervical Line, arch-body line.
 Projection: Lateral cervical spine

  (neutral, flexion, extension).
 The cortical white line of the

  spinolaminar junction identified at
  each level C1 to C7
• Each spinolaminar junction will be
  curved slightly anteriorly from
  superior to inferior
• For consistency, the most anterior part of the convexity is
  compared between levels
 Discontinuous at any level

     Anterior or posterior        displacement
   This line is especially useful for
    detecting subtle odontoid fractures
    and atlantoaxial subluxation
    (anterior)
   A disruption in the middle to lower
    cervical spine may also be a sign of
    anterolisthesis, retrolisthesis, or
    frank dislocation.
    Cervical Spinal Canal
    Projection: Lateral cervical (neutral,
    flexion, extension)
   The sagittal diameter is measured
    from the posterior surface of the
    midvertebral body to the nearest
    surface of the same segmental
    spinolaminar junction line


        Level          Average (mm)   Minimum (mm)   Maximum (mm)

                C1          22               16           31
                C2          20               14           27
                C3          18               13           23
                C4          17               12           22
                C5          17               12           22
                C6          17               12           22
                C7          17               12           22

    Narrowing of the canal (stenosis) < 12 mm
    Significance
   If degenerative posterior osteophytes are
        present, the measurement can be made
        from their tip to examine the magnitude of
        the stenotic effect. The degree of stenosis
        from these spurs is best measured on
        extension films
     An abnormally widened canal may be

        associated with a spinal cord neoplasm or
        syringomyelia.
   The most accurate measurement is by the ratio
    of the sagittal dimension of the canal and
    vertebral body (canal to body ratio, Pavlov’s
    ratio)
   A ratio of less than 0.82 is significant for spinal
    stenosis. The benefit of this method is that it
    removes the effects of radiographic
    magnification.

        Cervical, thoracic, and
        lumbar endplate lines
       On the lateral cervical projection, lines arc
        drawn along the inferior endplate of the
        C2-T1 vertebrae and extended posteriorly
        to the cervical spine
       The cervical endplate lines should all
        intersect at a common point located
        posterior to the spine
       Lack of convergence
             Normal lordotic cervical spine
               curve
             Intersegmental malpositions
       Lines that cross closely to the spine
             Extension malposition of the
               superior segment
       Lines that diverge sharply
             flexion malposition of the
               superior segment.
   Frontal cervical, thoracic, and lumbar projections
     Lines are drawn to approximate the inferior vertebral endplates
     The lines at adjacent levels should be parallel
     Divergence of the endplate lines
          Lateral flexion malposition opposite the side of divergence


      Cervical, thoracic, and lumbar vertebral
      rotation
Body width method
     Distance from the lateral margins
      of the vertebral bodies to the
      origin of the spinous process
      should be equal bilaterally.
     Distances not equal
           Vertebral rotation

      Spinous process deviation to the side of the smaller distance.



      Pedicle method
Frontal projection
     The appearance of the pedicle
      shadows may suggest vertebral
      rotation
     It is expected the pedicle shadows
      demonstrate bilateral symmetry
     If the width of a pedicle shadow
      appears narrower than the
      contralateral pedicle shadow, it
      suggests
            Segmental rotation with the
              spinous process deviated to the
              side of the narrower pedicle
              shadow
            Posterior vertebral body
rotation to the side of the wider pedicle shadow


       Cervical, thoracic, and lumbar vertebral sagittal
       alignment
George's line
Lateral projections
    Curvilinear line is drawn along

      the posterior surfaces of the
      vertebral bodies
    The curve should maintain a

      smooth contour throughout
      the spinal region without segmental disruption.
      Disruption
            Segmental anterolisthesis
            Retrolisthesis
      Disruptions at multiple consecutive levels
            Normal flexion and extension patterns.
      However, the adjacent posterior body lines should not demonstrate more than 3 mm of
       net translation in a comparison of the flexion and extension radiographs

       Barge's "e" space
       Lateral lumbar projection
      Lines are drawn along the superior and inferior vertebral endplates of each
       segment
      Lines perpendicular to each endplate line are then drawn and extended
       across the intervertebral disc space.
      The distance between the perpendicular lines at the inferior end- plate of
       each lumbar segment is
       measured as the "e" space

      The space should not exceed
       3 mm
      Larger Barge's "e" space
             Retrolisthesis of the
              segment above
      Negative values indicate
   Anterolisthesis
    Visual method
   Segmental retrolisthesis
          Intervertebral disc degeneration (osteophytes, eburnation, reduced
           disc space, Schmorl's nodes, endplate irregularity)
          The lowest segment of a "stack" of three or more vertebrae that do
           not contribute to a sagittal curvature may be posterior
          The lowest involved segment of
           three or more consecutive
           segments that appear to be flexed
           or extended during neutral patient
           posture may be posterior
          Segmental rotation in a coronal
           plane that produces an hourglass
           appearance
          Narrowed sagittal diameter of the
           intervertebral foramen
          Visual disparity of segmental
           alignment when comparing the
           margins of adjacent vertebrae
   Retrolisthesis of L5 is often seen as a
    normal variant, accompanying short pedicles

    Cervical toggle analysis
    Atlas tilt
    Lateral cervical projection
   Three lines are constructed
          Occipital condyle line (OCL) is
           drawn along the base of the
           occipital condyles
          Atlas plane line (APL) is drawn
           through the center of the anterior
           tubercle and the narrowest portion
           of the posterior arch of the atlas
          Listing line (LL) is drawn parallel to
           the occipital condyle line and
through the narrowest portion of the posterior arch of the atlas.
          The atlas plane line should be 4 degrees above the listing line
   APL > 4 degrees above the listing line
          Superior malposition of the atlas
   APL < 4 degrees
          Inferior malposition of atlas
    Atlas laterality
   4 lines are constructed:
   Horizontal ocular orbit line (OOL) is drawn through similar matched points
    of the orbits
   Superior basic line (SBL) is drawn
    parallel to the OOL through the tip of
    the most superior occipital condyle
   Inferior basic line (IBL) is drawn
    through the inferior tips of the
    lateral masses
   Vertical median line (ViML) is drawn
    perpendicular to the OOL and
    through the center of the foramen
    magnum
   The distances between the inferior
    lateral tip of each lateral mass and
    the VML should be equal.
   The atlas is lateral toward the side of
    the greater measurement when the
    distances between the lateral
    inferior tip of each lateral mass and
    the VML are not equal
   In addition, the SBL and IBL lines are
    thought to converge to the side of
    atlas laterality 70% of the time
    Atlas rotation
   On a cervical film whose projection is directed vertical to the atlas (base
    posterior)
   Two lines are constructed
   Transverse atlas line (TAL) is drawn through the transverse foramen
    bilaterally
   Perpendicular skull line (PSL) is drawn through points representing the
    centers of the nasal septum and the basal process of the occiput
   The angle of intersection of the two lines should be approximately 90
    degrees.
   The atlas is rotated posteriorly on the side of the larger angle
    created by the intersection of the PSL and TAL.
   In addition, 70% of the time the atlas is posteriorly rotated to the
    side of the diverging superior basic line (SBL) and inferior basic
    line (IBL) on the frontal open mouth projection.
    ATLAS MALPOSITION
    Frontal open-mouth projection
   Four lines are constructed
   Ocular orbit line (OOL) is drawn
    through a set of similar points of the
    orbit
   Superior basic line (SBL) is drawn
    bilaterally through the jugular
    processes
   Inferior basic line (IBL) is drawn
    through the lateral inferior tip of both lateral masses
   Vertical median line (VML) is drawn perpendicular to the OOL through the
    center of the foramen magnum
   VML should approximate the center of the odontoid process base
   If the VML does not bisect the odontoid, the axis is laterally malpositioned
    to the side opposite the VML.
   In addition, the center of the odontoid process base is compared with the
    center of the spinous process to assess for possible spinous deviation.
   The direction and magnitude of spinous process lateral malposition may be
    different from the lateral malposition of the axis body (i.e., the body of the
    axis may be exhibit right laterality with left spinous deviation).
Cobb’s Method of Scoliosis Evaluation
      Cobb-Lippman method
     Projection: AP spine.
      End vertebrae
     Last segment that contributes to the spinal
      curvature.
     Extreme ends of the scoliosis, where the
      endplates tilt to the side of the curvature
      concavity
      Endplate lines
     On the superior end vertebra, a line is drawn
      through and parallel to the superior endplate
     On the inferior end vertebra, a line is constructed
      in a similar manner through and parallel to the
      inferior endplate
     This is the preferred method in scoliosis
      assessment
     In patients with double scoliotic curves each component should be
      measured.
     5° progression of a scoliosis between two successive radiographs is
      considered significant
  
     Curvatures < 20° - No bracing or surgical intervention
            Patient between 10 and 15 years of age, careful monitoring should be
             implemented to assess for progression of 5° or more in any 3-month period.
     Curves between 20° and 40° - Bracing / Surgical intervention
     Curvature progression in an immature spine, or curvature in excess of 40° -
      Surgical intervention

      Risser-Ferguson Method of Scoliosis Evaluation
AP spine.
    Apical vertebra
            Most laterally placed segment in the curve
Vertebral body center
     For each end vertebra and apical segment diagonals are drawn from
      opposing corners of the body to locate the body center
     Connecting line
   Two lines are constructed connecting the body
    centers of the apical segment with each end
    vertebra, and the resultant angle is measured
   This method gives values approximately 25%
    lower than those of Cobb’s method (10°)
   Advocated its use for larger curves

    Coupled spinal motion sign
   Spinal motion is not pure and occurs in directions other
    than the primary direction of movement
   For example, on frontal cervical, thoracic, or lumbar
    lateral bending projections, the lateral tilting of each
    vertebra is accompanied by concurrent vertebral rotation
   In the cervical and upper thoracic region the spinous
    processes rotate to the convexity of the curve
   In the lumbar and lower thoracic region the
    spinous processes rotate to the concavity of the
    curve
   The amount of coupled motion may be small and therefore radiographically
    imperceptible.
   Alteration of the normal coupled motion occurs with aberrant
    intersegmental mechanics, muscle spasm, and vertebral fusion

    Interpedicular Distance
   Coronal dimension of the spinal canal
   Projection: AP cervical spine, thoracic
    spine, and lumbar spine.
   The shortest distance between the
    inner convex cortical surfaces of the
    opposing segmental pedicles is
    measured
                            Spinal Level                Maximum (mm)
                           Cervical spine                      30
                           Thoracic spine                      20
                             L1 TO L3                          25
                               L4, L5                          30
   This is a useful measurement applied in
       the evaluation of spinal stenosis,
       congenital malformation, and intraspinal
       neoplasms
      The maximum interpediculate distance
       may be increased as a result of pedicular
       erosion from an expanding spinal cord
       tumor (Elseberg-Dyke sign)

       Thoracic Cage Dimension
       Straight back syndrome evaluation
      Projection: Lateral chest.
      The distance between the posterior
       sternum and the anterior surface of
       the T8 body is measured
                         Normal Sagittal Dimensions of the Thoracic Cage
        Sex                   Average (cm)            Minimum (cm)            Maximum (cm)

        Male                       14                       11                       18

       Female                      12                       9                        15


                Sagittal Dimensions of the Thoracic Cage in Straight Back Syndrome

        Sex                   Average (cm)            Minimum (cm)            Maximum (cm)

        Male                       11                       9                        13
       Female                      10                       8                        11



       Thoracic Kyphosis
Lateral thoracic spine
    A line is drawn parallel to and through the

      superior endplate of the T1 body
    A similar line is drawn through the inferior

      endplate of the T12 body.
    Perpendicular lines to these endplate lines are

      then constructed
    Intersecting angle is measured
   Physiologic anterior vertebral body
       wedging accounts for the natural
       kyphotic curvature of the thoracic spine
      Normal anterior wedging for each
       vertebral body is 4-5° or 2-3 mm
      The wedging increases by almost 1 mm
       for each successive level, with
       approximately 45° of thoracic kyphosis
       accounted for by this wedging
      Increased kyphosis
               Old age
               Osteoporosis
               Scheuermann’s disease
               Congenital anomalies
               Muscular paralysis
               Cystic fibrosis
      Reduction in kyphosis
               straight back syndrome




       Lumbar Intervertebral Disc Angles
      Lines are drawn through and parallel to each
       lumbar body endplate
      The lines are extended posteriorly until they
       intersect
      Intersecting angle is measured

   Normal Values for Lumbar Intervertebral Disc Angles
       Disc Level                  Average Angle (°)
           L1                             8
           L2                             10
           L3                             12
           L4                             14
           L5                             14

Mean angle alteration
      Antalgia
      Muscular imbalance
Improper posture
Facet syndrome - Increased Angle
Acute discal injuries - Decreased Angle


Lumbar Intervertebral Disc
Height
Lateral lumbar spine
      Visual assessment
             Disc height compared with the adjacent
              levels
             Past experience
       Hurxthal’s method
      The distance between the opposing endplates
       at the midpoint between the anterior and the
       posterior vertebral body margins is measured.
       Farfan’s method
      Anterior disc height (A) & posterior disc height (P) are measured and expressed as a
       ratio to disc diameter (D)
      These two ratios are then reduced to a ratio of each other

                                                   Lumbar spine - normal disc ratios increase
                                                    LI                               0.17
                                                    L2                               0.18
                                                    L3                               0.20
                                                    L4                               0.25
                                                    L5                               0.28


      When segmental rotation is > 40° or lateral
       flexion is > 20°, these methods become
       unreliable.
      Decreased disc height
            Disc degeneration
            Post surgery
            Post chemonucleolysis
            Infection
            Congenital hypoplasia
Hadley’s S Curve
    Lumbar facet curve
   Projection: Oblique, AP lumbar spine
   Curvilinear line is constructed along the inferior margin of the transverse
    process and down along the inferior articular process to the apophyseal
    joint space
   Line is then continued across the articulation to connect with the outer
    edge of the opposing superior articular process
   The resultant configuration of this line will look like the letter S
   The key region of the S is the normally smooth transition across the joint
    space
   Abrupt interruption in the smooth contour of this line may indicate facet
    imbrication (subluxation)


    Lumbar Gravity Line
   The center of the L3 body is located by
    intersecting diagonals from opposing body
    corners
   A vertical line is constructed through center
    point
   Relationship to the upper sacrum is assessed
   Center of gravity of the trunk passes through
    the center of the L3 body and continues
    vertically to intersect the sacral base
   Normally the vertical line will pass through
    the anterior third of the sacral base.
   If this line passes anterior to the sacrum by >
    0.5 inch (> 10 mm), an increase in shearing
    stresses in an anterior direction between the lumbosacral apophyseal joints
    may be occurring.
   Conversely, it has been suggested that a posterior shift in this gravity line
    may indicate increased weight bearing forces on these same lumbosacral
    joints that may also be active in the production of low back pain
Van Akkerveeken’s
      Measurement of
      Lumbar Instability
     Projection: Lateral lumbar spine
      (neutral, flexion, extension).
     Two lines are drawn through and
      parallel to opposing segmental
      endplates until they intersect
      posteriorly.
     The distance from the posterior
      body margins to the point of
      intersection is then measured.
     Alternatively, the displacement can
      be assessed by measuring the offset
      in the opposing body corners

Normal Measurements
   There should be < 1.5 mm displacement, as

     determined by either measurement method
   If there is > 1.5 mm (3mm) difference in

     measurement, then it is likely that nuclear,
     annular, and posterior ligament damage at the
     displaced segment is present

      Lumbar Lordosis
     Lumbar curve, lumbar spinal angle, lumbar angle
     Projection: Lateral lumbar spine.
     Line is drawn through and parallel to the superior
      endplate of the first lumbar segment
     Second line is drawn through the superior endplate of the first sacral
      segment
     Perpendiculars are then created, and the angle at their intersection is
      measured
     A wide variation exists within normal individuals.
     The average appears to be 50-60°
Lumbar spinal canal
Eisenstein's method
Lateral lumbar projection
    Line is drawn connecting the tips of the

      superior and inferior articular processes of the
      same segment
    The canal width (x) is expressed as the distance

      from the posterior body margin to the middle
      portion of the facet line
    The canal dimension should not fall below 15

      mm (although some use 14 mm or 12 mm as
      the cutoff)
    Smaller measurements may indicate spinal stenosis

    Spinal stenosis is more accurately assessed on axial MRI and CT images

RATIO METHOD
Frontal lumbar projection
    Interpedicular distance is multiplied

      by sagittal width
    Coronal width of the vertebrae is

      multiplied by the sagittal width
    The product of the two canal

      measures is divided by the product
      of the two vertebral measures,
      expressing the canal size as a ratio of
      the vertebral body
    In the lumbar spine, the canal ratio should not fall below 1:3




       Meyerding’s Grading Method in Spondylolisthesis
      The superior surface of the first
       sacral segment is divided into four
       equal divisions. The relative
       position of the posterior inferior
       corner of the L5 body to these
       segments is then made
      The posterior inferior corner of the L5 body should be aligned with the
          posterior-superior corner of the first sacral segment.
         The same assessment can be applied to other spinal levels by dividing the
          superior endplate of the segment below the spondylolisthesis into four
          equal spaces.
          In spondylolisthesis, > 12° dynamic angulation or 8% translation on flexion-
          extension views is considered evidence of instability
         The degree of anterolisthesis of the affected vertebral body can be
          categorized according to the division in which the posterior-inferior corner
          of the body lies
          Grade 1          The posterior-inferior corner is aligned within the first division
          Grade 2          The posterior-inferior corner is aligned within the second division
          Grade 3          The posterior-inferior corner is aligned within the third division
          Grade 4          The posterior-inferior corner is aligned within the fourth division

         If the vertebral body has completely
          slipped beyond the sacral promontory, the
          condition is called spondyloptosis

          Lumbosacral Angle
          Two lines
         First, a horizontal line is made parallel to
          the bottom edge of the film
         Second, an oblique line is drawn through
          and parallel to the sacral base.
          Normal Values for Lumbosacral Angle
Position    Average   Standard    Minimum    Maximum
              (°)     Deviation      (°)        (°)

Upright        41        ±7          26          57
Sacral angle / Barge's
     angle
    The angle of the superior margin of
     the sacrum from the horizontal plane,
     measured in the sagittal plane
    lumbar lordosis increased if the sacral
     angle increased




     Ullmann’s Line
    Garland-Thomas line, right-angle test
     line
    Projection: Lateral lumbar spine,
     lumbosacral
    Parallel to and through the sacral base
    Perpendicular to the first line at the
     anterior margin of the sacral base.
     The relationship of the L5 body to this
     perpendicular line is then assessed
    Anterior margin of the L5 body crosses
     the perpendicular line,
Anterolisthesis
  This is a useful line for detecting the

   presence of spondylolisthesis when
   there is poor visualization of the pars
   region
Upper Extremity Measurements

   Acromioclavicular joint space
      AP or posteroanterior (PA) shoulder.
      The joint space is measured at the superior (S) and inferior (I) borders, and
       the two values are averaged
                    Normal Values for Acromioclavicular Joint Space
         Sex               Average (mm)         Minimum (mm)        Maximum (mm)
Male                              3.3               2.5                   4.1
Female                            2.9               2.1                   3.7

      Decreased joint space
              Degenerative joint disease
      Increased joint space
              Traumatic separation
              Hyperparathyroidism
              Rheumatoid arthritis
       Acromiohumeral joint
       space
      AP shoulder.
      The distance between the inferior
       surface of the acromion and the
       articular cortex of the humeral head is measured
       Normal Values for Acromiohumeral
                  Joint Space
       Average       Minimum          Maximum
        (mm)           (mm)            (mm)
          9              7               11
Narrowed space (<7mm)
      Superior shoulder displacement,
      which is often secondary to shoulder
      impingement syndrome with rotator
      cuff tendonopathy.
Enlarged space (>11mm)
      Dislocation
      Joint effusion
      Paralysis
Brachial plexus lesions (drooping shoulder)

Glenohumeral joint space
   AP shoulder with external rotation.
   The measurements are made at the superior, middle, and inferior aspects
    of the joint.
   These are combined and averaged.
   Each distance is ascertained between the opposing articular surfaces
   The average joint space is 4-5 mm
   Joint space diminished
          Degenerative arthritis,
          Calcium pyrophosphate
           dihydrate (CPPD) crystal
           disease
          Post-traumatic arthritis.
   Widened space
          Acromegaly
          Posterior humeral
           dislocation.




    Axial Relationships of the Shoulder
   Humeral axial angle
   AP shoulder with external
    rotation.
   Humeral shaft line (A). A line is
    drawn through and parallel to
    the humeral shaft.
   The average humeral angles are
    60° for males and 62° for
    females
   This relationship may be altered
    following a fracture, especially in
    the surgical neck.
Elbow - Anterior humeral line
     On the lateral elbow projection a line
      drawn along the anterior surface of the
      humerus should intersect the middle third
      of the lateral condylar ossific center.
  
     If the line passes anterior or posterior to
      the middle third of the lateral condyle, a
      fracture may be present

      Radiocapitellar Line
Radiocarpal line
     Lateral elbow.
   A line is drawn through the center of

     and parallel to the long axis of the
     radius and is extended through the
     elbow joint.
   This line should pass through the

     center of the capitellum in all stages
     of flexion of the elbow
   This assists in determining the

     presence of radial head subluxation
     (pulled elbow) or dislocation


      Axial Relationships of the
      Wrist
      PA and lateral wrist.
     Radioulnar articular line (A). A tangential line is drawn from the tip of the
      radial styloid to the base of the ulnar styloid.
     Radial shaft line (B). A line is drawn through and parallel to the shaft of the
      radius.
     Radioulnar angle (I). The ulnar side angle between the two lines is
      measured.
Normal Values for Axial Relationships of the Wrist
        Angle              Average (°)        Minimum (°)         Maximum (°)
 PA radioulnar                 83                  72                  95
 Lateral radius                86                  79                  94

These lines and constructed angles aid in
the assessment of radioulnar deformities,
especially those caused by displaced
fractures




       Hand - Capitolunate
       sign
      On the lateral wrist projection, lines
       are drawn to approximate the long
       axes of the lunate and capitate.
      Assessment assists in determining the
       presence of fracture or dislocation.

             Scapholunate angle
               (scaphoid tilt)
      On the lateral wrist projection, lines are
       drawn to approximate the long axes of the
       scaphoid and lunate.
      If the angle is greater than 80 and the
       lunate is also extended (dorsiflexed), dorsal
       intercalated segmental instability (DISI) is
       suggested.

       Metacarpal Sign
       PA hand
   A line is drawn tangentially through the articular cortex of the fourth and
      fifth metacarpal heads
     The line should pass distal to or just touch the third metacarpal head
Postive in
    Turner’s syndrome

    Fracture deformity

    Pseudo/ pseudo-pseudo

      hypoparathyroidism


      Metacarpal index
     Determined by dividing the length of each
      of the last four metacarpals by the width of
      its midpoint and averaging the values
     Marfan's patients are often grater than 8.4,
      while normals are less than 8.
      Method 2
     The outer and inner diameters of the
      metacarpal bone is measured, as shown
      below. From these measurements, the Combined Cortical Thickness (CCT)
      and the Metacarpal Index
      (MCI) are easily calculated
     CCT = L1 - L2
     MCI = CCT / L1

      Radiolunate
      angle (lunate
      tilt)
     On the lateral wrist projection,
      lines drawn to approximate the
      long axes of the radius and lunate
      should be parallel.
  
     If the lunate is flexed more than 15 degrees, volar intercalated segment
      instability (VISI) is suggested.
   If the angle is greater than 10 degrees in extension, dorsal intercalated
      segment instability (DISI) is suggested.
     Occasionally VISI and usually DISI occur with scapholunate dissociation
       VISI is also related to triquetrolunate dissociation


      Radioulnar variance
     On the anteroposterior wrist projection, the distal ulnar articular surface
      should align with the inner portion of the distal radial articular surface.
     Short ulna
            Avascular necrosis of the lunate (Kienbock's disease)
            Greater carpal stress distribution to the radius
     Long ulna
            Greater carpal stress distribution to the ulna.
            Differences of less than 5 mm are probably not significant.




      Teardrop Distance
  Medial joint space of hip.
   The distance between the most

    medial margin of the femoral
    head and the outer cortex of the
    pelvic teardrop is measured
ABNORMAL MEASUREMENT
  • >11 mm or
  • > 2 mm discrepancy from right to
    left (Waldenstrom’s sign)
Normal Values for Teardrop Distance
Average     Minimum       Maximum
  (mm)         (mm)         (mm)
    9            6            11
   Left to right discrepancies of > 1 mm will be present in 90% of hip joint
    effusions.
   Legg-Calve-Perthes disease
   Septic arthritis
   Other inflammatory diseases.
Hip Joint Space Width
   Three measurements are made of the joint
    cavity
   Superior joint space: Space between the
    most superior point on the convex articular
    surface of the femur and adjacent
    acetabular cortex.
   Axial joint space: Space between the
    femoral head and acetabulum immediately
    lateral to the acetabular notch.
   Medial joint space (teardrop distance):
    Space between the most medial surface of
    the femoral head and opposing acetabular surface
                   Normal Values for Hip Joint Space Width
     Space            Average (mm)       Minimum (mm)      Maximum (mm)

    Superior                   4                    3          6
     Axial                     4                    3          7
     Medial                    8                    4          13
   The superior and axial compartments are approximately equal (4 mm), The
    medial space is twice the distance (8 mm)
   Superior joint space Reduction
          Degenerative joint disease
   Axial joint space
          Degenerative arthritis
          Inflammatory arthritis (RA)
   Medial joint space
          Degenerative or inflammatory arthritis
    Acetabular Depth
   A line is drawn from the superior
    margin of the pubis at the symphysis
    joint to the upper outer acetabular
    margin.
Normal Values for Acetabular Depth
      The greatest distance
                                     Space    Average (mm)     Minimum         Maximum
       from this line to the                                     (mm)           (mm)
       acetabular floor is          Male            13            7                18
       measured                     Female          12            9                18

      An acetabular depth < 9 mm in females and < 7 mm in males is considered
       to be shallow and dysplastic, which may be a factor in precipitating
       degenerative joint disease of the hip.
       Acetabular center-edge angle
CE angle, CE angle of Wiberg.
      A vertical line is drawn through the center point
       of the femoral head.
      Another line is constructed through the femoral
       head center to the outer upper acetabular
       margin.
                                                Normal Values for Center-Edge Angle
      The angle formed is then               Average (°)  Minimum (°)     Maximum (°)
       measured.                                  36            20             40

      Shallow angle
              Acetabular dysplasia
                    degenerative joint
                     disease.
      It provides a measure of coverage of
       the femoral head, which means the
       amount of the acetabulum primarily
       concerned with weight bearing
       Symphysis Pubis Width
      The measured distance is between the
       opposing articular surfaces, halfway

                     Normal Values for Symphysis Pubis Width
         Sex            Average (mm)          Minimum (mm)       Maximum (mm)
Male                          6                    4.8                   7.2
Female                        5                    3.8                   6
between the superior and inferior margins of the joint
Widening of the
symphysis
       cleidocranial
       dysplasia,
       bladder exostrophy



       Hyperparathyroidism              Normal Values for Acetabular Angle in 1-Year-
       post-traumatic diastasis                             Old
       inflammatory resorption             Average (°)       Minimum      Maximum
             ankylosing spondylitis                             (°)            (°)
             osteitis pubis               20        12          29
             gout

       Presacral Space
   Retrorectal space
     The gray soft tissue density located between
      the anterior surface of the sacrum and the
      posterior wall of the rectum is assessed
    The most consistent measurement was

      obtained at the level opposite the S3-S4 disc
      space
An increase
                                      Normal Values for Presacral Space
measurement
      sacral destruction         Age        Average      Minimum      Maximum
             Tumor                            (mm)         (mm)         (mm)
                             Children (1-       3            1             5
             infection        15 years)
      sacral fracture and       Adults          7            2            20
      associated
      hematoma
      inflammatory bowel disease (in which there is thickening of the intestinal
      wall).


       Acetabular Angle
   A transverse line is drawn through the right and left triradiate cartilages at
    the pelvic rim
   A second oblique line connecting the lateral
    and medial acetabular surfaces is then
    constructed
   The angle of intersection is measured
   Increased acetabular angle
          acetabular dysplasia
          congenital hip dislocation
   Decreased acetabular angle
          Down’s syndrome.


    Acetabular index
   Horizontal line is drawn through
    the right and left triradiate
    cartilage (Hilgenreiner's Line).
   Another line is drawn along each
    of the acetabuli to intersect the
    horizontal triradiate cartilage line
   Dividing the hip into 4 quadrants.
   The proximal medial femur
    should be in the lower medial
    quadrant, or the ossific nucleus of
    the femoral head, if present (usually observed in patients aged 4-7 month),
    should be in the lower medial quadrant.
   The acetabular index is the angle between the Hilgenreiner line and a line
    drawn from the triradiate epiphysis to the lateral edge of the acetabulum.
   The angles of intersection (x°) should not exceed standards based on age:
   @ Birth        < 36 degrees in females,
          < 30 degrees in males;
   6 months     < 28 degrees in females,
           < 25 degrees in males;
   1 year < 25 degrees in females,
               24 degrees in males;

   7 years          < 19 degrees in females,
                     < 18 degrees in males
   Enlarged angle
             Acetabular dysplasia
             Congenital dislocation of the hip
   Shallow angle - Down syndrome
Iliac Angle and Index
   A line is drawn through the
    triradiate cartilage at the
    pelvic rim
    A second line is constructed
    tangential to the most lateral
    margin of the iliac wing and
    iliac body
   Iliac index: This is the sum of
    both the iliac angles and the
    acetabular angles divided by
    2.
   The iliac index is most useful
    in the determination of
    Down’s syndrome.
   When the index is < 60, Down’s syndrome is probable; when the index is
    60-68, the syndrome is possible; if > 68, the syndrome is unlikely
                       Normal Values for Iliac Angle

            Age         Average (°)    Minimum (°)     Maximum (°)

         0-3 months         44              35             58

        3-12 months         55              43             67

                       Normal Values for Iliac Index
            Age         Average (°)    Minimum (°)     Maximum (°)

         0-3 months         60              48             87

        3-12 months         81              68             97
Measurements of Protrusio Acetabuli
Köhler’s Line
     A line is constructed
      tangentially to the cortical
      margin of the pelvic inlet
      and outer border of the
      obturator foramen.
     The relationship of the
      acetabular floor to this line
      is assessed
     The acetabular floor should
      not cross this line and
      usually lies laterally to it.
     If the acetabular floor crosses the line, then protrusio acetabuli is present.
     The most common causes
           Idiopathic form
           Rheumatoid arthritis
           Paget’s disease
           Ankylosing spondylitis


      Shenton’s Line
  Makka’s line, Menard’s line.
     A curvilinear line is constructed along the
      undersurface of the femoral neck and is
      continued across the joint to the inferior
      margin of the superior pubic ramus.
     The constructed line should be smooth,
      especially in the transition zone between the femoral neck and superior
      pubic ramus.
     Occasionally, a small portion of the inferior femoral head may just cross the
      line
     Interrupted, discontinuous in
            Hip dislocation,
            Femoral neck fracture
            Slipped femoral capital epiphysis.
Iliofemoral Line
   A curvilinear line is constructed along the
    outer surface of the ilium, across the
    joint, and onto the femoral neck
   A small portion of the superior femoral
    head may cause a slight convexity in the
    line.
   The most important normal feature is
    that the line should be bilaterally
    symmetrical.
   A discrepancy in symmetry may be the result of
    congenital dysplasia, slipped femoral capital
    epiphysis, dislocation, or fracture
    Femoral Angle
   Femoral angle of incidence, femoral neck angle,
    Mikulicz’s angle.
   Two lines are drawn through and parallel to the
    midaxis of the femoral shaft and femoral neck.
   The angle subtended is then measured.
Skinner’s Line
      A line is drawn through and parallel to the axis
       of the femoral shaft.
       A second line is constructed at right angles to
       the shaft line and tangential to the tip of the
       greater trochanter.
      The relationship of the fovea capitis to this
       trochanteric line is assessed.
      The fovea capitis should lie above or at the
       level of the trochanteric line.
      The fovea lies below this line when there is a superior displacement of the
       femur relative to the femoral head.
      The most common causes are fracture and conditions leading to coxa vara.
       Klein’s Line
      A line is constructed tangential to the outer margin of the femoral neck.
      The degree of overlap of the femoral head will be apparent.
      Comparison should be made with the opposite side
      Generally there will be the same degree of
       overlap of the femoral head
       In most normal hips the outer margin of
       the femoral head will be lateral to the line.
      This line can be drawn on both the AP and
       frog-leg projections
      If the femoral head does not overlap the
       line or if there is asymmetry from side to
       side, then slippage of the femoral capital
       epiphysis should be suspected.


       Pelvic misalignment
Innominate rotation
    On the weight- bearing frontal pelvic projection

    Femoral head line (FHL) is drawn along the superior margins of the femoral

     heads bilaterally.
   A perpendicular line from the FHL is constructed to intersect the second
    sacral tubercle and should pass through the center of the pubic symphysis
    when extended interiorly.
   If the perpendicular line intersects the pubic bone instead of the symphysis,
    the innominate is externally rotated on the side the line crosses through.
    The innominate on the opposite side is internally rotated.
   Rotation can be double-checked by measuring the width of the ilium (a)
    and the obturator foramen (b).
   External rotation of the innominate, using the posterior superior iliac spine
    (PSIS) as a reference point, is accompanied by a narrower ilium width and a
    wider obturator foramen on the ipsilateral side. Internal rotation is
    associated with a wider ilium and narrower obturator width ipsilaterally.
   Innominate flexion-extension. On the weight-bearing frontal pelvic
    projection, the distance from the top of the iliac crest to the inferior margin
    of the ischial tuberosity should be bilaterally similar
   Sacrum rotation. On the weight-bearing frontal pelvic projection, the
    distances from the lateral margins of the sacrum to the second sacral
    tubercle (c and d) are measured parallel to the FHL and should be similar.
   Leg length inequality. On the frontal weight bearing pelvic projection, a line
    is drawn parallel to the lower margin of the film to the superior margin of
    the highest femoral head.
   The line should approximate both femoral heads if the legs are of equal
    length
   The vertical measurement of the innominate is larger on the flexed side
    (PSIS has moved posterior and inferior) and smaller on the extended side
    (the PSIS has moved anterior and superior).
   The sacrum is rotated posteriorly on the wider side and anteriorly on the
    narrower side.
   If the line constructed parallel to the bottom of the film does not
    approximate the femoral heads bilaterally, the line is drawn to the higher
    femoral head, and the distance from the line to the lower femoral head
    estimates the measured leg length deficiency.
   Flexed (PI) or externally rotated (EX) innominate will decrease the leg
    length discrepancy when the innominate misalignment is corrected on the
    ipsilateral side of the short leg.
    In other words, correction of flexed or externally rotated innominate raises
    the ipsilateral femoral head
   Conversely, an extended (AS) or internally (IN) rotated innominate will
    increase the leg length discrepancy when corrected on the ipsilateral side
    of the short leg. The opposite will be noted if the short leg is on the
    contralateral side of the innominate misalignment.

    Axial Relationships of
    the Knee
    AP knee.
   Four lines and two angles are drawn
   Femoral shaft line (A). A line is drawn
    through and parallel to the midaxis of
    the femoral shaft.
   Tibial shaft line (B). A line is drawn
    through and parallel to the midaxis of
    the tibial shaft.
   Femoral condyle line (C). A line is
    drawn through and tangential to the
    articular surfaces of the condyles
   Tibial plateau line (D). A line is drawn
    through the medial and lateral tibial
    plateau margins
   Femoral angle (FA). This is the angle
    formed between the femoral shaft and
    femoral condyle lines.
    Tibial angle (TA). This is the angle
    formed between the tibial shaft and
    tibial plateau lines
                 Normal Values for Axial Relationships of the Knee
         Angle            Average (°)        Minimum (°)       Maximum (°)
Femoral                       81                 75                  85
Tibial                        93                 85                  100

                                  Significance.
    These angles will be altered in fractures and other deformities about the
    knee.
Patellar Position
Patella alta evaluation
      Lateral knee (semiflexed)
    Patellar length (PL). This is the greatest diagonal dimension between the
      superior and the inferior poles.
    Patellar tendon length (PT). The
      distance measured is between
      the insertion points of the
      posterior tendon surface at the
      inferior patellar pole and the
      notch at the tibial tubercle.
    Normal Measurements.

    Patellar length and patellar

      tendon length are usually equal
      to each other.
    A normal variation up to 20%


      > 20% - patella alta
                       • chondromalacia patellae.
      A low-riding patella (patella baja)
                   Polio
                   Achondroplasia
                   juvenile rheumatoid arthritis
                   tibial tubercle
                    transposition


       Patellar Malalignment
       Patellar tracking, patellar
       subluxation, patellofemoral joint
       incongruence.
       Tangential knee (skyline)
      Patella apex The patella is centered
       when its apex is directly above the
deepest section of the intercondylar sulcus.
 Sulcus angle By drawing lines from the highest points on the medial and
  lateral condyles to the lowest point of the intercondylar sulcus, an angle is
    formed.
   Normally, this should be 138° ± 6°. Larger angles (shallow intercondylar
    groove) predispose the individual to subluxation and dislocation.
   Lateral patellofemoral joint index: The narrowest medial joint space
    measurement is divided by the narrowest lateral joint space measurement.
   This index is normally ≤ 1.0. A value > 1.0 is noted in patients with
    chondromalacia patellae.
   Lateral patellofemoral angle. A
    line tangential to the femoral
    condyles is intersected by a line
    joining the limits of the lateral
    facet.
   The angle is normally open.
   In patellar subluxation these lines
    are parallel or open medially.
   Significance.
   The combined use of these
    measurements may reveal
    contributing causes to
    patellofemoral joint pain syndromes and instability
Axial Relationships of the Ankle
       Four lines and two angles are constructed.
    Tibial shaft line (A). A line is drawn through and parallel to the tibial shaft.

    Medial malleolus line (B). A line is drawn tangential to the articular surface

       of the medial malleolus.
    Lateral malleolus line (C). A line is drawn

       tangential to the articular surface of the
       lateral malleolus.
    Talus line (D). A line is drawn tangential

       to the articular surface of the talar
       dome.
          Tibial angle (I). The angle is formed

            medially between the medial
            malleolus line and talus line.
       Fibular angle (II). The angle is formed
laterally between the lateral malleolus line
and talus line
   Normal Values for Axial Relationships of the
                     Ankle
   Angle     Average       Minimum     Maximum
                (°)           (°)          (°)
Tibial (I)      53            45           65
Fibular (II)     52          43          63

       Significance.
       These angles will be altered in fractures of the malleoli, ankle mortise
        instability, and tibiotalar slant deformities.
        The tibiotalar joint space is measured at the lateral and medial joint
        margins.
       This should be done on varus-valgus stress studies, on which there should
        not be > 3 mm difference between the normal and injured sides.
       Talar tilt is assessed by drawing a line tangential to the talar dome and
        another line along the adjacent tibial surface.
       In the neutral position, an angle > 6° indicates significant ligamentous
        injury.
       On valgus-varus stress views, the normal range is 5-23°.
    A difference between right and left of > 10° also indicates significant
    ligamentous damage.
   An anterior drawer of 4 mm is another indicator of instability.



    Boehler’s Angle
Axial relationships of the
 calcaneus, tuber angle.
   Lateral foot, lateral
    calcaneus.
   The three highest points on
    the superior surface of the
    calcaneus are connected with
    two tangential lines.
   The angle formed posteriorly
    is then assessed
   Normal Measurements.
   The angle formed posteriorly
    averages between 30° and 35° in most normal subjects but may range
    between 28° and 40°.
   Any angle < 28° is abnormal.
   The most common cause for an angle < 28° is a fracture with displacement
    through the calcaneus.
   Dysplastic development of the calcaneus may also disturb the angle.




    Heel Pad Measurement
    Two lines are drawn
   First line connecting the superior tuborosity to superior most point of
    anterior process of calcaneum
   Parallel to above line touching
       plantar surface of calcaneum
      Shortest perpendicular distance to
       second line is measured
      Normal Values for Heel Pad
           Measurement
    Sex       Average       Maximum
                (mm)          (mm)
Male             19             25
Female            19              23
   • Increased in
        • Obesity
        • myxedema
        • Acromegaly
        • Local inflammation



       First metatarsal angle
      On the anteroposterior foot
       projection, lines drawn to
       approximate the long axes of the
       first metatarsal and proximal first
       phalanx should form an angle (x°)
       of less than 15 degrees.
      An increased angle indicates a
       hallux valgus deformity.



       Meary's angle
      On the lateral foot projection, lines drawn to approximate the longitudinal
       axis of the first metatarsal and talus should be parallel
      If the lines are not parallel and form an angle that is greater than 0 degrees,
       forefoot cavus deformity is indicated.
Calcaneal pitch
   A line is drawn from the plantar most surface of the calcaneus to the
    inferior border of the distal articular surface.
   The angle made between this line and the transverse plane (or the line
    from the plantar surface of the calcaneus to the inferior surface of the 5th
    metatarsal head) is the calcaneal pitch.
   A decreased calcaneal
    pitch is consistent with
    pes planus.
   Unfortunately, there
    have been differing
    opinions between
    authors concerning the
    normal range of
    calcaneal pitch 18 to
    20°is generally
    considered normal (12), although measurements ranging from 17 to 32°
    have been reported to be normal
Lateral Talocalcaneal Angle
      The lateral talocalcaneal angle is the angle formed by the intersection of
       the line bisecting the talus with the line along the axis of the calcaneus on
       lateral weight bearing views. A line is drawn at the plantar border of the
       calcaneus (or a line
       can be drawn
       bisecting the long axis
       of the calcaneus).
      The other line is
       drawn through two
       midpoints in the talus,
       one at the body and
       one at the neck. The
       angle is formed by the
       intersection of these
       axes.
      The normal range is
       25-45 degrees.
      An angle over 45 degrees indicates hindfoot valgus, a component of pes
       planus

       Kite's angle
      AP talocalcaneal angle
      Angle formed by the longitudinal axis of the
       Calcaneus and the Talus
      Kite Angle < 15° : Tendency to supine rearfoot
      15° < Kite Angle < 25° : Normality range
      Kite Angle > 25°: Tendency to prone rearfoot

REFERENCE
    CLINICAL IMAGING – Dennis M.Marchiori

    Essentials of Skeletal Radiology 3rd Edition -

     Terry R. Yochum B.S., D.C., D.A.C.B.R., F.C.C.R.
     (C), F.I.C.C., Fellow, A.C.C.R

Roentgenometrics

  • 1.
    Roentgenometrics S.THIYAGARAJAN  Application of standard lines and measurements to radiographs  Allows the detection of subtle abnormalities  Assists in avoiding misdiagnosis  Comparison of studies is facilitated Basilar Angle Welcker’s basilar angle/Martin’s basilar angle / Sphenobasilar angle  Lateral skull  The Nasion(Frontal-nasal junction)  The center of the Sella turcica (Midpoint between the clinoid processes)  The Basion (Anterior margin of the foramen magnum)  Index of the relationship between the anterior skull and its base  >152° - Platybasia  Congenital AVERAGE MINIMUM MAXIMUM  Isolated impression 137 123 152  Occipitalization  Acquired  Paget’s disease  Rheumatoid arthritis  Fibrous dysplasia  This may or may not be associated with basilar impression Chamberlain’s Line  Palato-occipital line. Projection: Lateral skull; lateral cervical spine.  The posterior margin of the Hard palate  The posterior aspect of the foramen magnum (OPISTHION)  The relationship of this line to the tip of the odontoid process is then assessed
  • 2.
    Tip of the odontoid process should not project above this line  Normal variation of 3 mm above this line may occur  A measurement of ≥7 mm is definitely abnormal.  An abnormal superior position of the odontoid  Basilar impression  Platybasia  Atlas occipitalization  Bone-softening diseases of the skull base  Paget’s disease  Osteomalacia  Fibrous dysplasia  Rheumatoid arthritis McGregor’s Line (Basal line) Projection: Lateral skull; lateral cervical spine.  Postero superior margin of the hard palate  Most inferior surface of the occipital bone  The relationship of the odontoid apex to this line is examined  > 8 mm in males  > 10 mm in females  In children younger than 18 years, these maximum values diminish with decreasing chronologic age.  McGregor’s line appears to be the most accurate and reproducible  Abnormal superior position of the odontoid  Basilar impression Macrae’s Line  Foramen magnum line  The Basion (anterior margin of the foramen magnum)  Posterior (Opisthion) margins of the foramen magnum  The inferior margin of the occipital bone should lie at or below this line
  • 3.
    In addition a perpendicular line drawn through the odontoid apex should intersect this line in its anterior quarter  If the inferior margin of the occipital bone is convex in a superior direction and/or lies above this line, then basilar impression is present.  If the odontoid apex does not lie in the ventral quarter of this line  Dislocation of the atlanto-occipital joint  Fracture  Dysplasia of the dens Digastric Line (Biventer line) Projection: AP open mouth  The digastric groove medial to the base of the mastoid process  The vertical distance to the odontoid apex and atlanto occipital joints is measured Measure Average (mm) Minimum (mm) Maximum (mm) Digastric line-odontoid apex 11 1 21 Digastric line-atlanto-occipital 12 4 20 joint  Both measurements will decrease in basilar impression • Platybasia • Atlas occipitalization • Bone-softening diseases of the skull base • Paget’s disease • Osteomalacia • Fibrous dysplasia • Rheumatoid arthritis Occipitoatlantal alignment  Projection: Lateral skull.  Two lines are constructed
  • 4.
    1. Foramenmagnum line (FML) is drawn along the inferior margin of the occiput (MACRAE’S LINE) 2. Atlas plane line (APL) is drawn through the center of the anterior tubercle and the narrowest portion of the posterior arch of atlas  The FML and APL should be parallel.  Divergence of the FML and APL anteriorly suggests anterior-superior malposition of the occiput  Divergence of the lines posteriorly suggests posterior-superior malposition of the occiput Other method  The anterior margin of the foramen magnum should line up with the dens.  A line projected downward from the dorsum sellae along the clivus to the basion should point to the dens. Wachenheim's line  The posterior margin of foramen magnum should line up with the C1 spinolaminar line.  Power ratio :The ratio of Basion - spinolaminar line of C1 to Opisthion - posterior cortex of C1 anterior arch normally ranges from 0.6 to 1.0, with the mean being 0.8. A ratio greater than 1.0 implies anterior cranio-cervical dislocation. Sella Turcica Size The greatest AP diameter and the greatest vertical diameter Diameter Average (mm) Minimum (mm) Maximum (mm) Anteroposterior 11 5 16 Vertical 8 4 12
  • 5.
    Small sella Normal variant Hypopituitarism (long after Sheehan's) Microcephaly Myotonic dystrophy Prader-Willi-Lambert syndrome Cockayne syndrome Dystrophia myotonica  Enlarged sella Pituitary neoplasm Empty sella syndrome Extrapituitary mass  Neoplasm  Aneurysm Normal variant  J shaped sella Elongated sella with shallow anterior convexity which represents exaggerated of sulcus chiasmaticus  Normal variant  MPS  Achondroplasia  Chronic hydrocephalus  Optic chiasmatic glioma  Osteogenisis imperfecta  Neurofibromatosis Atlantoaxial "overhang" sign AP open-mouth projection  Lateral margin of the lateral masses of atlas should not appear more lateral than the superior articular processes of axis  If the lateral margin of the atlas lateral mass lies
  • 6.
    lateral to thelateral axis margin,  Radiologic sign of  Jefferson’s fracture  Odontoid fracture  Alar ligament instability  Rotatory atlantoaxial subluxation  Mild degree of overhanging may be a normal variant Atlantodental Interspace  Atlas-odontoid space, predental interspace, atlas-dens interval  Projection: Lateral neutral; flexion- extension cervical Age Minimum Maximum spine. (mm) (mm)  The distance measured is Adults 1 3 between the posterior margin of Children 1 5 the  anterior tubercle and the anterior surface of the odontoid Decreased space Advancing age (Degenerative joint disease of the atlantodental joint) Widened space with reduction in the neural canal size Trauma Occipitalization Down’s syndrome Pharyngeal infections (Grisel’s disease) Inflammatory arthropathies Ankylosing spondylitis Rheumatoid arthritis Psoriatic arthritis Reiter’s syndrome Cervical Gravity Line  A vertical line is drawn through the apex of the odontoid process
  • 7.
    This line should pass through the C7 body  Gross assessment of where the gravitational stresses are acting at the cervicothoracic junction. Stress Lines of the Cervical Spine  Ruth Jackson’s lines  Projection: Lateral cervical spine (flexion, extension)  Two lines are constructed on each film 1) The first line is drawn along the posterior surface of the axis 2) The second line is drawn along the posterior surface of the C7 body until it intersects the axis line  Normal Measurements  Flexion - lines should intersect at the level of the C5-C6 disc or facet joints.  Extension - lines should intersect at the level of the C4-C5 disc or facet joints.  The intersection point represents the focus of stress when the cervical spine is placed in the respective positions  The point of intersection does not appear to correlate with the level of degenerative disc disease  Muscle spasm, joint fixation, and disc degeneration may alter the stress point. Cervical Lordosis Visual assessment (Subjective)  On the lateral cervical projection  Well maintained anterior convexity is lordosis  Exaggerated anterior convexity is hyperlordosis
  • 8.
     Slightanterior convexity hypolordosis  Lack of curvature is alordosis Posterior convexity is kyphosis  Altered cervical lordosis  Trauma  Degeneration  Muscle spasm  Aberrant inter-segmental mechanics Depth method Lateral cervical projection  A line is drawn from the tip of the odontoid process to the posterior surface of C7  A horizontal measure is taken from the vertical line to the posterior surface of the C4 body (X)  The average depth is 12 mm  Negative – Kyphosis  Largest values – Hyperlordosis  The depth method provides a more accurate assessment of cervical lordosis Angle of curve Lateral cervical projection  A line is drawn connecting the anterior and posterior tubercles of the atlas  Second line is drawn along the inferior endplate of C7  Perpendicular lines are drawn from the atlas and C7 lines, and their angle of intersection is recorded as the cervical lordosis (X°)  The average value is 40 degrees  Negative – kyphosis  Large – hyperlordosis  Less accurate than the depth method. Because the measurements depend only on CI and C7 Prevertebral Soft Tissues
  • 9.
    The soft tissue in front of the vertebral bodies and behind the air shadow of the pharynx, larynx, and trachea is measured  The bony landmarks  Anterior arch of the atlas  Inferior corners of the axis & C3  Superior corner of C4  Inferior corners of C5, C6, and C7  C2-C3 - RPI  Behind the larynx (C4-C5) - RLI  Behind the trachea (C5-C7) - RTI. Widening  Post-traumatic hematoma  Retropharyngeal abscess  Neoplasm from the adjacent bone and soft tissue structures. Level Flexion (mm) Neutral (mm) Extension (mm) C1 11 10 8 C2 6 5 6 C3 7 7 6 C4 7 7 8 C5 22 20 20 C6 20 20 19 C7 20 20 21 Spinolaminar junction line Posterior Cervical Line, arch-body line.  Projection: Lateral cervical spine (neutral, flexion, extension).  The cortical white line of the spinolaminar junction identified at each level C1 to C7 • Each spinolaminar junction will be curved slightly anteriorly from superior to inferior
  • 10.
    • For consistency,the most anterior part of the convexity is compared between levels  Discontinuous at any level  Anterior or posterior displacement  This line is especially useful for detecting subtle odontoid fractures and atlantoaxial subluxation (anterior)  A disruption in the middle to lower cervical spine may also be a sign of anterolisthesis, retrolisthesis, or frank dislocation. Cervical Spinal Canal Projection: Lateral cervical (neutral, flexion, extension)  The sagittal diameter is measured from the posterior surface of the midvertebral body to the nearest surface of the same segmental spinolaminar junction line Level Average (mm) Minimum (mm) Maximum (mm) C1 22 16 31 C2 20 14 27 C3 18 13 23 C4 17 12 22 C5 17 12 22 C6 17 12 22 C7 17 12 22 Narrowing of the canal (stenosis) < 12 mm Significance
  • 11.
    If degenerative posterior osteophytes are present, the measurement can be made from their tip to examine the magnitude of the stenotic effect. The degree of stenosis from these spurs is best measured on extension films  An abnormally widened canal may be associated with a spinal cord neoplasm or syringomyelia.  The most accurate measurement is by the ratio of the sagittal dimension of the canal and vertebral body (canal to body ratio, Pavlov’s ratio)  A ratio of less than 0.82 is significant for spinal stenosis. The benefit of this method is that it removes the effects of radiographic magnification. Cervical, thoracic, and lumbar endplate lines  On the lateral cervical projection, lines arc drawn along the inferior endplate of the C2-T1 vertebrae and extended posteriorly to the cervical spine  The cervical endplate lines should all intersect at a common point located posterior to the spine  Lack of convergence  Normal lordotic cervical spine curve  Intersegmental malpositions  Lines that cross closely to the spine  Extension malposition of the superior segment  Lines that diverge sharply  flexion malposition of the superior segment.
  • 12.
    Frontal cervical, thoracic, and lumbar projections  Lines are drawn to approximate the inferior vertebral endplates  The lines at adjacent levels should be parallel  Divergence of the endplate lines  Lateral flexion malposition opposite the side of divergence Cervical, thoracic, and lumbar vertebral rotation Body width method  Distance from the lateral margins of the vertebral bodies to the origin of the spinous process should be equal bilaterally.  Distances not equal  Vertebral rotation Spinous process deviation to the side of the smaller distance. Pedicle method Frontal projection  The appearance of the pedicle shadows may suggest vertebral rotation  It is expected the pedicle shadows demonstrate bilateral symmetry  If the width of a pedicle shadow appears narrower than the contralateral pedicle shadow, it suggests  Segmental rotation with the spinous process deviated to the side of the narrower pedicle shadow  Posterior vertebral body
  • 13.
    rotation to theside of the wider pedicle shadow Cervical, thoracic, and lumbar vertebral sagittal alignment George's line Lateral projections  Curvilinear line is drawn along the posterior surfaces of the vertebral bodies  The curve should maintain a smooth contour throughout the spinal region without segmental disruption.  Disruption  Segmental anterolisthesis  Retrolisthesis  Disruptions at multiple consecutive levels  Normal flexion and extension patterns.  However, the adjacent posterior body lines should not demonstrate more than 3 mm of net translation in a comparison of the flexion and extension radiographs Barge's "e" space Lateral lumbar projection  Lines are drawn along the superior and inferior vertebral endplates of each segment  Lines perpendicular to each endplate line are then drawn and extended across the intervertebral disc space.  The distance between the perpendicular lines at the inferior end- plate of each lumbar segment is measured as the "e" space  The space should not exceed 3 mm  Larger Barge's "e" space  Retrolisthesis of the segment above  Negative values indicate
  • 14.
    Anterolisthesis Visual method  Segmental retrolisthesis  Intervertebral disc degeneration (osteophytes, eburnation, reduced disc space, Schmorl's nodes, endplate irregularity)  The lowest segment of a "stack" of three or more vertebrae that do not contribute to a sagittal curvature may be posterior  The lowest involved segment of three or more consecutive segments that appear to be flexed or extended during neutral patient posture may be posterior  Segmental rotation in a coronal plane that produces an hourglass appearance  Narrowed sagittal diameter of the intervertebral foramen  Visual disparity of segmental alignment when comparing the margins of adjacent vertebrae  Retrolisthesis of L5 is often seen as a normal variant, accompanying short pedicles Cervical toggle analysis Atlas tilt Lateral cervical projection  Three lines are constructed  Occipital condyle line (OCL) is drawn along the base of the occipital condyles  Atlas plane line (APL) is drawn through the center of the anterior tubercle and the narrowest portion of the posterior arch of the atlas  Listing line (LL) is drawn parallel to the occipital condyle line and
  • 15.
    through the narrowestportion of the posterior arch of the atlas.  The atlas plane line should be 4 degrees above the listing line  APL > 4 degrees above the listing line  Superior malposition of the atlas  APL < 4 degrees  Inferior malposition of atlas Atlas laterality  4 lines are constructed:  Horizontal ocular orbit line (OOL) is drawn through similar matched points of the orbits  Superior basic line (SBL) is drawn parallel to the OOL through the tip of the most superior occipital condyle  Inferior basic line (IBL) is drawn through the inferior tips of the lateral masses  Vertical median line (ViML) is drawn perpendicular to the OOL and through the center of the foramen magnum  The distances between the inferior lateral tip of each lateral mass and the VML should be equal.  The atlas is lateral toward the side of the greater measurement when the distances between the lateral inferior tip of each lateral mass and the VML are not equal  In addition, the SBL and IBL lines are thought to converge to the side of atlas laterality 70% of the time Atlas rotation  On a cervical film whose projection is directed vertical to the atlas (base posterior)  Two lines are constructed
  • 16.
    Transverse atlas line (TAL) is drawn through the transverse foramen bilaterally  Perpendicular skull line (PSL) is drawn through points representing the centers of the nasal septum and the basal process of the occiput  The angle of intersection of the two lines should be approximately 90 degrees.  The atlas is rotated posteriorly on the side of the larger angle created by the intersection of the PSL and TAL.  In addition, 70% of the time the atlas is posteriorly rotated to the side of the diverging superior basic line (SBL) and inferior basic line (IBL) on the frontal open mouth projection. ATLAS MALPOSITION Frontal open-mouth projection  Four lines are constructed  Ocular orbit line (OOL) is drawn through a set of similar points of the orbit  Superior basic line (SBL) is drawn bilaterally through the jugular processes  Inferior basic line (IBL) is drawn through the lateral inferior tip of both lateral masses  Vertical median line (VML) is drawn perpendicular to the OOL through the center of the foramen magnum  VML should approximate the center of the odontoid process base  If the VML does not bisect the odontoid, the axis is laterally malpositioned to the side opposite the VML.  In addition, the center of the odontoid process base is compared with the center of the spinous process to assess for possible spinous deviation.  The direction and magnitude of spinous process lateral malposition may be different from the lateral malposition of the axis body (i.e., the body of the axis may be exhibit right laterality with left spinous deviation).
  • 17.
    Cobb’s Method ofScoliosis Evaluation Cobb-Lippman method  Projection: AP spine. End vertebrae  Last segment that contributes to the spinal curvature.  Extreme ends of the scoliosis, where the endplates tilt to the side of the curvature concavity Endplate lines  On the superior end vertebra, a line is drawn through and parallel to the superior endplate  On the inferior end vertebra, a line is constructed in a similar manner through and parallel to the inferior endplate  This is the preferred method in scoliosis assessment  In patients with double scoliotic curves each component should be measured.  5° progression of a scoliosis between two successive radiographs is considered significant   Curvatures < 20° - No bracing or surgical intervention  Patient between 10 and 15 years of age, careful monitoring should be implemented to assess for progression of 5° or more in any 3-month period.  Curves between 20° and 40° - Bracing / Surgical intervention  Curvature progression in an immature spine, or curvature in excess of 40° - Surgical intervention Risser-Ferguson Method of Scoliosis Evaluation AP spine.  Apical vertebra  Most laterally placed segment in the curve Vertebral body center  For each end vertebra and apical segment diagonals are drawn from opposing corners of the body to locate the body center  Connecting line
  • 18.
    Two lines are constructed connecting the body centers of the apical segment with each end vertebra, and the resultant angle is measured  This method gives values approximately 25% lower than those of Cobb’s method (10°)  Advocated its use for larger curves Coupled spinal motion sign  Spinal motion is not pure and occurs in directions other than the primary direction of movement  For example, on frontal cervical, thoracic, or lumbar lateral bending projections, the lateral tilting of each vertebra is accompanied by concurrent vertebral rotation  In the cervical and upper thoracic region the spinous processes rotate to the convexity of the curve  In the lumbar and lower thoracic region the spinous processes rotate to the concavity of the curve  The amount of coupled motion may be small and therefore radiographically imperceptible.  Alteration of the normal coupled motion occurs with aberrant intersegmental mechanics, muscle spasm, and vertebral fusion Interpedicular Distance  Coronal dimension of the spinal canal  Projection: AP cervical spine, thoracic spine, and lumbar spine.  The shortest distance between the inner convex cortical surfaces of the opposing segmental pedicles is measured Spinal Level Maximum (mm) Cervical spine 30 Thoracic spine 20 L1 TO L3 25 L4, L5 30
  • 19.
    This is a useful measurement applied in the evaluation of spinal stenosis, congenital malformation, and intraspinal neoplasms  The maximum interpediculate distance may be increased as a result of pedicular erosion from an expanding spinal cord tumor (Elseberg-Dyke sign) Thoracic Cage Dimension Straight back syndrome evaluation  Projection: Lateral chest.  The distance between the posterior sternum and the anterior surface of the T8 body is measured Normal Sagittal Dimensions of the Thoracic Cage Sex Average (cm) Minimum (cm) Maximum (cm) Male 14 11 18 Female 12 9 15 Sagittal Dimensions of the Thoracic Cage in Straight Back Syndrome Sex Average (cm) Minimum (cm) Maximum (cm) Male 11 9 13 Female 10 8 11 Thoracic Kyphosis Lateral thoracic spine  A line is drawn parallel to and through the superior endplate of the T1 body  A similar line is drawn through the inferior endplate of the T12 body.  Perpendicular lines to these endplate lines are then constructed  Intersecting angle is measured
  • 20.
    Physiologic anterior vertebral body wedging accounts for the natural kyphotic curvature of the thoracic spine  Normal anterior wedging for each vertebral body is 4-5° or 2-3 mm  The wedging increases by almost 1 mm for each successive level, with approximately 45° of thoracic kyphosis accounted for by this wedging  Increased kyphosis  Old age  Osteoporosis  Scheuermann’s disease  Congenital anomalies  Muscular paralysis  Cystic fibrosis  Reduction in kyphosis  straight back syndrome Lumbar Intervertebral Disc Angles  Lines are drawn through and parallel to each lumbar body endplate  The lines are extended posteriorly until they intersect  Intersecting angle is measured Normal Values for Lumbar Intervertebral Disc Angles Disc Level Average Angle (°) L1 8 L2 10 L3 12 L4 14 L5 14 Mean angle alteration Antalgia Muscular imbalance
  • 21.
    Improper posture Facet syndrome- Increased Angle Acute discal injuries - Decreased Angle Lumbar Intervertebral Disc Height Lateral lumbar spine  Visual assessment  Disc height compared with the adjacent levels  Past experience Hurxthal’s method  The distance between the opposing endplates at the midpoint between the anterior and the posterior vertebral body margins is measured. Farfan’s method  Anterior disc height (A) & posterior disc height (P) are measured and expressed as a ratio to disc diameter (D)  These two ratios are then reduced to a ratio of each other Lumbar spine - normal disc ratios increase LI 0.17 L2 0.18 L3 0.20 L4 0.25 L5 0.28  When segmental rotation is > 40° or lateral flexion is > 20°, these methods become unreliable.  Decreased disc height  Disc degeneration  Post surgery  Post chemonucleolysis  Infection  Congenital hypoplasia
  • 22.
    Hadley’s S Curve Lumbar facet curve  Projection: Oblique, AP lumbar spine  Curvilinear line is constructed along the inferior margin of the transverse process and down along the inferior articular process to the apophyseal joint space  Line is then continued across the articulation to connect with the outer edge of the opposing superior articular process  The resultant configuration of this line will look like the letter S  The key region of the S is the normally smooth transition across the joint space  Abrupt interruption in the smooth contour of this line may indicate facet imbrication (subluxation) Lumbar Gravity Line  The center of the L3 body is located by intersecting diagonals from opposing body corners  A vertical line is constructed through center point  Relationship to the upper sacrum is assessed  Center of gravity of the trunk passes through the center of the L3 body and continues vertically to intersect the sacral base  Normally the vertical line will pass through the anterior third of the sacral base.  If this line passes anterior to the sacrum by > 0.5 inch (> 10 mm), an increase in shearing stresses in an anterior direction between the lumbosacral apophyseal joints may be occurring.  Conversely, it has been suggested that a posterior shift in this gravity line may indicate increased weight bearing forces on these same lumbosacral joints that may also be active in the production of low back pain
  • 23.
    Van Akkerveeken’s Measurement of Lumbar Instability  Projection: Lateral lumbar spine (neutral, flexion, extension).  Two lines are drawn through and parallel to opposing segmental endplates until they intersect posteriorly.  The distance from the posterior body margins to the point of intersection is then measured.  Alternatively, the displacement can be assessed by measuring the offset in the opposing body corners Normal Measurements  There should be < 1.5 mm displacement, as determined by either measurement method  If there is > 1.5 mm (3mm) difference in measurement, then it is likely that nuclear, annular, and posterior ligament damage at the displaced segment is present Lumbar Lordosis  Lumbar curve, lumbar spinal angle, lumbar angle  Projection: Lateral lumbar spine.  Line is drawn through and parallel to the superior endplate of the first lumbar segment  Second line is drawn through the superior endplate of the first sacral segment  Perpendiculars are then created, and the angle at their intersection is measured  A wide variation exists within normal individuals.  The average appears to be 50-60°
  • 24.
    Lumbar spinal canal Eisenstein'smethod Lateral lumbar projection  Line is drawn connecting the tips of the superior and inferior articular processes of the same segment  The canal width (x) is expressed as the distance from the posterior body margin to the middle portion of the facet line  The canal dimension should not fall below 15 mm (although some use 14 mm or 12 mm as the cutoff)  Smaller measurements may indicate spinal stenosis  Spinal stenosis is more accurately assessed on axial MRI and CT images RATIO METHOD Frontal lumbar projection  Interpedicular distance is multiplied by sagittal width  Coronal width of the vertebrae is multiplied by the sagittal width  The product of the two canal measures is divided by the product of the two vertebral measures, expressing the canal size as a ratio of the vertebral body  In the lumbar spine, the canal ratio should not fall below 1:3 Meyerding’s Grading Method in Spondylolisthesis  The superior surface of the first sacral segment is divided into four equal divisions. The relative position of the posterior inferior corner of the L5 body to these segments is then made
  • 25.
    The posterior inferior corner of the L5 body should be aligned with the posterior-superior corner of the first sacral segment.  The same assessment can be applied to other spinal levels by dividing the superior endplate of the segment below the spondylolisthesis into four equal spaces.  In spondylolisthesis, > 12° dynamic angulation or 8% translation on flexion- extension views is considered evidence of instability  The degree of anterolisthesis of the affected vertebral body can be categorized according to the division in which the posterior-inferior corner of the body lies Grade 1 The posterior-inferior corner is aligned within the first division Grade 2 The posterior-inferior corner is aligned within the second division Grade 3 The posterior-inferior corner is aligned within the third division Grade 4 The posterior-inferior corner is aligned within the fourth division  If the vertebral body has completely slipped beyond the sacral promontory, the condition is called spondyloptosis Lumbosacral Angle Two lines  First, a horizontal line is made parallel to the bottom edge of the film  Second, an oblique line is drawn through and parallel to the sacral base. Normal Values for Lumbosacral Angle Position Average Standard Minimum Maximum (°) Deviation (°) (°) Upright 41 ±7 26 57
  • 26.
    Sacral angle /Barge's angle  The angle of the superior margin of the sacrum from the horizontal plane, measured in the sagittal plane  lumbar lordosis increased if the sacral angle increased Ullmann’s Line  Garland-Thomas line, right-angle test line  Projection: Lateral lumbar spine, lumbosacral  Parallel to and through the sacral base  Perpendicular to the first line at the anterior margin of the sacral base. The relationship of the L5 body to this perpendicular line is then assessed  Anterior margin of the L5 body crosses the perpendicular line, Anterolisthesis  This is a useful line for detecting the presence of spondylolisthesis when there is poor visualization of the pars region
  • 27.
    Upper Extremity Measurements Acromioclavicular joint space  AP or posteroanterior (PA) shoulder.  The joint space is measured at the superior (S) and inferior (I) borders, and the two values are averaged Normal Values for Acromioclavicular Joint Space Sex Average (mm) Minimum (mm) Maximum (mm) Male 3.3 2.5 4.1 Female 2.9 2.1 3.7  Decreased joint space  Degenerative joint disease  Increased joint space  Traumatic separation  Hyperparathyroidism  Rheumatoid arthritis Acromiohumeral joint space  AP shoulder.  The distance between the inferior surface of the acromion and the articular cortex of the humeral head is measured Normal Values for Acromiohumeral Joint Space Average Minimum Maximum (mm) (mm) (mm) 9 7 11 Narrowed space (<7mm) Superior shoulder displacement, which is often secondary to shoulder impingement syndrome with rotator cuff tendonopathy. Enlarged space (>11mm) Dislocation Joint effusion Paralysis
  • 28.
    Brachial plexus lesions(drooping shoulder) Glenohumeral joint space  AP shoulder with external rotation.  The measurements are made at the superior, middle, and inferior aspects of the joint.  These are combined and averaged.  Each distance is ascertained between the opposing articular surfaces  The average joint space is 4-5 mm  Joint space diminished  Degenerative arthritis,  Calcium pyrophosphate dihydrate (CPPD) crystal disease  Post-traumatic arthritis.  Widened space  Acromegaly  Posterior humeral dislocation. Axial Relationships of the Shoulder  Humeral axial angle  AP shoulder with external rotation.  Humeral shaft line (A). A line is drawn through and parallel to the humeral shaft.  The average humeral angles are 60° for males and 62° for females  This relationship may be altered following a fracture, especially in the surgical neck.
  • 29.
    Elbow - Anteriorhumeral line  On the lateral elbow projection a line drawn along the anterior surface of the humerus should intersect the middle third of the lateral condylar ossific center.   If the line passes anterior or posterior to the middle third of the lateral condyle, a fracture may be present Radiocapitellar Line Radiocarpal line Lateral elbow.  A line is drawn through the center of and parallel to the long axis of the radius and is extended through the elbow joint.  This line should pass through the center of the capitellum in all stages of flexion of the elbow  This assists in determining the presence of radial head subluxation (pulled elbow) or dislocation Axial Relationships of the Wrist PA and lateral wrist.  Radioulnar articular line (A). A tangential line is drawn from the tip of the radial styloid to the base of the ulnar styloid.  Radial shaft line (B). A line is drawn through and parallel to the shaft of the radius.  Radioulnar angle (I). The ulnar side angle between the two lines is measured.
  • 30.
    Normal Values forAxial Relationships of the Wrist Angle Average (°) Minimum (°) Maximum (°) PA radioulnar 83 72 95 Lateral radius 86 79 94 These lines and constructed angles aid in the assessment of radioulnar deformities, especially those caused by displaced fractures Hand - Capitolunate sign  On the lateral wrist projection, lines are drawn to approximate the long axes of the lunate and capitate.  Assessment assists in determining the presence of fracture or dislocation. Scapholunate angle (scaphoid tilt)  On the lateral wrist projection, lines are drawn to approximate the long axes of the scaphoid and lunate.  If the angle is greater than 80 and the lunate is also extended (dorsiflexed), dorsal intercalated segmental instability (DISI) is suggested. Metacarpal Sign PA hand
  • 31.
    A line is drawn tangentially through the articular cortex of the fourth and fifth metacarpal heads  The line should pass distal to or just touch the third metacarpal head Postive in  Turner’s syndrome  Fracture deformity  Pseudo/ pseudo-pseudo hypoparathyroidism Metacarpal index  Determined by dividing the length of each of the last four metacarpals by the width of its midpoint and averaging the values  Marfan's patients are often grater than 8.4, while normals are less than 8. Method 2  The outer and inner diameters of the metacarpal bone is measured, as shown below. From these measurements, the Combined Cortical Thickness (CCT) and the Metacarpal Index (MCI) are easily calculated  CCT = L1 - L2  MCI = CCT / L1 Radiolunate angle (lunate tilt)  On the lateral wrist projection, lines drawn to approximate the long axes of the radius and lunate should be parallel.   If the lunate is flexed more than 15 degrees, volar intercalated segment instability (VISI) is suggested.
  • 32.
    If the angle is greater than 10 degrees in extension, dorsal intercalated segment instability (DISI) is suggested.  Occasionally VISI and usually DISI occur with scapholunate dissociation VISI is also related to triquetrolunate dissociation Radioulnar variance  On the anteroposterior wrist projection, the distal ulnar articular surface should align with the inner portion of the distal radial articular surface.  Short ulna  Avascular necrosis of the lunate (Kienbock's disease)  Greater carpal stress distribution to the radius  Long ulna  Greater carpal stress distribution to the ulna.  Differences of less than 5 mm are probably not significant. Teardrop Distance Medial joint space of hip.  The distance between the most medial margin of the femoral head and the outer cortex of the pelvic teardrop is measured ABNORMAL MEASUREMENT • >11 mm or • > 2 mm discrepancy from right to left (Waldenstrom’s sign) Normal Values for Teardrop Distance Average Minimum Maximum (mm) (mm) (mm) 9 6 11  Left to right discrepancies of > 1 mm will be present in 90% of hip joint effusions.  Legg-Calve-Perthes disease  Septic arthritis  Other inflammatory diseases.
  • 33.
    Hip Joint SpaceWidth  Three measurements are made of the joint cavity  Superior joint space: Space between the most superior point on the convex articular surface of the femur and adjacent acetabular cortex.  Axial joint space: Space between the femoral head and acetabulum immediately lateral to the acetabular notch.  Medial joint space (teardrop distance): Space between the most medial surface of the femoral head and opposing acetabular surface Normal Values for Hip Joint Space Width Space Average (mm) Minimum (mm) Maximum (mm) Superior 4 3 6 Axial 4 3 7 Medial 8 4 13  The superior and axial compartments are approximately equal (4 mm), The medial space is twice the distance (8 mm)  Superior joint space Reduction  Degenerative joint disease  Axial joint space  Degenerative arthritis  Inflammatory arthritis (RA)  Medial joint space  Degenerative or inflammatory arthritis Acetabular Depth  A line is drawn from the superior margin of the pubis at the symphysis joint to the upper outer acetabular margin.
  • 34.
    Normal Values forAcetabular Depth  The greatest distance Space Average (mm) Minimum Maximum from this line to the (mm) (mm) acetabular floor is Male 13 7 18 measured Female 12 9 18  An acetabular depth < 9 mm in females and < 7 mm in males is considered to be shallow and dysplastic, which may be a factor in precipitating degenerative joint disease of the hip. Acetabular center-edge angle CE angle, CE angle of Wiberg.  A vertical line is drawn through the center point of the femoral head.  Another line is constructed through the femoral head center to the outer upper acetabular margin. Normal Values for Center-Edge Angle  The angle formed is then Average (°) Minimum (°) Maximum (°) measured. 36 20 40  Shallow angle  Acetabular dysplasia  degenerative joint disease.  It provides a measure of coverage of the femoral head, which means the amount of the acetabulum primarily concerned with weight bearing Symphysis Pubis Width  The measured distance is between the opposing articular surfaces, halfway Normal Values for Symphysis Pubis Width Sex Average (mm) Minimum (mm) Maximum (mm) Male 6 4.8 7.2 Female 5 3.8 6
  • 35.
    between the superiorand inferior margins of the joint Widening of the symphysis cleidocranial dysplasia, bladder exostrophy Hyperparathyroidism Normal Values for Acetabular Angle in 1-Year- post-traumatic diastasis Old inflammatory resorption Average (°) Minimum Maximum ankylosing spondylitis (°) (°) osteitis pubis 20 12 29 gout Presacral Space Retrorectal space  The gray soft tissue density located between the anterior surface of the sacrum and the posterior wall of the rectum is assessed  The most consistent measurement was obtained at the level opposite the S3-S4 disc space An increase Normal Values for Presacral Space measurement sacral destruction Age Average Minimum Maximum Tumor (mm) (mm) (mm) Children (1- 3 1 5 infection 15 years) sacral fracture and Adults 7 2 20 associated hematoma inflammatory bowel disease (in which there is thickening of the intestinal wall). Acetabular Angle
  • 36.
    A transverse line is drawn through the right and left triradiate cartilages at the pelvic rim  A second oblique line connecting the lateral and medial acetabular surfaces is then constructed  The angle of intersection is measured  Increased acetabular angle  acetabular dysplasia  congenital hip dislocation  Decreased acetabular angle  Down’s syndrome. Acetabular index  Horizontal line is drawn through the right and left triradiate cartilage (Hilgenreiner's Line).  Another line is drawn along each of the acetabuli to intersect the horizontal triradiate cartilage line  Dividing the hip into 4 quadrants.  The proximal medial femur should be in the lower medial quadrant, or the ossific nucleus of the femoral head, if present (usually observed in patients aged 4-7 month), should be in the lower medial quadrant.  The acetabular index is the angle between the Hilgenreiner line and a line drawn from the triradiate epiphysis to the lateral edge of the acetabulum.
  • 37.
    The angles of intersection (x°) should not exceed standards based on age:  @ Birth < 36 degrees in females, < 30 degrees in males;  6 months < 28 degrees in females, < 25 degrees in males;  1 year < 25 degrees in females, 24 degrees in males;  7 years < 19 degrees in females, < 18 degrees in males  Enlarged angle  Acetabular dysplasia  Congenital dislocation of the hip  Shallow angle - Down syndrome
  • 38.
    Iliac Angle andIndex  A line is drawn through the triradiate cartilage at the pelvic rim  A second line is constructed tangential to the most lateral margin of the iliac wing and iliac body  Iliac index: This is the sum of both the iliac angles and the acetabular angles divided by 2.  The iliac index is most useful in the determination of Down’s syndrome.  When the index is < 60, Down’s syndrome is probable; when the index is 60-68, the syndrome is possible; if > 68, the syndrome is unlikely Normal Values for Iliac Angle Age Average (°) Minimum (°) Maximum (°) 0-3 months 44 35 58 3-12 months 55 43 67 Normal Values for Iliac Index Age Average (°) Minimum (°) Maximum (°) 0-3 months 60 48 87 3-12 months 81 68 97
  • 39.
    Measurements of ProtrusioAcetabuli Köhler’s Line  A line is constructed tangentially to the cortical margin of the pelvic inlet and outer border of the obturator foramen.  The relationship of the acetabular floor to this line is assessed  The acetabular floor should not cross this line and usually lies laterally to it.  If the acetabular floor crosses the line, then protrusio acetabuli is present.  The most common causes  Idiopathic form  Rheumatoid arthritis  Paget’s disease  Ankylosing spondylitis Shenton’s Line Makka’s line, Menard’s line.  A curvilinear line is constructed along the undersurface of the femoral neck and is continued across the joint to the inferior margin of the superior pubic ramus.  The constructed line should be smooth, especially in the transition zone between the femoral neck and superior pubic ramus.  Occasionally, a small portion of the inferior femoral head may just cross the line  Interrupted, discontinuous in  Hip dislocation,  Femoral neck fracture  Slipped femoral capital epiphysis.
  • 40.
    Iliofemoral Line  A curvilinear line is constructed along the outer surface of the ilium, across the joint, and onto the femoral neck  A small portion of the superior femoral head may cause a slight convexity in the line.  The most important normal feature is that the line should be bilaterally symmetrical.  A discrepancy in symmetry may be the result of congenital dysplasia, slipped femoral capital epiphysis, dislocation, or fracture Femoral Angle  Femoral angle of incidence, femoral neck angle, Mikulicz’s angle.  Two lines are drawn through and parallel to the midaxis of the femoral shaft and femoral neck.  The angle subtended is then measured.
  • 41.
    Skinner’s Line  A line is drawn through and parallel to the axis of the femoral shaft.  A second line is constructed at right angles to the shaft line and tangential to the tip of the greater trochanter.  The relationship of the fovea capitis to this trochanteric line is assessed.  The fovea capitis should lie above or at the level of the trochanteric line.  The fovea lies below this line when there is a superior displacement of the femur relative to the femoral head.  The most common causes are fracture and conditions leading to coxa vara. Klein’s Line  A line is constructed tangential to the outer margin of the femoral neck.  The degree of overlap of the femoral head will be apparent.  Comparison should be made with the opposite side  Generally there will be the same degree of overlap of the femoral head  In most normal hips the outer margin of the femoral head will be lateral to the line.  This line can be drawn on both the AP and frog-leg projections  If the femoral head does not overlap the line or if there is asymmetry from side to side, then slippage of the femoral capital epiphysis should be suspected. Pelvic misalignment Innominate rotation  On the weight- bearing frontal pelvic projection  Femoral head line (FHL) is drawn along the superior margins of the femoral heads bilaterally.
  • 42.
    A perpendicular line from the FHL is constructed to intersect the second sacral tubercle and should pass through the center of the pubic symphysis when extended interiorly.  If the perpendicular line intersects the pubic bone instead of the symphysis, the innominate is externally rotated on the side the line crosses through. The innominate on the opposite side is internally rotated.  Rotation can be double-checked by measuring the width of the ilium (a) and the obturator foramen (b).  External rotation of the innominate, using the posterior superior iliac spine (PSIS) as a reference point, is accompanied by a narrower ilium width and a wider obturator foramen on the ipsilateral side. Internal rotation is associated with a wider ilium and narrower obturator width ipsilaterally.  Innominate flexion-extension. On the weight-bearing frontal pelvic projection, the distance from the top of the iliac crest to the inferior margin of the ischial tuberosity should be bilaterally similar  Sacrum rotation. On the weight-bearing frontal pelvic projection, the distances from the lateral margins of the sacrum to the second sacral tubercle (c and d) are measured parallel to the FHL and should be similar.  Leg length inequality. On the frontal weight bearing pelvic projection, a line is drawn parallel to the lower margin of the film to the superior margin of the highest femoral head.  The line should approximate both femoral heads if the legs are of equal length  The vertical measurement of the innominate is larger on the flexed side (PSIS has moved posterior and inferior) and smaller on the extended side (the PSIS has moved anterior and superior).  The sacrum is rotated posteriorly on the wider side and anteriorly on the narrower side.  If the line constructed parallel to the bottom of the film does not approximate the femoral heads bilaterally, the line is drawn to the higher femoral head, and the distance from the line to the lower femoral head estimates the measured leg length deficiency.  Flexed (PI) or externally rotated (EX) innominate will decrease the leg length discrepancy when the innominate misalignment is corrected on the ipsilateral side of the short leg. In other words, correction of flexed or externally rotated innominate raises the ipsilateral femoral head
  • 43.
    Conversely, an extended (AS) or internally (IN) rotated innominate will increase the leg length discrepancy when corrected on the ipsilateral side of the short leg. The opposite will be noted if the short leg is on the contralateral side of the innominate misalignment. Axial Relationships of the Knee AP knee.  Four lines and two angles are drawn  Femoral shaft line (A). A line is drawn through and parallel to the midaxis of the femoral shaft.  Tibial shaft line (B). A line is drawn through and parallel to the midaxis of the tibial shaft.  Femoral condyle line (C). A line is drawn through and tangential to the articular surfaces of the condyles  Tibial plateau line (D). A line is drawn through the medial and lateral tibial plateau margins  Femoral angle (FA). This is the angle formed between the femoral shaft and femoral condyle lines. Tibial angle (TA). This is the angle formed between the tibial shaft and tibial plateau lines Normal Values for Axial Relationships of the Knee Angle Average (°) Minimum (°) Maximum (°) Femoral 81 75 85 Tibial 93 85 100 Significance. These angles will be altered in fractures and other deformities about the knee.
  • 44.
    Patellar Position Patella altaevaluation Lateral knee (semiflexed)  Patellar length (PL). This is the greatest diagonal dimension between the superior and the inferior poles.  Patellar tendon length (PT). The distance measured is between the insertion points of the posterior tendon surface at the inferior patellar pole and the notch at the tibial tubercle.  Normal Measurements.  Patellar length and patellar tendon length are usually equal to each other.  A normal variation up to 20%  > 20% - patella alta • chondromalacia patellae.  A low-riding patella (patella baja)  Polio  Achondroplasia  juvenile rheumatoid arthritis  tibial tubercle transposition Patellar Malalignment Patellar tracking, patellar subluxation, patellofemoral joint incongruence. Tangential knee (skyline)  Patella apex The patella is centered when its apex is directly above the
  • 45.
    deepest section ofthe intercondylar sulcus.  Sulcus angle By drawing lines from the highest points on the medial and lateral condyles to the lowest point of the intercondylar sulcus, an angle is formed.  Normally, this should be 138° ± 6°. Larger angles (shallow intercondylar groove) predispose the individual to subluxation and dislocation.  Lateral patellofemoral joint index: The narrowest medial joint space measurement is divided by the narrowest lateral joint space measurement.  This index is normally ≤ 1.0. A value > 1.0 is noted in patients with chondromalacia patellae.  Lateral patellofemoral angle. A line tangential to the femoral condyles is intersected by a line joining the limits of the lateral facet.  The angle is normally open.  In patellar subluxation these lines are parallel or open medially.  Significance.  The combined use of these measurements may reveal contributing causes to patellofemoral joint pain syndromes and instability
  • 46.
    Axial Relationships ofthe Ankle Four lines and two angles are constructed.  Tibial shaft line (A). A line is drawn through and parallel to the tibial shaft.  Medial malleolus line (B). A line is drawn tangential to the articular surface of the medial malleolus.  Lateral malleolus line (C). A line is drawn tangential to the articular surface of the lateral malleolus.  Talus line (D). A line is drawn tangential to the articular surface of the talar dome.  Tibial angle (I). The angle is formed medially between the medial malleolus line and talus line. Fibular angle (II). The angle is formed laterally between the lateral malleolus line and talus line Normal Values for Axial Relationships of the Ankle Angle Average Minimum Maximum (°) (°) (°) Tibial (I) 53 45 65 Fibular (II) 52 43 63  Significance.  These angles will be altered in fractures of the malleoli, ankle mortise instability, and tibiotalar slant deformities.  The tibiotalar joint space is measured at the lateral and medial joint margins.  This should be done on varus-valgus stress studies, on which there should not be > 3 mm difference between the normal and injured sides.  Talar tilt is assessed by drawing a line tangential to the talar dome and another line along the adjacent tibial surface.  In the neutral position, an angle > 6° indicates significant ligamentous injury.  On valgus-varus stress views, the normal range is 5-23°.
  • 47.
    A difference between right and left of > 10° also indicates significant ligamentous damage.  An anterior drawer of 4 mm is another indicator of instability. Boehler’s Angle Axial relationships of the calcaneus, tuber angle.  Lateral foot, lateral calcaneus.  The three highest points on the superior surface of the calcaneus are connected with two tangential lines.  The angle formed posteriorly is then assessed  Normal Measurements.  The angle formed posteriorly averages between 30° and 35° in most normal subjects but may range between 28° and 40°.  Any angle < 28° is abnormal.  The most common cause for an angle < 28° is a fracture with displacement through the calcaneus.  Dysplastic development of the calcaneus may also disturb the angle. Heel Pad Measurement Two lines are drawn  First line connecting the superior tuborosity to superior most point of anterior process of calcaneum
  • 48.
    Parallel to above line touching plantar surface of calcaneum  Shortest perpendicular distance to second line is measured Normal Values for Heel Pad Measurement Sex Average Maximum (mm) (mm) Male 19 25 Female 19 23 • Increased in • Obesity • myxedema • Acromegaly • Local inflammation First metatarsal angle  On the anteroposterior foot projection, lines drawn to approximate the long axes of the first metatarsal and proximal first phalanx should form an angle (x°) of less than 15 degrees.  An increased angle indicates a hallux valgus deformity. Meary's angle  On the lateral foot projection, lines drawn to approximate the longitudinal axis of the first metatarsal and talus should be parallel  If the lines are not parallel and form an angle that is greater than 0 degrees, forefoot cavus deformity is indicated.
  • 49.
    Calcaneal pitch  A line is drawn from the plantar most surface of the calcaneus to the inferior border of the distal articular surface.  The angle made between this line and the transverse plane (or the line from the plantar surface of the calcaneus to the inferior surface of the 5th metatarsal head) is the calcaneal pitch.  A decreased calcaneal pitch is consistent with pes planus.  Unfortunately, there have been differing opinions between authors concerning the normal range of calcaneal pitch 18 to 20°is generally considered normal (12), although measurements ranging from 17 to 32° have been reported to be normal
  • 50.
    Lateral Talocalcaneal Angle  The lateral talocalcaneal angle is the angle formed by the intersection of the line bisecting the talus with the line along the axis of the calcaneus on lateral weight bearing views. A line is drawn at the plantar border of the calcaneus (or a line can be drawn bisecting the long axis of the calcaneus).  The other line is drawn through two midpoints in the talus, one at the body and one at the neck. The angle is formed by the intersection of these axes.  The normal range is 25-45 degrees.  An angle over 45 degrees indicates hindfoot valgus, a component of pes planus Kite's angle  AP talocalcaneal angle  Angle formed by the longitudinal axis of the Calcaneus and the Talus  Kite Angle < 15° : Tendency to supine rearfoot  15° < Kite Angle < 25° : Normality range  Kite Angle > 25°: Tendency to prone rearfoot REFERENCE  CLINICAL IMAGING – Dennis M.Marchiori  Essentials of Skeletal Radiology 3rd Edition - Terry R. Yochum B.S., D.C., D.A.C.B.R., F.C.C.R. (C), F.I.C.C., Fellow, A.C.C.R