Agenda	
  
•  What is Entrepreneurship?
•  What is Phenomenology?
•  Conducting a Phenomenological Study
•  Sampling
•  Collecting data
•  Analyzing data
•  Presenting results
What	
  is	
  Entrepreneurship?	
  
Not small business owner
Not founder of new firm
Related to innovation and developing new
products, services, organizations under
conditions of great uncertainty
Old	
  economists	
  knew	
  this	
  
Joseph	
  Schumpeter	
  
“What has been done already has the
sharp-edged reality of all things which
we have seen and experienced; the new
is only the figment of our imagination.
Carrying out a new plan and acting
according to a customary one are things
as different as making a road and
walking along it.”
(Schumpeter 1934: 85).
Frank	
  Knight	
  
“The importance of uncertainty as a factor
interfering with the perfect workings of
competition in accordance with the laws of
pure theory necessitated an examination of
foundations of knowledge and conduct.
The most important result of this survey is
the emphatic contrast between knowledge as
the scientist and the logician of science uses
the term and the convictions or opinions
upon which conduct is based outside of
laboratory experiments, [which] have little
similarity with conclusions reached by
exhaustive analysis and accurate
measurement”
(Knight 1921: 231).
Current	
  pracFFoners	
  do	
  as	
  well	
  
“a startup is an organization
designed to search for a
repeatable and scalable
business model”
Steve	
  Blank	
  
“A startup is a human
institution designed to
create a new product or
service under conditions
of extreme uncertainty”
Eric	
  Ries	
  
Personality traits, behaviors, cognitions or discursive
factors.
Traits research = largely abandoned
Behaviors = PSED etc. ignores individual. Focus
on decontextualized behavior.
Cognitions = entrepreneurial action is reduced
down to the sub-conscious
Discursive = entrepreneurial action is reduced
up to the social discourse
Common	
  ways	
  of	
  explaining	
  
entrepreneurs	
  and	
  their	
  acFons	
  
Personality traits, behaviors, cognitions or discursive
factors.
Traits research = largely abandoned
Behaviors = PSED etc. ignores individual. Focus
on decontextualized behavior.
Cognitions = entrepreneurial action is reduced
down to the sub-conscious
Discursive = entrepreneurial action is reduced
up to the social discourse
Common	
  ways	
  of	
  explaining	
  
entrepreneurs	
  and	
  their	
  acFons	
  
Personality traits, behaviors, cognitions or discursive
factors.
Traits research = largely abandoned
Behaviors = PSED etc. ignores individual. Focus
on decontextualized behavior.
Cognitions = entrepreneurial action is reduced
down to the sub-conscious
Discursive = entrepreneurial action is reduced
up to the social discourse
Common	
  ways	
  of	
  explaining	
  
entrepreneurs	
  and	
  their	
  acFons	
  
Personality traits, behaviors, cognitions or discursive
factors.
Traits research = largely abandoned
Behaviors = PSED etc. ignores individual. Focus
on decontextualized behavior.
Cognitions = entrepreneurial action is reduced
down to the sub-conscious
Discursive = entrepreneurial action is reduced
up to the social discourse
Common	
  ways	
  of	
  explaining	
  
entrepreneurs	
  and	
  their	
  acFons	
  
CogniFve	
  approaches	
  to	
  Entrepreneurship	
  
“Entrepreneurial cognitions are the knowledge
structures people use to make assessments,
judgments or decisions involving opportunity
evaluation, venture creation and growth”
(Mitchell et al. 2002).
Discursive	
  approaches	
  to	
  Entrep.	
  
“Rather than to see entrepreneurs as masters of their
own creation, entrepreneurial identities are formed in the
webs of actualized discourses”
(Steyaert 2004)
If entrepreneurship is about creating new things
under uncertain conditions, are there essential
aspects that research focusing on cognitive
mechanisms and discourses miss?
QuesFon	
  
Table	
  from:	
  	
  
	
  
Berglund,	
  H.	
  (2015).	
  Between	
  Cogni9on	
  and	
  Discourse:	
  	
  
Phenomenology	
  and	
  the	
  Study	
  of	
  Entrepreneurship.	
  	
  
Interna9onal	
  Journal	
  of	
  Entrepreneurial	
  Behaviour	
  &	
  Research.	
  	
  
Special	
  Issue:	
  Embracing	
  Qualita9ve	
  Research	
  Philosophies	
  and	
  Metho
Phenomenology?	
  
“The whole universe of science is built
upon the world as directly experienced,
and if we want to subject science itself
to rigorous scrutiny…we must begin by
reawakening the basic experience of
the world of which science is the
second-order expression.”
(Maurice Merleau-Ponty 1945, ix)
Phenomenology	
  
“we must go back to the ‘forgotten man’ of the
social sciences, to the actor in the social world
whose doing and feeling lies at the bottom of
the whole system
…
the safeguarding of the subjective point of
view is the only sufficient guarantee that the
world of social reality will not be replaced by a
fictional non-existing world constructed by the
scientific observer.”
(Schütz 1964: 7-8)
Phenomenology	
  
“Phenomenological approaches to
entrepreneurship seek, as far as
possible, an ‘insider’s perspective’ of
the phenomenon or episode under
investigation.
An important part of this ambition is to
remain sensitive to ambiguity,
complexity and indeterminacy as
entrepreneurs conceive of and work
through particular phenomena or
situations “
Berglund (2015)
Phenomenology	
  and	
  Entrepreneurship	
  
Not only an academic method.
Learning how to better understand the lived
experiences of others is also extremely valuable for
entrepreneurs!
Cf. http://www.cindyalvarez.com/lean/10-things-ive-
learned-about-customer-development-2014
Phenomenology	
  and	
  Entrepreneurship	
  
What is it like to live with chronic pain?
What are the various meanings of feeling “distant”
from a loved one?
How does it feel to move to a new school as a young
adolescent?
How does a woman’s sense of identity change during
the transition to motherhood?
RQs	
  suitable	
  for	
  phenomenological	
  
inquiry	
  
Phenomenology	
  in	
  Context	
  
Phenomenology	
  in	
  Context	
  
Phenomenology	
  in	
  Context	
  
Phenomenology	
  in	
  Context	
  
QualitaFve	
  and	
  QuanFtaFve	
  methods	
  
How do entrepreneurs perceive opportunities?
Berglund, H. (2007). Opportunities as Existing and Created: A Study of Entrepreneurs in the
Swedish Mobile Internet Industry, Journal of Enterprising Culture. 15(3): 243-273.
http://henrikberglund.com/Opportunities.pdf
How do researchers turned entrepreneurs feel about
their professional identity?
Hellström, T., Hellström, C. and Berglund, H. (2002). The Innovating Self: Exploring Self Among a Group of
Technological Innovators, Journal of Managerial Psychology, 17(4): 267-286.
http://henrikberglund.com/TheInnovatingSelf.pdf
How is risk experienced and managed by technology
entrepreneurs?
Berglund, H. and Hellström, T. (2002). Enacting Risk in Independent Technological
Innovation, International Journal of Risk Assessment and Management. 3(2/3/4): 205-221.
http://henrikberglund.com/EnactingRisk.pdf
RQs	
  suitable	
  for	
  phenomenological	
  
inquiry	
  in	
  entrepreneurship	
  
How do founders experience co-founder conflicts?
What is it like for CEOs to project confidence in front of their
employees, when the startup is close to bankruptcy?
How do founders manage work life balance?
What is it like for founders to fire underperforming executives?
RQs	
  suitable	
  for	
  phenomenological	
  
inquiry	
  in	
  entrepreneurship	
  
ConducFng	
  a	
  Phenomenological	
  Study	
  
	
  
with	
  illustraFons	
  from:	
  
http://henrikberglund.com/EnactingRisk.pdf
Sampling	
  
Purposive – identify a manageable and fairly
homogeneous group of individuals with whom the
investigated phenomenon is salient.
No given #, but depth over breadth.
No need for randomization.
Sampling	
  -­‐	
  example	
  
12 high-tech entrepreneurs distributed across
Sweden (information technologies, biotech or
advanced services).
They had all taken a key role in driving the process
of inventing, producing and marketing a
technological innovation.
Active in their technology-based ventures for at least
one year.
Data	
  collecFon	
  
Key trade off – be flexible enough to accommodate the
richness of the participant’s experience, while staying focused
on the RQ and phenomenon.
Semi-structured interviews are the exemplary method. They
give respondents room to elaborate and also lets the
researcher follow respondents’ leads into novel and
unexpected areas.
Prepare an interview schedule and questions. But only use
the schedule as a guide.
Important task – establish rapport with subject. Make them
feel comfortable sharing their thoughts and feelings.
Record and transcribe => captures detail, affords presence.
Data	
  collecFon	
  -­‐	
  example	
  
Semi-structured interviews on location in the firms.
Average two hours per interview.
Two or three interviewers. One leading the interview, the
others taking detailed notes.
Initial discussions concerned the company and innovation in
general but gradually moved towards the issue of risk.
Risk was discussed very broadly as related to things like the
firm, the innovation and with regard to both the participant as
well as to the company and business environment.
Developing	
  an	
  Interview	
  Schedule	
  -­‐	
  
Example	
  
Example taken from
Smith,	
  J.	
  A.,	
  &	
  Osborn,	
  M.	
  (2008).	
  Interpreta<ve	
  
Phenomenological	
  Analysis.	
  In	
  J.	
  Smith,	
  Qualita<ve	
  	
  
Psychology:	
  A	
  Prac<cal	
  Guide	
  to	
  Research	
  Methods	
  (pp.	
  53-­‐80).	
  
London:	
  Sage.	
  	
  
Developing	
  an	
  Interview	
  Schedule	
  
1)  Think about the broad range of issues you want your
interview to cover.
2)  Order topics appropriately. What is the most logical
order in which to address these issues or areas?
Which is the most sensitive area? Go from general to
specific.
3)  Think of appropriate questions related to each area.
4)  Think about possible probes and prompts.
Example	
  interview	
  schedule:	
  	
  
paFent’s	
  experience	
  of	
  renal	
  dialysis	
  	
  
	
  A.  Dialysis
1)  Could you give me a brief history of your kidney
problem from when it started to your beginning
dialysis?
2)  Could you describe what happens in dialysis, in your
own words?
3)  What do you do when you are having dialysis?
4)  How do you feel when you are dialysing?
prompt: physically, emotionally, mentally.
5)  What do you think about?
6)  How do you feel about having dialysis?
prompt: some people/relief from previous illness/
a bind.
Example:	
  	
  
paFent’s	
  experience	
  of	
  renal	
  dialysis	
  	
  
	
  A.  Dialysis
7)  How does dialysis/kidney disease affect your everyday
life?
prompt: work, interests, relationships.
8)  If you had to describe what the dialysis machine means
to you, what would you say?
prompt: What words come to mind, what
images? Do you have a nickname for it?
Example:	
  	
  
paFent’s	
  experience	
  of	
  renal	
  dialysis	
  	
  
	
  B. Identity
1)  How would you describe yourself as a person?
prompt: What sort of person are you? Most
important characteristics: happy, moody, nervy.
2)  Has having kidney disease and starting dialysis made
a difference to how you see yourself?
prompt: If so, how do you see yourself now as
different from before you started dialysis? How
would you say you have changed?
3)  What about compared to before you had kidney
disease?
4)  What about the way other people see you?
prompt: members of your family, friends?
changed?
Example:	
  	
  
paFent’s	
  experience	
  of	
  renal	
  dialysis	
  	
  
	
  C. Coping
1)  What does the term ‘illness’ mean to you? How do
you define it?
2)  How much do you think about your own physical
health?
3)  Do you see yourself as being ill?
prompt: always, sometimes? Would you say
you were an ill person?
4)  On a day-to-day basis, how do you deal with having
kidney disease (the illness)?
prompt: do you have particular strategies for
helping you? ways of coping, practical, mental.
5)  Do you think about the future much?
Structure	
  for	
  interview	
  schedule	
  
A.  Theme
1)  Question
prompt
2)  Question
prompt
B.  Theme
1)  Question
2)  Question
C.  Theme
1)  Question
2)  Question
Interview	
  Fps	
  and	
  examples	
  
Be	
  prepared	
  to	
  go	
  off	
  script	
  
	
  
If	
  users	
  get	
  worked	
  up	
  –	
  don’t	
  stay	
  on	
  script,	
  	
  
but	
  follow	
  their	
  lead	
  and	
  drill	
  down!	
  
	
  
	
  
Emo9on	
  =	
  Importance!	
  
	
  
Don’t	
  talk	
  
You	
  should	
  be	
  talking	
  as	
  F]le	
  as	
  possible!	
  
	
  
Don’t	
  fear	
  ”uncomfortable	
  silence”	
  	
  
(let	
  them	
  break	
  it).	
  
	
  
80/20	
  is	
  a	
  good	
  raFo	
  to	
  aim	
  for.	
  
Ask	
  brief	
  prompts	
  and	
  follow-­‐ups	
  
(remember,	
  they	
  	
  should	
  be	
  takning)	
  
That	
  sounds	
  interes<ng…	
  
	
  
Tell	
  me	
  more!	
  
	
  
When	
  was	
  the	
  last	
  <me	
  that	
  happened?	
  
	
  
Can	
  you	
  give	
  an	
  example?	
  
	
  
What	
  do	
  you	
  mean	
  by	
  that?	
  
	
  
Can	
  you	
  explain	
  that	
  a	
  liUle	
  more?	
  
	
  
How	
  do	
  you	
  feel	
  about	
  that?	
  
	
  
	
  
Don’t	
  assume	
  things	
  
	
  
	
  
Bad:	
  You	
  hate	
  conflicts	
  with	
  your	
  co-­‐founder!	
  
	
  
Good:	
  How	
  do	
  you	
  feel	
  about	
  co-­‐founder	
  conflict?	
  
	
  
Even	
  BeRer:	
  What	
  was	
  it	
  like	
  the	
  last	
  Fme	
  you	
  had	
  a	
  conflict	
  with	
  
your	
  co-­‐founder?	
  
Write	
  up	
  results	
  a.s.a.p.	
  
	
  
	
  
	
  
Write	
  upp	
  results	
  and	
  	
  
reflecFons	
  
immediately	
  aeer	
  	
  
the	
  interview!	
  
Data	
  analysis	
  
The interview is transcribed verbatim.
The transcript is read and re-read a number of times in order
to establish familiarity with the case.
As you read, feel free to write down reflections in the margin.
Data	
  analysis	
  
After case familiarity is reached, the interview transcript is
read line by line and broken down into discrete parts, not
according to syntactic rules such as sentences but with
respect to visible changes in meaning, i.e. meaning units
(MUs).
Each MU is then associated with a tentative descriptive
concept and broken out of the text.
Data	
  analysis	
  -­‐	
  example	
  
Data	
  analysis	
  
When the whole text has been broken down in this way, start
from the beginning and cut the first MU out of the original
document and pasted into a new document together with a
tentative category heading.
Continue with the remaining document. Each MU is either put
in an existing category or allowed to create its own new
category.
This process will generate a great number of categories and
during the process some categories which are found to be
similar will be merged and others will be split up until all MUs
had been clustered into categories that capture specific
homogeneous aspects of what was said by the participants.
Data	
  analysis	
  
01. Human capital risk
02. (Risk mangement through) opportunistic adaptation
03. Missing the ”business time slot”
04. Driving partnership processes
05. Managing (or creating) risks through partnerships
06. Uniqeness and product competition
07. Risk learning (for the capital market and for the entrepreneur)
08. Positive risktaking and self-efficacy
09. Perception of venture immaturity (lack of substance)
10. Venture incrementalism
11. Force majeure (unexpected events outside of control)
12. Changes in dominant risk logic (sub-category to 07?)
13. Affecting perception of riskyness
14. Lack of time to evaluate decisions
15. Matching partnerships to venture pace
16. The venture as a test-case
17. Affecting human capital
18. External innovation audit
19. Market risk
20. Financing for corporate autonomy
21. Technological prowess (using the strength of the technology)
22. ”First mover” risk
23. Risk administration (dealing with the expected)
24. Opportunity scanning, market pull
25. Piggy-backing
26. Network activation
27. Creating momentum
28. Abundance of slack and lack of coordination
Data	
  analysis	
  
The categories and their interrelationships are then focused
on in more detail with similar themes being clustered into
factors and overarching super-factors.
Data	
  analysis	
  
Data	
  analysis	
  –	
  integraFng	
  mulFple	
  
cases	
  
When categories and higher-order factors have been
developed for all individual cases, the individual cases are
compared.
Here you will again allow new categories and higher-order
factors to develop.
Inclusion in the composit results is not determined by
frequency. Richness of particular passages, importance to
making sense of the whole etc. are also important when
deciding what to include.
Results	
  
The results section is a natural extension of the analysis
process and contains further interpretive elements.
To accomplish a clear distinction between the participants and
the researchers, the participants’ accounts can be presented
using direct quotes.
The style of such a results presentation is shown next. This
results section shows how the factor “Creating and sustaining
autonomy” is described using the categories “External
innovation audits”, “Technological prowess”, “Piggybacking”
and “Creation of momentum”.
Results	
  
Box	
  4.1	
  	
  	
  	
  	
  Crea9ng	
  and	
  sustaining	
  autonomy	
  
Several of the interviewed innovators found it useful to utilise different kinds of external innovation
audits in order to assure innovative integrity of the venture. One way in which an interviewee
achieved this is given in the following quote: “I tried to get my academic colleagues to shoot down
the idea on several occasions, but it withstood their attempts. That way I figured the technological
risk was accounted for.” Another, more externally oriented version was that: “The most important
thing is not to get the product out on the market in a certain space of time, but rather to get an
external actor to validate the concept by showing an interest in that particular technology.”
Technological prowess is a version of the previous category, where the innovator uses the strength of
the technology to achieve autonomy. One example of this was: “The idea is like a shotgun; it’s so
versatile that it can be adapted to new applications, if the initially chosen ones for some reason
wouldn’t work. These additional exits help minimising the risks.” On the administrative/financial
side we have found piggybacking to be the rule rather than the exception. Piggybacking is clearly a
commonplace informal strategy for furthering the autonomy of the venture, e.g.: “Too little and too
dedicated money is another risk. We took money budgeted by S (public utility) for machine
purchases and used part of it for developing the innovation. […] It’s easier to obtain forgiveness than
permission.” The last category under this general factor relates to the creation of momentum for
purposes of getting into and staying in the race as an autonomous player. One innovator addressed
this phenomenon directly and stated that: “In a short period of time we have met numerous VC,
recruited personnel, made 350 presentations and presented at eight trade-fairs. This has kept the
wheels spinning […] one keeps up the momentum.”
•  What is Entrepreneurship?
•  What is Phenomenology?
•  Conducting a Phenomenological Study
•  Sampling
•  Collecting data
•  Analyzing data
•  Presenting results
Tack!	
  

Researching Entrepreneurship using Phenomenological Methods

  • 1.
    Phenomenology  as  a  Method  in   Entrepreneurship  Research       Lecture  at  the  University  of  Oslo,  Center  for  Entrepreneurship,  August  2014             Henrik  Berglund   Chalmers  University  of  Technology   Center  for  Business  InnovaFon   henber@chalmers.se   www.henrikberglund.com     @khberglund  
  • 2.
    Agenda   •  Whatis Entrepreneurship? •  What is Phenomenology? •  Conducting a Phenomenological Study •  Sampling •  Collecting data •  Analyzing data •  Presenting results
  • 3.
    What  is  Entrepreneurship?   Not small business owner Not founder of new firm Related to innovation and developing new products, services, organizations under conditions of great uncertainty
  • 4.
  • 5.
    Joseph  Schumpeter   “Whathas been done already has the sharp-edged reality of all things which we have seen and experienced; the new is only the figment of our imagination. Carrying out a new plan and acting according to a customary one are things as different as making a road and walking along it.” (Schumpeter 1934: 85).
  • 6.
    Frank  Knight   “Theimportance of uncertainty as a factor interfering with the perfect workings of competition in accordance with the laws of pure theory necessitated an examination of foundations of knowledge and conduct. The most important result of this survey is the emphatic contrast between knowledge as the scientist and the logician of science uses the term and the convictions or opinions upon which conduct is based outside of laboratory experiments, [which] have little similarity with conclusions reached by exhaustive analysis and accurate measurement” (Knight 1921: 231).
  • 7.
  • 8.
    “a startup isan organization designed to search for a repeatable and scalable business model” Steve  Blank  
  • 9.
    “A startup isa human institution designed to create a new product or service under conditions of extreme uncertainty” Eric  Ries  
  • 10.
    Personality traits, behaviors,cognitions or discursive factors. Traits research = largely abandoned Behaviors = PSED etc. ignores individual. Focus on decontextualized behavior. Cognitions = entrepreneurial action is reduced down to the sub-conscious Discursive = entrepreneurial action is reduced up to the social discourse Common  ways  of  explaining   entrepreneurs  and  their  acFons  
  • 11.
    Personality traits, behaviors,cognitions or discursive factors. Traits research = largely abandoned Behaviors = PSED etc. ignores individual. Focus on decontextualized behavior. Cognitions = entrepreneurial action is reduced down to the sub-conscious Discursive = entrepreneurial action is reduced up to the social discourse Common  ways  of  explaining   entrepreneurs  and  their  acFons  
  • 12.
    Personality traits, behaviors,cognitions or discursive factors. Traits research = largely abandoned Behaviors = PSED etc. ignores individual. Focus on decontextualized behavior. Cognitions = entrepreneurial action is reduced down to the sub-conscious Discursive = entrepreneurial action is reduced up to the social discourse Common  ways  of  explaining   entrepreneurs  and  their  acFons  
  • 13.
    Personality traits, behaviors,cognitions or discursive factors. Traits research = largely abandoned Behaviors = PSED etc. ignores individual. Focus on decontextualized behavior. Cognitions = entrepreneurial action is reduced down to the sub-conscious Discursive = entrepreneurial action is reduced up to the social discourse Common  ways  of  explaining   entrepreneurs  and  their  acFons  
  • 14.
    CogniFve  approaches  to  Entrepreneurship   “Entrepreneurial cognitions are the knowledge structures people use to make assessments, judgments or decisions involving opportunity evaluation, venture creation and growth” (Mitchell et al. 2002).
  • 15.
    Discursive  approaches  to  Entrep.   “Rather than to see entrepreneurs as masters of their own creation, entrepreneurial identities are formed in the webs of actualized discourses” (Steyaert 2004)
  • 16.
    If entrepreneurship isabout creating new things under uncertain conditions, are there essential aspects that research focusing on cognitive mechanisms and discourses miss? QuesFon  
  • 26.
    Table  from:       Berglund,  H.  (2015).  Between  Cogni9on  and  Discourse:     Phenomenology  and  the  Study  of  Entrepreneurship.     Interna9onal  Journal  of  Entrepreneurial  Behaviour  &  Research.     Special  Issue:  Embracing  Qualita9ve  Research  Philosophies  and  Metho
  • 27.
  • 28.
    “The whole universeof science is built upon the world as directly experienced, and if we want to subject science itself to rigorous scrutiny…we must begin by reawakening the basic experience of the world of which science is the second-order expression.” (Maurice Merleau-Ponty 1945, ix) Phenomenology  
  • 29.
    “we must goback to the ‘forgotten man’ of the social sciences, to the actor in the social world whose doing and feeling lies at the bottom of the whole system … the safeguarding of the subjective point of view is the only sufficient guarantee that the world of social reality will not be replaced by a fictional non-existing world constructed by the scientific observer.” (Schütz 1964: 7-8) Phenomenology  
  • 30.
    “Phenomenological approaches to entrepreneurshipseek, as far as possible, an ‘insider’s perspective’ of the phenomenon or episode under investigation. An important part of this ambition is to remain sensitive to ambiguity, complexity and indeterminacy as entrepreneurs conceive of and work through particular phenomena or situations “ Berglund (2015) Phenomenology  and  Entrepreneurship  
  • 31.
    Not only anacademic method. Learning how to better understand the lived experiences of others is also extremely valuable for entrepreneurs! Cf. http://www.cindyalvarez.com/lean/10-things-ive- learned-about-customer-development-2014 Phenomenology  and  Entrepreneurship  
  • 37.
    What is itlike to live with chronic pain? What are the various meanings of feeling “distant” from a loved one? How does it feel to move to a new school as a young adolescent? How does a woman’s sense of identity change during the transition to motherhood? RQs  suitable  for  phenomenological   inquiry  
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
    How do entrepreneursperceive opportunities? Berglund, H. (2007). Opportunities as Existing and Created: A Study of Entrepreneurs in the Swedish Mobile Internet Industry, Journal of Enterprising Culture. 15(3): 243-273. http://henrikberglund.com/Opportunities.pdf How do researchers turned entrepreneurs feel about their professional identity? Hellström, T., Hellström, C. and Berglund, H. (2002). The Innovating Self: Exploring Self Among a Group of Technological Innovators, Journal of Managerial Psychology, 17(4): 267-286. http://henrikberglund.com/TheInnovatingSelf.pdf How is risk experienced and managed by technology entrepreneurs? Berglund, H. and Hellström, T. (2002). Enacting Risk in Independent Technological Innovation, International Journal of Risk Assessment and Management. 3(2/3/4): 205-221. http://henrikberglund.com/EnactingRisk.pdf RQs  suitable  for  phenomenological   inquiry  in  entrepreneurship  
  • 44.
    How do foundersexperience co-founder conflicts? What is it like for CEOs to project confidence in front of their employees, when the startup is close to bankruptcy? How do founders manage work life balance? What is it like for founders to fire underperforming executives? RQs  suitable  for  phenomenological   inquiry  in  entrepreneurship  
  • 45.
    ConducFng  a  Phenomenological  Study     with  illustraFons  from:   http://henrikberglund.com/EnactingRisk.pdf
  • 46.
    Sampling   Purposive –identify a manageable and fairly homogeneous group of individuals with whom the investigated phenomenon is salient. No given #, but depth over breadth. No need for randomization.
  • 47.
    Sampling  -­‐  example   12 high-tech entrepreneurs distributed across Sweden (information technologies, biotech or advanced services). They had all taken a key role in driving the process of inventing, producing and marketing a technological innovation. Active in their technology-based ventures for at least one year.
  • 48.
    Data  collecFon   Keytrade off – be flexible enough to accommodate the richness of the participant’s experience, while staying focused on the RQ and phenomenon. Semi-structured interviews are the exemplary method. They give respondents room to elaborate and also lets the researcher follow respondents’ leads into novel and unexpected areas. Prepare an interview schedule and questions. But only use the schedule as a guide. Important task – establish rapport with subject. Make them feel comfortable sharing their thoughts and feelings. Record and transcribe => captures detail, affords presence.
  • 49.
    Data  collecFon  -­‐  example   Semi-structured interviews on location in the firms. Average two hours per interview. Two or three interviewers. One leading the interview, the others taking detailed notes. Initial discussions concerned the company and innovation in general but gradually moved towards the issue of risk. Risk was discussed very broadly as related to things like the firm, the innovation and with regard to both the participant as well as to the company and business environment.
  • 50.
    Developing  an  Interview  Schedule  -­‐   Example   Example taken from Smith,  J.  A.,  &  Osborn,  M.  (2008).  Interpreta<ve   Phenomenological  Analysis.  In  J.  Smith,  Qualita<ve     Psychology:  A  Prac<cal  Guide  to  Research  Methods  (pp.  53-­‐80).   London:  Sage.    
  • 51.
    Developing  an  Interview  Schedule   1)  Think about the broad range of issues you want your interview to cover. 2)  Order topics appropriately. What is the most logical order in which to address these issues or areas? Which is the most sensitive area? Go from general to specific. 3)  Think of appropriate questions related to each area. 4)  Think about possible probes and prompts.
  • 52.
    Example  interview  schedule:     paFent’s  experience  of  renal  dialysis      A.  Dialysis 1)  Could you give me a brief history of your kidney problem from when it started to your beginning dialysis? 2)  Could you describe what happens in dialysis, in your own words? 3)  What do you do when you are having dialysis? 4)  How do you feel when you are dialysing? prompt: physically, emotionally, mentally. 5)  What do you think about? 6)  How do you feel about having dialysis? prompt: some people/relief from previous illness/ a bind.
  • 53.
    Example:     paFent’s  experience  of  renal  dialysis      A.  Dialysis 7)  How does dialysis/kidney disease affect your everyday life? prompt: work, interests, relationships. 8)  If you had to describe what the dialysis machine means to you, what would you say? prompt: What words come to mind, what images? Do you have a nickname for it?
  • 54.
    Example:     paFent’s  experience  of  renal  dialysis      B. Identity 1)  How would you describe yourself as a person? prompt: What sort of person are you? Most important characteristics: happy, moody, nervy. 2)  Has having kidney disease and starting dialysis made a difference to how you see yourself? prompt: If so, how do you see yourself now as different from before you started dialysis? How would you say you have changed? 3)  What about compared to before you had kidney disease? 4)  What about the way other people see you? prompt: members of your family, friends? changed?
  • 55.
    Example:     paFent’s  experience  of  renal  dialysis      C. Coping 1)  What does the term ‘illness’ mean to you? How do you define it? 2)  How much do you think about your own physical health? 3)  Do you see yourself as being ill? prompt: always, sometimes? Would you say you were an ill person? 4)  On a day-to-day basis, how do you deal with having kidney disease (the illness)? prompt: do you have particular strategies for helping you? ways of coping, practical, mental. 5)  Do you think about the future much?
  • 56.
    Structure  for  interview  schedule   A.  Theme 1)  Question prompt 2)  Question prompt B.  Theme 1)  Question 2)  Question C.  Theme 1)  Question 2)  Question
  • 57.
  • 58.
    Be  prepared  to  go  off  script     If  users  get  worked  up  –  don’t  stay  on  script,     but  follow  their  lead  and  drill  down!       Emo9on  =  Importance!    
  • 59.
    Don’t  talk   You  should  be  talking  as  F]le  as  possible!     Don’t  fear  ”uncomfortable  silence”     (let  them  break  it).     80/20  is  a  good  raFo  to  aim  for.  
  • 60.
    Ask  brief  prompts  and  follow-­‐ups   (remember,  they    should  be  takning)   That  sounds  interes<ng…     Tell  me  more!     When  was  the  last  <me  that  happened?     Can  you  give  an  example?     What  do  you  mean  by  that?     Can  you  explain  that  a  liUle  more?     How  do  you  feel  about  that?      
  • 61.
    Don’t  assume  things       Bad:  You  hate  conflicts  with  your  co-­‐founder!     Good:  How  do  you  feel  about  co-­‐founder  conflict?     Even  BeRer:  What  was  it  like  the  last  Fme  you  had  a  conflict  with   your  co-­‐founder?  
  • 62.
    Write  up  results  a.s.a.p.         Write  upp  results  and     reflecFons   immediately  aeer     the  interview!  
  • 63.
    Data  analysis   Theinterview is transcribed verbatim. The transcript is read and re-read a number of times in order to establish familiarity with the case. As you read, feel free to write down reflections in the margin.
  • 64.
    Data  analysis   Aftercase familiarity is reached, the interview transcript is read line by line and broken down into discrete parts, not according to syntactic rules such as sentences but with respect to visible changes in meaning, i.e. meaning units (MUs). Each MU is then associated with a tentative descriptive concept and broken out of the text.
  • 65.
  • 66.
    Data  analysis   Whenthe whole text has been broken down in this way, start from the beginning and cut the first MU out of the original document and pasted into a new document together with a tentative category heading. Continue with the remaining document. Each MU is either put in an existing category or allowed to create its own new category. This process will generate a great number of categories and during the process some categories which are found to be similar will be merged and others will be split up until all MUs had been clustered into categories that capture specific homogeneous aspects of what was said by the participants.
  • 67.
    Data  analysis   01.Human capital risk 02. (Risk mangement through) opportunistic adaptation 03. Missing the ”business time slot” 04. Driving partnership processes 05. Managing (or creating) risks through partnerships 06. Uniqeness and product competition 07. Risk learning (for the capital market and for the entrepreneur) 08. Positive risktaking and self-efficacy 09. Perception of venture immaturity (lack of substance) 10. Venture incrementalism 11. Force majeure (unexpected events outside of control) 12. Changes in dominant risk logic (sub-category to 07?) 13. Affecting perception of riskyness 14. Lack of time to evaluate decisions 15. Matching partnerships to venture pace 16. The venture as a test-case 17. Affecting human capital 18. External innovation audit 19. Market risk 20. Financing for corporate autonomy 21. Technological prowess (using the strength of the technology) 22. ”First mover” risk 23. Risk administration (dealing with the expected) 24. Opportunity scanning, market pull 25. Piggy-backing 26. Network activation 27. Creating momentum 28. Abundance of slack and lack of coordination
  • 68.
    Data  analysis   Thecategories and their interrelationships are then focused on in more detail with similar themes being clustered into factors and overarching super-factors.
  • 69.
  • 70.
    Data  analysis  –  integraFng  mulFple   cases   When categories and higher-order factors have been developed for all individual cases, the individual cases are compared. Here you will again allow new categories and higher-order factors to develop. Inclusion in the composit results is not determined by frequency. Richness of particular passages, importance to making sense of the whole etc. are also important when deciding what to include.
  • 71.
    Results   The resultssection is a natural extension of the analysis process and contains further interpretive elements. To accomplish a clear distinction between the participants and the researchers, the participants’ accounts can be presented using direct quotes. The style of such a results presentation is shown next. This results section shows how the factor “Creating and sustaining autonomy” is described using the categories “External innovation audits”, “Technological prowess”, “Piggybacking” and “Creation of momentum”.
  • 72.
    Results   Box  4.1          Crea9ng  and  sustaining  autonomy   Several of the interviewed innovators found it useful to utilise different kinds of external innovation audits in order to assure innovative integrity of the venture. One way in which an interviewee achieved this is given in the following quote: “I tried to get my academic colleagues to shoot down the idea on several occasions, but it withstood their attempts. That way I figured the technological risk was accounted for.” Another, more externally oriented version was that: “The most important thing is not to get the product out on the market in a certain space of time, but rather to get an external actor to validate the concept by showing an interest in that particular technology.” Technological prowess is a version of the previous category, where the innovator uses the strength of the technology to achieve autonomy. One example of this was: “The idea is like a shotgun; it’s so versatile that it can be adapted to new applications, if the initially chosen ones for some reason wouldn’t work. These additional exits help minimising the risks.” On the administrative/financial side we have found piggybacking to be the rule rather than the exception. Piggybacking is clearly a commonplace informal strategy for furthering the autonomy of the venture, e.g.: “Too little and too dedicated money is another risk. We took money budgeted by S (public utility) for machine purchases and used part of it for developing the innovation. […] It’s easier to obtain forgiveness than permission.” The last category under this general factor relates to the creation of momentum for purposes of getting into and staying in the race as an autonomous player. One innovator addressed this phenomenon directly and stated that: “In a short period of time we have met numerous VC, recruited personnel, made 350 presentations and presented at eight trade-fairs. This has kept the wheels spinning […] one keeps up the momentum.”
  • 73.
    •  What isEntrepreneurship? •  What is Phenomenology? •  Conducting a Phenomenological Study •  Sampling •  Collecting data •  Analyzing data •  Presenting results Tack!