SlideShare a Scribd company logo
1 of 3
SURESH JAGANNATH KAMBLE
E-Mail: suresh_jk2002@yahoo.co.in, Phone: 022-25836294, 09870498125
Managerial assignments in Project Management and Plant Operations with a leading organisation
CAREER OVERVIEW
 With nearly 14 years of experience in New Product Development, Project Management, Installation,
Commissioning, Testing, Operation, Maintenance & Team Management.
 Adept at managing design engineering operations involving design & development, developing detailed drawing
for fabrication, coordinating with internal departments; investigating technical problems and establishing
procedures and corrective actions to avoid recurrences.
 Well conversant with diagnosing the faults, rectification, planning & scheduling effective maintenance schedule
for enhancing systems.
 Demonstrated analytical, problem solving and organisational ability coupled with strong communication and
relationship management skills.
EMPLOYMENT SUMMARY
Machine maker r.s., Thane Manufacturing, Designing Since April
10
Automation R & D ,New Product Development,
Design ,Installation & Commissioning
N.T.Machines, Thane Manufacturing, Designing Aug’09-April
10
Automation R & D,New Product Development
,Installation & Commissioning
RSB Groups I- Design Engineering Solution Ltd., Pune Engineer Sep’08-
Aug‘09
Automation, Design Installation &
Commissioning
Machine Makers R.S., Thane Manufacturing, Designing Oct’01-
Sep’08
Design Installation & Commissioning
Key Deliverables
Project Management: Managing project activities involving working out various requirements with respect to
utilities, machines, manpower & monitoring overall project operations for ensuring timely completion. Handling
layout planning & design and undertaking quality control plan for site activities. Providing work flow management
task to the subordinates for machine spare parts manufacturing.
Design Engineering: Preparing engineering designs / drawings and technical specifications for ensuring smooth
execution of projects within the time and cost parameters. Writing / reviewing detailed documents explaining about
the work and its results, in terms of product quality, by ensuring stability & determining preservative efficacy.
Analysing / producing technical requirements (PLC Programs) & specifications and recommending design
modifications based on clients requirements.
Installation & Commissioning: Overseeing installation & commissioning as well as conducting tests & inspections
to ensure operational effectiveness of utilities (Wire Processing Machines); planning & effectuating maintenance
plans for machines and equipments. Reviewing technical specifications, cost estimates for erection & commission of
the plant.
Quality Management: Maintaining quality standards, ensuring stringent adherence to quality standards, norms &
practices, identifying gaps & taking corrective action. Working in close coordination in work groups for ensuring
adherence to quality standards.
Team Management: Monitoring, training & motivating the manpower for accomplishing the desired objective.
Working on succession planning of the workforce, shift management activities, appraising the member’s
performance & providing feedback.
NOTABLE ATTAINMENTS ACROSS THE TENURE
 Functioned Project Leader on L&T MCCB 630A Testing of Breaker, Testing includes Mechanical, Thermal &
Magnetic stations with rework station.
 Dextrously developed various cut to length applications during the Machine Makers R.S., Thane tenure:
o Automatic Cable winding & tieing machine
o Machine for Z bending of resistance
o PVC Copper Wire Cutting Machine
o Paper Cutting Machine
o Sleeve Cutting Machine
o Pipe Cutting Machine
o PVC Copper Wire Cutting & Stripping
o PVC Copper Wire Cutting,Stripping & Twisting.
o PVC Copper Wire Cutting ,Stripping & Crimping
o Thermal stripping machine
o Wire Crimping
o Automatic Cable Winding & tieing
o Clutch cable cutting machine
o Battery Cable Cutting Machine
o Battery Cable Cutting & Stripping Machine
o PVC Copper Wire Cutting Stripping & Crimping Machines with 4 Axis Programming
 Successfully developed various Jigs Fixtures for increasing the production of parts used in manufacturing of
machines.
OPERATIONAL PURVIEW
Worked on:
 Allen Bradley PLC
 Fatek Automation PLC.
 PLC Programming of Wire Cutting & Stripping Machine
 Servo Motors (Make Panasonic) using motion control
 Stepper Motors (Sanyo Denki) using High Speed Pulse Output
 Pneumatics Cylinders as well as its programming in PLC with 4 axis Motion control.
EDUCATION
Advanced Diploma in Business Management in2013.(from ICFAI University)
Diploma in Business Management in2012.(from ICFAI University)
Diploma in CAD from ECIT Thane in 2005. (AutoCAD 2004, Pro-E Wild fire 2.0, & Catia V5R9)
B.E. (Mechanical) from K. J. Somaiya College of Engineering Vidyavihar, Mumbai, University of Mumbai in 2001
Advanced Course in PLC Programming (Allen Bradley PLC) from Technical Institute Mumbai.
IT SKILLS
Platform Windows 7
Packages Solid Edge ST4 ,PRO-E WILD FIRE 2.0, CATIA V5R9, AutoCAD 2004
Languages C++
TRAINING
B.E. Trainings
Organization Mukand Iron & Steel Ltd. Kalwa, Thane
Duration July 2000 to May 2001
Synopsis Study of Total Productive Maintenance and Autonomous Maintenance on Shear II m/c in
Wire
Rod Mill.
PERSONAL DOSSIER
Date of Birth 22nd
December 1978
Language English, Marathi, & Hindi
Address B/40 Muktidham, Shreenagar, Wagle Estate, Thane (W) – 400604
Relocate Ready to Relocate
Current CTC 6.1 Lac/ annum.
Expected CTC As per market Trend

More Related Content

What's hot

dhananjay_gijare_resume_08.10.2016
dhananjay_gijare_resume_08.10.2016dhananjay_gijare_resume_08.10.2016
dhananjay_gijare_resume_08.10.2016Dhananjay Gijare
 
Rohit heromoto CV (PROCESS QA)
Rohit heromoto CV (PROCESS QA)Rohit heromoto CV (PROCESS QA)
Rohit heromoto CV (PROCESS QA)Rohit Kumar
 
Engr.Efren_ CV_Updated
Engr.Efren_ CV_UpdatedEngr.Efren_ CV_Updated
Engr.Efren_ CV_UpdatedEfren Eito
 
Resume_Terry201526(English&Chinese)
Resume_Terry201526(English&Chinese)Resume_Terry201526(English&Chinese)
Resume_Terry201526(English&Chinese)Terry Lin
 
CV of Pochalu Bishnu
CV of Pochalu BishnuCV of Pochalu Bishnu
CV of Pochalu BishnuP BISHNU
 
Resume Muthu Automobile Product Costing 7years
Resume Muthu Automobile Product Costing 7yearsResume Muthu Automobile Product Costing 7years
Resume Muthu Automobile Product Costing 7yearsmuthugtti
 
Maintenence supervisor
Maintenence supervisorMaintenence supervisor
Maintenence supervisorirfan ali ali
 
murali resume latest
murali resume latestmurali resume latest
murali resume latestMURALI GOUDA
 
Engineering & Development
Engineering & DevelopmentEngineering & Development
Engineering & DevelopmentMohd Imran
 

What's hot (20)

cv [51990]
cv [51990]cv [51990]
cv [51990]
 
dhananjay_gijare_resume_08.10.2016
dhananjay_gijare_resume_08.10.2016dhananjay_gijare_resume_08.10.2016
dhananjay_gijare_resume_08.10.2016
 
Deepanjan New.
Deepanjan New.Deepanjan New.
Deepanjan New.
 
Vivek_cv
Vivek_cvVivek_cv
Vivek_cv
 
Pramesak Poonthong
Pramesak PoonthongPramesak Poonthong
Pramesak Poonthong
 
Resume
ResumeResume
Resume
 
C.V
C.VC.V
C.V
 
Resume tech
Resume techResume tech
Resume tech
 
Rohit heromoto CV (PROCESS QA)
Rohit heromoto CV (PROCESS QA)Rohit heromoto CV (PROCESS QA)
Rohit heromoto CV (PROCESS QA)
 
Updated CV
Updated CVUpdated CV
Updated CV
 
Engr.Efren_ CV_Updated
Engr.Efren_ CV_UpdatedEngr.Efren_ CV_Updated
Engr.Efren_ CV_Updated
 
Resume_Terry201526(English&Chinese)
Resume_Terry201526(English&Chinese)Resume_Terry201526(English&Chinese)
Resume_Terry201526(English&Chinese)
 
CV of Pochalu Bishnu
CV of Pochalu BishnuCV of Pochalu Bishnu
CV of Pochalu Bishnu
 
Resume Muthu Automobile Product Costing 7years
Resume Muthu Automobile Product Costing 7yearsResume Muthu Automobile Product Costing 7years
Resume Muthu Automobile Product Costing 7years
 
Maintenence supervisor
Maintenence supervisorMaintenence supervisor
Maintenence supervisor
 
Ankit Saxena
Ankit SaxenaAnkit Saxena
Ankit Saxena
 
murali resume latest
murali resume latestmurali resume latest
murali resume latest
 
Sharik Ansari
Sharik AnsariSharik Ansari
Sharik Ansari
 
kamal
kamalkamal
kamal
 
Engineering & Development
Engineering & DevelopmentEngineering & Development
Engineering & Development
 

Viewers also liked

Huy Phan's Resume
Huy Phan's ResumeHuy Phan's Resume
Huy Phan's ResumeHuy Phan
 
MartinJDudziak Biocyb Resume Execsumm July2011
MartinJDudziak Biocyb Resume Execsumm July2011MartinJDudziak Biocyb Resume Execsumm July2011
MartinJDudziak Biocyb Resume Execsumm July2011martindudziak
 
Resume update PMM Lkdn
Resume update PMM LkdnResume update PMM Lkdn
Resume update PMM LkdnANUJ Varshney
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2john rhynold
 
Alain Bizette - Resume
Alain Bizette - ResumeAlain Bizette - Resume
Alain Bizette - ResumeAlain Bizette
 
CV Alan Brady 2015
CV Alan Brady 2015CV Alan Brady 2015
CV Alan Brady 2015alan brady
 
Your CV, Interviews and Waiting for Response
Your CV, Interviews and Waiting for ResponseYour CV, Interviews and Waiting for Response
Your CV, Interviews and Waiting for ResponseRodion Gorkovenko
 
Resume Tim Gardner - Aug 2015
Resume Tim Gardner - Aug 2015Resume Tim Gardner - Aug 2015
Resume Tim Gardner - Aug 2015Tim Gardner
 
THASLEEM RESUME ELECTRONICS
THASLEEM RESUME ELECTRONICSTHASLEEM RESUME ELECTRONICS
THASLEEM RESUME ELECTRONICSthasleem v
 

Viewers also liked (17)

Cv marco dibiase_eng
Cv marco dibiase_engCv marco dibiase_eng
Cv marco dibiase_eng
 
Huy Phan's Resume
Huy Phan's ResumeHuy Phan's Resume
Huy Phan's Resume
 
MartinJDudziak Biocyb Resume Execsumm July2011
MartinJDudziak Biocyb Resume Execsumm July2011MartinJDudziak Biocyb Resume Execsumm July2011
MartinJDudziak Biocyb Resume Execsumm July2011
 
Resume update PMM Lkdn
Resume update PMM LkdnResume update PMM Lkdn
Resume update PMM Lkdn
 
Resume
ResumeResume
Resume
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2
 
Alain Bizette - Resume
Alain Bizette - ResumeAlain Bizette - Resume
Alain Bizette - Resume
 
CV Alan Brady 2015
CV Alan Brady 2015CV Alan Brady 2015
CV Alan Brady 2015
 
Your CV, Interviews and Waiting for Response
Your CV, Interviews and Waiting for ResponseYour CV, Interviews and Waiting for Response
Your CV, Interviews and Waiting for Response
 
edit resume
edit resumeedit resume
edit resume
 
Resume
ResumeResume
Resume
 
Jai kishore Tiwari resume
Jai kishore Tiwari resume Jai kishore Tiwari resume
Jai kishore Tiwari resume
 
Resume Tim Gardner - Aug 2015
Resume Tim Gardner - Aug 2015Resume Tim Gardner - Aug 2015
Resume Tim Gardner - Aug 2015
 
Resume tirthankar basu
Resume tirthankar basuResume tirthankar basu
Resume tirthankar basu
 
QA Resume _Muthu_Updated
QA Resume _Muthu_UpdatedQA Resume _Muthu_Updated
QA Resume _Muthu_Updated
 
Sergio Resume
Sergio ResumeSergio Resume
Sergio Resume
 
THASLEEM RESUME ELECTRONICS
THASLEEM RESUME ELECTRONICSTHASLEEM RESUME ELECTRONICS
THASLEEM RESUME ELECTRONICS
 

Similar to Resume april 2015

Similar to Resume april 2015 (20)

Naveesh Kapoor - resume
Naveesh Kapoor - resumeNaveesh Kapoor - resume
Naveesh Kapoor - resume
 
My cv 016
My cv 016My cv 016
My cv 016
 
Raghu _CV_07012017docx
Raghu _CV_07012017docxRaghu _CV_07012017docx
Raghu _CV_07012017docx
 
HARI
HARIHARI
HARI
 
Prashant Rayarikar Resume
Prashant Rayarikar ResumePrashant Rayarikar Resume
Prashant Rayarikar Resume
 
Abuthaheer- Curriculum vitae
Abuthaheer- Curriculum vitaeAbuthaheer- Curriculum vitae
Abuthaheer- Curriculum vitae
 
ARUNBALAJI_5.5_YRS_EXP_PRDT DEV
ARUNBALAJI_5.5_YRS_EXP_PRDT DEVARUNBALAJI_5.5_YRS_EXP_PRDT DEV
ARUNBALAJI_5.5_YRS_EXP_PRDT DEV
 
CV Fehran 2014 ver 1.0 - Copy (1)
CV Fehran 2014 ver 1.0 - Copy (1)CV Fehran 2014 ver 1.0 - Copy (1)
CV Fehran 2014 ver 1.0 - Copy (1)
 
Sunil G R
Sunil G RSunil G R
Sunil G R
 
KrishnasamyResume-updated
KrishnasamyResume-updatedKrishnasamyResume-updated
KrishnasamyResume-updated
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
Sarath Sreedhar (082016)
Sarath Sreedhar (082016)Sarath Sreedhar (082016)
Sarath Sreedhar (082016)
 
Ajay's Resume
Ajay's ResumeAjay's Resume
Ajay's Resume
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Nikhil resume (1)
Nikhil resume (1)Nikhil resume (1)
Nikhil resume (1)
 
Manoj Shirole
Manoj ShiroleManoj Shirole
Manoj Shirole
 
Rajendra_Nimonkar
Rajendra_NimonkarRajendra_Nimonkar
Rajendra_Nimonkar
 
Anih Resume v16.01
Anih Resume v16.01Anih Resume v16.01
Anih Resume v16.01
 
LAK-2016_CV_-Rev-02
LAK-2016_CV_-Rev-02LAK-2016_CV_-Rev-02
LAK-2016_CV_-Rev-02
 
Tool room & engineering manager
Tool room & engineering managerTool room & engineering manager
Tool room & engineering manager
 

Resume april 2015

  • 1. SURESH JAGANNATH KAMBLE E-Mail: suresh_jk2002@yahoo.co.in, Phone: 022-25836294, 09870498125 Managerial assignments in Project Management and Plant Operations with a leading organisation CAREER OVERVIEW  With nearly 14 years of experience in New Product Development, Project Management, Installation, Commissioning, Testing, Operation, Maintenance & Team Management.  Adept at managing design engineering operations involving design & development, developing detailed drawing for fabrication, coordinating with internal departments; investigating technical problems and establishing procedures and corrective actions to avoid recurrences.  Well conversant with diagnosing the faults, rectification, planning & scheduling effective maintenance schedule for enhancing systems.  Demonstrated analytical, problem solving and organisational ability coupled with strong communication and relationship management skills. EMPLOYMENT SUMMARY Machine maker r.s., Thane Manufacturing, Designing Since April 10 Automation R & D ,New Product Development, Design ,Installation & Commissioning N.T.Machines, Thane Manufacturing, Designing Aug’09-April 10 Automation R & D,New Product Development ,Installation & Commissioning RSB Groups I- Design Engineering Solution Ltd., Pune Engineer Sep’08- Aug‘09 Automation, Design Installation & Commissioning Machine Makers R.S., Thane Manufacturing, Designing Oct’01- Sep’08 Design Installation & Commissioning Key Deliverables Project Management: Managing project activities involving working out various requirements with respect to utilities, machines, manpower & monitoring overall project operations for ensuring timely completion. Handling layout planning & design and undertaking quality control plan for site activities. Providing work flow management task to the subordinates for machine spare parts manufacturing. Design Engineering: Preparing engineering designs / drawings and technical specifications for ensuring smooth execution of projects within the time and cost parameters. Writing / reviewing detailed documents explaining about the work and its results, in terms of product quality, by ensuring stability & determining preservative efficacy. Analysing / producing technical requirements (PLC Programs) & specifications and recommending design modifications based on clients requirements. Installation & Commissioning: Overseeing installation & commissioning as well as conducting tests & inspections to ensure operational effectiveness of utilities (Wire Processing Machines); planning & effectuating maintenance plans for machines and equipments. Reviewing technical specifications, cost estimates for erection & commission of the plant. Quality Management: Maintaining quality standards, ensuring stringent adherence to quality standards, norms & practices, identifying gaps & taking corrective action. Working in close coordination in work groups for ensuring adherence to quality standards. Team Management: Monitoring, training & motivating the manpower for accomplishing the desired objective. Working on succession planning of the workforce, shift management activities, appraising the member’s performance & providing feedback.
  • 2. NOTABLE ATTAINMENTS ACROSS THE TENURE  Functioned Project Leader on L&T MCCB 630A Testing of Breaker, Testing includes Mechanical, Thermal & Magnetic stations with rework station.  Dextrously developed various cut to length applications during the Machine Makers R.S., Thane tenure: o Automatic Cable winding & tieing machine o Machine for Z bending of resistance o PVC Copper Wire Cutting Machine o Paper Cutting Machine o Sleeve Cutting Machine o Pipe Cutting Machine o PVC Copper Wire Cutting & Stripping o PVC Copper Wire Cutting,Stripping & Twisting. o PVC Copper Wire Cutting ,Stripping & Crimping o Thermal stripping machine o Wire Crimping o Automatic Cable Winding & tieing o Clutch cable cutting machine o Battery Cable Cutting Machine o Battery Cable Cutting & Stripping Machine o PVC Copper Wire Cutting Stripping & Crimping Machines with 4 Axis Programming  Successfully developed various Jigs Fixtures for increasing the production of parts used in manufacturing of machines. OPERATIONAL PURVIEW Worked on:  Allen Bradley PLC  Fatek Automation PLC.  PLC Programming of Wire Cutting & Stripping Machine  Servo Motors (Make Panasonic) using motion control  Stepper Motors (Sanyo Denki) using High Speed Pulse Output  Pneumatics Cylinders as well as its programming in PLC with 4 axis Motion control. EDUCATION Advanced Diploma in Business Management in2013.(from ICFAI University) Diploma in Business Management in2012.(from ICFAI University) Diploma in CAD from ECIT Thane in 2005. (AutoCAD 2004, Pro-E Wild fire 2.0, & Catia V5R9) B.E. (Mechanical) from K. J. Somaiya College of Engineering Vidyavihar, Mumbai, University of Mumbai in 2001 Advanced Course in PLC Programming (Allen Bradley PLC) from Technical Institute Mumbai. IT SKILLS Platform Windows 7 Packages Solid Edge ST4 ,PRO-E WILD FIRE 2.0, CATIA V5R9, AutoCAD 2004 Languages C++ TRAINING B.E. Trainings Organization Mukand Iron & Steel Ltd. Kalwa, Thane Duration July 2000 to May 2001 Synopsis Study of Total Productive Maintenance and Autonomous Maintenance on Shear II m/c in Wire Rod Mill. PERSONAL DOSSIER Date of Birth 22nd December 1978
  • 3. Language English, Marathi, & Hindi Address B/40 Muktidham, Shreenagar, Wagle Estate, Thane (W) – 400604 Relocate Ready to Relocate Current CTC 6.1 Lac/ annum. Expected CTC As per market Trend