R.K. Shakar has over 28 years of experience working in electrical roles in the power industry. He is currently serving as Senior Deputy General Manager of the 105 MVA power plant at Godawari Power & Ispat Ltd. in Raipur, Chhattisgarh, India. Some of his responsibilities include maintenance planning, overseeing electrical systems, ensuring regulatory compliance, and training subordinates. He has experience with commissioning various power equipment including turbines, generators, transformers, and switchgear.
A Senior Level graduate Electrical Engineer with an experience of 16 Year 9 Month in Project Management entailing Installation & Commissioning, Maintenance, Operations, Troubleshooting, Quality Control and Team Management in Steel, Power and Solar Plant.
Adept in managing Maintenance & operation activities involving resource planning, in-process inspection, team building and co-ordination with internal / external departments.
Demonstrated excellence in setting priorities, developing work schedule, monitoring progress towards goals and tracking details/data/information/activities.
An effective communicator and possess good experience in building relationships with different country person like USA/France/UK/Germany/China/Russia during work.
A Senior Level graduate Electrical Engineer with an experience of 16 Year 9 Month in Project Management entailing Installation & Commissioning, Maintenance, Operations, Troubleshooting, Quality Control and Team Management in Steel, Power and Solar Plant.
Adept in managing Maintenance & operation activities involving resource planning, in-process inspection, team building and co-ordination with internal / external departments.
Demonstrated excellence in setting priorities, developing work schedule, monitoring progress towards goals and tracking details/data/information/activities.
An effective communicator and possess good experience in building relationships with different country person like USA/France/UK/Germany/China/Russia during work.
This presentation gives a quick perspective on costs that are involved in executing a MW scale power project in the Indian context. Both the indicative costs and the cost split-up among the various BOQ items are laid out at the various project scales. Indicative costs are assumed from a pure EPC perspective. However, generally the EPC scopes of work are sliced and diced and further outsourced/subcontracted. In such a scenario the execution costs might increase from the indicated costs.
Project Proposal on 10 MW Solar PV Power PlantVignesh Sekar
By installing and successfully operating 10 MW photovoltaic (PV) power plants will deliver electricity for consumption by the owners, the relevant peoples in the project assessment place will be made aware of the technical and economic potential of solar power generation. Furthermore, the power required from the public grid will be reduced, and overall expenditure on electric power will be lowered & our project aims to create the necessary awareness among the population, and especially among policy-makers and large investors, Youngsters.....
Gensol strives to add value from Project Conceptualisation to Commissioning to ensure timely, quality and cost effective completion. From drafting exhaustive EPC contracts to approving engineering drawings and quality control during construction, Gensol's experience of 1500 MW works to ensure Peace of Mind for the Project Developer.
Rfp document for Solar PV Project in DelhiHeadway Solar
Bid document for Solar PV Project in Delhi. Released by North Delhi Power Limited.
This document is not a work of Headway Solar (http://headwaysolar.com/) and it has been released here for the benefit of the general public.
Having 7+ years of experience as a Sr. Engineer / Engineer in EPC power industry.
• Preparation of Technical Specifications related to Electrical System, Single Line Diagrams, Control schemes, Layouts, and developing drawings as per Site requirement using AUTOCAD.
• Basic Design, Detailed Engineering, Project Co-ordination and commissioning of Power & Distribution
Transformers, 132KV Switchyard equipment, 6.6KV HT Panels, 415V PMCC & MCC Panels, AC & DC Distribution Boards, LDB’s, Batteries & Battery Charger, UPS, HT & LT Cables, Earthing and Lightening Protection system, Illumination system etc.
• Preparation of Bill of Quantities (BOQ) & Costing for Electrical System.
• Preparation of Material indents as per the Site requirement in SAP.
• Review of drawing and documents submitted by Vendors and approving the same.
• Releasing of Approved Drawings to site for Erection and commissioning activities.
• Tendering for Electrical system of Power plants ranging from 10MW to 60MW and Sub-stations upto 132KV voltage level.
Balance of System (BOS) of a Solar Project has undergone a significant price reduction but continuous optimisation is making the trend continuing to go further down.
The presentation discusses on aspects around over-loading, cable optimisation, introduction of 1500 V systems and many other interesting optimisations.
This presentation gives a quick perspective on costs that are involved in executing a MW scale power project in the Indian context. Both the indicative costs and the cost split-up among the various BOQ items are laid out at the various project scales. Indicative costs are assumed from a pure EPC perspective. However, generally the EPC scopes of work are sliced and diced and further outsourced/subcontracted. In such a scenario the execution costs might increase from the indicated costs.
Project Proposal on 10 MW Solar PV Power PlantVignesh Sekar
By installing and successfully operating 10 MW photovoltaic (PV) power plants will deliver electricity for consumption by the owners, the relevant peoples in the project assessment place will be made aware of the technical and economic potential of solar power generation. Furthermore, the power required from the public grid will be reduced, and overall expenditure on electric power will be lowered & our project aims to create the necessary awareness among the population, and especially among policy-makers and large investors, Youngsters.....
Gensol strives to add value from Project Conceptualisation to Commissioning to ensure timely, quality and cost effective completion. From drafting exhaustive EPC contracts to approving engineering drawings and quality control during construction, Gensol's experience of 1500 MW works to ensure Peace of Mind for the Project Developer.
Rfp document for Solar PV Project in DelhiHeadway Solar
Bid document for Solar PV Project in Delhi. Released by North Delhi Power Limited.
This document is not a work of Headway Solar (http://headwaysolar.com/) and it has been released here for the benefit of the general public.
Having 7+ years of experience as a Sr. Engineer / Engineer in EPC power industry.
• Preparation of Technical Specifications related to Electrical System, Single Line Diagrams, Control schemes, Layouts, and developing drawings as per Site requirement using AUTOCAD.
• Basic Design, Detailed Engineering, Project Co-ordination and commissioning of Power & Distribution
Transformers, 132KV Switchyard equipment, 6.6KV HT Panels, 415V PMCC & MCC Panels, AC & DC Distribution Boards, LDB’s, Batteries & Battery Charger, UPS, HT & LT Cables, Earthing and Lightening Protection system, Illumination system etc.
• Preparation of Bill of Quantities (BOQ) & Costing for Electrical System.
• Preparation of Material indents as per the Site requirement in SAP.
• Review of drawing and documents submitted by Vendors and approving the same.
• Releasing of Approved Drawings to site for Erection and commissioning activities.
• Tendering for Electrical system of Power plants ranging from 10MW to 60MW and Sub-stations upto 132KV voltage level.
Balance of System (BOS) of a Solar Project has undergone a significant price reduction but continuous optimisation is making the trend continuing to go further down.
The presentation discusses on aspects around over-loading, cable optimisation, introduction of 1500 V systems and many other interesting optimisations.
1. R.K.Shakar,
rkshakar@gmail.com
R.K.Shakar RESUME 98939 00305 (M)
Objectives : To persue career in good and reputed organization, and work for progress &
achievement of organizational goals. Rendering efficient services for the
betterment of the organization in a cost effective manner, utilizing best of my
knowledge, experience and skills.
Experience: More than 28 Years
Professional Career:
Sr. No. Name of Employer Designation Period
1
Godawari Power & Ispat Ltd.
Siltara, Raipur ( CG )
Sr. DGM – Power Plant
(Electrical)
1 X 105 MVA CPP
April - 2013 to Till
Date
(3.5 yrs.)
2
Godawari Power & Ispat Ltd.
Siltara, Raipur ( CG )
DGM – Power Plant
(Electrical)
1 X 105 MVA CPP
April - 2010 to 31st
March 2013
(03 yrs.)
3
Godawari Power & Ispat Ltd.
Siltara, Raipur ( CG )
AGM – Power Plant
(Electrical)
1 X 75 MVA CPP
April - 2007 to 31st
March 2010
(03 yrs.)
4
Ispat Godawari Ltd. Siltara,
Raipur ( CG )
Dy. Mgr. – Power Plant
(Electrical)
1 X 12.5 MVA CPP
August - 2005 to
31st
March 2007
(03 yrs.)
5
The Associated Cement
Companies Ltd. ACC Jamul
Cement Works
Foremen – (Electrical) 25 MW
CPP & 1.67 MT Cement Plant.
1st
. August 1988 to
25th
August 2005
(18 yrs.)
Educational Qualifications:
Sr. No. Exam. Passed Name of Board/University/
Institution
Year of
Passing
% of
marks
1 H.S.S.C. Examination Board of Secondary Education,
Madhya Pradesh, Bhopal
1984 52
2 4 yrs. Job oriented Diploma in
(ELECTRICAL) Engineering.
ACC Engineering Institute,
Kymore. ( M.P)
1988
3 Diploma in Plant Engineering &
Management
IIPE-Chennai
2002 First
4 Electrical Supervisory Certificate
(Non Mining) Exam.
C.G. Electrical Licensing
Board, Govt. of C.G.
2003
5 Master Program in Electrical
Engineering (MEE)
CIIMS- Nagpur. (Distance
Course)
2012 A Grade
6 Electrical Supervisory Certificate
(Mining) Exam.
C.G. Electrical Licensing
Board, Govt. of C.G.
2014
Date of Birth: 20th
DECEMBER 1966
PASSPORT: M 4885379 (12.01.2025)
2. AADHAR NO.: 2903 9177 7313
JOB RESPONSIBILITY:
• Working as Sr. D.G.M. Power Plant (Electrical) for 105 MVA, CPP with
commissioning, environment, troubleshooting, planning & execution for
Preventive improvement & shutdown jobs at GPIL, Siltara, Raipur.
• Preferred managerial Duties at the Division level including preparation &
verification of the existing Drawings, including the interface with various
engineering disciplines during design / commissioning documents.
Conceptual & detailed Electrical / C7I design & layout maintenance and
logic development related to Control and Instrumentation system in GPIL,
(Line-3) 2.5 MTPA Clinker Project Yanbu Cement Company, KSA &
ACC Jamul 1.67 MTPA Cement Works & its 25MW Power Plant.
• Directed preparation of and reviews / approves forecast for Manpower,
materials, and supplier required, order tools & initiative action to assure
stocks are maintained at minimum adequate level.
• Supporting for ISO-9002 & TPM implementation at ACC Jamul Cement
Works, Durg. ISO 9001 2008 for Quality Management, ISO 14001 2004 for
Environment Management System & ISO 18001 2007 for Occupational
Health & Safety at GPIL.
• Planning for Critical as well as general electrical & mechanical spares.
• Preparation of Safe Operating Instructions, good housekeeping, training &
development of subordinates and Plant.
• Historization of all the data related to the plant.
• Preparation of all occurrence reports, Failure reports, Generation Reports,
Abnormal incident reports etc. related to the plant.
• IMS based maintenance activities in the Plant and overall IMS
implementation in the department. Facilitation of Autonomous maintenance
and Equipment ownership amongst the Staff.
• All electrical Equipments routine test, maintenance, calibration & trouble
shooting.
• All Over Head Lines, HT Cable Termination, switch board & their Protection
Relays.
• All the VVVF Drives of ABB & VACON, ESP,s and their Control panels, DC
Battery Bank and chargers up to 600 AH. Blue Star Package AC systems
etc.
• To ensure high availability of All Electrical Equipments & Systems in the
Power Plant.
• To minimize cost of maintenance of the plant & optimize equipment lifecycle
cost.
• Statutory compliance with the Office of CSPDCL, CSPTCL, SLDC, NLDC,
CREDA, CSERC, CEA & Electrical Inspectorate – C.G.
• Core Competence in application of Preventive, planned, Breakdown &
Predictive maintenance practices ensuring maximum availability with
3. expertise in ensuring adherence to safety, Environment & Health standards
along with CDM projects, REC Issuance and sale.
• Training to subordinates and their skill up gradation.
• Annual shut down planning for Synchronous Turbo-Generators, Boilers,
Turbines, & their Auxiliaries, All HT (11KV & 132 KV) Switch Boards and
Substation, All Motor, AC Drive Panels, HT & LT Breakers, EHV & HV
Transformers, up to 45 MVA. Emergency HT & LT DG Sets of 2100 KVA,
750 KVA & 1010 KVA.
Thermal Captive Power Plant:
• Engineering & successful Commissioning of Black Start scheme for 25 MW
CPP under totally Blackout condition with TATA Electric Company at ACC
Jamul Cement Works.
• Engineering Planning & successful Commissioning of Load Management
System by Rockwell Automation System.
• Prepared Energy Data Monitoring & Display System for Report Package
Required as per CREDA, CSPDCL, SLDC & NLDC.
Technical Capability : Sound Technical Knowledge of :-
1) WOODWARD 505 & 509 Governor Controllers.
2) VVVF Drives – Siemens, L&T, ABB & Vacon makes.
3) Relay co-ordination for Stability of Plant to avoid Cascade tripping
of generators.
4) Load Management system for Load Shading, Sharing, Limiting of
Export, Import, Auto Synchronizing Schemes among Generators,
Couplers, Emergency DG Set & Grid.
5) UPS System of Plant
Successful Installation Erection & commissioning:
• 1 x 25 MW ABB make Steam Turbine Synchronous Generator Along with
complete Auxiliary with CHP and GT of 11/132 KV at ACC Jamul Cement
Works.
• 1 x 12.5 MVA Synchronous Turbo-Generators from CA Parson, England,
Along with complete Auxiliary at GPIL
• 1 x 12.5 MVA Synchronous Turbo-Generators from Hitachi, JAPAN Along
with complete Auxiliary and GT of 6.9/11KV at GPIL.
• 1 x 37.5 MVA Synchronous Turbo-Generators from China Along with
complete Auxiliary at GPIL
• 2 x 31.25 MVA Synchronous Turbo-Generators from VA Tech, BHOPAL,
Along with complete Auxiliary design. Distribution, lay outing of CIVIL
Construction with 2 x 2900KVA Distribution Transformers at Sister plant
Jagdamba Power & Alloys Ltd and GPIL, Siltara.
• Upgradation and Replacement of Old Analog AVR with New Digital
AVR designed by ABB on our demanded parameters for 3x10MW
Generator at GPIL
4. • 2 x 132 KV/ 11 KV EHV Sub Station with accessories & 2x45 MVA
Transformers at Sister plant Jagdamba Power & Alloys Ltd and GPIL,
Siltara.
• 1 x 8 MW Bio Mass Power Plant (OLD Inoperative) Plant Started after
complete O/H, Sister Plant of Hira Group
• Electrical Installation Testing and Commissioning support to 1 x 50
MW Solar Thermal Power Plant Based in Nokh, Rajasthan under
National Solar Mission named Godawari Green Energy Ltd (GGEL)
• 1 x 2100 KVA Emergency LV DG Set for Power Plant
• 2 x 2100 KVA Emergency HV (11KV) DG Set with HT Panel synchronizing
scheme for Power Plant and SID (GPIL)
• 160 TPH CHP Circuit Planning, Designing, and commissioning at GPIL
• 100TPH Biomass (Rice Husk) Boiler Planning, Installation and
Commissioning along with 2 x 2900KVA Distribution Transformers at GPIL
• Project of SMS Induction Furnaces all Electrical HT and LT installation,
testing and Commissioning activities at GPIL
.
TRAININGS
• Has undergone training on VACON Drives at Site after Installation
• Has undergone training on Thyristor Controlled Drives Maintenance at ACC
RCD, Thane.
PLACE: RAIPUR, (CG)
(RajendRa KumaR