Review in SPM
Shanmugapriya.P,AP/KEC
Review:
• Review is a very effective technique to remove defects from all work
products including code.
• Cost-effective.
• Utility of Review:
• To identify any deviation from standards, including issues that affect
maintenance software.
• To improve the work product such as using algorithms that are more
time or space efficient.
• Review meeting provides learning opportunities
• Good understanding of the work product.
Candidate work products for review
• Requirement specification documents.
• User interface specification and design documents.
• Architectural, high-level and detailed design documents.
• Test plan and designed test cases.
• Project mgmt plan and configuration mgmt plan.
Review Roles
• Roles are moderator, recorder and reviewers.
• Moderator-plays key role
• Responsibilities of moderator-scheduling, convening meetings, distributing
review materials, leading , moderating review sessions, ensuring that the
defects are tracked to closure.
• Role of recorder- record the defects found, time, and effort data.
• Reviewers- review the work product and give suggestions to the author
about existing defects and point put ways to improve work product.
Review Process
• Four Important activities:
• Planning
• Review Preparation
• Review Meeting
• Rework and Follow-up
• Planning:
• Project mngr-nominates a moderator once product is ready for submission.
• Moderator-familiar to product
• Project mngr-nominates other members of the review team after conclusion
with moderator.
• Less than 3 members-effectiveness reduced
• Selected from the following types of project team members
• Author of preceding work product based on which work product under review
was developed.
• Member who would use the product under review
• Peers of author.
• Authors of products that would inreface with the product under review
• Preparation:
• To initiate the review process moderator convenes a brief preparation
meeting.
• Copies of product are distributed to review tms
• Author presents the overview of product.
• Moderator-highlights the objectives of the review.
• Reviewers individually carry out review and record their observations in
separate documents called review logs.
• Review Meeting:
• Reviewer’s give their comments based on the logs they have prepared
beforehand.
• Author respond to the comments.
• Moderator ensures that the discussions remain focused and productive.
Rework:
• Author –addresses all issues raised by the reviewers by carrying out the
necessary modifications to work product.
• Rejoinder-records the exact ways in which the comments have been
discussed.
• In final brief meeting, the review team members check whether all the
issues scribed in review log have been resolved.
• At the end of this meeting, final summary report of the review is prepared.
• Data Collection:
• data representing the results of the meetings is properly recorded, it can get
lost.
• In addition to all the issues, data about the time spent by the reviewers in the
review activity must also be captured.
• Different types of reports
• Review preparation log-each reviewers prepares a review preparation log.
• Data about he/she observes, their locations, their criticality and the total time
spent in doing review of the work product.
• Review log-Only those defects that are agreed by the author are logged.
• Review summary report- summarizes the review data and presents an overall
picture of the review.
• Contains information regarding the total defects and the amount of time spent
on each of the review process activities.

More Related Content

Similar to Review.pptx

Tester performance evaluation
Tester performance evaluationTester performance evaluation
Tester performance evaluation
gaoliang641
 
Software Quality Assurance - Software Engineering
Software Quality Assurance - Software EngineeringSoftware Quality Assurance - Software Engineering
Software Quality Assurance - Software Engineering
Purvik Rana
 
E success client-software-development
E success client-software-developmentE success client-software-development
E success client-software-development
Riyaan Sharma
 
project review.pptx
project review.pptxproject review.pptx
project review.pptx
ANANDChavan56
 
project review.pptx
project review.pptxproject review.pptx
project review.pptx
ANANDChavan56
 
Software vjhghjjkhjkkkghhjhEngineering.pdf
Software vjhghjjkhjkkkghhjhEngineering.pdfSoftware vjhghjjkhjkkkghhjhEngineering.pdf
Software vjhghjjkhjkkkghhjhEngineering.pdf
avishekpradhan24
 
chapter 7.ppt
chapter 7.pptchapter 7.ppt
chapter 7.ppt
TesfahunAsmare1
 
Software quality assurance
Software quality assuranceSoftware quality assurance
Software quality assurance
Rizky Munggaran
 
Test Management.pptx
Test Management.pptxTest Management.pptx
Test Management.pptx
MAshok10
 
Bab 3
Bab 3Bab 3
Software Testing PPT.pptx
Software Testing PPT.pptxSoftware Testing PPT.pptx
Software Testing PPT.pptx
MirzaHammad12
 
DELPHI METHOD (COST ESTIMATION MODELT)
DELPHI METHOD (COST ESTIMATION MODELT)DELPHI METHOD (COST ESTIMATION MODELT)
DELPHI METHOD (COST ESTIMATION MODELT)
Arsalan Ghaffar
 
Seven deadly sins of software reviews
Seven deadly sins of software reviewsSeven deadly sins of software reviews
Seven deadly sins of software reviews
allle90
 
Static Testing
Static TestingStatic Testing
Static Testing
Dharita Chokshi
 
project review.pptx
project review.pptxproject review.pptx
project review.pptx
ANANDChavan56
 
Beginning auditor (1)
Beginning auditor (1)Beginning auditor (1)
Beginning auditor (1)
Idear S. Wanichkul
 
UNIT IV.ppt
UNIT IV.pptUNIT IV.ppt
UNIT IV.ppt
Varshini62
 
Static techniques
Static techniquesStatic techniques
Static techniques
Muhammad Khairil
 
softwareinspections
softwareinspectionssoftwareinspections
softwareinspections
Dorin Paunescu
 
Requirements engineering activities
Requirements engineering activitiesRequirements engineering activities
Requirements engineering activities
Syed Zaid Irshad
 

Similar to Review.pptx (20)

Tester performance evaluation
Tester performance evaluationTester performance evaluation
Tester performance evaluation
 
Software Quality Assurance - Software Engineering
Software Quality Assurance - Software EngineeringSoftware Quality Assurance - Software Engineering
Software Quality Assurance - Software Engineering
 
E success client-software-development
E success client-software-developmentE success client-software-development
E success client-software-development
 
project review.pptx
project review.pptxproject review.pptx
project review.pptx
 
project review.pptx
project review.pptxproject review.pptx
project review.pptx
 
Software vjhghjjkhjkkkghhjhEngineering.pdf
Software vjhghjjkhjkkkghhjhEngineering.pdfSoftware vjhghjjkhjkkkghhjhEngineering.pdf
Software vjhghjjkhjkkkghhjhEngineering.pdf
 
chapter 7.ppt
chapter 7.pptchapter 7.ppt
chapter 7.ppt
 
Software quality assurance
Software quality assuranceSoftware quality assurance
Software quality assurance
 
Test Management.pptx
Test Management.pptxTest Management.pptx
Test Management.pptx
 
Bab 3
Bab 3Bab 3
Bab 3
 
Software Testing PPT.pptx
Software Testing PPT.pptxSoftware Testing PPT.pptx
Software Testing PPT.pptx
 
DELPHI METHOD (COST ESTIMATION MODELT)
DELPHI METHOD (COST ESTIMATION MODELT)DELPHI METHOD (COST ESTIMATION MODELT)
DELPHI METHOD (COST ESTIMATION MODELT)
 
Seven deadly sins of software reviews
Seven deadly sins of software reviewsSeven deadly sins of software reviews
Seven deadly sins of software reviews
 
Static Testing
Static TestingStatic Testing
Static Testing
 
project review.pptx
project review.pptxproject review.pptx
project review.pptx
 
Beginning auditor (1)
Beginning auditor (1)Beginning auditor (1)
Beginning auditor (1)
 
UNIT IV.ppt
UNIT IV.pptUNIT IV.ppt
UNIT IV.ppt
 
Static techniques
Static techniquesStatic techniques
Static techniques
 
softwareinspections
softwareinspectionssoftwareinspections
softwareinspections
 
Requirements engineering activities
Requirements engineering activitiesRequirements engineering activities
Requirements engineering activities
 

More from ShanmugapriyaSenthil3

Visualizing Progress.pptx
Visualizing Progress.pptxVisualizing Progress.pptx
Visualizing Progress.pptx
ShanmugapriyaSenthil3
 
Software Configuration Management.pptx
Software Configuration Management.pptxSoftware Configuration Management.pptx
Software Configuration Management.pptx
ShanmugapriyaSenthil3
 
Risk Evaluation.pptx
Risk Evaluation.pptxRisk Evaluation.pptx
Risk Evaluation.pptx
ShanmugapriyaSenthil3
 
PROJECT PLANNING.pptx
PROJECT PLANNING.pptxPROJECT PLANNING.pptx
PROJECT PLANNING.pptx
ShanmugapriyaSenthil3
 
PROJECT PLANNING.pptx
PROJECT PLANNING.pptxPROJECT PLANNING.pptx
PROJECT PLANNING.pptx
ShanmugapriyaSenthil3
 
LDAP(In_Linux).pptx
LDAP(In_Linux).pptxLDAP(In_Linux).pptx
LDAP(In_Linux).pptx
ShanmugapriyaSenthil3
 
FTP(In_Linux).pptx
FTP(In_Linux).pptxFTP(In_Linux).pptx
FTP(In_Linux).pptx
ShanmugapriyaSenthil3
 
DNS(In_Linux).pptx
DNS(In_Linux).pptxDNS(In_Linux).pptx
DNS(In_Linux).pptx
ShanmugapriyaSenthil3
 
DHCP(In_Linux).pptx
DHCP(In_Linux).pptxDHCP(In_Linux).pptx
DHCP(In_Linux).pptx
ShanmugapriyaSenthil3
 
Syslog.pptx
Syslog.pptxSyslog.pptx
Boot_Loaders.pptx
Boot_Loaders.pptxBoot_Loaders.pptx
Boot_Loaders.pptx
ShanmugapriyaSenthil3
 

More from ShanmugapriyaSenthil3 (11)

Visualizing Progress.pptx
Visualizing Progress.pptxVisualizing Progress.pptx
Visualizing Progress.pptx
 
Software Configuration Management.pptx
Software Configuration Management.pptxSoftware Configuration Management.pptx
Software Configuration Management.pptx
 
Risk Evaluation.pptx
Risk Evaluation.pptxRisk Evaluation.pptx
Risk Evaluation.pptx
 
PROJECT PLANNING.pptx
PROJECT PLANNING.pptxPROJECT PLANNING.pptx
PROJECT PLANNING.pptx
 
PROJECT PLANNING.pptx
PROJECT PLANNING.pptxPROJECT PLANNING.pptx
PROJECT PLANNING.pptx
 
LDAP(In_Linux).pptx
LDAP(In_Linux).pptxLDAP(In_Linux).pptx
LDAP(In_Linux).pptx
 
FTP(In_Linux).pptx
FTP(In_Linux).pptxFTP(In_Linux).pptx
FTP(In_Linux).pptx
 
DNS(In_Linux).pptx
DNS(In_Linux).pptxDNS(In_Linux).pptx
DNS(In_Linux).pptx
 
DHCP(In_Linux).pptx
DHCP(In_Linux).pptxDHCP(In_Linux).pptx
DHCP(In_Linux).pptx
 
Syslog.pptx
Syslog.pptxSyslog.pptx
Syslog.pptx
 
Boot_Loaders.pptx
Boot_Loaders.pptxBoot_Loaders.pptx
Boot_Loaders.pptx
 

Recently uploaded

Bituminous road construction project based learning report
Bituminous road construction project based learning reportBituminous road construction project based learning report
Bituminous road construction project based learning report
CE19KaushlendraKumar
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
MadhavJungKarki
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
ijseajournal
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
vmspraneeth
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
wafawafa52
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
ijaia
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
TeluguBadi
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
Seetal Daas
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 
Power Electronics- AC -AC Converters.pptx
Power Electronics- AC -AC Converters.pptxPower Electronics- AC -AC Converters.pptx
Power Electronics- AC -AC Converters.pptx
Poornima D
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 

Recently uploaded (20)

Bituminous road construction project based learning report
Bituminous road construction project based learning reportBituminous road construction project based learning report
Bituminous road construction project based learning report
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 
Power Electronics- AC -AC Converters.pptx
Power Electronics- AC -AC Converters.pptxPower Electronics- AC -AC Converters.pptx
Power Electronics- AC -AC Converters.pptx
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 

Review.pptx

  • 2. Review: • Review is a very effective technique to remove defects from all work products including code. • Cost-effective. • Utility of Review: • To identify any deviation from standards, including issues that affect maintenance software. • To improve the work product such as using algorithms that are more time or space efficient. • Review meeting provides learning opportunities • Good understanding of the work product.
  • 3. Candidate work products for review • Requirement specification documents. • User interface specification and design documents. • Architectural, high-level and detailed design documents. • Test plan and designed test cases. • Project mgmt plan and configuration mgmt plan.
  • 4. Review Roles • Roles are moderator, recorder and reviewers. • Moderator-plays key role • Responsibilities of moderator-scheduling, convening meetings, distributing review materials, leading , moderating review sessions, ensuring that the defects are tracked to closure. • Role of recorder- record the defects found, time, and effort data. • Reviewers- review the work product and give suggestions to the author about existing defects and point put ways to improve work product.
  • 5. Review Process • Four Important activities: • Planning • Review Preparation • Review Meeting • Rework and Follow-up
  • 6. • Planning: • Project mngr-nominates a moderator once product is ready for submission. • Moderator-familiar to product • Project mngr-nominates other members of the review team after conclusion with moderator. • Less than 3 members-effectiveness reduced • Selected from the following types of project team members • Author of preceding work product based on which work product under review was developed. • Member who would use the product under review • Peers of author. • Authors of products that would inreface with the product under review
  • 7. • Preparation: • To initiate the review process moderator convenes a brief preparation meeting. • Copies of product are distributed to review tms • Author presents the overview of product. • Moderator-highlights the objectives of the review. • Reviewers individually carry out review and record their observations in separate documents called review logs.
  • 8. • Review Meeting: • Reviewer’s give their comments based on the logs they have prepared beforehand. • Author respond to the comments. • Moderator ensures that the discussions remain focused and productive. Rework: • Author –addresses all issues raised by the reviewers by carrying out the necessary modifications to work product. • Rejoinder-records the exact ways in which the comments have been discussed. • In final brief meeting, the review team members check whether all the issues scribed in review log have been resolved. • At the end of this meeting, final summary report of the review is prepared.
  • 9. • Data Collection: • data representing the results of the meetings is properly recorded, it can get lost. • In addition to all the issues, data about the time spent by the reviewers in the review activity must also be captured. • Different types of reports • Review preparation log-each reviewers prepares a review preparation log. • Data about he/she observes, their locations, their criticality and the total time spent in doing review of the work product. • Review log-Only those defects that are agreed by the author are logged. • Review summary report- summarizes the review data and presents an overall picture of the review. • Contains information regarding the total defects and the amount of time spent on each of the review process activities.