Career Highlight
 Rays Power Expert ( 150 MW) Solar Park Developed (October – 2020 to Present )
 Shri Keshav cement infra limited (SKCIL) Capative Solar Power Plants 40 MW(Jan-2018–Nov
2020)
 WIND WORLD INDIA 600 MW Gadag Karnataka (Jan-2016 to Dec 2017)
 Lalitpur Power Generations Corporations limited 660 X3 MW (Jun-2014 to Jan- 2016)
ORGANISATIONAL EXPERIENCE
Total relevant experience: 6 years +
Rays Power Expert (150 MW) Solar Park Developed (October 2020 to Present
Designation: Assistant Manager (Solar Project)
Roles & Responsibilities:
PROECT-
• Conduct site surveys before plant design and layout are finalized.
• Conduct the contour survey and land development work.
• Conduct electrical transmission line survey and line execution work.
• Co-ordinate with design engineer for accuracy, optimization of design as per site survey conducted.
• DC & AC side designing which includes design & selection and Analysing the existing system configuration and
selecting a proper evacuation etc.
• Shadow analysis, basics of PV-Syst, Sketch-Up and AutoCAD...
• Guide project management, scheduling, planning, erection, and commissioning of the project within
stipulated timelines.
• Project Management, Design, Procurement, Execution and Tendering
• Checking of Bill of Materials and Scope of Works on Projects
• Project execution Planning.
• Co -ordination with EPC Contractor for work related issues.
• System Design for ON & OFF grid, Grid connected and standalone system
• Coordinate with clients in developing new electrical power, solar and renewable energy projects.
• Technical assistance for site survey and resource assessment
• Comprehensive knowledge of electrical power systems, supervisory control and data acquisition systems
• Liaison with the Business Development Team to understand the client's requirements to ensure plant design &
engineering is pre-approved and incorporated in the PPA
• Prepare daily, weekly & monthly reports as required by supervision and management teams.
Operation & Maintenance
• Operation and maintenance of 150 MW S plants maintenance and coordination.
• Inverter, solar panel and other equipment maintenance and warranty claim and replacement.
Shri Keshav cement infra limited (SKCIL) Capative Solar Power Plants 40 MW(Jan- 2018 –Nov 2020)
Designation: SCADA & Operations maintenance Solar Engineer
Roles & Responsibilities:
PROJECT-
 Power system, Ethernet and networking, PLC programming and microcontrollers, network communication protocols,
network security, intro to utility SCADA, three-phase power, protective relaying, load flow and reactive compensation
 Networking and Communications: design and configure network and communication paths for Remote Terminal
Units (RTUs), Intelligent Electronic Devices (IEDs)
 Human Machine Interface (HMIs), PLC’s and other SCADA system equipment; specify and design communication
networks including data security and availability; develop basic specifications for fiber optic, microwave, power line
carrier, or radio communication paths;
 Applicable network and communication protocols: DNP, Modbus, SEL Communication Protocol, Goose Messaging, IEC
61850, TCP/IP, UDP
 Data Acquisition: Prepare points lists of all data to be transferred between control centers and controlled apparatus,
assign and program data addressing and routing information, develop Human Machine Interface (HMI) screens,
travel to project sites to test and commission data transfer schemes. Applicable Software: Wonder ware, Clearview,
AcSELerator RTAC, Visual Basic, OSIPI, Python scripting etc.
O&M
 Maintenance & troubleshooting of Electrical equipment’s PV modules, Junction box, Inverters, HT/LT
 Panels, 110KV Power transformers, 33kV Switchyard, bay & Control relay panel.
 Preparing Daily generation & downtime reports.
 JMR Preparation and Submission to KPTCL Ensure highest plant availability, Grid availability
 lowest down time by Corrective Maintenance to reduce the breakdown time.
 Knowledge about, ABB, TBEA companies of PV solar inverters.
Wind World India Limited, (ENERCON) Mumbai.
Designation: Assistant Engineer
Roles & Responsibilities:
PROECT-
• Execute and commissioned all activities from site survey to commissioning of solar plant with quality assurance.
• Execute and commissioned all electrical activities of WTG and USS with quality assurance.
• Execute all DC& AC cable laying and termination in SCB’s, Inverter’s, Transformer’s, Panels, MCR etc.
• Testing & Installation of all electrical equipment like transformers, 33KVswitch gear, inverters, HT panels, etc.
• Responsible for installation of external electrical line (33KV), CT, PT, VCB and DP structure to commission plant.
• Daily MOM (minutes of meeting) with my colleague/ down line (Supervisor & technicians) for zero communication
gap.
• Liaising with the site agent and surveyor throughout the process and making adjustment to project as necessary.
O&M
• Wind energy systems – Performed data acquisition, data validation and reporting
• Working experience in operation and maintenance of WTG at Gadag site Karnataka
• Managing operations & maintenance works through team planning and also looking after general administrative
activities.
• Monitoring the progress, control quality & cost and undertaking the quantity survey.
Lalitpur Power Generations Corporations limited 660 X3 MW (Jun 2014 – Jan 2016 )
Designation: Control & Instrument Engineer
 Operation, maintenance& troubleshooting of various range of Electrical and instrumentation related to the
below listed discipline
 ABB 800XA DCS.
 Boiler Instrumentation (Pressure, Flow, Level, etc.
 Turbine Instrumentation (Vibration, temperature, Trip logics etc.
 Ash Handling System (Dense Phase System).
 Air Cooling & Condensate System (ACC)
AREA OF PERTICULAREXPERTISE:
 Experience in maintenance servicing of Industrial Instruments (control valves and all types of sensors) and
servicing.
 Calibration, Installation, Testing & commissioning of all types of Electronic and Pneumatic instruments.
(Pressure, Temperature, Flow & Level Instruments etc.).
 Installations & testing of control panels, marshalling cabinets, relay cabinets and various instrument
cabinets.
 Instruments calibration for Pressure Indicators, Pressure transmitters, Differential pressure transmitters,
pressure switches, temperature transmitters, Temperature indicators, flow transmitters, level
transmitters & Control valves.
 Having good experience in HART & SMART transmitters, Flow controllers, Cascade, split range and
Open/Close loops.
CORE COMPETENCIES
Project Management Installation & Commissioning Instrumentation Resource Planning
Quality Assurance Client Relationship
Management
Documentation Handing over & site
closer
HIGHLIGHTS:
 Completed the solar project of 200 MW (Ground-mount & Roof-top) on site.
 Completed the wind project of 500 MW (commissioned 400 wind turbines-“synchronous technology”,
each 840KW) on site.
 Maintenance of 3 Unit each 660 MW(CFBC Boiler) in control & instrumentation department.
IT SKILLS
SCADA System (Programming of AT mega series Microcontrollers Siemens PLC’s ABB
Well versed with MS Office, Internet Applications and CLanguage.
PERSONAL DETAILS
Educational Qualifications:
2019 M.B.A. (Project & Energy Management) G.I.M.S. Delhi
2014 Bachelor of Electronics Communication Engineering, R.G.P.V. University......... Bhopal M.P.
2010 Higher secondary school Satna M.P. Boards ...............Bhopal M.P.
Current Position: Project Engineer
CTC : 6 lakh
Mo : 9916667000
Native Place: SATNA Madhya Pradesh
Declaration
I hereby declare that all above-mentioned statements are true to the best of my knowledge.
Krishna Mohan Dwivedi

Solar Power Engineering & Operation Maintenances

  • 1.
    Krishna Mohan Contact No.- 7869123466 Email: er.km@yahoo.com Current City - Vadodara Gujrat Seeking assignments in Project Management/ Operation & maintenance with an organization of repute, preferably in Power, Generation and Project & Energy Management Power Industry. Career Highlight  Rays Power Expert ( 150 MW) Solar Park Developed (October – 2020 to Present )  Shri Keshav cement infra limited (SKCIL) Capative Solar Power Plants 40 MW(Jan-2018–Nov 2020)  WIND WORLD INDIA 600 MW Gadag Karnataka (Jan-2016 to Dec 2017)  Lalitpur Power Generations Corporations limited 660 X3 MW (Jun-2014 to Jan- 2016) ORGANISATIONAL EXPERIENCE Total relevant experience: 6 years + Rays Power Expert (150 MW) Solar Park Developed (October 2020 to Present Designation: Assistant Manager (Solar Project) Roles & Responsibilities: PROECT- • Conduct site surveys before plant design and layout are finalized. • Conduct the contour survey and land development work. • Conduct electrical transmission line survey and line execution work. • Co-ordinate with design engineer for accuracy, optimization of design as per site survey conducted. • DC & AC side designing which includes design & selection and Analysing the existing system configuration and selecting a proper evacuation etc. • Shadow analysis, basics of PV-Syst, Sketch-Up and AutoCAD... • Guide project management, scheduling, planning, erection, and commissioning of the project within stipulated timelines. • Project Management, Design, Procurement, Execution and Tendering • Checking of Bill of Materials and Scope of Works on Projects • Project execution Planning. • Co -ordination with EPC Contractor for work related issues. • System Design for ON & OFF grid, Grid connected and standalone system • Coordinate with clients in developing new electrical power, solar and renewable energy projects. • Technical assistance for site survey and resource assessment • Comprehensive knowledge of electrical power systems, supervisory control and data acquisition systems • Liaison with the Business Development Team to understand the client's requirements to ensure plant design & engineering is pre-approved and incorporated in the PPA • Prepare daily, weekly & monthly reports as required by supervision and management teams. Operation & Maintenance • Operation and maintenance of 150 MW S plants maintenance and coordination. • Inverter, solar panel and other equipment maintenance and warranty claim and replacement.
  • 2.
    Shri Keshav cementinfra limited (SKCIL) Capative Solar Power Plants 40 MW(Jan- 2018 –Nov 2020) Designation: SCADA & Operations maintenance Solar Engineer Roles & Responsibilities: PROJECT-  Power system, Ethernet and networking, PLC programming and microcontrollers, network communication protocols, network security, intro to utility SCADA, three-phase power, protective relaying, load flow and reactive compensation  Networking and Communications: design and configure network and communication paths for Remote Terminal Units (RTUs), Intelligent Electronic Devices (IEDs)  Human Machine Interface (HMIs), PLC’s and other SCADA system equipment; specify and design communication networks including data security and availability; develop basic specifications for fiber optic, microwave, power line carrier, or radio communication paths;  Applicable network and communication protocols: DNP, Modbus, SEL Communication Protocol, Goose Messaging, IEC 61850, TCP/IP, UDP  Data Acquisition: Prepare points lists of all data to be transferred between control centers and controlled apparatus, assign and program data addressing and routing information, develop Human Machine Interface (HMI) screens, travel to project sites to test and commission data transfer schemes. Applicable Software: Wonder ware, Clearview, AcSELerator RTAC, Visual Basic, OSIPI, Python scripting etc. O&M  Maintenance & troubleshooting of Electrical equipment’s PV modules, Junction box, Inverters, HT/LT  Panels, 110KV Power transformers, 33kV Switchyard, bay & Control relay panel.  Preparing Daily generation & downtime reports.  JMR Preparation and Submission to KPTCL Ensure highest plant availability, Grid availability  lowest down time by Corrective Maintenance to reduce the breakdown time.  Knowledge about, ABB, TBEA companies of PV solar inverters. Wind World India Limited, (ENERCON) Mumbai. Designation: Assistant Engineer Roles & Responsibilities: PROECT- • Execute and commissioned all activities from site survey to commissioning of solar plant with quality assurance. • Execute and commissioned all electrical activities of WTG and USS with quality assurance. • Execute all DC& AC cable laying and termination in SCB’s, Inverter’s, Transformer’s, Panels, MCR etc. • Testing & Installation of all electrical equipment like transformers, 33KVswitch gear, inverters, HT panels, etc. • Responsible for installation of external electrical line (33KV), CT, PT, VCB and DP structure to commission plant. • Daily MOM (minutes of meeting) with my colleague/ down line (Supervisor & technicians) for zero communication gap. • Liaising with the site agent and surveyor throughout the process and making adjustment to project as necessary. O&M • Wind energy systems – Performed data acquisition, data validation and reporting • Working experience in operation and maintenance of WTG at Gadag site Karnataka • Managing operations & maintenance works through team planning and also looking after general administrative activities. • Monitoring the progress, control quality & cost and undertaking the quantity survey. Lalitpur Power Generations Corporations limited 660 X3 MW (Jun 2014 – Jan 2016 ) Designation: Control & Instrument Engineer  Operation, maintenance& troubleshooting of various range of Electrical and instrumentation related to the below listed discipline  ABB 800XA DCS.
  • 3.
     Boiler Instrumentation(Pressure, Flow, Level, etc.  Turbine Instrumentation (Vibration, temperature, Trip logics etc.  Ash Handling System (Dense Phase System).  Air Cooling & Condensate System (ACC) AREA OF PERTICULAREXPERTISE:  Experience in maintenance servicing of Industrial Instruments (control valves and all types of sensors) and servicing.  Calibration, Installation, Testing & commissioning of all types of Electronic and Pneumatic instruments. (Pressure, Temperature, Flow & Level Instruments etc.).  Installations & testing of control panels, marshalling cabinets, relay cabinets and various instrument cabinets.  Instruments calibration for Pressure Indicators, Pressure transmitters, Differential pressure transmitters, pressure switches, temperature transmitters, Temperature indicators, flow transmitters, level transmitters & Control valves.  Having good experience in HART & SMART transmitters, Flow controllers, Cascade, split range and Open/Close loops. CORE COMPETENCIES Project Management Installation & Commissioning Instrumentation Resource Planning Quality Assurance Client Relationship Management Documentation Handing over & site closer HIGHLIGHTS:  Completed the solar project of 200 MW (Ground-mount & Roof-top) on site.  Completed the wind project of 500 MW (commissioned 400 wind turbines-“synchronous technology”, each 840KW) on site.  Maintenance of 3 Unit each 660 MW(CFBC Boiler) in control & instrumentation department. IT SKILLS SCADA System (Programming of AT mega series Microcontrollers Siemens PLC’s ABB Well versed with MS Office, Internet Applications and CLanguage. PERSONAL DETAILS Educational Qualifications: 2019 M.B.A. (Project & Energy Management) G.I.M.S. Delhi 2014 Bachelor of Electronics Communication Engineering, R.G.P.V. University......... Bhopal M.P. 2010 Higher secondary school Satna M.P. Boards ...............Bhopal M.P. Current Position: Project Engineer CTC : 6 lakh Mo : 9916667000 Native Place: SATNA Madhya Pradesh Declaration I hereby declare that all above-mentioned statements are true to the best of my knowledge. Krishna Mohan Dwivedi