SlideShare a Scribd company logo
R.K.Shakar,
rkshakar@gmail.com
R.K.Shakar RESUME 98939 00305 (M)
Objectives : To persue career in good and reputed organization, and work for progress &
achievement of organizational goals. Rendering efficient services for the
betterment of the organization in a cost effective manner, utilizing best of my
knowledge, experience and skills.
Experience: More than 28 Years
Professional Career:
Sr. No. Name of Employer Designation Period
1
Godawari Power & Ispat Ltd.
Siltara, Raipur ( CG )
Sr. DGM – Power Plant
(Electrical)
1 X 105 MVA CPP
April - 2013 to Till
Date
(3.5 yrs.)
2
Godawari Power & Ispat Ltd.
Siltara, Raipur ( CG )
DGM – Power Plant
(Electrical)
1 X 105 MVA CPP
April - 2010 to 31st
March 2013
(03 yrs.)
3
Godawari Power & Ispat Ltd.
Siltara, Raipur ( CG )
AGM – Power Plant
(Electrical)
1 X 75 MVA CPP
April - 2007 to 31st
March 2010
(03 yrs.)
4
Ispat Godawari Ltd. Siltara,
Raipur ( CG )
Dy. Mgr. – Power Plant
(Electrical)
1 X 12.5 MVA CPP
August - 2005 to
31st
March 2007
(03 yrs.)
5
The Associated Cement
Companies Ltd. ACC Jamul
Cement Works
Foremen – (Electrical) 25 MW
CPP & 1.67 MT Cement Plant.
1st
. August 1988 to
25th
August 2005
(18 yrs.)
Educational Qualifications:
Sr. No. Exam. Passed Name of Board/University/
Institution
Year of
Passing
% of
marks
1 H.S.S.C. Examination Board of Secondary Education,
Madhya Pradesh, Bhopal
1984 52
2 4 yrs. Job oriented Diploma in
(ELECTRICAL) Engineering.
ACC Engineering Institute,
Kymore. ( M.P)
1988
3 Diploma in Plant Engineering &
Management
IIPE-Chennai
2002 First
4 Electrical Supervisory Certificate
(Non Mining) Exam.
C.G. Electrical Licensing
Board, Govt. of C.G.
2003
5 Master Program in Electrical
Engineering (MEE)
CIIMS- Nagpur. (Distance
Course)
2012 A Grade
6 Electrical Supervisory Certificate
(Mining) Exam.
C.G. Electrical Licensing
Board, Govt. of C.G.
2014
Date of Birth: 20th
DECEMBER 1966
PASSPORT: M 4885379 (12.01.2025)
AADHAR NO.: 2903 9177 7313
JOB RESPONSIBILITY:
• Working as Sr. D.G.M. Power Plant (Electrical) for 105 MVA, CPP with
commissioning, environment, troubleshooting, planning & execution for
Preventive improvement & shutdown jobs at GPIL, Siltara, Raipur.
• Preferred managerial Duties at the Division level including preparation &
verification of the existing Drawings, including the interface with various
engineering disciplines during design / commissioning documents.
Conceptual & detailed Electrical / C7I design & layout maintenance and
logic development related to Control and Instrumentation system in GPIL,
(Line-3) 2.5 MTPA Clinker Project Yanbu Cement Company, KSA &
ACC Jamul 1.67 MTPA Cement Works & its 25MW Power Plant.
• Directed preparation of and reviews / approves forecast for Manpower,
materials, and supplier required, order tools & initiative action to assure
stocks are maintained at minimum adequate level.
• Supporting for ISO-9002 & TPM implementation at ACC Jamul Cement
Works, Durg. ISO 9001 2008 for Quality Management, ISO 14001 2004 for
Environment Management System & ISO 18001 2007 for Occupational
Health & Safety at GPIL.
• Planning for Critical as well as general electrical & mechanical spares.
• Preparation of Safe Operating Instructions, good housekeeping, training &
development of subordinates and Plant.
• Historization of all the data related to the plant.
• Preparation of all occurrence reports, Failure reports, Generation Reports,
Abnormal incident reports etc. related to the plant.
• IMS based maintenance activities in the Plant and overall IMS
implementation in the department. Facilitation of Autonomous maintenance
and Equipment ownership amongst the Staff.
• All electrical Equipments routine test, maintenance, calibration & trouble
shooting.
• All Over Head Lines, HT Cable Termination, switch board & their Protection
Relays.
• All the VVVF Drives of ABB & VACON, ESP,s and their Control panels, DC
Battery Bank and chargers up to 600 AH. Blue Star Package AC systems
etc.
• To ensure high availability of All Electrical Equipments & Systems in the
Power Plant.
• To minimize cost of maintenance of the plant & optimize equipment lifecycle
cost.
• Statutory compliance with the Office of CSPDCL, CSPTCL, SLDC, NLDC,
CREDA, CSERC, CEA & Electrical Inspectorate – C.G.
• Core Competence in application of Preventive, planned, Breakdown &
Predictive maintenance practices ensuring maximum availability with
expertise in ensuring adherence to safety, Environment & Health standards
along with CDM projects, REC Issuance and sale.
• Training to subordinates and their skill up gradation.
• Annual shut down planning for Synchronous Turbo-Generators, Boilers,
Turbines, & their Auxiliaries, All HT (11KV & 132 KV) Switch Boards and
Substation, All Motor, AC Drive Panels, HT & LT Breakers, EHV & HV
Transformers, up to 45 MVA. Emergency HT & LT DG Sets of 2100 KVA,
750 KVA & 1010 KVA.
Thermal Captive Power Plant:
• Engineering & successful Commissioning of Black Start scheme for 25 MW
CPP under totally Blackout condition with TATA Electric Company at ACC
Jamul Cement Works.
• Engineering Planning & successful Commissioning of Load Management
System by Rockwell Automation System.
• Prepared Energy Data Monitoring & Display System for Report Package
Required as per CREDA, CSPDCL, SLDC & NLDC.
Technical Capability : Sound Technical Knowledge of :-
1) WOODWARD 505 & 509 Governor Controllers.
2) VVVF Drives – Siemens, L&T, ABB & Vacon makes.
3) Relay co-ordination for Stability of Plant to avoid Cascade tripping
of generators.
4) Load Management system for Load Shading, Sharing, Limiting of
Export, Import, Auto Synchronizing Schemes among Generators,
Couplers, Emergency DG Set & Grid.
5) UPS System of Plant
Successful Installation Erection & commissioning:
• 1 x 25 MW ABB make Steam Turbine Synchronous Generator Along with
complete Auxiliary with CHP and GT of 11/132 KV at ACC Jamul Cement
Works.
• 1 x 12.5 MVA Synchronous Turbo-Generators from CA Parson, England,
Along with complete Auxiliary at GPIL
• 1 x 12.5 MVA Synchronous Turbo-Generators from Hitachi, JAPAN Along
with complete Auxiliary and GT of 6.9/11KV at GPIL.
• 1 x 37.5 MVA Synchronous Turbo-Generators from China Along with
complete Auxiliary at GPIL
• 2 x 31.25 MVA Synchronous Turbo-Generators from VA Tech, BHOPAL,
Along with complete Auxiliary design. Distribution, lay outing of CIVIL
Construction with 2 x 2900KVA Distribution Transformers at Sister plant
Jagdamba Power & Alloys Ltd and GPIL, Siltara.
• Upgradation and Replacement of Old Analog AVR with New Digital
AVR designed by ABB on our demanded parameters for 3x10MW
Generator at GPIL
• 2 x 132 KV/ 11 KV EHV Sub Station with accessories & 2x45 MVA
Transformers at Sister plant Jagdamba Power & Alloys Ltd and GPIL,
Siltara.
• 1 x 8 MW Bio Mass Power Plant (OLD Inoperative) Plant Started after
complete O/H, Sister Plant of Hira Group
• Electrical Installation Testing and Commissioning support to 1 x 50
MW Solar Thermal Power Plant Based in Nokh, Rajasthan under
National Solar Mission named Godawari Green Energy Ltd (GGEL)
• 1 x 2100 KVA Emergency LV DG Set for Power Plant
• 2 x 2100 KVA Emergency HV (11KV) DG Set with HT Panel synchronizing
scheme for Power Plant and SID (GPIL)
• 160 TPH CHP Circuit Planning, Designing, and commissioning at GPIL
• 100TPH Biomass (Rice Husk) Boiler Planning, Installation and
Commissioning along with 2 x 2900KVA Distribution Transformers at GPIL
• Project of SMS Induction Furnaces all Electrical HT and LT installation,
testing and Commissioning activities at GPIL
.
TRAININGS
• Has undergone training on VACON Drives at Site after Installation
• Has undergone training on Thyristor Controlled Drives Maintenance at ACC
RCD, Thane.
PLACE: RAIPUR, (CG)
(RajendRa KumaR
ShaKaR)

More Related Content

What's hot

Steinbeis 1MW Grid connected system design
Steinbeis 1MW Grid connected system designSteinbeis 1MW Grid connected system design
Steinbeis 1MW Grid connected system designShrikant Hiremath
 
Steinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design reportSteinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design reportShrikant Hiremath
 
Cost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power ProjectCost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power Project
Srini Chopakatla, PE, PMP
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power Plant
Vignesh Sekar
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installation
Amitesh Kumar
 
Gensol detailed engineering services
Gensol detailed engineering servicesGensol detailed engineering services
Gensol detailed engineering services
Gensol Engineering Limited
 
17 mohit epri-sandia symposium_v1
17 mohit epri-sandia symposium_v117 mohit epri-sandia symposium_v1
Rfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in DelhiRfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in Delhi
Headway Solar
 
Pdv narasimha rao 7+
Pdv narasimha rao 7+Pdv narasimha rao 7+
Pdv narasimha rao 7+
Narasimha Pasupuleti
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar Projects
Gensol Engineering Limited
 
Proposal solar
Proposal solarProposal solar
Proposal solar
Sashikant Tiwari
 
performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterAshish Verma
 

What's hot (20)

Steinbeis 1MW Grid connected system design
Steinbeis 1MW Grid connected system designSteinbeis 1MW Grid connected system design
Steinbeis 1MW Grid connected system design
 
Encotec -Company Presentation_Apr 2016
Encotec -Company Presentation_Apr 2016Encotec -Company Presentation_Apr 2016
Encotec -Company Presentation_Apr 2016
 
CV_Gopalakrishna
CV_GopalakrishnaCV_Gopalakrishna
CV_Gopalakrishna
 
Steinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design reportSteinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design report
 
Cost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power ProjectCost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power Project
 
viren.cv
viren.cvviren.cv
viren.cv
 
rakesh resume_10.03.2016
rakesh resume_10.03.2016rakesh resume_10.03.2016
rakesh resume_10.03.2016
 
Spectrum of Projects - ENCOTEC
Spectrum of Projects - ENCOTECSpectrum of Projects - ENCOTEC
Spectrum of Projects - ENCOTEC
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power Plant
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installation
 
Gensol detailed engineering services
Gensol detailed engineering servicesGensol detailed engineering services
Gensol detailed engineering services
 
17 mohit epri-sandia symposium_v1
17 mohit epri-sandia symposium_v117 mohit epri-sandia symposium_v1
17 mohit epri-sandia symposium_v1
 
Rfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in DelhiRfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in Delhi
 
L Narayan's Resume
L Narayan's ResumeL Narayan's Resume
L Narayan's Resume
 
Pdv narasimha rao 7+
Pdv narasimha rao 7+Pdv narasimha rao 7+
Pdv narasimha rao 7+
 
SOURABH SONI
SOURABH SONISOURABH SONI
SOURABH SONI
 
PDV narasimha Rao 6+ (2)
PDV narasimha Rao 6+ (2)PDV narasimha Rao 6+ (2)
PDV narasimha Rao 6+ (2)
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar Projects
 
Proposal solar
Proposal solarProposal solar
Proposal solar
 
performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverter
 

Viewers also liked

REGLAMENTO GENERAL DE COMERCIALIZACION DE CARNE EN EL PERÚ
REGLAMENTO GENERAL DE COMERCIALIZACION DE CARNE EN EL PERÚ REGLAMENTO GENERAL DE COMERCIALIZACION DE CARNE EN EL PERÚ
REGLAMENTO GENERAL DE COMERCIALIZACION DE CARNE EN EL PERÚ
Josselyn Yajayra
 
Reyes izaguirre
Reyes izaguirreReyes izaguirre
Reyes izaguirre
Cristall-Reyes
 
Woo (korea)
Woo (korea)Woo (korea)
Woo (korea)
malikuz zahar
 
Company profile
Company profileCompany profile
Company profile
ulteno dot com
 
Bni會員守則簡報
Bni會員守則簡報Bni會員守則簡報
Bni會員守則簡報
Chris Kuo
 
Procedural writing-powerpoint-1vyibev
Procedural writing-powerpoint-1vyibevProcedural writing-powerpoint-1vyibev
Procedural writing-powerpoint-1vyibevhroberts14
 
BNI長佑回顧
BNI長佑回顧BNI長佑回顧
BNI長佑回顧
Chris Kuo
 
El resumen
El resumenEl resumen
El resumen
lenguaiesocouto
 
Regimento aprovado na Conferência
Regimento aprovado na ConferênciaRegimento aprovado na Conferência
Regimento aprovado na Conferência
DiversidadeSexualSP
 

Viewers also liked (9)

REGLAMENTO GENERAL DE COMERCIALIZACION DE CARNE EN EL PERÚ
REGLAMENTO GENERAL DE COMERCIALIZACION DE CARNE EN EL PERÚ REGLAMENTO GENERAL DE COMERCIALIZACION DE CARNE EN EL PERÚ
REGLAMENTO GENERAL DE COMERCIALIZACION DE CARNE EN EL PERÚ
 
Reyes izaguirre
Reyes izaguirreReyes izaguirre
Reyes izaguirre
 
Woo (korea)
Woo (korea)Woo (korea)
Woo (korea)
 
Company profile
Company profileCompany profile
Company profile
 
Bni會員守則簡報
Bni會員守則簡報Bni會員守則簡報
Bni會員守則簡報
 
Procedural writing-powerpoint-1vyibev
Procedural writing-powerpoint-1vyibevProcedural writing-powerpoint-1vyibev
Procedural writing-powerpoint-1vyibev
 
BNI長佑回顧
BNI長佑回顧BNI長佑回顧
BNI長佑回顧
 
El resumen
El resumenEl resumen
El resumen
 
Regimento aprovado na Conferência
Regimento aprovado na ConferênciaRegimento aprovado na Conferência
Regimento aprovado na Conferência
 

Similar to CV_ RKS 2016 (20)

Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
 
Resume_Ravindra
Resume_RavindraResume_Ravindra
Resume_Ravindra
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
ajit-cv-2015
ajit-cv-2015ajit-cv-2015
ajit-cv-2015
 
Resume
ResumeResume
Resume
 
Saroja patra@cv
Saroja patra@cvSaroja patra@cv
Saroja patra@cv
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Narendra@working reliance CV
Narendra@working reliance CVNarendra@working reliance CV
Narendra@working reliance CV
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
SUDIP DHAR Resume electrical Engineering
SUDIP DHAR  Resume electrical EngineeringSUDIP DHAR  Resume electrical Engineering
SUDIP DHAR Resume electrical Engineering
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
VATSAL JANAKRAI BHATT
VATSAL JANAKRAI BHATTVATSAL JANAKRAI BHATT
VATSAL JANAKRAI BHATT
 
Resume- Plant Manager- Harish
Resume- Plant Manager- HarishResume- Plant Manager- Harish
Resume- Plant Manager- Harish
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
venkatCV
venkatCVvenkatCV
venkatCV
 
NIKHIL-RESUME
NIKHIL-RESUMENIKHIL-RESUME
NIKHIL-RESUME
 
Resume-Smita
Resume-SmitaResume-Smita
Resume-Smita
 
SRao_cv
SRao_cvSRao_cv
SRao_cv
 
NEW CV
NEW CVNEW CV
NEW CV
 

CV_ RKS 2016

  • 1. R.K.Shakar, rkshakar@gmail.com R.K.Shakar RESUME 98939 00305 (M) Objectives : To persue career in good and reputed organization, and work for progress & achievement of organizational goals. Rendering efficient services for the betterment of the organization in a cost effective manner, utilizing best of my knowledge, experience and skills. Experience: More than 28 Years Professional Career: Sr. No. Name of Employer Designation Period 1 Godawari Power & Ispat Ltd. Siltara, Raipur ( CG ) Sr. DGM – Power Plant (Electrical) 1 X 105 MVA CPP April - 2013 to Till Date (3.5 yrs.) 2 Godawari Power & Ispat Ltd. Siltara, Raipur ( CG ) DGM – Power Plant (Electrical) 1 X 105 MVA CPP April - 2010 to 31st March 2013 (03 yrs.) 3 Godawari Power & Ispat Ltd. Siltara, Raipur ( CG ) AGM – Power Plant (Electrical) 1 X 75 MVA CPP April - 2007 to 31st March 2010 (03 yrs.) 4 Ispat Godawari Ltd. Siltara, Raipur ( CG ) Dy. Mgr. – Power Plant (Electrical) 1 X 12.5 MVA CPP August - 2005 to 31st March 2007 (03 yrs.) 5 The Associated Cement Companies Ltd. ACC Jamul Cement Works Foremen – (Electrical) 25 MW CPP & 1.67 MT Cement Plant. 1st . August 1988 to 25th August 2005 (18 yrs.) Educational Qualifications: Sr. No. Exam. Passed Name of Board/University/ Institution Year of Passing % of marks 1 H.S.S.C. Examination Board of Secondary Education, Madhya Pradesh, Bhopal 1984 52 2 4 yrs. Job oriented Diploma in (ELECTRICAL) Engineering. ACC Engineering Institute, Kymore. ( M.P) 1988 3 Diploma in Plant Engineering & Management IIPE-Chennai 2002 First 4 Electrical Supervisory Certificate (Non Mining) Exam. C.G. Electrical Licensing Board, Govt. of C.G. 2003 5 Master Program in Electrical Engineering (MEE) CIIMS- Nagpur. (Distance Course) 2012 A Grade 6 Electrical Supervisory Certificate (Mining) Exam. C.G. Electrical Licensing Board, Govt. of C.G. 2014 Date of Birth: 20th DECEMBER 1966 PASSPORT: M 4885379 (12.01.2025)
  • 2. AADHAR NO.: 2903 9177 7313 JOB RESPONSIBILITY: • Working as Sr. D.G.M. Power Plant (Electrical) for 105 MVA, CPP with commissioning, environment, troubleshooting, planning & execution for Preventive improvement & shutdown jobs at GPIL, Siltara, Raipur. • Preferred managerial Duties at the Division level including preparation & verification of the existing Drawings, including the interface with various engineering disciplines during design / commissioning documents. Conceptual & detailed Electrical / C7I design & layout maintenance and logic development related to Control and Instrumentation system in GPIL, (Line-3) 2.5 MTPA Clinker Project Yanbu Cement Company, KSA & ACC Jamul 1.67 MTPA Cement Works & its 25MW Power Plant. • Directed preparation of and reviews / approves forecast for Manpower, materials, and supplier required, order tools & initiative action to assure stocks are maintained at minimum adequate level. • Supporting for ISO-9002 & TPM implementation at ACC Jamul Cement Works, Durg. ISO 9001 2008 for Quality Management, ISO 14001 2004 for Environment Management System & ISO 18001 2007 for Occupational Health & Safety at GPIL. • Planning for Critical as well as general electrical & mechanical spares. • Preparation of Safe Operating Instructions, good housekeeping, training & development of subordinates and Plant. • Historization of all the data related to the plant. • Preparation of all occurrence reports, Failure reports, Generation Reports, Abnormal incident reports etc. related to the plant. • IMS based maintenance activities in the Plant and overall IMS implementation in the department. Facilitation of Autonomous maintenance and Equipment ownership amongst the Staff. • All electrical Equipments routine test, maintenance, calibration & trouble shooting. • All Over Head Lines, HT Cable Termination, switch board & their Protection Relays. • All the VVVF Drives of ABB & VACON, ESP,s and their Control panels, DC Battery Bank and chargers up to 600 AH. Blue Star Package AC systems etc. • To ensure high availability of All Electrical Equipments & Systems in the Power Plant. • To minimize cost of maintenance of the plant & optimize equipment lifecycle cost. • Statutory compliance with the Office of CSPDCL, CSPTCL, SLDC, NLDC, CREDA, CSERC, CEA & Electrical Inspectorate – C.G. • Core Competence in application of Preventive, planned, Breakdown & Predictive maintenance practices ensuring maximum availability with
  • 3. expertise in ensuring adherence to safety, Environment & Health standards along with CDM projects, REC Issuance and sale. • Training to subordinates and their skill up gradation. • Annual shut down planning for Synchronous Turbo-Generators, Boilers, Turbines, & their Auxiliaries, All HT (11KV & 132 KV) Switch Boards and Substation, All Motor, AC Drive Panels, HT & LT Breakers, EHV & HV Transformers, up to 45 MVA. Emergency HT & LT DG Sets of 2100 KVA, 750 KVA & 1010 KVA. Thermal Captive Power Plant: • Engineering & successful Commissioning of Black Start scheme for 25 MW CPP under totally Blackout condition with TATA Electric Company at ACC Jamul Cement Works. • Engineering Planning & successful Commissioning of Load Management System by Rockwell Automation System. • Prepared Energy Data Monitoring & Display System for Report Package Required as per CREDA, CSPDCL, SLDC & NLDC. Technical Capability : Sound Technical Knowledge of :- 1) WOODWARD 505 & 509 Governor Controllers. 2) VVVF Drives – Siemens, L&T, ABB & Vacon makes. 3) Relay co-ordination for Stability of Plant to avoid Cascade tripping of generators. 4) Load Management system for Load Shading, Sharing, Limiting of Export, Import, Auto Synchronizing Schemes among Generators, Couplers, Emergency DG Set & Grid. 5) UPS System of Plant Successful Installation Erection & commissioning: • 1 x 25 MW ABB make Steam Turbine Synchronous Generator Along with complete Auxiliary with CHP and GT of 11/132 KV at ACC Jamul Cement Works. • 1 x 12.5 MVA Synchronous Turbo-Generators from CA Parson, England, Along with complete Auxiliary at GPIL • 1 x 12.5 MVA Synchronous Turbo-Generators from Hitachi, JAPAN Along with complete Auxiliary and GT of 6.9/11KV at GPIL. • 1 x 37.5 MVA Synchronous Turbo-Generators from China Along with complete Auxiliary at GPIL • 2 x 31.25 MVA Synchronous Turbo-Generators from VA Tech, BHOPAL, Along with complete Auxiliary design. Distribution, lay outing of CIVIL Construction with 2 x 2900KVA Distribution Transformers at Sister plant Jagdamba Power & Alloys Ltd and GPIL, Siltara. • Upgradation and Replacement of Old Analog AVR with New Digital AVR designed by ABB on our demanded parameters for 3x10MW Generator at GPIL
  • 4. • 2 x 132 KV/ 11 KV EHV Sub Station with accessories & 2x45 MVA Transformers at Sister plant Jagdamba Power & Alloys Ltd and GPIL, Siltara. • 1 x 8 MW Bio Mass Power Plant (OLD Inoperative) Plant Started after complete O/H, Sister Plant of Hira Group • Electrical Installation Testing and Commissioning support to 1 x 50 MW Solar Thermal Power Plant Based in Nokh, Rajasthan under National Solar Mission named Godawari Green Energy Ltd (GGEL) • 1 x 2100 KVA Emergency LV DG Set for Power Plant • 2 x 2100 KVA Emergency HV (11KV) DG Set with HT Panel synchronizing scheme for Power Plant and SID (GPIL) • 160 TPH CHP Circuit Planning, Designing, and commissioning at GPIL • 100TPH Biomass (Rice Husk) Boiler Planning, Installation and Commissioning along with 2 x 2900KVA Distribution Transformers at GPIL • Project of SMS Induction Furnaces all Electrical HT and LT installation, testing and Commissioning activities at GPIL . TRAININGS • Has undergone training on VACON Drives at Site after Installation • Has undergone training on Thyristor Controlled Drives Maintenance at ACC RCD, Thane. PLACE: RAIPUR, (CG) (RajendRa KumaR ShaKaR)