SlideShare a Scribd company logo
MBA(PGDIM), B.E.(MECH.), BOE CERTIFICATE Power plant operation
`
`
GOPI CHANDRA SAHU
Ph. No. : - +91-7757035921,+91-8975144928, +91-7697913150
Passport No. L6340183
E-mail:- gopisahu333@gmail.com
Near Shaheed garden, Beside anil bekary ,
Vindhya Washni Ward, Tahsil:- Dhamtari
Post Office:- Dhamtari, Dist.:- Dhamtari
State:- Chhattisgarh, Pin no. 493773
CAREER OBJECTIVE
“Seeking a Position to utilize my skills and ability in the field of power plant
Operation and maintenance in the organization that offers Professional growth
while being Resourceful and innovative.”
EDUCATIONAND CERTIFICATION
 MBA (PGDIM) from Indira Gandhi Open University New Delhi in 2010 with 1st
class 60.22%.
 B.E. Mechanical from Pt. Ravisanker Sukla University Raipur in 2007, with 1st class
CPI, 7.25 (72.5%).
 12th from Sarashwati Higher Secondary School Dhamtari in 2003 with 2nd class
59.2%.
 10th Govt. Higher Secondary School Antagarh in 2001 with 1st class 60.6%.
 Boiler Operation Engineer (BOE) certificate from Andhra Pradesh Government.
TOTAL EXPERIENCEIN PULVERIZED COAL (PF)FIRED POWER
PLANT 9th YEAR’S IN COMMISSIONING,OPERATION&
MANTENANCE
COMMISSIONING
Trail run of equipments, pre commissioning test (air & gas tightness or leakage),
Alkali boil out, thermal flow test, chemical cleaning (water washing alkali, alkali boil
out & rinsing boil out, acid cleaning of boiler, 1st stage preservation, 2nd stage
preservation), steam blowing, safety valve setting, hydraulic test, wet preservation,
preparation of first light up (Air system, gas system, water system, fuel steam, FSSS
system), Lubrication and governing system (oil flushing and hydraulic test, bearing
inspection of turbine, governing system baring gear, vacuum tightness test.
MBA(PGDIM), B.E.(MECH.), BOE CERTIFICATE Power plant operation
`OPERATION
540 MW (4*135), 160 MW (2*80) & 2650 MW (2*660, 4*250, 3*110)
 Presently working as an Assistant Manager (Unit Controller / Shift In charge)
in SAI WARDHA POWER LTD- WARORA, from 18th June 2014 to till date. It
has 540 MW (4*135) CPP and IPP power plant; with PF Boiler
Boiler make: Dong Fang Electric Corporation, China.
Specifications: PF Boiler of 440TPH Steam generating capacity at 13.73 Mpa
Pressure and 540 deg. C with Reheat at pressure at 2.73 Mpa & 540m Deg C temp.
Turbine make: Dong Fang Electric Corporation, china.
Type: Extra High Pressure, single Shaft, Double Cylinder, Double Flow, One
Intermediate Reheat, condensed Type.
Specifications: Capacity 135 MW, 398.9 TPH steam inlet at 13.24 Mpa and 535
deg. C.
 Worked as Executive Engineer (DCS Engineer) in HINDUSTAN ZINC LTD. –
DARIBA, Under WARSTILA INDIA LTD. (O&M), from 25th September 2009 to
10th June 2014. It has 160 MW (2*80) Captive power plants; with pulverize Boiler
2*320 TPH, Boiler, Turbine & Generator make- BHEL, Working pressure 94
kg/cm2 & Temp. 540 C, Mill - Medium speed Pressurized Bowl Mill (XRP-623) ,
automation DCS (EMERSON & MAX DNA).
 Worked as an Engineer (DCS Engineer) in chhabra thermal power plant under
Instrumentation Limited (O&M) from 24/12/2007 to 21/09/2009. It has 2650
MW (2*660, 4*250, and 3*110) power plant, with pulverize Boiler and natural gas
based plant, knowledge of TD BFP/MD BFP, Hydrogen cooling/oil sealing,
Boiler Force circulation/ BCP, Primary water (DM Water) for cooling.
JOB RESPONSIBILITIES (UNIT CONTROLLER / SHIFT INCHARGE)
 Lead a team of power plant professionals for safe operation of plant.
Guide control desk operators and Field operators for day-today operation.
 Analyze operation roblem, in routine observation and corrective actions.
 Emergency handling and risk management during exigency. Co-ordination with
Load Despatch canter and regulatory body for control of power generation.
 Manage Manpower availability and equipment availability.
 Operation of thermal power plants (BTG), and Balance of Plant (BOP) with
optimum efficiency and defect monitoring
 Cold Start up, Warm start up, Hot Start-up, Very Hot Start-up, Normal
Operation, Emergency Handling like unit blackout ,home load, equipment
trappings and Safe start-up /shut down and load throw-off to control generation
as per requirement of Units.
 Line up of the unit and its auxiliaries, Change-over of equipments, routine
testing of protection system.
MBA(PGDIM), B.E.(MECH.), BOE CERTIFICATE Power plant operation
`
 Issue and cancellation PTW (Permit to Work) system with LOTOTO, safe
isolation, personnel safety and equipment safety.
 Emergency Equipment Trial and restoration/isolation of process and Equipment
 Preparation of daily reports & MIS reports.
 Focusing on how Specific coal consumption & APC can be controlled.
 Focusing on efficient operation of power plant, performing daily shift routine
activities.
 Management of Coal & its blending & Ash Handling.
 Daily efficiency & defect monitoring of power plant.
 Manage Shift management of the Junior Engineer.
COMPUTERSKILL
 MS-Office (Excel , World & Power Point)
 SAP
 IFS
 Auto Cad 2004
 Internet Browsing
PERSONAL
 Name - Gopi Chandra Sahu
 Father's Name – Mr. Vishnu Ram Sahu
 Father's Designation – Government Job
 DOB – 10/10/1984
 States – Male
 Marital States – Married
 Current CTC – 8.76 Lakh Per annum
 Expected CTC – Negotiable
DECLARATION
I do hereby declare that the above written particulars are to the best of my
knowledge and belief.
Date: -…………… Signature

More Related Content

What's hot

Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
Prakash Jarotia
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
Vaibhav Paydelwar
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
Rajashekar Gurrala
 
Kota Super Thermal Power Plant
Kota Super Thermal Power PlantKota Super Thermal Power Plant
Kota Super Thermal Power Plant
Himanshu Dixit
 
boiler operator cv
boiler operator cvboiler operator cv
boiler operator cvHamad Talhaa
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERsaravanan muthu
 
NTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action PlanNTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action PlanNTPC
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam Boiler
Vaibhav Paydelwar
 
Transformers in NTPC
Transformers in NTPCTransformers in NTPC
Transformers in NTPC
Sagnik Saha
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Pradeep Avanigadda
 
Unit protection scheme
Unit protection schemeUnit protection scheme
Unit protection scheme
SHIVAJI CHOUDHURY
 
Turbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & WorkingTurbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & Working
Tahoor Alam Khan
 
MECHANICAL MAINTENANCE ENGINEER (1)
MECHANICAL MAINTENANCE ENGINEER (1)MECHANICAL MAINTENANCE ENGINEER (1)
MECHANICAL MAINTENANCE ENGINEER (1)Pramodbhai More
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - Manual
Sheel Shah
 
210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance
Manohar Tatwawadi
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
pratikguptateddy
 
training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...
Sagar Mehta
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boiler
Ashvani Shukla
 

What's hot (20)

SRIDHARAN.R RESUME
SRIDHARAN.R RESUMESRIDHARAN.R RESUME
SRIDHARAN.R RESUME
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
 
Kota Super Thermal Power Plant
Kota Super Thermal Power PlantKota Super Thermal Power Plant
Kota Super Thermal Power Plant
 
boiler operator cv
boiler operator cvboiler operator cv
boiler operator cv
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEER
 
NTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action PlanNTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action Plan
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam Boiler
 
Transformers in NTPC
Transformers in NTPCTransformers in NTPC
Transformers in NTPC
 
Kstps ppt
Kstps pptKstps ppt
Kstps ppt
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
 
Unit protection scheme
Unit protection schemeUnit protection scheme
Unit protection scheme
 
Turbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & WorkingTurbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & Working
 
MECHANICAL MAINTENANCE ENGINEER (1)
MECHANICAL MAINTENANCE ENGINEER (1)MECHANICAL MAINTENANCE ENGINEER (1)
MECHANICAL MAINTENANCE ENGINEER (1)
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - Manual
 
210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boiler
 

Similar to gopi chandra sahu, Resume

Resume of Gaurav Gaur, Electrical
Resume of Gaurav Gaur, ElectricalResume of Gaurav Gaur, Electrical
Resume of Gaurav Gaur, Electricalgaurav gaur
 
Zishan Curriculum Vitae Eqp
Zishan Curriculum Vitae EqpZishan Curriculum Vitae Eqp
Zishan Curriculum Vitae EqpZishan Khan
 
Zishan curriculum vitae eqp
Zishan curriculum vitae eqpZishan curriculum vitae eqp
Zishan curriculum vitae eqp
Zishan Khan
 
AMIT MUKHERJEE (2) (1)
AMIT MUKHERJEE (2) (1)AMIT MUKHERJEE (2) (1)
AMIT MUKHERJEE (2) (1)Amit Mukherjee
 
Muhammad Imran Mugha1
Muhammad Imran Mugha1Muhammad Imran Mugha1
Muhammad Imran Mugha1mynain
 
Piyush Dekavadiya_CV(06.12.14)
Piyush Dekavadiya_CV(06.12.14)Piyush Dekavadiya_CV(06.12.14)
Piyush Dekavadiya_CV(06.12.14)piyush_deks
 
Koneru_Raj_kumar_2
Koneru_Raj_kumar_2Koneru_Raj_kumar_2
Koneru_Raj_kumar_2Raj Kumar
 
CURRICULUM VITAE RAHUL SHARMA (1) (1)
CURRICULUM VITAE RAHUL SHARMA (1) (1)CURRICULUM VITAE RAHUL SHARMA (1) (1)
CURRICULUM VITAE RAHUL SHARMA (1) (1)RAHUL SHARMA
 
Ayush april 2016(ce np)
Ayush april 2016(ce np) Ayush april 2016(ce np)
Ayush april 2016(ce np)
Ayush Gupta
 

Similar to gopi chandra sahu, Resume (20)

Resume_Dipak-linkedin
Resume_Dipak-linkedinResume_Dipak-linkedin
Resume_Dipak-linkedin
 
Babban_Pandey-3
Babban_Pandey-3Babban_Pandey-3
Babban_Pandey-3
 
Bitu.word
Bitu.wordBitu.word
Bitu.word
 
resume
resumeresume
resume
 
reseume ccr
reseume ccrreseume ccr
reseume ccr
 
Resume of Gaurav Gaur, Electrical
Resume of Gaurav Gaur, ElectricalResume of Gaurav Gaur, Electrical
Resume of Gaurav Gaur, Electrical
 
RESUME AMIT (2)
RESUME AMIT (2)RESUME AMIT (2)
RESUME AMIT (2)
 
Zishan Curriculum Vitae Eqp
Zishan Curriculum Vitae EqpZishan Curriculum Vitae Eqp
Zishan Curriculum Vitae Eqp
 
Zishan curriculum vitae eqp
Zishan curriculum vitae eqpZishan curriculum vitae eqp
Zishan curriculum vitae eqp
 
AMIT MUKHERJEE (2) (1)
AMIT MUKHERJEE (2) (1)AMIT MUKHERJEE (2) (1)
AMIT MUKHERJEE (2) (1)
 
Muhammad Imran Mugha1
Muhammad Imran Mugha1Muhammad Imran Mugha1
Muhammad Imran Mugha1
 
CVPradeepKumarGupta
CVPradeepKumarGuptaCVPradeepKumarGupta
CVPradeepKumarGupta
 
resume 11-2015
resume 11-2015resume 11-2015
resume 11-2015
 
Piyush Dekavadiya_CV(06.12.14)
Piyush Dekavadiya_CV(06.12.14)Piyush Dekavadiya_CV(06.12.14)
Piyush Dekavadiya_CV(06.12.14)
 
Koneru_Raj_kumar_2
Koneru_Raj_kumar_2Koneru_Raj_kumar_2
Koneru_Raj_kumar_2
 
Vishnu_CV final rev2
Vishnu_CV final rev2Vishnu_CV final rev2
Vishnu_CV final rev2
 
CURRICULUM VITAE RAHUL SHARMA (1) (1)
CURRICULUM VITAE RAHUL SHARMA (1) (1)CURRICULUM VITAE RAHUL SHARMA (1) (1)
CURRICULUM VITAE RAHUL SHARMA (1) (1)
 
Ayush april 2016(ce np)
Ayush april 2016(ce np) Ayush april 2016(ce np)
Ayush april 2016(ce np)
 
Pioneer of thermal power(o&m).
Pioneer of thermal power(o&m).Pioneer of thermal power(o&m).
Pioneer of thermal power(o&m).
 
Chaithanya Potluri
Chaithanya PotluriChaithanya Potluri
Chaithanya Potluri
 

gopi chandra sahu, Resume

  • 1. MBA(PGDIM), B.E.(MECH.), BOE CERTIFICATE Power plant operation ` ` GOPI CHANDRA SAHU Ph. No. : - +91-7757035921,+91-8975144928, +91-7697913150 Passport No. L6340183 E-mail:- gopisahu333@gmail.com Near Shaheed garden, Beside anil bekary , Vindhya Washni Ward, Tahsil:- Dhamtari Post Office:- Dhamtari, Dist.:- Dhamtari State:- Chhattisgarh, Pin no. 493773 CAREER OBJECTIVE “Seeking a Position to utilize my skills and ability in the field of power plant Operation and maintenance in the organization that offers Professional growth while being Resourceful and innovative.” EDUCATIONAND CERTIFICATION  MBA (PGDIM) from Indira Gandhi Open University New Delhi in 2010 with 1st class 60.22%.  B.E. Mechanical from Pt. Ravisanker Sukla University Raipur in 2007, with 1st class CPI, 7.25 (72.5%).  12th from Sarashwati Higher Secondary School Dhamtari in 2003 with 2nd class 59.2%.  10th Govt. Higher Secondary School Antagarh in 2001 with 1st class 60.6%.  Boiler Operation Engineer (BOE) certificate from Andhra Pradesh Government. TOTAL EXPERIENCEIN PULVERIZED COAL (PF)FIRED POWER PLANT 9th YEAR’S IN COMMISSIONING,OPERATION& MANTENANCE COMMISSIONING Trail run of equipments, pre commissioning test (air & gas tightness or leakage), Alkali boil out, thermal flow test, chemical cleaning (water washing alkali, alkali boil out & rinsing boil out, acid cleaning of boiler, 1st stage preservation, 2nd stage preservation), steam blowing, safety valve setting, hydraulic test, wet preservation, preparation of first light up (Air system, gas system, water system, fuel steam, FSSS system), Lubrication and governing system (oil flushing and hydraulic test, bearing inspection of turbine, governing system baring gear, vacuum tightness test.
  • 2. MBA(PGDIM), B.E.(MECH.), BOE CERTIFICATE Power plant operation `OPERATION 540 MW (4*135), 160 MW (2*80) & 2650 MW (2*660, 4*250, 3*110)  Presently working as an Assistant Manager (Unit Controller / Shift In charge) in SAI WARDHA POWER LTD- WARORA, from 18th June 2014 to till date. It has 540 MW (4*135) CPP and IPP power plant; with PF Boiler Boiler make: Dong Fang Electric Corporation, China. Specifications: PF Boiler of 440TPH Steam generating capacity at 13.73 Mpa Pressure and 540 deg. C with Reheat at pressure at 2.73 Mpa & 540m Deg C temp. Turbine make: Dong Fang Electric Corporation, china. Type: Extra High Pressure, single Shaft, Double Cylinder, Double Flow, One Intermediate Reheat, condensed Type. Specifications: Capacity 135 MW, 398.9 TPH steam inlet at 13.24 Mpa and 535 deg. C.  Worked as Executive Engineer (DCS Engineer) in HINDUSTAN ZINC LTD. – DARIBA, Under WARSTILA INDIA LTD. (O&M), from 25th September 2009 to 10th June 2014. It has 160 MW (2*80) Captive power plants; with pulverize Boiler 2*320 TPH, Boiler, Turbine & Generator make- BHEL, Working pressure 94 kg/cm2 & Temp. 540 C, Mill - Medium speed Pressurized Bowl Mill (XRP-623) , automation DCS (EMERSON & MAX DNA).  Worked as an Engineer (DCS Engineer) in chhabra thermal power plant under Instrumentation Limited (O&M) from 24/12/2007 to 21/09/2009. It has 2650 MW (2*660, 4*250, and 3*110) power plant, with pulverize Boiler and natural gas based plant, knowledge of TD BFP/MD BFP, Hydrogen cooling/oil sealing, Boiler Force circulation/ BCP, Primary water (DM Water) for cooling. JOB RESPONSIBILITIES (UNIT CONTROLLER / SHIFT INCHARGE)  Lead a team of power plant professionals for safe operation of plant. Guide control desk operators and Field operators for day-today operation.  Analyze operation roblem, in routine observation and corrective actions.  Emergency handling and risk management during exigency. Co-ordination with Load Despatch canter and regulatory body for control of power generation.  Manage Manpower availability and equipment availability.  Operation of thermal power plants (BTG), and Balance of Plant (BOP) with optimum efficiency and defect monitoring  Cold Start up, Warm start up, Hot Start-up, Very Hot Start-up, Normal Operation, Emergency Handling like unit blackout ,home load, equipment trappings and Safe start-up /shut down and load throw-off to control generation as per requirement of Units.  Line up of the unit and its auxiliaries, Change-over of equipments, routine testing of protection system.
  • 3. MBA(PGDIM), B.E.(MECH.), BOE CERTIFICATE Power plant operation `  Issue and cancellation PTW (Permit to Work) system with LOTOTO, safe isolation, personnel safety and equipment safety.  Emergency Equipment Trial and restoration/isolation of process and Equipment  Preparation of daily reports & MIS reports.  Focusing on how Specific coal consumption & APC can be controlled.  Focusing on efficient operation of power plant, performing daily shift routine activities.  Management of Coal & its blending & Ash Handling.  Daily efficiency & defect monitoring of power plant.  Manage Shift management of the Junior Engineer. COMPUTERSKILL  MS-Office (Excel , World & Power Point)  SAP  IFS  Auto Cad 2004  Internet Browsing PERSONAL  Name - Gopi Chandra Sahu  Father's Name – Mr. Vishnu Ram Sahu  Father's Designation – Government Job  DOB – 10/10/1984  States – Male  Marital States – Married  Current CTC – 8.76 Lakh Per annum  Expected CTC – Negotiable DECLARATION I do hereby declare that the above written particulars are to the best of my knowledge and belief. Date: -…………… Signature