SlideShare a Scribd company logo
1 of 4
Santosh Shelake Contact
Tel : 9561111052
e-mail:
santosh.shelake@gmail.com
TITLE BE (INDUSTRIAL AND PRODUCTION) WITH 8+ YRS OF EXPERIENCE IN PROCESS
DESIGN/LEAN METHODOLOGIES
PROFESSIONAL EXPERIENCE
 A competent professional having 8+ years of domestic and overseas experience in Process
Planning, Industrial Engineering practices, Virtual manufacturing, Lean concepts and
Remanufacturing processes.
 Currently working in John Deere Technology Center as Sr. Manufacturing Engineer.
 Hands on experience of working on Assembly Process Planning, Tooling Identification &
Ergonomic validation for New Product Introduction Programs, Virtual Audits, Time
Standards, 3-D Factory Design & Layout Optimization using Visualisation Mock up, Vis-
Jack, Classic Jack, Factory Cad, Wplanner ( Based on MTM ), Dynamic Line balancing using
Simulation tool
 Proficient in Mistake Proofing, Lean tools like 5-S and Kaizen, Value stream mapping and wide
range of continuous improvement programs.
 End user in SAP Production planning module for John Deere Power System units.
 As an Industrial Engineering point of contact for the team, conduct methods audits for accurate
standards.
PROFESSIONAL TRAINING & SKILL SET
 Undergone John Deere Corporate driven Industrial Engineering Experts training.
 Undergone Lean Practitioners training-provided by BMGI. Completed 3 Lean projects for John
Deere Pune factory.
 Undergone Six Sigma Green Belt training.
Key skills
 Modeling : Pro-E, AutoCAD
 Simulation : Vis Mockup, Vis Pro, VisJack (Ergonomic Evaluation), Classic Jack (Advanced
Ergonomic Evaluation and Simulation) , ALiSS Simulation (Discrete event simulation), ICIDO,
Factory Flow
 Animation : Seemage
Education
2000 to 2004 BE in Industrial and Production Engineering - “First Class”
Gogte Institute of Technology (Visvesvaraya Technological University),
Karnataka
1999 to 2000 Pre-University (12th) - “First Class”
JA Junior College. Athani, Karnataka
Work Experience
John Deere India Pvt Ltd (Sept 2009 to till date)
Sr. Manufacturing Engineer.
Role :
 Have been performing the role of IE (Industrial Engineering) since Feb-12
 Providing EPDP (New Product Introduction program) support for Engines, axles and
Transmission factories.
 Making a sound project execution plan and allocating suitable resources.
 Developing Skill set required for the new process and identifying the trainings required for
resources.
 Line balancing & line design processes.
 Engineering Change Management for Engine assembly processes.
 Coordinating the project activities and drawing specifications with the plants to ensure
BOM is as per the specifications.
 To coordinate with inventory, logistics for proper consumption of BOM.
 Routing the BOM.
 Facilitating proto type builds by providing virtual build solutions (Animation, factory flow,
ergonomic analysis etc)
 Analyzing the need for the new assembly tools.
 Analyzing reach ability & assembly ability through E-build.
 Tracking team’s productivity & quality.
Major Projects Executed :
1. 944 Wheel loader’s final drive EPDP (Enterprise Product Development Program) :
Unit: Motores John Deere, Torreon, Mexico
Responsibilities:
 Designing of the process through GSOE (Graphical sequence of events),
 Conducting Virtual build sessions at various phases of the EPDP (NPI) process,
 Identifying the tooling requirement and coordinating with Tool design team to develop
required tools & fixtures
 Collaborating with Quality team and work on developing PFMEAs.
 Validate tools, fixtures, facilities and the factory equipment by means of animation.
 By means of Ergonomic analysis, provided solutions to improve working conditions &
safety,
 Make sure that Enterprise Industrial Engineering standards are followed by setting the
accurate labor standards using Enterprise process planning tool – Wplanner.
 Identifying VAs and NVAs and work on reducing them.
Major accomplishments: Most of the tools, fixtures & material handling equipment were
designed & implemented with minimum post design changes. Improvement areas (process,
tools, ergonomics etc) identified during lab build & proto build were well documented &
improvements were implemented before the physical build.
2. EPDP support for OX_large_axles:
Unit: Motores John Deere, Torreon, Mexico
Activities Process feasibility study for the new axle. Identified interferences with the
existing equipments (Press, drivers, lifting tools, test benches etc) for the new axle.
Completing GSOE, validating the process & tools through animation, Ergonomic analysis,
ALiSS Dynamic simulation, updating W-planner process planning, and Factory flow analysis.
3. Engineering Change Managemenr :
 Assembly Planning activities (ECM & VA) for engines used for Locomotives, Marine and
commercial purpose.
 Generating BOM routing in SAP.
 Creating alternate hierarchy in Vis mockup as an input for Graphical Sequence of Events
of Engine assembly.
 Line balancing & line design activities.
 Identifying the tooling, spare part packaging requirement for the new components &
defining the same.
 Suggesting factories to standardize parts & standardizing the torque used for different
hardware.
4. IE roles and responsibilities:
 In coordination with JDPS IE platform lead, prepared an action item on the IE scorecard to
bring all the factories up to the Deere standards.
 Have taken knowledge sharing sessions for the team, making them aware of common
mistakes that can happen while setting the time standards.
 Clear training plan for each individual team member for IE has been prepared & the
matrix being tracked.
 Participated in Enterprise level projects to improve the Standard Data Application process.
 Contributed in setting up JDTCI-Manufacturing Lab. Developin a training module for
Industrial Engineering, to be set up in the lab.
5. Remanufacturing:
Unit: John Deere Reman, Springfield, MO, USA.
Roles and responsibilities:
 Incoming core (Used parts) inspection method analysis.
 Evaluating current disassembly methodology and suggesting improved more efficient way
of disassembling.
 Identifying NVAs in Core treatment process after the disassembly (Cleaning, blasting,
baking etc)
 Identifying NVAs in Parts identification & storage process.
 Overview of inspections process.
 Analyzing the current methods in Machining & salvaging process and suggesting
improvements
 Auditing correctness of SAP BOM and its periodic maintenance.
 Creating Work Instruction for assemblers to ensure mistake proofing.
 Identifying tools and fixtures by benchmarking other John Deere factories.
 Implementing John Deere Industrial Engineering standards.
6. Engine test cell safety & productivity improvement project
 Using Lean tools, identified wastes in this area.
 Working on a breakthrough concept of match-plate which will address both safety and
productivity concerns.
 Using Industrial Engineering concepts, developed methods of rigging and de-rigging in our
Argentinian factory. Same thing will be benchmarked for other factories.
Department level activities at John Deere
 Member of Technology and Innovation Team- Currently working on Pune factory innovation
project.
 Part of a team which is working on setting up a state of art Manufacturing Lab for training
purpose.
 Part of Enterprise Industrial Engineering Experts team.
 Developed “IE Methods development” training module in JD R&D lab and I am a trainer for
this module.
MAHINDRA SATYAM BPO HYDERABAD (MAY-06 TO AUG-09)
Client: Caterpillar Inc. USA
Role :
 Processing Engineering changes.
 To coordinate with inventory, logistics for proper consumption of BOM.
 Creating Work Instruction for assembly operations as per Engineering Changes.
 Setting of time standards: - Setting Time Standards for different operations
Of assembly line using Centralized database Tool - “CDSA” (based on PMTS)
Also suggesting & documenting best Practices for operation methods.
 BOM generation
 Hands on experience on Vismockup, Visview.
CATERPILLAR MOSSVILLE ENGINE CENTER-ONSITE PROJECT:-
As a Manufacturing Engineer, involved in Assembly Planning activities.
Roles & responsibilities:
1. Coordinating offshore Planning Team for smooth documentation of Post Assembly process for
variety of engines.
2. Coordinating Engineering Change Management activities & participate in implementing the
ECMs on floor.
3. Discuss with Design Engineer regarding latest Engineering Changes on upcoming engines.
4. Setup the Engine masking line.
5. Completed Visual Aids project for ATA (After Test Assembly) assembly line.
6. Completed a project on organizing part locations according to stations in ATA assembly line.
7. Actual Time Study and Line Balancing
8. Taking complete responsibility of visual aids for each engine model.
9. Validating the wash preparation, paint protection, after paint assembly process.
10. Implementing Visual Aids for paint protection & after paint assembly line.
11. Been a part of the team in setting the process for the new Tier IV engines.
12. Coordinating with logistics for availability of material for assembly as scheduled.
13. Optimizing part locations for commercial engine assembly area.
14. Setting up stall build area for Marine engines for selected assembly processes.
Personal Details
• Date of Birth : 16/11/1982
• Sex : Male
• Languages : English, Hindi, Kannada, Marathi, Telugu.
• Nationality : Indian.
• Visa : B1/B2 valid up to 2017, L1 B

More Related Content

What's hot (20)

sandeep sisodia rspl cv
sandeep sisodia rspl cvsandeep sisodia rspl cv
sandeep sisodia rspl cv
 
Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16
 
Sanchit Dubey CV.
Sanchit Dubey CV.Sanchit Dubey CV.
Sanchit Dubey CV.
 
Aghil Jith
Aghil JithAghil Jith
Aghil Jith
 
Jay Portfolio - Engineering Manager
Jay Portfolio - Engineering ManagerJay Portfolio - Engineering Manager
Jay Portfolio - Engineering Manager
 
ALESSIA NEWTON HARRELL RESUME_2015
ALESSIA NEWTON HARRELL RESUME_2015ALESSIA NEWTON HARRELL RESUME_2015
ALESSIA NEWTON HARRELL RESUME_2015
 
dapski042116
dapski042116dapski042116
dapski042116
 
DINOOP PRODN.
DINOOP PRODN.DINOOP PRODN.
DINOOP PRODN.
 
Nagesh babu_CV_July_Fx2016
Nagesh babu_CV_July_Fx2016 Nagesh babu_CV_July_Fx2016
Nagesh babu_CV_July_Fx2016
 
Priyanka Shrivastava - Career Snapshot
Priyanka Shrivastava - Career SnapshotPriyanka Shrivastava - Career Snapshot
Priyanka Shrivastava - Career Snapshot
 
CV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMACV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMA
 
Anih Resume v16.01
Anih Resume v16.01Anih Resume v16.01
Anih Resume v16.01
 
Rakesh burman resume
Rakesh burman resume Rakesh burman resume
Rakesh burman resume
 
Resume
ResumeResume
Resume
 
UDAY Rsm-16
UDAY Rsm-16UDAY Rsm-16
UDAY Rsm-16
 
G28 dec8 ASR Resu
G28 dec8 ASR ResuG28 dec8 ASR Resu
G28 dec8 ASR Resu
 
Rsume CB
Rsume CBRsume CB
Rsume CB
 
KARTHIK CV
KARTHIK CVKARTHIK CV
KARTHIK CV
 
Resume
ResumeResume
Resume
 
2016JMB5
2016JMB52016JMB5
2016JMB5
 

Viewers also liked

Geografia 02 exercicis
Geografia 02 exercicisGeografia 02 exercicis
Geografia 02 exercicisescolalapau
 
MedicuRx_MG, Chair, CFO
MedicuRx_MG, Chair, CFOMedicuRx_MG, Chair, CFO
MedicuRx_MG, Chair, CFOMark Gustavson
 
Unitat 04 geografia_resum
Unitat 04 geografia_resumUnitat 04 geografia_resum
Unitat 04 geografia_resumescolalapau
 
Marin Vladović: Pregled spletnega trga v 2015, bazirano na raziskavi STL2015
Marin Vladović: Pregled spletnega trga v 2015, bazirano na raziskavi STL2015Marin Vladović: Pregled spletnega trga v 2015, bazirano na raziskavi STL2015
Marin Vladović: Pregled spletnega trga v 2015, bazirano na raziskavi STL2015my-sMind
 
Slip, Trip & Falls
Slip, Trip & FallsSlip, Trip & Falls
Slip, Trip & FallsTorben Farup
 
Gonzalla we still run (idea 2
Gonzalla   we still run (idea 2Gonzalla   we still run (idea 2
Gonzalla we still run (idea 2Molly Robinson
 
Geografia 03 04_exercicis
Geografia 03 04_exercicisGeografia 03 04_exercicis
Geografia 03 04_exercicisescolalapau
 
Geografia 03 05_exercicis
Geografia 03 05_exercicisGeografia 03 05_exercicis
Geografia 03 05_exercicisescolalapau
 
Stefan Jørgensen: Conquering commerce
Stefan Jørgensen: Conquering commerceStefan Jørgensen: Conquering commerce
Stefan Jørgensen: Conquering commercemy-sMind
 
니프니 종이접기
니프니 종이접기니프니 종이접기
니프니 종이접기moonjunu
 
Production Diary - Countdown
Production Diary - CountdownProduction Diary - Countdown
Production Diary - CountdownChloeohare
 
uso de las redes sociales
uso de las redes sociales uso de las redes sociales
uso de las redes sociales yurival09
 
CSA Argentina - Jornada CXO Cloud
CSA Argentina - Jornada CXO CloudCSA Argentina - Jornada CXO Cloud
CSA Argentina - Jornada CXO Cloudcloudsa_arg
 
Columbus presentationaug2013
Columbus presentationaug2013Columbus presentationaug2013
Columbus presentationaug2013Indrajeet Kumar
 
An Honest Reply Please
An Honest Reply PleaseAn Honest Reply Please
An Honest Reply PleaseJon Farmer
 
Trabajo partes de la ventana de excel #1
Trabajo partes de la ventana de excel #1Trabajo partes de la ventana de excel #1
Trabajo partes de la ventana de excel #1Visual Sonica
 

Viewers also liked (20)

Geografia 02 exercicis
Geografia 02 exercicisGeografia 02 exercicis
Geografia 02 exercicis
 
MedicuRx_MG, Chair, CFO
MedicuRx_MG, Chair, CFOMedicuRx_MG, Chair, CFO
MedicuRx_MG, Chair, CFO
 
Unitat 04 geografia_resum
Unitat 04 geografia_resumUnitat 04 geografia_resum
Unitat 04 geografia_resum
 
Marin Vladović: Pregled spletnega trga v 2015, bazirano na raziskavi STL2015
Marin Vladović: Pregled spletnega trga v 2015, bazirano na raziskavi STL2015Marin Vladović: Pregled spletnega trga v 2015, bazirano na raziskavi STL2015
Marin Vladović: Pregled spletnega trga v 2015, bazirano na raziskavi STL2015
 
Slip, Trip & Falls
Slip, Trip & FallsSlip, Trip & Falls
Slip, Trip & Falls
 
Gonzalla we still run (idea 2
Gonzalla   we still run (idea 2Gonzalla   we still run (idea 2
Gonzalla we still run (idea 2
 
Afia Appiah-FSR Cover Ltr
Afia Appiah-FSR Cover LtrAfia Appiah-FSR Cover Ltr
Afia Appiah-FSR Cover Ltr
 
Geografia 03 04_exercicis
Geografia 03 04_exercicisGeografia 03 04_exercicis
Geografia 03 04_exercicis
 
Geografia 03 05_exercicis
Geografia 03 05_exercicisGeografia 03 05_exercicis
Geografia 03 05_exercicis
 
Stefan Jørgensen: Conquering commerce
Stefan Jørgensen: Conquering commerceStefan Jørgensen: Conquering commerce
Stefan Jørgensen: Conquering commerce
 
니프니 종이접기
니프니 종이접기니프니 종이접기
니프니 종이접기
 
Song Ideas
Song IdeasSong Ideas
Song Ideas
 
Production Diary - Countdown
Production Diary - CountdownProduction Diary - Countdown
Production Diary - Countdown
 
uso de las redes sociales
uso de las redes sociales uso de las redes sociales
uso de las redes sociales
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
CSA Argentina - Jornada CXO Cloud
CSA Argentina - Jornada CXO CloudCSA Argentina - Jornada CXO Cloud
CSA Argentina - Jornada CXO Cloud
 
Columbus presentationaug2013
Columbus presentationaug2013Columbus presentationaug2013
Columbus presentationaug2013
 
An Honest Reply Please
An Honest Reply PleaseAn Honest Reply Please
An Honest Reply Please
 
Trabajo partes de la ventana de excel #1
Trabajo partes de la ventana de excel #1Trabajo partes de la ventana de excel #1
Trabajo partes de la ventana de excel #1
 
GILLCO BUDGET HOMES
GILLCO BUDGET HOMESGILLCO BUDGET HOMES
GILLCO BUDGET HOMES
 

Similar to Resume_Santosh

ResumeSagli_Nov14
ResumeSagli_Nov14ResumeSagli_Nov14
ResumeSagli_Nov14Jerry Sagli
 
Paresh Gawade-Manufacturing
Paresh Gawade-ManufacturingParesh Gawade-Manufacturing
Paresh Gawade-ManufacturingParesh Gawade
 
Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer
 
A.V.Aravind - Resume Final_oct2016
A.V.Aravind - Resume Final_oct2016A.V.Aravind - Resume Final_oct2016
A.V.Aravind - Resume Final_oct2016Aravind Av
 
Resume_Todd Brill
Resume_Todd BrillResume_Todd Brill
Resume_Todd BrillTodd_Brill
 
ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...
ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...
ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...Aberla
 
Resume__GARY_SHELTON
Resume__GARY_SHELTONResume__GARY_SHELTON
Resume__GARY_SHELTONGary Shelton
 
Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4Brendan Salmond
 

Similar to Resume_Santosh (20)

ResumeSagli_Nov14
ResumeSagli_Nov14ResumeSagli_Nov14
ResumeSagli_Nov14
 
Bhushan Bhapkar-CV
Bhushan Bhapkar-CVBhushan Bhapkar-CV
Bhushan Bhapkar-CV
 
Paresh Gawade-Manufacturing
Paresh Gawade-ManufacturingParesh Gawade-Manufacturing
Paresh Gawade-Manufacturing
 
CV Mukund Sonawane
CV Mukund SonawaneCV Mukund Sonawane
CV Mukund Sonawane
 
R. Venkatraman-Resume
R. Venkatraman-ResumeR. Venkatraman-Resume
R. Venkatraman-Resume
 
Resume
ResumeResume
Resume
 
Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16
 
Sanchit - Resume
Sanchit - ResumeSanchit - Resume
Sanchit - Resume
 
Sandeep_CV_Updated
Sandeep_CV_UpdatedSandeep_CV_Updated
Sandeep_CV_Updated
 
Sandeep_CV_Updated
Sandeep_CV_UpdatedSandeep_CV_Updated
Sandeep_CV_Updated
 
A.V.Aravind - Resume Final_oct2016
A.V.Aravind - Resume Final_oct2016A.V.Aravind - Resume Final_oct2016
A.V.Aravind - Resume Final_oct2016
 
Resume_Todd Brill
Resume_Todd BrillResume_Todd Brill
Resume_Todd Brill
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...
ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...
ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...
 
MARY PAULSON CV
MARY PAULSON CVMARY PAULSON CV
MARY PAULSON CV
 
Resume__GARY_SHELTON
Resume__GARY_SHELTONResume__GARY_SHELTON
Resume__GARY_SHELTON
 
Arjun Kumar
Arjun KumarArjun Kumar
Arjun Kumar
 
Biodata_VishweshBehere
Biodata_VishweshBehereBiodata_VishweshBehere
Biodata_VishweshBehere
 
Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4
 
Rohit new resume
Rohit new resumeRohit new resume
Rohit new resume
 

Resume_Santosh

  • 1. Santosh Shelake Contact Tel : 9561111052 e-mail: santosh.shelake@gmail.com TITLE BE (INDUSTRIAL AND PRODUCTION) WITH 8+ YRS OF EXPERIENCE IN PROCESS DESIGN/LEAN METHODOLOGIES PROFESSIONAL EXPERIENCE  A competent professional having 8+ years of domestic and overseas experience in Process Planning, Industrial Engineering practices, Virtual manufacturing, Lean concepts and Remanufacturing processes.  Currently working in John Deere Technology Center as Sr. Manufacturing Engineer.  Hands on experience of working on Assembly Process Planning, Tooling Identification & Ergonomic validation for New Product Introduction Programs, Virtual Audits, Time Standards, 3-D Factory Design & Layout Optimization using Visualisation Mock up, Vis- Jack, Classic Jack, Factory Cad, Wplanner ( Based on MTM ), Dynamic Line balancing using Simulation tool  Proficient in Mistake Proofing, Lean tools like 5-S and Kaizen, Value stream mapping and wide range of continuous improvement programs.  End user in SAP Production planning module for John Deere Power System units.  As an Industrial Engineering point of contact for the team, conduct methods audits for accurate standards. PROFESSIONAL TRAINING & SKILL SET  Undergone John Deere Corporate driven Industrial Engineering Experts training.  Undergone Lean Practitioners training-provided by BMGI. Completed 3 Lean projects for John Deere Pune factory.  Undergone Six Sigma Green Belt training. Key skills  Modeling : Pro-E, AutoCAD  Simulation : Vis Mockup, Vis Pro, VisJack (Ergonomic Evaluation), Classic Jack (Advanced Ergonomic Evaluation and Simulation) , ALiSS Simulation (Discrete event simulation), ICIDO, Factory Flow  Animation : Seemage Education 2000 to 2004 BE in Industrial and Production Engineering - “First Class” Gogte Institute of Technology (Visvesvaraya Technological University), Karnataka 1999 to 2000 Pre-University (12th) - “First Class” JA Junior College. Athani, Karnataka
  • 2. Work Experience John Deere India Pvt Ltd (Sept 2009 to till date) Sr. Manufacturing Engineer. Role :  Have been performing the role of IE (Industrial Engineering) since Feb-12  Providing EPDP (New Product Introduction program) support for Engines, axles and Transmission factories.  Making a sound project execution plan and allocating suitable resources.  Developing Skill set required for the new process and identifying the trainings required for resources.  Line balancing & line design processes.  Engineering Change Management for Engine assembly processes.  Coordinating the project activities and drawing specifications with the plants to ensure BOM is as per the specifications.  To coordinate with inventory, logistics for proper consumption of BOM.  Routing the BOM.  Facilitating proto type builds by providing virtual build solutions (Animation, factory flow, ergonomic analysis etc)  Analyzing the need for the new assembly tools.  Analyzing reach ability & assembly ability through E-build.  Tracking team’s productivity & quality. Major Projects Executed : 1. 944 Wheel loader’s final drive EPDP (Enterprise Product Development Program) : Unit: Motores John Deere, Torreon, Mexico Responsibilities:  Designing of the process through GSOE (Graphical sequence of events),  Conducting Virtual build sessions at various phases of the EPDP (NPI) process,  Identifying the tooling requirement and coordinating with Tool design team to develop required tools & fixtures  Collaborating with Quality team and work on developing PFMEAs.  Validate tools, fixtures, facilities and the factory equipment by means of animation.  By means of Ergonomic analysis, provided solutions to improve working conditions & safety,  Make sure that Enterprise Industrial Engineering standards are followed by setting the accurate labor standards using Enterprise process planning tool – Wplanner.  Identifying VAs and NVAs and work on reducing them. Major accomplishments: Most of the tools, fixtures & material handling equipment were designed & implemented with minimum post design changes. Improvement areas (process, tools, ergonomics etc) identified during lab build & proto build were well documented & improvements were implemented before the physical build. 2. EPDP support for OX_large_axles: Unit: Motores John Deere, Torreon, Mexico Activities Process feasibility study for the new axle. Identified interferences with the existing equipments (Press, drivers, lifting tools, test benches etc) for the new axle. Completing GSOE, validating the process & tools through animation, Ergonomic analysis, ALiSS Dynamic simulation, updating W-planner process planning, and Factory flow analysis.
  • 3. 3. Engineering Change Managemenr :  Assembly Planning activities (ECM & VA) for engines used for Locomotives, Marine and commercial purpose.  Generating BOM routing in SAP.  Creating alternate hierarchy in Vis mockup as an input for Graphical Sequence of Events of Engine assembly.  Line balancing & line design activities.  Identifying the tooling, spare part packaging requirement for the new components & defining the same.  Suggesting factories to standardize parts & standardizing the torque used for different hardware. 4. IE roles and responsibilities:  In coordination with JDPS IE platform lead, prepared an action item on the IE scorecard to bring all the factories up to the Deere standards.  Have taken knowledge sharing sessions for the team, making them aware of common mistakes that can happen while setting the time standards.  Clear training plan for each individual team member for IE has been prepared & the matrix being tracked.  Participated in Enterprise level projects to improve the Standard Data Application process.  Contributed in setting up JDTCI-Manufacturing Lab. Developin a training module for Industrial Engineering, to be set up in the lab. 5. Remanufacturing: Unit: John Deere Reman, Springfield, MO, USA. Roles and responsibilities:  Incoming core (Used parts) inspection method analysis.  Evaluating current disassembly methodology and suggesting improved more efficient way of disassembling.  Identifying NVAs in Core treatment process after the disassembly (Cleaning, blasting, baking etc)  Identifying NVAs in Parts identification & storage process.  Overview of inspections process.  Analyzing the current methods in Machining & salvaging process and suggesting improvements  Auditing correctness of SAP BOM and its periodic maintenance.  Creating Work Instruction for assemblers to ensure mistake proofing.  Identifying tools and fixtures by benchmarking other John Deere factories.  Implementing John Deere Industrial Engineering standards. 6. Engine test cell safety & productivity improvement project  Using Lean tools, identified wastes in this area.  Working on a breakthrough concept of match-plate which will address both safety and productivity concerns.  Using Industrial Engineering concepts, developed methods of rigging and de-rigging in our Argentinian factory. Same thing will be benchmarked for other factories. Department level activities at John Deere  Member of Technology and Innovation Team- Currently working on Pune factory innovation project.  Part of a team which is working on setting up a state of art Manufacturing Lab for training purpose.  Part of Enterprise Industrial Engineering Experts team.  Developed “IE Methods development” training module in JD R&D lab and I am a trainer for this module.
  • 4. MAHINDRA SATYAM BPO HYDERABAD (MAY-06 TO AUG-09) Client: Caterpillar Inc. USA Role :  Processing Engineering changes.  To coordinate with inventory, logistics for proper consumption of BOM.  Creating Work Instruction for assembly operations as per Engineering Changes.  Setting of time standards: - Setting Time Standards for different operations Of assembly line using Centralized database Tool - “CDSA” (based on PMTS) Also suggesting & documenting best Practices for operation methods.  BOM generation  Hands on experience on Vismockup, Visview. CATERPILLAR MOSSVILLE ENGINE CENTER-ONSITE PROJECT:- As a Manufacturing Engineer, involved in Assembly Planning activities. Roles & responsibilities: 1. Coordinating offshore Planning Team for smooth documentation of Post Assembly process for variety of engines. 2. Coordinating Engineering Change Management activities & participate in implementing the ECMs on floor. 3. Discuss with Design Engineer regarding latest Engineering Changes on upcoming engines. 4. Setup the Engine masking line. 5. Completed Visual Aids project for ATA (After Test Assembly) assembly line. 6. Completed a project on organizing part locations according to stations in ATA assembly line. 7. Actual Time Study and Line Balancing 8. Taking complete responsibility of visual aids for each engine model. 9. Validating the wash preparation, paint protection, after paint assembly process. 10. Implementing Visual Aids for paint protection & after paint assembly line. 11. Been a part of the team in setting the process for the new Tier IV engines. 12. Coordinating with logistics for availability of material for assembly as scheduled. 13. Optimizing part locations for commercial engine assembly area. 14. Setting up stall build area for Marine engines for selected assembly processes. Personal Details • Date of Birth : 16/11/1982 • Sex : Male • Languages : English, Hindi, Kannada, Marathi, Telugu. • Nationality : Indian. • Visa : B1/B2 valid up to 2017, L1 B