SlideShare a Scribd company logo
1 of 6
ANIH EMMANUEL
MISSION
Project Management, Production, Process & instrumentation Engineering,
Integrated Work System (IWS), LEAN Manufacturing & Logistic
Recognized throughout career for being visionary, energetic, engaging production leader
leveraging in-depth knowledge of the marketplace and the manufacturing landscape to
significantly reduce cost of production and increase operational efficiency. Sound
Organizational, communication, Analytical, time and Project management skills. Adept
at bridging engineering performance gaps to achieving Compelling Business
Needs(CBN), developing process improvement initiative and conveying complex
initiatives in a simple and compelling manner. Seeking an Operations Management
position in Production, and Project Management bringing 16+ years of experience as
follows:
2C peace lane Goodwill Estate Ojodu Berger.
emmanuel.anih@cchellenic.com.com
enjanih@gmail.com;
08056137983
08020599756
08070893920
PROFESSIONAL PROFILE
Company Role Years 3 top achievements
Bottling Filling Equipment Project Manager a Successful execution of the First HOTFILL Line in West Africa- "Pulpy Orange"
b
Successful Execution of all Super Enabling works of redesigning and
recapitalization of existing lines to accommodate the Supper HOTFILL line
c
Successful Recapitalization of an Old RGB line from one Location to another,
surmounting challenges with line relocation and recapitalization
LEAN: Continous Process Improvement Manager a Successfully Certifying 5 plants in LEAN Manufacturing methodologies
b Successfully Raised and implemented 2 cost benefiting Innovative projects
c
Successfully implemented Perfomance Management across the plants in line
with LEAN Manufacturing methodologies
Project Engineer -P&G, F&HC ENGR DEPT. 2012
Project start Up Leader -P&G, F&HC DEPT. 2011
Process Engineer P&G, F&HC DEPT. 2008
Validation Engineer P&G, F&HC DEPT. 2008
Process Control Strategist (Six Sigma) and Improvement leader
P&G, F&HC DEPT. 2008
Integrated Work System Dept Coordinator(FI) P&G, F&HC DEPT.
2005
Shift Engineering Leader P&G, VICKS DEPT. 2004
Shift Electrical & Instrumentation leader P&G, VICKS DEPT. 2003
Coca Cola Hellenic ,
NBC, Lagos
10 Led Project technical expertise ; Provided technical expertise and engineering
support to the manufacturing facility. This included: interaction with the
operations and maintenance employees, design and modification of existing
and new facilities, gathered and analyzed data, identifying root cause(s),
presented conceptual solutions, detailed engineering, equipment sizing,
feasibility studies, recommended and implemented process improvements.
Responsible for ensuring process engineering design, standards, material of
construction & Raw material specifications, operations and maintenance
procedures at the Detergent Making Tower (Syndet) are carried out in
accordance with engineering principles and practices to promote a safe
operating environment and process optimization
Procter & Gamble,
Nigeria, Ibadan
2
2
Filling Equipment Project Manager -2013 till Date
Job description
 Managing and leading project team.
 Managing co-ordination of the partners and working groups engaged in
project work.
 Detailed project planning and control including:
 Developing and maintaining a detailed project plan.
 Managing project deliverables in line with the project plan.
 Recording and managing project issues and escalating where necessary.
 Resolving cross-functional issues at project level.
 Managing project scope and change control and escalating issues where
necessary.
 Monitoring project progress and performance.
 Providing status reports to the project sponsor.
 Managing project training within the defined budget.
 Liaises with, and updates progress to, project board/senior management.
 Managing project evaluation and dissemination activities.
 Managing consultancy input within the defined budget.
 Working closely with users to ensure the project meets business needs.
 Definition and management of the User Acceptance Testing programme.
 Identifying user training needs and devising and managing user training
programmes.
 Providing regular status reports to the IPSC Programme Board.
2
Continuous Improvement Manager -2012 - 2013
Job description
 Drove Continuous Improvement to quantitatively and qualitatively improve
costs, quality, and service.
 Trained and educated the Plant Team and implemented continuous
improvement methodologies including but not limited to 6 Sigma, 5S, Lean,
EAtB.
 Responsible for discrete categories of EAtB opportunity including tracking
downtime results, improving data integrity and developing improvement plans
based on the data.
 Supported safety as a top priority - in training, job design, ergonomics, and
regulatory compliance.
 Ensured product quality. Established and managed systems for “right first
time”
Performance and incorporated this philosophy in the continuous improvement
teams.
 Focused on plant wide issues and inter-plant initiatives including developing
synergies and business opportunities to optimize other NBC plants.
 Provided strategic leadership and tactical planning for the technical training
community at the TTC, Ikeja. Partner with HR leadership on broader training
plans and processes.
 Identified and worked collaboratively with the HR to make enhancements to the
pay-for-skills programs that drives business results improvements and equity
for all plant employees.
F&HC Project Engineer -2012
Led Project technical expertise and engineering support to the manufacturing
facility. This included: interaction with the operations and maintenance
employees, design and modification of existing and new facilities, gather and
analyze data, identify root cause(s), present conceptual solutions, detailed
3
engineering, equipment sizing, feasibility studies, recommend and implement
process improvements.
Process & Instrumentation Engineer, Start-up Leader, Validation Engineer-
2011
Responsible for ensuring process engineering design, standards, material of
construction & Raw material specifications, operations and maintenance
procedures at the Detergent Making Tower (Syndet) are carried out in
accordance with engineering principles and practices to promote a safe
operating environment and process optimization. Conducted process simulations
utilizing differing conditions to investigate system steady state and dynamic
response in order to develop proactive troubleshooting and diagnostic procedures
mitigating production disruption is minimized and that safe operating conditions
are maintained.
Integrated Work System Dept Coordinator (FI) - 2005
Supervised and performed the initial Detergent process equipment shake down in
Cairo in line with learning to implement 5s standards and IWS(LEAN Model) roll
out. Led the team of Technicians in the supervision and installation of tower
equipment, review of tower, process Parameter setting, maintenance support,
setup operations and execution of identified IWS defects on the combustion
systems and the adoption of this equipment as the lead AM model for the site
Shift Engineering Leader - 2004
Supervised and performed the initial Eurosicma Flow pack machine shake down in
Italy. Participated in the development of Training Program as well as building an
operational team to man the newly commissioned Packaging machine (TT&T
Program). Experienced and Familiar with Sizing, troubleshooting and
maintenance repairs on assigned Production equipment and facilities such as
compressors, steam generators(Boilers), Hot Air Generators vacuum system
Extractor ducts, chiller units, industrial dehumidifier, Filters, Combustion units,
Fan Filters, Cyclone, Tower-Vacuum system, Air lift Duct, Gravity Separators,
High Pressure systems ,Slurry spray technology.
BSc Electrical /Electronics Engineering
4
QUALIFICATION HISTORY
PET HOTFILL Technology,
2015
Lean manufacturing &
Logistic Training- 2013
Supply Chain Leadership and Its
Impact on Business Performance-
2013
Bursa, Turkey, Accenture Academy, Coca-Cola
Hellenic, NBC
Accenture Academy, Coca-Cola
Hellenic, NBC
Tower Swirl Reapplication
Course, 2010
High Pressure Air Injection
Reapplication Course, 2009
P&G Sophonation &
Neutralization Process University,
2008
P&G Timisoara, Romania P&G Rakona, Czech Newcastle, Uk
5
Quality Assurance KE , 2007 Process Control Strategy(6
Sigma) , 2006
Process Engineering Validation ,
2004
P&G QAKE Workshop, Ibadan P&G PCS College, Ibadan- P&G Validation Workshop, Ibadan
IH&SE Trainings ,
2006/2007/2008/2009/2010/201
1
P&G Web Base Training , Ibadan-
INTERNATIONAL TRAINING HISTORY
LOCAL TRAINING HISTORY
PET HOTFILL Technology,
2015
Lean manufacturing &
Logistic Training- 2013
Supply Chain Leadership and Its
Impact on Business Performance-
2013
Bursa, Turkey, Accenture Academy, Coca-Cola
Hellenic, NBC
Accenture Academy, Coca-Cola
Hellenic, NBC
Tower Swirl Reapplication
Course, 2010
High Pressure Air Injection
Reapplication Course, 2009
P&G Sophonation &
Neutralization Process University,
2008
P&G Timisoara, Romania P&G Rakona, Czech Newcastle, Uk
5
Quality Assurance KE , 2007 Process Control Strategy(6
Sigma) , 2006
Process Engineering Validation ,
2004
P&G QAKE Workshop, Ibadan P&G PCS College, Ibadan- P&G Validation Workshop, Ibadan
IH&SE Trainings ,
2006/2007/2008/2009/2010/201
1
P&G Web Base Training , Ibadan-
INTERNATIONAL TRAINING HISTORY
LOCAL TRAINING HISTORY

More Related Content

What's hot (20)

Wayne Thomas Resume
Wayne Thomas ResumeWayne Thomas Resume
Wayne Thomas Resume
 
Resume 2016 PH Updated
Resume 2016  PH UpdatedResume 2016  PH Updated
Resume 2016 PH Updated
 
141210_SBryerResume
141210_SBryerResume141210_SBryerResume
141210_SBryerResume
 
Juan Caballero Resume -Final-22
Juan Caballero Resume -Final-22Juan Caballero Resume -Final-22
Juan Caballero Resume -Final-22
 
Dr Gloria Hillr5
Dr Gloria Hillr5Dr Gloria Hillr5
Dr Gloria Hillr5
 
Niranjana UCV
Niranjana UCVNiranjana UCV
Niranjana UCV
 
CV PMF - L1
CV PMF - L1CV PMF - L1
CV PMF - L1
 
Resume-Johnson Shi.docx(1)
Resume-Johnson Shi.docx(1)Resume-Johnson Shi.docx(1)
Resume-Johnson Shi.docx(1)
 
160401 sbryer resume
160401   sbryer resume160401   sbryer resume
160401 sbryer resume
 
Harikrishna AV
Harikrishna AVHarikrishna AV
Harikrishna AV
 
Majo quality engineer cv
Majo quality engineer cvMajo quality engineer cv
Majo quality engineer cv
 
Gattu Hari
Gattu HariGattu Hari
Gattu Hari
 
G28 dec8 ASR Resu
G28 dec8 ASR ResuG28 dec8 ASR Resu
G28 dec8 ASR Resu
 
Resume Kevin_Koski_August_2016
Resume Kevin_Koski_August_2016Resume Kevin_Koski_August_2016
Resume Kevin_Koski_August_2016
 
Naveesh Kapoor - resume
Naveesh Kapoor - resumeNaveesh Kapoor - resume
Naveesh Kapoor - resume
 
Cv 30032015 3
Cv 30032015 3Cv 30032015 3
Cv 30032015 3
 
MONDAY OVIAWE new cv
MONDAY OVIAWE new cvMONDAY OVIAWE new cv
MONDAY OVIAWE new cv
 
Resume marty hudson bloomington
Resume marty hudson bloomingtonResume marty hudson bloomington
Resume marty hudson bloomington
 
NM[1].R.WORD
NM[1].R.WORDNM[1].R.WORD
NM[1].R.WORD
 
Pfeiffer Juergen 2015-04-28 REV01
Pfeiffer Juergen 2015-04-28 REV01Pfeiffer Juergen 2015-04-28 REV01
Pfeiffer Juergen 2015-04-28 REV01
 

Viewers also liked

Photography media stills
Photography media stillsPhotography media stills
Photography media stillslpreece
 
LEÇON 12 – Je suis contrarié parce que je vois un monde in-signifiant.
LEÇON 12 – Je suis contrarié parce que je vois un monde in-signifiant.LEÇON 12 – Je suis contrarié parce que je vois un monde in-signifiant.
LEÇON 12 – Je suis contrarié parce que je vois un monde in-signifiant.Pierrot Caron
 
Proyecto ordenanza: Prohibición de grafitis y pegatinas políticas
Proyecto ordenanza: Prohibición de grafitis y pegatinas políticasProyecto ordenanza: Prohibición de grafitis y pegatinas políticas
Proyecto ordenanza: Prohibición de grafitis y pegatinas políticasMatias Porta Aldave
 
Flash informativo - Golden Globes Awards 2.016
Flash informativo - Golden Globes Awards 2.016Flash informativo - Golden Globes Awards 2.016
Flash informativo - Golden Globes Awards 2.0166 Grados
 
Ra2hauge btb leadmanagement
Ra2hauge btb leadmanagementRa2hauge btb leadmanagement
Ra2hauge btb leadmanagementMichael Raahauge
 
Ije sc a template
Ije sc a templateIje sc a template
Ije sc a templatesmpn1tgt
 
paises mas pobres del mundo sfrica
paises mas pobres del mundo sfricapaises mas pobres del mundo sfrica
paises mas pobres del mundo sfricaorlandomoposita
 
Mapa conceptual de c.politicas
Mapa conceptual de c.politicas Mapa conceptual de c.politicas
Mapa conceptual de c.politicas Elizabeth Castillo
 
Winter 2015 Entertainment and Sports Committee Newsletter
Winter 2015 Entertainment and Sports Committee NewsletterWinter 2015 Entertainment and Sports Committee Newsletter
Winter 2015 Entertainment and Sports Committee NewsletterAmanda Katzenstein
 

Viewers also liked (15)

Photography media stills
Photography media stillsPhotography media stills
Photography media stills
 
Journal de bussy numéro 119
Journal de bussy numéro 119Journal de bussy numéro 119
Journal de bussy numéro 119
 
Maltrato animal <3
Maltrato animal <3Maltrato animal <3
Maltrato animal <3
 
LEÇON 12 – Je suis contrarié parce que je vois un monde in-signifiant.
LEÇON 12 – Je suis contrarié parce que je vois un monde in-signifiant.LEÇON 12 – Je suis contrarié parce que je vois un monde in-signifiant.
LEÇON 12 – Je suis contrarié parce que je vois un monde in-signifiant.
 
Proyecto ordenanza: Prohibición de grafitis y pegatinas políticas
Proyecto ordenanza: Prohibición de grafitis y pegatinas políticasProyecto ordenanza: Prohibición de grafitis y pegatinas políticas
Proyecto ordenanza: Prohibición de grafitis y pegatinas políticas
 
Flash informativo - Golden Globes Awards 2.016
Flash informativo - Golden Globes Awards 2.016Flash informativo - Golden Globes Awards 2.016
Flash informativo - Golden Globes Awards 2.016
 
BussyScope numéro 119
BussyScope numéro 119BussyScope numéro 119
BussyScope numéro 119
 
Ra2hauge btb leadmanagement
Ra2hauge btb leadmanagementRa2hauge btb leadmanagement
Ra2hauge btb leadmanagement
 
CV
CVCV
CV
 
Timeline
TimelineTimeline
Timeline
 
Ije sc a template
Ije sc a templateIje sc a template
Ije sc a template
 
Tix
TixTix
Tix
 
paises mas pobres del mundo sfrica
paises mas pobres del mundo sfricapaises mas pobres del mundo sfrica
paises mas pobres del mundo sfrica
 
Mapa conceptual de c.politicas
Mapa conceptual de c.politicas Mapa conceptual de c.politicas
Mapa conceptual de c.politicas
 
Winter 2015 Entertainment and Sports Committee Newsletter
Winter 2015 Entertainment and Sports Committee NewsletterWinter 2015 Entertainment and Sports Committee Newsletter
Winter 2015 Entertainment and Sports Committee Newsletter
 

Similar to Anih Resume v16.01

Similar to Anih Resume v16.01 (20)

LGD (new)
LGD (new)LGD (new)
LGD (new)
 
Suresh Babu G P Resume
Suresh Babu G P ResumeSuresh Babu G P Resume
Suresh Babu G P Resume
 
NIKET SONI RESUME UPDATED
NIKET SONI RESUME UPDATEDNIKET SONI RESUME UPDATED
NIKET SONI RESUME UPDATED
 
Nantha Kumaran CV_1
Nantha Kumaran CV_1Nantha Kumaran CV_1
Nantha Kumaran CV_1
 
Utpal bose resume
Utpal bose resumeUtpal bose resume
Utpal bose resume
 
CV Czech
CV CzechCV Czech
CV Czech
 
Peter cv
Peter cvPeter cv
Peter cv
 
Resume Anuj
Resume AnujResume Anuj
Resume Anuj
 
Rev Bio Times
Rev Bio TimesRev Bio Times
Rev Bio Times
 
Paul Philips Praneshkumar Paul Devanbu - Resume Final
Paul Philips Praneshkumar Paul Devanbu  - Resume FinalPaul Philips Praneshkumar Paul Devanbu  - Resume Final
Paul Philips Praneshkumar Paul Devanbu - Resume Final
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 
Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 Revised
 
Muhammad mohsin updated resume
Muhammad mohsin updated resumeMuhammad mohsin updated resume
Muhammad mohsin updated resume
 
Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1
 
SURESH MANICKAM
SURESH MANICKAMSURESH MANICKAM
SURESH MANICKAM
 
Sean_Hougham_Resume
Sean_Hougham_ResumeSean_Hougham_Resume
Sean_Hougham_Resume
 
Syed Shihabdeen - Resume
Syed Shihabdeen - ResumeSyed Shihabdeen - Resume
Syed Shihabdeen - Resume
 
BJ Fardi - Resume
BJ Fardi - ResumeBJ Fardi - Resume
BJ Fardi - Resume
 
CV LTE Intel
CV LTE IntelCV LTE Intel
CV LTE Intel
 
hgs resume 090615
hgs resume 090615hgs resume 090615
hgs resume 090615
 

Anih Resume v16.01

  • 1. ANIH EMMANUEL MISSION Project Management, Production, Process & instrumentation Engineering, Integrated Work System (IWS), LEAN Manufacturing & Logistic Recognized throughout career for being visionary, energetic, engaging production leader leveraging in-depth knowledge of the marketplace and the manufacturing landscape to significantly reduce cost of production and increase operational efficiency. Sound Organizational, communication, Analytical, time and Project management skills. Adept at bridging engineering performance gaps to achieving Compelling Business Needs(CBN), developing process improvement initiative and conveying complex initiatives in a simple and compelling manner. Seeking an Operations Management position in Production, and Project Management bringing 16+ years of experience as follows: 2C peace lane Goodwill Estate Ojodu Berger. emmanuel.anih@cchellenic.com.com enjanih@gmail.com; 08056137983 08020599756 08070893920 PROFESSIONAL PROFILE
  • 2. Company Role Years 3 top achievements Bottling Filling Equipment Project Manager a Successful execution of the First HOTFILL Line in West Africa- "Pulpy Orange" b Successful Execution of all Super Enabling works of redesigning and recapitalization of existing lines to accommodate the Supper HOTFILL line c Successful Recapitalization of an Old RGB line from one Location to another, surmounting challenges with line relocation and recapitalization LEAN: Continous Process Improvement Manager a Successfully Certifying 5 plants in LEAN Manufacturing methodologies b Successfully Raised and implemented 2 cost benefiting Innovative projects c Successfully implemented Perfomance Management across the plants in line with LEAN Manufacturing methodologies Project Engineer -P&G, F&HC ENGR DEPT. 2012 Project start Up Leader -P&G, F&HC DEPT. 2011 Process Engineer P&G, F&HC DEPT. 2008 Validation Engineer P&G, F&HC DEPT. 2008 Process Control Strategist (Six Sigma) and Improvement leader P&G, F&HC DEPT. 2008 Integrated Work System Dept Coordinator(FI) P&G, F&HC DEPT. 2005 Shift Engineering Leader P&G, VICKS DEPT. 2004 Shift Electrical & Instrumentation leader P&G, VICKS DEPT. 2003 Coca Cola Hellenic , NBC, Lagos 10 Led Project technical expertise ; Provided technical expertise and engineering support to the manufacturing facility. This included: interaction with the operations and maintenance employees, design and modification of existing and new facilities, gathered and analyzed data, identifying root cause(s), presented conceptual solutions, detailed engineering, equipment sizing, feasibility studies, recommended and implemented process improvements. Responsible for ensuring process engineering design, standards, material of construction & Raw material specifications, operations and maintenance procedures at the Detergent Making Tower (Syndet) are carried out in accordance with engineering principles and practices to promote a safe operating environment and process optimization Procter & Gamble, Nigeria, Ibadan 2 2 Filling Equipment Project Manager -2013 till Date Job description  Managing and leading project team.  Managing co-ordination of the partners and working groups engaged in project work.  Detailed project planning and control including:  Developing and maintaining a detailed project plan.  Managing project deliverables in line with the project plan.  Recording and managing project issues and escalating where necessary.  Resolving cross-functional issues at project level.  Managing project scope and change control and escalating issues where necessary.  Monitoring project progress and performance.  Providing status reports to the project sponsor.  Managing project training within the defined budget.  Liaises with, and updates progress to, project board/senior management.  Managing project evaluation and dissemination activities.  Managing consultancy input within the defined budget.  Working closely with users to ensure the project meets business needs.  Definition and management of the User Acceptance Testing programme.  Identifying user training needs and devising and managing user training programmes.  Providing regular status reports to the IPSC Programme Board. 2
  • 3. Continuous Improvement Manager -2012 - 2013 Job description  Drove Continuous Improvement to quantitatively and qualitatively improve costs, quality, and service.  Trained and educated the Plant Team and implemented continuous improvement methodologies including but not limited to 6 Sigma, 5S, Lean, EAtB.  Responsible for discrete categories of EAtB opportunity including tracking downtime results, improving data integrity and developing improvement plans based on the data.  Supported safety as a top priority - in training, job design, ergonomics, and regulatory compliance.  Ensured product quality. Established and managed systems for “right first time” Performance and incorporated this philosophy in the continuous improvement teams.  Focused on plant wide issues and inter-plant initiatives including developing synergies and business opportunities to optimize other NBC plants.  Provided strategic leadership and tactical planning for the technical training community at the TTC, Ikeja. Partner with HR leadership on broader training plans and processes.  Identified and worked collaboratively with the HR to make enhancements to the pay-for-skills programs that drives business results improvements and equity for all plant employees. F&HC Project Engineer -2012 Led Project technical expertise and engineering support to the manufacturing facility. This included: interaction with the operations and maintenance employees, design and modification of existing and new facilities, gather and analyze data, identify root cause(s), present conceptual solutions, detailed 3
  • 4. engineering, equipment sizing, feasibility studies, recommend and implement process improvements. Process & Instrumentation Engineer, Start-up Leader, Validation Engineer- 2011 Responsible for ensuring process engineering design, standards, material of construction & Raw material specifications, operations and maintenance procedures at the Detergent Making Tower (Syndet) are carried out in accordance with engineering principles and practices to promote a safe operating environment and process optimization. Conducted process simulations utilizing differing conditions to investigate system steady state and dynamic response in order to develop proactive troubleshooting and diagnostic procedures mitigating production disruption is minimized and that safe operating conditions are maintained. Integrated Work System Dept Coordinator (FI) - 2005 Supervised and performed the initial Detergent process equipment shake down in Cairo in line with learning to implement 5s standards and IWS(LEAN Model) roll out. Led the team of Technicians in the supervision and installation of tower equipment, review of tower, process Parameter setting, maintenance support, setup operations and execution of identified IWS defects on the combustion systems and the adoption of this equipment as the lead AM model for the site Shift Engineering Leader - 2004 Supervised and performed the initial Eurosicma Flow pack machine shake down in Italy. Participated in the development of Training Program as well as building an operational team to man the newly commissioned Packaging machine (TT&T Program). Experienced and Familiar with Sizing, troubleshooting and maintenance repairs on assigned Production equipment and facilities such as compressors, steam generators(Boilers), Hot Air Generators vacuum system Extractor ducts, chiller units, industrial dehumidifier, Filters, Combustion units, Fan Filters, Cyclone, Tower-Vacuum system, Air lift Duct, Gravity Separators, High Pressure systems ,Slurry spray technology. BSc Electrical /Electronics Engineering 4 QUALIFICATION HISTORY
  • 5. PET HOTFILL Technology, 2015 Lean manufacturing & Logistic Training- 2013 Supply Chain Leadership and Its Impact on Business Performance- 2013 Bursa, Turkey, Accenture Academy, Coca-Cola Hellenic, NBC Accenture Academy, Coca-Cola Hellenic, NBC Tower Swirl Reapplication Course, 2010 High Pressure Air Injection Reapplication Course, 2009 P&G Sophonation & Neutralization Process University, 2008 P&G Timisoara, Romania P&G Rakona, Czech Newcastle, Uk 5 Quality Assurance KE , 2007 Process Control Strategy(6 Sigma) , 2006 Process Engineering Validation , 2004 P&G QAKE Workshop, Ibadan P&G PCS College, Ibadan- P&G Validation Workshop, Ibadan IH&SE Trainings , 2006/2007/2008/2009/2010/201 1 P&G Web Base Training , Ibadan- INTERNATIONAL TRAINING HISTORY LOCAL TRAINING HISTORY
  • 6. PET HOTFILL Technology, 2015 Lean manufacturing & Logistic Training- 2013 Supply Chain Leadership and Its Impact on Business Performance- 2013 Bursa, Turkey, Accenture Academy, Coca-Cola Hellenic, NBC Accenture Academy, Coca-Cola Hellenic, NBC Tower Swirl Reapplication Course, 2010 High Pressure Air Injection Reapplication Course, 2009 P&G Sophonation & Neutralization Process University, 2008 P&G Timisoara, Romania P&G Rakona, Czech Newcastle, Uk 5 Quality Assurance KE , 2007 Process Control Strategy(6 Sigma) , 2006 Process Engineering Validation , 2004 P&G QAKE Workshop, Ibadan P&G PCS College, Ibadan- P&G Validation Workshop, Ibadan IH&SE Trainings , 2006/2007/2008/2009/2010/201 1 P&G Web Base Training , Ibadan- INTERNATIONAL TRAINING HISTORY LOCAL TRAINING HISTORY