CURRICULUM VITAE
KRISHNASAMY C
G2, Block B, Mount Vie Apartment
Kanadairpalayam, WestTambaram
Chennai - 600045
Ph.: (0)98406 80204, 044-22263230
Mail: jaikrish5578@yahoo.com
PROFESSIONAL QUALIFICATION:
B. Tech., in Mechanical Engineering(PT)
fromSRM University– Ramapuram,Chennai.
Completion- April 2012.
Bachelor of BusinessAdminstration(DE)
fromPondicherry University
Completion –January2001.
Diploma in Mechanical Engineeringwith60% of marks,
fromMotilal Nehru Govt.Polytechnic.Pondicherry
Completion –April 1994.
COMPUTER PROFICIENCY:
Design software - Pro/E, AutoCAD, Factory CAD.
Virtual Engineering software - VisMock-up,
Time StudyTool:MOST, ATS, ODS
General Software- MS-Office.
Managerial Skills:Communication,Decisiveness,Initiative,WorkEthic,HighLevel Energy,Integrity
Certificate Skills:CertifiedSix SigmaGreenBelt
PROFESSIONAL EXPERIENCE:
A competentanddrivenProfessional withanabilitytoworkindependentlyandhasexcellent
problemsolving,judgmentanddecisionmakingskills.Possessesanabilitytosee the bigpicture
whilstatthe same time focusingonthe tasksat hand,and managingmultipleprojects.Above all,
has a successful trackrecordof analysingandevaluatingresultsthroughcritical problemsolvingand
reasoning.Lookingforasuitable position.
Accomplishments:
 As a LeadEngineer,Co-ordinatedthe assemblyProcessPlanningProjectWithin 5-member
teamand accountable forresultsintermsof qualityanddelivery
 As an Onsite co-ordinatorinCIPL-Thiruvalur,leadcompleteaccountabilityforOrderto
Deliveryof PilotBuild777 E2 & 773 E2 OHT
 Successfullycompletedthe Pilotbuildasperthe customerrequestedplanandschedule
 Got appreciatedfromthe ProcessPartnerforthe valuable supportadheringthe NPI
methodology.
 As a ProcessEngineerforManufacturing,managed10-memberteaminEDC and taken
accountabilityforVPPA Quality,Velocity&Delivery
 As an Onsite co-ordinatorinCAMP-NC-USA,leadcomplete accountabilityforOrderto
Deliveryof VPPA toPilotBuild785C & 797,793,795 FAC RearAxle.
 ExploredManufacturingknowledge andsharedtothe teamfor the betterqualitydeliveryof
the project
 As a teammember,participatedin3Different6SigmaGreenBeltProjectandsupportedfor
results.Ex:iPQMS,Automationof SWES,Standardisation of APPWork.
 SupportedasDesignEngineerforLarge Engine Components,Group Drawings,ECR’s,
conversionwork.
 Mainlysupportedfordrawingof AFT.
Functions: Six Sigma Green belt around 20 years of rich hands on experience in Design, Digital
Manufacturing, Assembly process Planning, Layout planning, PFD, Torque Audit, Standard work
instruction, Responsible for product & process integration, ensuring DFMA, serviceability, safety &
ergonomics for Mining Trucks, Wheel Loader and Motor Grader NPI.Helping customers in developing
efficientprocesses&operationstobuildtheworldclassproductsinConstruction&Miningequipments.
Topics of interest: Six sigma,CaterpillarProductionSystem,Machine shopproductionplanning,
standardwork design,DFMA,SQC(Statistical Qualitycontrol)
WORKHISTORY
Detailsof Manufacturing EngineeringExperience: -
Lead Engineer- Manufacturing Engineering
CAT India
Jan 2014 -Jan 2015
Jan 2016 -Aug 2016
 Standard Work Sheet creation,Torque Audit, Virtual Build, Build book,Time study validation.
 Estimate the projectand execute the projectwith the support of team members with quality and velocity
 APP Supports provided for US Facilities likeAurora, Decatur, UK Facilities likeGrenoble, Dortmund
 Tool Validation, PFMEA, SFMEA, Time study analysis.
 Process Standardization of SWES across all facilities.
Detailsof Manufacturing EngineeringExperience: -
Lead Engineer-Onsite Support- CAT India
CIPL- Thiruvalur Feb2015 -Dec 2015
 Process engineer for NPI of Optimus OHT Machine (777E2, 773E2) manufacturing responsible for Planning and
executing the build fromdrawingto until production.
 NPI Responsibilities include implementing Design for Assembly, design for serviceability and structuring the Virtual-
MBOM to M-BOM, SWES, PFD, and Torque Tool, build tool selection & control plan.
 Assembly linebalancing,Virtual MBOMto refine design concepts,Virtual Sequence Validation to enhancesafety,Quality
and velocity performances of the assembly process.
 Completed comparison study and havemadeprocess design for NPI productwhich matches with currentProductprocess
flow.
 Supported the lineassembly build (Pilot) to assembler and gave solutions on the spot and rectify the lineissues while
pilotbuild for both 777 E2 & 773 E2
Detailsof Manufacturing EngineeringExperience: -
Lead Engineer-Onsite Support- CAT India
CAMP-NorthCarolina USA*
Oct-2010- Apr 2011
May 2011 -May 2012*
June 2012- Dec 2013
 As an Onsite Co-Coordinator for this Project, lead a 5 Members team in Cat-India by providing the VPPA
projectsandguidingthe teamby technicallyandstrategically.
 Getting the Output from the Off-shore team as per the plan and deliver to the customer end without
affectingthe pilotbuildplanfromcustomerend.
 SupportedRearAxle ManufacturingUnitforabout10 DifferentModelsOHT
 NPIsupportsuccessfullycompletedfor4Modelsduringmytenure at onsite
 SupportcontinuesfromOffshore forthe restof the 6 Modelsaftermy Onsite tenure wasover.
 BasedonourQuality&Commitmentwe havebeenadded5more teammembersinadditiontothe previous
numbersandbecome 10-memberteam.
 GainedPractical knowledgeof PilotLine Assemblyforthe RearAxles.
 Got BestPerformance-2012for the dedicatedsupport.
DesignEngineer CAT India
Mar 2005 -Sep2010
 Created2D – 3D Drawingsasper CAT-Standardsforthe Large Engine Components
 SupportedforLafayette Engine Centre USA.
 Major work relatedtoGroupdrawing creationusingPro/E
 Lead EngineeringChange Request(ECR) 4-memberteam
 Hose RoutingsforFluidlines inLarge Engines
 Lead 3-memberteamforAftertreatmentComponentsMossville USA
 AdheringCPSstandardsdrawingqualityanddeliverontime toprocesspartner
Engineer-Design& Development
PondyDie Castings(P) ltd., July-2003 to Feb2005
UsingAuto-Cad& Pro/E I have beenworkedforsome of the projectsforthe companieslike Delphi-
TVS ltd,Hi-TechArai ltd, Alstomltd.
 2D drawing- 3D model creation
 Designchangesfromthe customerforthe 3D modelsaftergettingapproval fromthe
customer
 Accuratelyestimate costof variousprojectforpresentationtoclientsforfinal approval
givenforthe correct tool planfor the customer& to monitorthe projectcompletionas
perschedule.
 Follow-upwiththe Die makersasperthe schedule togetthe assignedDie at righttime
 Travelledtootherplaceslike Chennai &Madurai for Die monitoringtoensure thatthe
actual processison schedule.
DesignEngineer
Doux Systems(P) ltd. Jan/2002 to June 2003
Completedsome of the Industrial Automotive ComponentslikeLucas-TVS,FALindustriesltd..,
Visteon Ford.
Componentslike
 StarterMotor FixingBracket
 Honda MountingBracket
 CompressorMounting
 RegulatorMoulding
As a TeachingfacultyIhandledclassesforPro/Eincollegeslike:
 I.F.E.TEngineeringCollege- Villipuram-TN
 MailamEngineeringCollege-Mailam-TN
DesignAssistant
AlchemyDataSystems(P) ltd. Nov/2000 to June 2001
 TrainedStudentsinAuto-Cad2000 Package
 GivenCounsellingforthe studentsregardingthe Course
 Completedsome Auto-CadProjectslikeIndustrial Layout,ProductionDrawings
 Done Line drawingsrepresentingthe layoutof shopfloor
Production Supervisor
AnishEnterprises(AnUnitof Balaji DistilleriesGroupLtd.) Dec 1994 -Dec 1999
 MaintainingandControllingof 60 employeesinvolvedinsheetmetal punchingwork
 Supervisingthe production of metal capsforliquorbottles
 Controllingof PowerPress20T and30 T
 Enforcingthe productionlayoutandgettingthe productionoutputinrighttime and
reportingtothe superiors.
Certificate Courses
Certificate CoursesInAuto-CadfromAutodesk
DiplomaCoursesInPro/EfromDoux Systems
Personal Details
Date of Birth: 12.06.1975
Marital Status: Married
Passport Details:H0279402(Valid upto 01/09/2018)

KrishnasamyResume-updated

  • 1.
    CURRICULUM VITAE KRISHNASAMY C G2,Block B, Mount Vie Apartment Kanadairpalayam, WestTambaram Chennai - 600045 Ph.: (0)98406 80204, 044-22263230 Mail: jaikrish5578@yahoo.com PROFESSIONAL QUALIFICATION: B. Tech., in Mechanical Engineering(PT) fromSRM University– Ramapuram,Chennai. Completion- April 2012. Bachelor of BusinessAdminstration(DE) fromPondicherry University Completion –January2001. Diploma in Mechanical Engineeringwith60% of marks, fromMotilal Nehru Govt.Polytechnic.Pondicherry Completion –April 1994. COMPUTER PROFICIENCY: Design software - Pro/E, AutoCAD, Factory CAD. Virtual Engineering software - VisMock-up, Time StudyTool:MOST, ATS, ODS General Software- MS-Office. Managerial Skills:Communication,Decisiveness,Initiative,WorkEthic,HighLevel Energy,Integrity Certificate Skills:CertifiedSix SigmaGreenBelt PROFESSIONAL EXPERIENCE: A competentanddrivenProfessional withanabilitytoworkindependentlyandhasexcellent problemsolving,judgmentanddecisionmakingskills.Possessesanabilitytosee the bigpicture whilstatthe same time focusingonthe tasksat hand,and managingmultipleprojects.Above all, has a successful trackrecordof analysingandevaluatingresultsthroughcritical problemsolvingand reasoning.Lookingforasuitable position. Accomplishments:
  • 2.
     As aLeadEngineer,Co-ordinatedthe assemblyProcessPlanningProjectWithin 5-member teamand accountable forresultsintermsof qualityanddelivery  As an Onsite co-ordinatorinCIPL-Thiruvalur,leadcompleteaccountabilityforOrderto Deliveryof PilotBuild777 E2 & 773 E2 OHT  Successfullycompletedthe Pilotbuildasperthe customerrequestedplanandschedule  Got appreciatedfromthe ProcessPartnerforthe valuable supportadheringthe NPI methodology.  As a ProcessEngineerforManufacturing,managed10-memberteaminEDC and taken accountabilityforVPPA Quality,Velocity&Delivery  As an Onsite co-ordinatorinCAMP-NC-USA,leadcomplete accountabilityforOrderto Deliveryof VPPA toPilotBuild785C & 797,793,795 FAC RearAxle.  ExploredManufacturingknowledge andsharedtothe teamfor the betterqualitydeliveryof the project  As a teammember,participatedin3Different6SigmaGreenBeltProjectandsupportedfor results.Ex:iPQMS,Automationof SWES,Standardisation of APPWork.  SupportedasDesignEngineerforLarge Engine Components,Group Drawings,ECR’s, conversionwork.  Mainlysupportedfordrawingof AFT. Functions: Six Sigma Green belt around 20 years of rich hands on experience in Design, Digital Manufacturing, Assembly process Planning, Layout planning, PFD, Torque Audit, Standard work instruction, Responsible for product & process integration, ensuring DFMA, serviceability, safety & ergonomics for Mining Trucks, Wheel Loader and Motor Grader NPI.Helping customers in developing efficientprocesses&operationstobuildtheworldclassproductsinConstruction&Miningequipments. Topics of interest: Six sigma,CaterpillarProductionSystem,Machine shopproductionplanning, standardwork design,DFMA,SQC(Statistical Qualitycontrol) WORKHISTORY Detailsof Manufacturing EngineeringExperience: - Lead Engineer- Manufacturing Engineering CAT India Jan 2014 -Jan 2015 Jan 2016 -Aug 2016  Standard Work Sheet creation,Torque Audit, Virtual Build, Build book,Time study validation.  Estimate the projectand execute the projectwith the support of team members with quality and velocity  APP Supports provided for US Facilities likeAurora, Decatur, UK Facilities likeGrenoble, Dortmund  Tool Validation, PFMEA, SFMEA, Time study analysis.  Process Standardization of SWES across all facilities. Detailsof Manufacturing EngineeringExperience: -
  • 3.
    Lead Engineer-Onsite Support-CAT India CIPL- Thiruvalur Feb2015 -Dec 2015  Process engineer for NPI of Optimus OHT Machine (777E2, 773E2) manufacturing responsible for Planning and executing the build fromdrawingto until production.  NPI Responsibilities include implementing Design for Assembly, design for serviceability and structuring the Virtual- MBOM to M-BOM, SWES, PFD, and Torque Tool, build tool selection & control plan.  Assembly linebalancing,Virtual MBOMto refine design concepts,Virtual Sequence Validation to enhancesafety,Quality and velocity performances of the assembly process.  Completed comparison study and havemadeprocess design for NPI productwhich matches with currentProductprocess flow.  Supported the lineassembly build (Pilot) to assembler and gave solutions on the spot and rectify the lineissues while pilotbuild for both 777 E2 & 773 E2 Detailsof Manufacturing EngineeringExperience: - Lead Engineer-Onsite Support- CAT India CAMP-NorthCarolina USA* Oct-2010- Apr 2011 May 2011 -May 2012* June 2012- Dec 2013  As an Onsite Co-Coordinator for this Project, lead a 5 Members team in Cat-India by providing the VPPA projectsandguidingthe teamby technicallyandstrategically.  Getting the Output from the Off-shore team as per the plan and deliver to the customer end without affectingthe pilotbuildplanfromcustomerend.  SupportedRearAxle ManufacturingUnitforabout10 DifferentModelsOHT  NPIsupportsuccessfullycompletedfor4Modelsduringmytenure at onsite  SupportcontinuesfromOffshore forthe restof the 6 Modelsaftermy Onsite tenure wasover.  BasedonourQuality&Commitmentwe havebeenadded5more teammembersinadditiontothe previous numbersandbecome 10-memberteam.  GainedPractical knowledgeof PilotLine Assemblyforthe RearAxles.  Got BestPerformance-2012for the dedicatedsupport. DesignEngineer CAT India Mar 2005 -Sep2010  Created2D – 3D Drawingsasper CAT-Standardsforthe Large Engine Components  SupportedforLafayette Engine Centre USA.  Major work relatedtoGroupdrawing creationusingPro/E  Lead EngineeringChange Request(ECR) 4-memberteam  Hose RoutingsforFluidlines inLarge Engines  Lead 3-memberteamforAftertreatmentComponentsMossville USA  AdheringCPSstandardsdrawingqualityanddeliverontime toprocesspartner Engineer-Design& Development PondyDie Castings(P) ltd., July-2003 to Feb2005
  • 4.
    UsingAuto-Cad& Pro/E Ihave beenworkedforsome of the projectsforthe companieslike Delphi- TVS ltd,Hi-TechArai ltd, Alstomltd.  2D drawing- 3D model creation  Designchangesfromthe customerforthe 3D modelsaftergettingapproval fromthe customer  Accuratelyestimate costof variousprojectforpresentationtoclientsforfinal approval givenforthe correct tool planfor the customer& to monitorthe projectcompletionas perschedule.  Follow-upwiththe Die makersasperthe schedule togetthe assignedDie at righttime  Travelledtootherplaceslike Chennai &Madurai for Die monitoringtoensure thatthe actual processison schedule. DesignEngineer Doux Systems(P) ltd. Jan/2002 to June 2003 Completedsome of the Industrial Automotive ComponentslikeLucas-TVS,FALindustriesltd.., Visteon Ford. Componentslike  StarterMotor FixingBracket  Honda MountingBracket  CompressorMounting  RegulatorMoulding As a TeachingfacultyIhandledclassesforPro/Eincollegeslike:  I.F.E.TEngineeringCollege- Villipuram-TN  MailamEngineeringCollege-Mailam-TN DesignAssistant AlchemyDataSystems(P) ltd. Nov/2000 to June 2001  TrainedStudentsinAuto-Cad2000 Package  GivenCounsellingforthe studentsregardingthe Course  Completedsome Auto-CadProjectslikeIndustrial Layout,ProductionDrawings  Done Line drawingsrepresentingthe layoutof shopfloor Production Supervisor AnishEnterprises(AnUnitof Balaji DistilleriesGroupLtd.) Dec 1994 -Dec 1999  MaintainingandControllingof 60 employeesinvolvedinsheetmetal punchingwork  Supervisingthe production of metal capsforliquorbottles  Controllingof PowerPress20T and30 T  Enforcingthe productionlayoutandgettingthe productionoutputinrighttime and reportingtothe superiors. Certificate Courses Certificate CoursesInAuto-CadfromAutodesk DiplomaCoursesInPro/EfromDoux Systems Personal Details
  • 5.
    Date of Birth:12.06.1975 Marital Status: Married Passport Details:H0279402(Valid upto 01/09/2018)