SlideShare a Scribd company logo
Page 1
C U R R I C U L U M V I T A E
N E L S O N P E R A N T E V I L L A S I S
096 Manigbas St. Bolo Bauan, Bantangas City
+63999-354-56-03 / +63-043-980-0031
E-mail Address: villasisnelson@yahoo.com
villasisnelson@gmail.com
OBJECTIVE:
To have a trustworthy position in a company through efficient and active involvement in its
operations. Share my skills, knowledge and abilities for the success of the company and for the growth of
my career
PERSONAL DATA
PermanentAddress : 096 Manigbas St. Bolo Bauan, Bantangas City
Date of Birth : November 16, 1975
Place of Birth : Ilo-Ilo City
Age : 40 years old
Height : 5’5”
Weight : 85 kgs.
Gender : Male
Civil Status : Married
SUPPLEMENTAL INFORMATION
SSS No. : 04 - 0905949 – 0
T.I.N : 304-562-250-00
PassportNo : EC2256189
EDUCATIONAL QUALIFICATION
College GOLDEN GATE COLLEGES
Piprieto St. Batangas City
BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING
April 02, 2005
Secondary BAUAN HIGH SCHOOL
Bauan,Batangas
Primary BOLO ELEMENTARY SCHOOL
Bolo, Bauan,Batangas
Vocational Course ADVANCED BUSINESS CONSULTANCY CENTRE PHILS. INC.
ABCC Bldg. 127 M.H. Del Pilar St., Batangas City
AUTOCAD I
July 15, 2006 – August 26, 2006
TRAININGS AND SEMINARS ATTENDED:
 GAS TURBINE POWER PLANTS SEMINAR
Held at the Golden Gate College
February 05, 2005
 OCCUPATIONAL SAFETY AND HEALTH
Held on March 15-19 2004
Alpa Hotel Batangas City
 OJT – KEPPEL BATANGAS
April 20, 2005 – June 14, 2005 (300 hrs.)
Page 2
PROFESSIONAL WORK EXPERIENCES
MAY. 11, 2016. PIPING ENGINEER
TO PRESENT JEL - Jurong Engineering Limited
PCP PENGERANG COGENERATION PLANT
RAPID PROJECT MALAYSIA
Responsible for the planning and erection of4 Units of HRSG Piping.
Monitoring the availability and quantity of all piping material thatneed on site erection.Direct coordination to client
regarding any deviation and clarification atsite erection.
Supervise the efficiency of manpower for every system and monitoring ofdaily progress againstprojecttarget
schedule.
REFERENCES
N. SUBRAMANIAN
Project Manager
Jurong Engineering Limited
PCP PENGERANG COGENERATION PLANT
MALAYSIA
Jan. 22, 2015. PIPING ENGINEER
March. 2016 JEL - Jurong Engineering Limited
Az-Zour North Phase 1 IWPP Project
KUWAIT
JOB DESCRIPTION
Responsible for the planning and erection ofRemenelization and 10 Units of Desalination Plantboth metallic and
GRP Piping.Also in-charge in the fabrication of all big/small bore piping and pipe support atfabrication as well as
blasting and painting.
Monitoring the availability and quantity of all piping material thatneed on site erection.Direct coordination to client
regarding any deviation and clarification atsite erection.
Supervise the efficiency of manpower for every system and monitoring of daily progress againstprojecttarget
schedule.
REFERENCES
Norlyne L. Gagarin
Project Manager
Jurong Engineering Limited
Page 3
Az-Zour North Phase 1 IWPP Project
KUWAIT
June 16, 2014. QA/QC SUPERVISOR
Sept. 15, 2014 Mitsubishi Heavy Industries,Ltd.
O Mon Thermal Power Plant Project Phase II
Lilama 45.1 Fabrication, Dong Nai Province,
Vietnam
JOB DESCRIPTION
Responsible for the implementation of quality control at fabrication site, supervises quality control
documentation and inspection in the piping fabrication in accordance with the existing codes and standards,
approved MHPS inspection procedures, and project specifications. monitoring for the actual piping progress
against project plan. and conduct weekly meeting for resolving any site deviation as will as the project
weekly progress. reviewing final package for final documentation hand over.
REFERENCES
Ms. Harumi Yasuda
Project Manager
Mitsubishi Heavy Industries,Ltd.
O Mon Thermal Power PlantProject Phase II
Lilama 45.1 Fabrication, Dong Nai Province, Vietnam
Feb. 05, 2013. PIPING ENGINEER
Mar. 31, 2014 JEL - Jurong Engineering Limited
Chana II Combined Cycle Power Project
124/5 Moo 1, Highway 43 Tambon Paching,
Chana Songkhla 90130,THAILAND
JOB DESCRIPTION
Responsible for the planning ofpiping erection as per approved piping erection sequence also in -charge for
widrawall ofpiping spools and permanentsupports as per priorityto be supplyon each piping team for ERECTION.
Performing actual site supervision to raise-up (RFI) RequestFor Information to any significantpiping deviation and
changes atsite condition.Also in-charges for the actual piping progress reportagainstprojectplan.Also incharge in
projectschedule implementation and coordination with the clientand other contractor and give instructions and
information to projectstaff and worker. Also supervise and implementthe company’s safety, health and
environmental program ,monitor and coordinate overall activities between revenue line to ensure efficiencyof
operation especiallyduring breakdown and peak hours . Execution of ECC walkdown and Preparation of Erection
Clearance Certificate (ECC) documents prior to commissioning.As well as, clearing ofpunch listitems for ECCs.
Preparation of Turn Over Package (TOP) documents prior to final hand over project.
REFERENCES
Nicholas Chen Nyit Kong
Project Manager
Page 4
Jurong Engineering Limited
Chana II Combined Cycle Power Project
124/5 Moo 1, Highway 43 tambon paching,
Chana Songkhla 90130, THAILAND
Feb. 01, 2012. QA/QC SUPERVISOR
Nov. 30 2012. Mitsui-Kinzoku Engineering Kabushiki-Kaisha
MESCO INC. PHILIPPINE BRANCH
TAGANITO MINING PROJECT
Claver, Surigao Del Norte 8410
JOB DESCRIPTION
Responsible for the implementation of quality control at construction site, supervises quality control
documentation and inspection in the off-site battery limit piping accordance with the existing codes and
standards, approved site erection and inspection procedures, and project specifications. Scope of
inspection includes all activities in piping, equipments, and structural works such as piping fit up check,
weld visual check, line check, pressure test, column alignment check, bolt tightness check,pump location
and elevation check, pump alignment check, erection completion check and others as statedin the approved
site erection and inspection procedures.
REFERENCES
Mr. MasaakiUemura
Site Manager
Taganito Mining Project
Claver Surigao Del Norte
PHILIPPINES
May 27, 2011. QA/QC SUPERVISOR
to Nov. 30 2011. Mitsubishi Heavy Industries, Ltd. ( MITSUI & CO. LTD)
PAITON-3 EXPANSION PROJECT
INDONESIA
JOB DESCRIPTION
Responsible for the implementation of quality control at construction site, supervises quality control
documentation and inspection in the boiler in accordance with the existing codes and standards, approved
site erection and inspection procedures, and project specifications. Scope of inspection includes all
activities in piping, equipments, and structural works such as piping fit up check, weld visual check, line
check, pressure test, packer plate location and elevation check, column alignment check, bolt tightness
check, grouting, pump location and elevation check, pump alignment check, erection completion check and
others as statedin the approved site erection and inspection procedures.
REFERENCES
Mr. Ryoichi Jono
QA/QC Manager
Mitsubishi Heavy Industries,Ltd.
Paiton – 3 Expansion Project
Indonesia
Page 5
May 15, 2010. QA/QC SUPERVISOR
May 7, 2011 Mitsubishi Heavy Industries, Ltd. (SUMITOMO CORPORATION BOILER
DIVISION)
TANJUNG JATI B. PROJECT UNIT 3&4
INDONESIA
JOB DESCRIPTION
Responsible for the implementation of quality control at construction site, supervises quality control
documentation and inspection in the boiler in accordance with the existing codes and standards, approved
site erection and inspection procedures, and project specifications. Scope of inspection includes all
activities in piping, equipments, and structural works such as piping fit up check, weld visual check, line
check, pressure test, packer plate location and elevation check, column alignment check, grouting, bolt
tightness check,pump location and elevation check, pump alignment check,erection completion check and
others as statedin the approved site erection and inspection procedures.
REFERENCES
Mr. Jun Sakamoto
QA/QC Manager
Mitsubishi Heavy Industries,Ltd.
Tanjung Jati B. Projecet
Indonesia
March 27, 2009. QA/QC SUPERVISOR
April 15, 2010 Mitsubishi Heavy Industries, Ltd.
SHUQAIQ II
(IWPP) IndependentWater & Power Plant Project
Jizan Province Kingdom of Saudi Arabia
JOB DESCRIPTION
Responsible for the implementation of quality control at construction site, supervises quality control
documentation and inspection in the boiler, turbine, and balance of plant (outdoor) areas in accordance with
the existing codes and standards, approved site erection and inspection procedures, and project
specifications. Scope of inspection includes all activities in piping, equipments, and structural works such
as piping fit up check,weld visual check, line check,pressure test, column alignment check, bolt tightness
check, tank/vessel location and elevation check, pump location and elevation check, pump alignment check,
erection completion check and others as stated in the approved site erection and inspection procedures.
Balance of plant areas include Fuel Gas Reducing Station, Piperack,Fuel Oil Pumphouse, Fuel Oil Tank area,
Emergency Diesel Generator area, Water Tank area,Water Treatment area, Seawater Intake area,Chlorination
area,Auxiliary Boiler area and Desalination Plants.
REFERENCES
Mr. Takayuki Okamoto
QA/QC Manager
Mitsubishi Heavy Industries,Ltd.
SHUQAIQ II
(IWPP) IndependentWater & Power Plant Project
Page 6
Jizan Province Kingdom of Saudi Arabia
June 07, 2008. QA/QC SUPERVISOR
February 28, 2009. Mitsubishi Heavy Industries,Ltd.
O Mon Thermal Power PlantProject
Can Tho Province, Vietnam
JOB DESCRIPTION
Responsible for the implementation of quality control at construction site, supervises quality control
documentation and inspection in the boiler, turbine, and balance of plant (outdoor) areas in accordance with
the existing codes and standards, approved site erection and inspection procedures and project
specifications. Scope of inspection includes all activities in piping, tanks/vessels, auxiliary equipments,
condenser, and structural works such as piping fit up check, weld visual check, line check,pressure test,
column alignment check, bolt tightness check, tank/vessel location and elevation check, pump location and
elevation check, pump alignment check, erection completion check and others as stated in the approved site
erection and inspection procedures. Balance of Plant areas include Fuel Oil Metering Station, Fuel Gas
Reducing Station, Piperack, Fuel Oil Tank Area, Fuel Oil Pumphouse, Fuel Oil Valve Station, Steam
Transformer area,Seawater Chlorination Plant, Water Treatment Plant, Seawater Intake area
REFERENCES
Mr. Yasuhisa Morinaga
QA/QC Manager
Mitsubishi Heavy Industries,Ltd.
O Mon Thermal Power PlantProject
Can Tho Province, Vietnam
November 2, 2006 Process Engineer
June 06, 2008 EEI CORPORATION - INCO - GORO Nickel Modularization Project
Sta. Maria Bolo, Bauan,Batangas
 In-Charged in Traveler preparation/monitoring & Control on Over all Fabrication Shop Operation involving
Structural Pipe Supportand other ancillaries’ items.
 Performs actual field-work inspections on related on going activities as to the use and type of materials,
quality of workmanship and for compliance with codes,contractplans,specifications and providing other
assistance in projectdevelopmentand Monitoring actual work projects as againstprojectschedule
represented bychart, updating work schedule and evaluates significantdeviation of actual project
performance from the projected activities. ;
 Prepare daily report summaryof observation base on actual work progress and other design changes.
 Reviews/Checks ofPiping Isometric fabrication drawing made bythe draftsman from IFC Clients drawing.
 Updates traveler blocks a change notice and latestdrawing revision number and change notice
block on affected approved for fabrication drawings.
 Reviews/Checks technical sketches/cutting list prepared bydraftsman.
Coordinates with Shop section supervisors on fabrication process workability.
 Standard Code and project specification studies.
REFERENCES
Raul G. J. Dela Cruz
Page 7
Project Manager
EEI Corporation
GORO-Nickle Project
March 2005 – KMP STEEL FABRICATION
October 2006 (QC/ Quality Control / Project Coordinator)
In House Subcontractor of Babcock Hitachi Phils.Inc. (BHPI)
JOB DESCRIPTION
As Quality Control Engineer
 Documentation ofthe reports to be submitted to the Quality Control DepartmentofBHPI. (especiallydimensions,
weld size, defects,etc.
 Visual inspection ofwelds using penetranttesting (PT)
 Inspection ofdimension according to drawing plan.
 Check of cosmetics.
As Project Coordinator / Engineer
 Scheduled and allocate manpower
 Representatives in meetings
 Responsible for the material take-offand cutting plans
 As follow – upper
 Time keeper
March 05, 2000 – CDS GENERAL CONTRACTOR
September 30, 2003 (Mechanical Fitter)
JOB DESCRIPTION:
 Check - up and Calibration Clearance and Repair ofOverhauling any types of Pump such as:
a. RECIPROCATING PUMP
b. CENTRIFUGAL PUMP
c. SCREW PUMP AND CONDUCTORS
 Disassemble and Assemble Lube Compressor Lube Oil Purifiers Lube Oil Coolers and Hydraulic Motors.
 Check – up Clearance and Calibrate Intermediate Shaft, Anchor winch, Capstan, Rudder Stock and
Rudder Blades,Dismantle and Installing Propeller Shaftand the Propeller with Regards for Blue Fittings.
 RE-aligning Pump Rooms Motors Generators Units and Reduction Gear with Re-engine Installation.
I hereby certify the statementI made are true and correct to the bestof my knowledge and beliefany false
information,misrepresentation,falsification and materials omission offacts may used as a ground for cancellation.I
am further authorizing this companyto conductan investigation ofmy personal background and inquire,through my
referees.
Page 8
MR. NELSON P. VILLASIS

More Related Content

What's hot

Paul vanson-resume
Paul vanson-resumePaul vanson-resume
Paul vanson-resume
iminneedofu
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
MOHAMAD ANWAR MALIK
 
Clifton SC - CV 2017
Clifton SC - CV 2017Clifton SC - CV 2017
Clifton SC - CV 2017
Stewart Clifton
 
CIRRICULUM VITAE - PelisP
CIRRICULUM VITAE - PelisPCIRRICULUM VITAE - PelisP
CIRRICULUM VITAE - PelisP
Peter Pelis
 
Cris' Updated resume
Cris' Updated resumeCris' Updated resume
Cris' Updated resume
Cristopher Donayre
 
Ariel Awayan CV updated
Ariel Awayan CV updatedAriel Awayan CV updated
Ariel Awayan CV updated
ariel awayan
 
Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross CV .doc 1
Glenn Ross CV .doc 1
Glenn Ross
 
John Keenan - Resume
John Keenan - ResumeJohn Keenan - Resume
John Keenan - Resume
John Keenan
 
WEC CV_2016 09 06
WEC CV_2016 09 06WEC CV_2016 09 06
WEC CV_2016 09 06
Wauren Cruz
 
Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross CV .doc 1
Glenn Ross CV .doc 1
Glenn Ross
 
Zeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh 4 page CV
Zeonn Koh 4 page CV
Zeonn Koh
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
Mahmoud Azab
 
Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Muhammad Naveed Gohar.
Muhammad Naveed Gohar.
Naveed Gohar
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
andi dipayadnya
 
Saifulrizan Annuar CV UPDATED.
Saifulrizan Annuar CV UPDATED.Saifulrizan Annuar CV UPDATED.
Saifulrizan Annuar CV UPDATED.
Saifulrizan Bin Annuar
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
Ricky Dasal
 
Sollie CV 25 June 2015 (4)_CHANGED
Sollie CV 25 June 2015 (4)_CHANGEDSollie CV 25 June 2015 (4)_CHANGED
Sollie CV 25 June 2015 (4)_CHANGED
Sollie Van Nieuwenhuizen
 
CV 3
CV 3CV 3
Chee Wong - CV DEC2016
Chee Wong - CV DEC2016Chee Wong - CV DEC2016
Chee Wong - CV DEC2016
Chee Wong
 
JAGMOC RESUME
JAGMOC RESUMEJAGMOC RESUME
JAGMOC RESUME
Ferdenand Jagmoc
 

What's hot (20)

Paul vanson-resume
Paul vanson-resumePaul vanson-resume
Paul vanson-resume
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Clifton SC - CV 2017
Clifton SC - CV 2017Clifton SC - CV 2017
Clifton SC - CV 2017
 
CIRRICULUM VITAE - PelisP
CIRRICULUM VITAE - PelisPCIRRICULUM VITAE - PelisP
CIRRICULUM VITAE - PelisP
 
Cris' Updated resume
Cris' Updated resumeCris' Updated resume
Cris' Updated resume
 
Ariel Awayan CV updated
Ariel Awayan CV updatedAriel Awayan CV updated
Ariel Awayan CV updated
 
Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross CV .doc 1
Glenn Ross CV .doc 1
 
John Keenan - Resume
John Keenan - ResumeJohn Keenan - Resume
John Keenan - Resume
 
WEC CV_2016 09 06
WEC CV_2016 09 06WEC CV_2016 09 06
WEC CV_2016 09 06
 
Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross CV .doc 1
Glenn Ross CV .doc 1
 
Zeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh 4 page CV
Zeonn Koh 4 page CV
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Muhammad Naveed Gohar.
Muhammad Naveed Gohar.
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
 
Saifulrizan Annuar CV UPDATED.
Saifulrizan Annuar CV UPDATED.Saifulrizan Annuar CV UPDATED.
Saifulrizan Annuar CV UPDATED.
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
Sollie CV 25 June 2015 (4)_CHANGED
Sollie CV 25 June 2015 (4)_CHANGEDSollie CV 25 June 2015 (4)_CHANGED
Sollie CV 25 June 2015 (4)_CHANGED
 
CV 3
CV 3CV 3
CV 3
 
Chee Wong - CV DEC2016
Chee Wong - CV DEC2016Chee Wong - CV DEC2016
Chee Wong - CV DEC2016
 
JAGMOC RESUME
JAGMOC RESUMEJAGMOC RESUME
JAGMOC RESUME
 

Viewers also liked

Pemex global consultancy
Pemex global consultancyPemex global consultancy
Pemex global consultancy
Pemex Global
 
Profile Lakshmi Narayanan
Profile Lakshmi NarayananProfile Lakshmi Narayanan
Profile Lakshmi Narayanan
lakshmi narayanan
 
Numeros complejos ejercicios y superposicion
Numeros complejos ejercicios y superposicionNumeros complejos ejercicios y superposicion
Numeros complejos ejercicios y superposicion
Warren Madrigal Murillo
 
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
adasdasd dasd
 
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
adasdasd dasd
 
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
adasdasd dasd
 
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
adasdasd dasd
 
Argus 012-526-20
Argus 012-526-20Argus 012-526-20
Argus 012-526-20
savomir
 
Syllabus 2016 sep-12
Syllabus 2016 sep-12Syllabus 2016 sep-12
Syllabus 2016 sep-12
andreiitaramon
 
How has selling changed with the internet?
How has selling changed with the internet?How has selling changed with the internet?
How has selling changed with the internet?
jane GARDNER
 
El controlador pid
El controlador pidEl controlador pid
El controlador pid
INVYRTE S. A. de C. V.
 
materi
materimateri
ENC Times-September 12,2016
ENC Times-September 12,2016ENC Times-September 12,2016
ENC Times-September 12,2016
ENC
 
Presentación1
Presentación1Presentación1
Presentación1
Stephanie Castillo
 
Selection process don_obl
Selection process don_oblSelection process don_obl
Selection process don_obl
KhatD
 
PowerCube 1000 V300R005C15 Installation Guide 01 (Nepal, Ncell, ICC310-H1H-C1...
PowerCube 1000 V300R005C15 Installation Guide 01 (Nepal, Ncell, ICC310-H1H-C1...PowerCube 1000 V300R005C15 Installation Guide 01 (Nepal, Ncell, ICC310-H1H-C1...
PowerCube 1000 V300R005C15 Installation Guide 01 (Nepal, Ncell, ICC310-H1H-C1...
babisonshrestha
 
Selection process_Poltavskaya obl
Selection process_Poltavskaya oblSelection process_Poltavskaya obl
Selection process_Poltavskaya obl
KhatD
 

Viewers also liked (17)

Pemex global consultancy
Pemex global consultancyPemex global consultancy
Pemex global consultancy
 
Profile Lakshmi Narayanan
Profile Lakshmi NarayananProfile Lakshmi Narayanan
Profile Lakshmi Narayanan
 
Numeros complejos ejercicios y superposicion
Numeros complejos ejercicios y superposicionNumeros complejos ejercicios y superposicion
Numeros complejos ejercicios y superposicion
 
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
 
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
 
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
 
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
GHB물뽕을 먹은후 여성분들이 어떻게 되는가? 카톡:SKP999 & << DDF11.KR >>물뽕 판매,물뽕 구입,물뽕 파는곳,...
 
Argus 012-526-20
Argus 012-526-20Argus 012-526-20
Argus 012-526-20
 
Syllabus 2016 sep-12
Syllabus 2016 sep-12Syllabus 2016 sep-12
Syllabus 2016 sep-12
 
How has selling changed with the internet?
How has selling changed with the internet?How has selling changed with the internet?
How has selling changed with the internet?
 
El controlador pid
El controlador pidEl controlador pid
El controlador pid
 
materi
materimateri
materi
 
ENC Times-September 12,2016
ENC Times-September 12,2016ENC Times-September 12,2016
ENC Times-September 12,2016
 
Presentación1
Presentación1Presentación1
Presentación1
 
Selection process don_obl
Selection process don_oblSelection process don_obl
Selection process don_obl
 
PowerCube 1000 V300R005C15 Installation Guide 01 (Nepal, Ncell, ICC310-H1H-C1...
PowerCube 1000 V300R005C15 Installation Guide 01 (Nepal, Ncell, ICC310-H1H-C1...PowerCube 1000 V300R005C15 Installation Guide 01 (Nepal, Ncell, ICC310-H1H-C1...
PowerCube 1000 V300R005C15 Installation Guide 01 (Nepal, Ncell, ICC310-H1H-C1...
 
Selection process_Poltavskaya obl
Selection process_Poltavskaya oblSelection process_Poltavskaya obl
Selection process_Poltavskaya obl
 

Similar to Resume of mr. villasis nelson p. 2016 r1

Jordan Cv
Jordan CvJordan Cv
Jordan Cv
proactives
 
JONE. WELDING piping inspector new ROPE ACCESS LEVEL 2
JONE. WELDING piping inspector new  ROPE ACCESS LEVEL 2JONE. WELDING piping inspector new  ROPE ACCESS LEVEL 2
JONE. WELDING piping inspector new ROPE ACCESS LEVEL 2
Jone Prakash
 
MS-Abinash
MS-AbinashMS-Abinash
MS-Abinash
Abinash Routray
 
MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
Midel Dalangin
 
MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
Midel Dalangin
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
Siow Chon Wah
 
Hagy Resume (New)
Hagy Resume (New)Hagy Resume (New)
Hagy Resume (New)
Mike (Magic) Hagy
 
Latest cv engr. zubair
Latest cv engr. zubairLatest cv engr. zubair
Latest cv engr. zubair
Zubair Noor
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
Zubair Noor
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
omijie ehinomen prince
 
SABRI CV
SABRI CVSABRI CV
SABRI CV
Sabri Da
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernesto Costorio
 
Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi
 
anoop-CV 2016
anoop-CV 2016anoop-CV 2016
anoop-CV 2016
anoop raveendran
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
arjunan saravanan
 
hatata cv 2015
hatata cv 2015hatata cv 2015
hatata cv 2015
mohamed hatata
 
DHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normalDHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normal
Dhakshina murthy
 
WILLY-Resume B
WILLY-Resume BWILLY-Resume B
WILLY-Resume B
Willy Ak Mingkil Willy
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
rosdi baharuddin
 
Wp 241016
Wp 241016Wp 241016

Similar to Resume of mr. villasis nelson p. 2016 r1 (20)

Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
JONE. WELDING piping inspector new ROPE ACCESS LEVEL 2
JONE. WELDING piping inspector new  ROPE ACCESS LEVEL 2JONE. WELDING piping inspector new  ROPE ACCESS LEVEL 2
JONE. WELDING piping inspector new ROPE ACCESS LEVEL 2
 
MS-Abinash
MS-AbinashMS-Abinash
MS-Abinash
 
MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
 
MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
Hagy Resume (New)
Hagy Resume (New)Hagy Resume (New)
Hagy Resume (New)
 
Latest cv engr. zubair
Latest cv engr. zubairLatest cv engr. zubair
Latest cv engr. zubair
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
 
SABRI CV
SABRI CVSABRI CV
SABRI CV
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - Updated
 
Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017
 
anoop-CV 2016
anoop-CV 2016anoop-CV 2016
anoop-CV 2016
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
hatata cv 2015
hatata cv 2015hatata cv 2015
hatata cv 2015
 
DHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normalDHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normal
 
WILLY-Resume B
WILLY-Resume BWILLY-Resume B
WILLY-Resume B
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
Wp 241016
Wp 241016Wp 241016
Wp 241016
 

Recently uploaded

Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
SakkaravarthiShanmug
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
TaghreedAltamimi
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
gaafergoudaay7aga
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 

Recently uploaded (20)

Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 

Resume of mr. villasis nelson p. 2016 r1

  • 1. Page 1 C U R R I C U L U M V I T A E N E L S O N P E R A N T E V I L L A S I S 096 Manigbas St. Bolo Bauan, Bantangas City +63999-354-56-03 / +63-043-980-0031 E-mail Address: villasisnelson@yahoo.com villasisnelson@gmail.com OBJECTIVE: To have a trustworthy position in a company through efficient and active involvement in its operations. Share my skills, knowledge and abilities for the success of the company and for the growth of my career PERSONAL DATA PermanentAddress : 096 Manigbas St. Bolo Bauan, Bantangas City Date of Birth : November 16, 1975 Place of Birth : Ilo-Ilo City Age : 40 years old Height : 5’5” Weight : 85 kgs. Gender : Male Civil Status : Married SUPPLEMENTAL INFORMATION SSS No. : 04 - 0905949 – 0 T.I.N : 304-562-250-00 PassportNo : EC2256189 EDUCATIONAL QUALIFICATION College GOLDEN GATE COLLEGES Piprieto St. Batangas City BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING April 02, 2005 Secondary BAUAN HIGH SCHOOL Bauan,Batangas Primary BOLO ELEMENTARY SCHOOL Bolo, Bauan,Batangas Vocational Course ADVANCED BUSINESS CONSULTANCY CENTRE PHILS. INC. ABCC Bldg. 127 M.H. Del Pilar St., Batangas City AUTOCAD I July 15, 2006 – August 26, 2006 TRAININGS AND SEMINARS ATTENDED:  GAS TURBINE POWER PLANTS SEMINAR Held at the Golden Gate College February 05, 2005  OCCUPATIONAL SAFETY AND HEALTH Held on March 15-19 2004 Alpa Hotel Batangas City  OJT – KEPPEL BATANGAS April 20, 2005 – June 14, 2005 (300 hrs.)
  • 2. Page 2 PROFESSIONAL WORK EXPERIENCES MAY. 11, 2016. PIPING ENGINEER TO PRESENT JEL - Jurong Engineering Limited PCP PENGERANG COGENERATION PLANT RAPID PROJECT MALAYSIA Responsible for the planning and erection of4 Units of HRSG Piping. Monitoring the availability and quantity of all piping material thatneed on site erection.Direct coordination to client regarding any deviation and clarification atsite erection. Supervise the efficiency of manpower for every system and monitoring ofdaily progress againstprojecttarget schedule. REFERENCES N. SUBRAMANIAN Project Manager Jurong Engineering Limited PCP PENGERANG COGENERATION PLANT MALAYSIA Jan. 22, 2015. PIPING ENGINEER March. 2016 JEL - Jurong Engineering Limited Az-Zour North Phase 1 IWPP Project KUWAIT JOB DESCRIPTION Responsible for the planning and erection ofRemenelization and 10 Units of Desalination Plantboth metallic and GRP Piping.Also in-charge in the fabrication of all big/small bore piping and pipe support atfabrication as well as blasting and painting. Monitoring the availability and quantity of all piping material thatneed on site erection.Direct coordination to client regarding any deviation and clarification atsite erection. Supervise the efficiency of manpower for every system and monitoring of daily progress againstprojecttarget schedule. REFERENCES Norlyne L. Gagarin Project Manager Jurong Engineering Limited
  • 3. Page 3 Az-Zour North Phase 1 IWPP Project KUWAIT June 16, 2014. QA/QC SUPERVISOR Sept. 15, 2014 Mitsubishi Heavy Industries,Ltd. O Mon Thermal Power Plant Project Phase II Lilama 45.1 Fabrication, Dong Nai Province, Vietnam JOB DESCRIPTION Responsible for the implementation of quality control at fabrication site, supervises quality control documentation and inspection in the piping fabrication in accordance with the existing codes and standards, approved MHPS inspection procedures, and project specifications. monitoring for the actual piping progress against project plan. and conduct weekly meeting for resolving any site deviation as will as the project weekly progress. reviewing final package for final documentation hand over. REFERENCES Ms. Harumi Yasuda Project Manager Mitsubishi Heavy Industries,Ltd. O Mon Thermal Power PlantProject Phase II Lilama 45.1 Fabrication, Dong Nai Province, Vietnam Feb. 05, 2013. PIPING ENGINEER Mar. 31, 2014 JEL - Jurong Engineering Limited Chana II Combined Cycle Power Project 124/5 Moo 1, Highway 43 Tambon Paching, Chana Songkhla 90130,THAILAND JOB DESCRIPTION Responsible for the planning ofpiping erection as per approved piping erection sequence also in -charge for widrawall ofpiping spools and permanentsupports as per priorityto be supplyon each piping team for ERECTION. Performing actual site supervision to raise-up (RFI) RequestFor Information to any significantpiping deviation and changes atsite condition.Also in-charges for the actual piping progress reportagainstprojectplan.Also incharge in projectschedule implementation and coordination with the clientand other contractor and give instructions and information to projectstaff and worker. Also supervise and implementthe company’s safety, health and environmental program ,monitor and coordinate overall activities between revenue line to ensure efficiencyof operation especiallyduring breakdown and peak hours . Execution of ECC walkdown and Preparation of Erection Clearance Certificate (ECC) documents prior to commissioning.As well as, clearing ofpunch listitems for ECCs. Preparation of Turn Over Package (TOP) documents prior to final hand over project. REFERENCES Nicholas Chen Nyit Kong Project Manager
  • 4. Page 4 Jurong Engineering Limited Chana II Combined Cycle Power Project 124/5 Moo 1, Highway 43 tambon paching, Chana Songkhla 90130, THAILAND Feb. 01, 2012. QA/QC SUPERVISOR Nov. 30 2012. Mitsui-Kinzoku Engineering Kabushiki-Kaisha MESCO INC. PHILIPPINE BRANCH TAGANITO MINING PROJECT Claver, Surigao Del Norte 8410 JOB DESCRIPTION Responsible for the implementation of quality control at construction site, supervises quality control documentation and inspection in the off-site battery limit piping accordance with the existing codes and standards, approved site erection and inspection procedures, and project specifications. Scope of inspection includes all activities in piping, equipments, and structural works such as piping fit up check, weld visual check, line check, pressure test, column alignment check, bolt tightness check,pump location and elevation check, pump alignment check, erection completion check and others as statedin the approved site erection and inspection procedures. REFERENCES Mr. MasaakiUemura Site Manager Taganito Mining Project Claver Surigao Del Norte PHILIPPINES May 27, 2011. QA/QC SUPERVISOR to Nov. 30 2011. Mitsubishi Heavy Industries, Ltd. ( MITSUI & CO. LTD) PAITON-3 EXPANSION PROJECT INDONESIA JOB DESCRIPTION Responsible for the implementation of quality control at construction site, supervises quality control documentation and inspection in the boiler in accordance with the existing codes and standards, approved site erection and inspection procedures, and project specifications. Scope of inspection includes all activities in piping, equipments, and structural works such as piping fit up check, weld visual check, line check, pressure test, packer plate location and elevation check, column alignment check, bolt tightness check, grouting, pump location and elevation check, pump alignment check, erection completion check and others as statedin the approved site erection and inspection procedures. REFERENCES Mr. Ryoichi Jono QA/QC Manager Mitsubishi Heavy Industries,Ltd. Paiton – 3 Expansion Project Indonesia
  • 5. Page 5 May 15, 2010. QA/QC SUPERVISOR May 7, 2011 Mitsubishi Heavy Industries, Ltd. (SUMITOMO CORPORATION BOILER DIVISION) TANJUNG JATI B. PROJECT UNIT 3&4 INDONESIA JOB DESCRIPTION Responsible for the implementation of quality control at construction site, supervises quality control documentation and inspection in the boiler in accordance with the existing codes and standards, approved site erection and inspection procedures, and project specifications. Scope of inspection includes all activities in piping, equipments, and structural works such as piping fit up check, weld visual check, line check, pressure test, packer plate location and elevation check, column alignment check, grouting, bolt tightness check,pump location and elevation check, pump alignment check,erection completion check and others as statedin the approved site erection and inspection procedures. REFERENCES Mr. Jun Sakamoto QA/QC Manager Mitsubishi Heavy Industries,Ltd. Tanjung Jati B. Projecet Indonesia March 27, 2009. QA/QC SUPERVISOR April 15, 2010 Mitsubishi Heavy Industries, Ltd. SHUQAIQ II (IWPP) IndependentWater & Power Plant Project Jizan Province Kingdom of Saudi Arabia JOB DESCRIPTION Responsible for the implementation of quality control at construction site, supervises quality control documentation and inspection in the boiler, turbine, and balance of plant (outdoor) areas in accordance with the existing codes and standards, approved site erection and inspection procedures, and project specifications. Scope of inspection includes all activities in piping, equipments, and structural works such as piping fit up check,weld visual check, line check,pressure test, column alignment check, bolt tightness check, tank/vessel location and elevation check, pump location and elevation check, pump alignment check, erection completion check and others as stated in the approved site erection and inspection procedures. Balance of plant areas include Fuel Gas Reducing Station, Piperack,Fuel Oil Pumphouse, Fuel Oil Tank area, Emergency Diesel Generator area, Water Tank area,Water Treatment area, Seawater Intake area,Chlorination area,Auxiliary Boiler area and Desalination Plants. REFERENCES Mr. Takayuki Okamoto QA/QC Manager Mitsubishi Heavy Industries,Ltd. SHUQAIQ II (IWPP) IndependentWater & Power Plant Project
  • 6. Page 6 Jizan Province Kingdom of Saudi Arabia June 07, 2008. QA/QC SUPERVISOR February 28, 2009. Mitsubishi Heavy Industries,Ltd. O Mon Thermal Power PlantProject Can Tho Province, Vietnam JOB DESCRIPTION Responsible for the implementation of quality control at construction site, supervises quality control documentation and inspection in the boiler, turbine, and balance of plant (outdoor) areas in accordance with the existing codes and standards, approved site erection and inspection procedures and project specifications. Scope of inspection includes all activities in piping, tanks/vessels, auxiliary equipments, condenser, and structural works such as piping fit up check, weld visual check, line check,pressure test, column alignment check, bolt tightness check, tank/vessel location and elevation check, pump location and elevation check, pump alignment check, erection completion check and others as stated in the approved site erection and inspection procedures. Balance of Plant areas include Fuel Oil Metering Station, Fuel Gas Reducing Station, Piperack, Fuel Oil Tank Area, Fuel Oil Pumphouse, Fuel Oil Valve Station, Steam Transformer area,Seawater Chlorination Plant, Water Treatment Plant, Seawater Intake area REFERENCES Mr. Yasuhisa Morinaga QA/QC Manager Mitsubishi Heavy Industries,Ltd. O Mon Thermal Power PlantProject Can Tho Province, Vietnam November 2, 2006 Process Engineer June 06, 2008 EEI CORPORATION - INCO - GORO Nickel Modularization Project Sta. Maria Bolo, Bauan,Batangas  In-Charged in Traveler preparation/monitoring & Control on Over all Fabrication Shop Operation involving Structural Pipe Supportand other ancillaries’ items.  Performs actual field-work inspections on related on going activities as to the use and type of materials, quality of workmanship and for compliance with codes,contractplans,specifications and providing other assistance in projectdevelopmentand Monitoring actual work projects as againstprojectschedule represented bychart, updating work schedule and evaluates significantdeviation of actual project performance from the projected activities. ;  Prepare daily report summaryof observation base on actual work progress and other design changes.  Reviews/Checks ofPiping Isometric fabrication drawing made bythe draftsman from IFC Clients drawing.  Updates traveler blocks a change notice and latestdrawing revision number and change notice block on affected approved for fabrication drawings.  Reviews/Checks technical sketches/cutting list prepared bydraftsman. Coordinates with Shop section supervisors on fabrication process workability.  Standard Code and project specification studies. REFERENCES Raul G. J. Dela Cruz
  • 7. Page 7 Project Manager EEI Corporation GORO-Nickle Project March 2005 – KMP STEEL FABRICATION October 2006 (QC/ Quality Control / Project Coordinator) In House Subcontractor of Babcock Hitachi Phils.Inc. (BHPI) JOB DESCRIPTION As Quality Control Engineer  Documentation ofthe reports to be submitted to the Quality Control DepartmentofBHPI. (especiallydimensions, weld size, defects,etc.  Visual inspection ofwelds using penetranttesting (PT)  Inspection ofdimension according to drawing plan.  Check of cosmetics. As Project Coordinator / Engineer  Scheduled and allocate manpower  Representatives in meetings  Responsible for the material take-offand cutting plans  As follow – upper  Time keeper March 05, 2000 – CDS GENERAL CONTRACTOR September 30, 2003 (Mechanical Fitter) JOB DESCRIPTION:  Check - up and Calibration Clearance and Repair ofOverhauling any types of Pump such as: a. RECIPROCATING PUMP b. CENTRIFUGAL PUMP c. SCREW PUMP AND CONDUCTORS  Disassemble and Assemble Lube Compressor Lube Oil Purifiers Lube Oil Coolers and Hydraulic Motors.  Check – up Clearance and Calibrate Intermediate Shaft, Anchor winch, Capstan, Rudder Stock and Rudder Blades,Dismantle and Installing Propeller Shaftand the Propeller with Regards for Blue Fittings.  RE-aligning Pump Rooms Motors Generators Units and Reduction Gear with Re-engine Installation. I hereby certify the statementI made are true and correct to the bestof my knowledge and beliefany false information,misrepresentation,falsification and materials omission offacts may used as a ground for cancellation.I am further authorizing this companyto conductan investigation ofmy personal background and inquire,through my referees.
  • 8. Page 8 MR. NELSON P. VILLASIS