Rajesh.s.Angadi
REVIT MEP, HVAC designer
Mobile No: +919738556909,+919902671219
E-mail: angadirajesh@yahoo.com
JOB APPLICATION
To
HR Manager
Subject: Job Application
Respected Sir/Madam,
I, Rajesh Angadi, with 6 months of experience as REVIT MEP, HVAC designer in various projects
currently seeking a position of REVIT MEP, HVAC Designer in your esteemed organization and I
would like to submit my resume for your kind perusal. I believe my qualifications will match
your requirements.
Please consider this letter as an expression of my sincere interest in pursuing the vacancy in
your prestigious organization. I am capable of working hard, self-confident, optimistic, sincere
and honest with good leadership qualities.
I look forward to hear from you.
Sincerely,
Rajesh Angadi
RESUME
RAJESH.S.ANGADI Email-angadirajesh@yahoo.com
B.E (MECHANICAL) Contact no- +919738556909,9902671219
DHARWAD
CAREER OBJECTIVE
To work in a firm with a professional work driven environment where I can utilize and apply my
knowledge, skills which would enable me to grow while fulfilling organizational goals.
BASIC ACADEMIC CREDENTIALS
Qualification Board/University Percentage
B.E (Mechanical) Visvesvaraya Technological University,
Belgaum
63.36%
PUC S.M.P.U , Dharwad 59%
High School Karnataka Secondary Education Examination
Board.
83.36%
PROFESSIONAL COURSEUNDERGONE
Course: REVIT MEP with HVAC Design
Duration: Two months from September 2015 to December 2015.
Successfully completed training program in HVAC as per standards from Desapex Engineering
Consultants
Training Program Contains:
 Calculation of Cooling and Heating loads.
 Duct designing using Duct sizer.
 Primary and Secondary Pipe Designing using Pipe sizer.
 Preparing Of Bill of Quantity (BOQ).
SOFTWARESKILLS
 Design and Analysis: Revit 2014, AutoCAD 2014.
 HVAC Software: McQuay ductsizer V6.4, McQuay Design tool pipesizer v6.2.
 Software Packages: Microsoft Office 2013.
 Operating Systems: Windows (95, 98, XP, Vista, Windows 7, Windows 8)
REVIT SKILLS
 Creating a MEP project, Linking a CAD file and REVIT file, Creating and modifying a project
template, creating annotations and tagging by categories.
 Creating spaces, zones for heat load calculation and also creating a zone color scheme.
 Creating duct by manually or automatic routing, sizing of ducts, inspecting of the ducts by
system inspector.
 Creating of pipes for chilled water supply and return, sizing of pipes, Inspecting by system
inspector.
 Placing sanitary plumbing fixture and creating a sanitary system, creating cold and hot
water system.
 Adding lighting fixture, creating cable tray for lighting fixtures.
 Designing of firefighting system, adding sprinkler, creating of piping system, modifying of
pipe diameter according to standards.
 Performing clash detection between various systems using their element ID.
 Creating scheduling/documentation of project-scheduling of ducts, pipes, lighting fixture,
air terminals etc.
HVAC SKILLS
 Heat load calculation.
 Duct designing by Static regain method, Equal friction method, Velocity Reduction and by
software like McQuay ductsizer V6.4.
 Selection of air terminal based on the required CFM.
 Chilled water piping by McQuay pipesizer v6.2.
 Public Health Engineering(PHE) and chilled water plant.
 BOQ of duct, duct fittings, air terminals.
PROJECT UNDERTAKEN
Type: Office Space (ground floor+6 floors)
Location: Bangalore
Total area: 102,051 square ft.
Load calculation: 225 TR
Total CFM: 8500
 Architecture model:-
Linking the 2D file or CAD file into REVIT project & then developed architecture model using
architecture template.
 Heat load:-
 Creating spaces:
Creation of spaces within the room bounding element such as wall, roof & room
separation lines that exists in an architectural model.
 Creating a space properties schedule:
Created working schedule of the building space properties and defined the different
parameters to calculate the heat load.
 Creating zones:
After creating the spaces, created the zones for space function to maintain a common
environment like temperature, humidity, and so on.
 Performing heat load analysis:
Once creation of all spaces and defined respective parameters, conditioning system, and
space construction defined, the next step is to pull this all data into heat load analysis report.
 Equipment selection:-
After completing the heat load report selected the equipment’s depends on the types of air
conditioning system.
Chiller : Air cooled scroll chiller of 25 TR
: Two Water cooled screw chiller of 90 TR
Cooling tower : Induced draft cooling tower of 225 TR
AHU : Floor mounted AHU with top discharge
With requisite capacities of 6 row cooling
Aluminum fins.
Duct design:-
Based on the Air flow rate, calculated the duct size by using the Equal friction method. And
also calculated duct size using Mcquay duct size software.
 Air distribution:-
Selection of air distribution devices such as supply and return air diffusers, grills. These must
be selected to maintain noise level. And then placed the air terminals on the false ceiling and
these terminals are connected to the duct systemthrough the flexible ducts. Distribute air to the
rooms from the AHU unit through the duct system and air terminals.
 Fire protectionsystem:-
Selected the smoke detectors and then placed smoke detectors on the false ceiling to avoid
the fire hazards.
 Light system: -
As per the cable tray size created the cable tray layout and then placed the Lighting
fixtures.
PERSONALINFORMATION
STANDARDS REFERED
PROJECTPORTFOLIOLINK
 BOQ’S:-
Creation of scheduled quantities (BOQ or BOM) material used in the HVAC system.
 Bill of quantities of Duct and Duct fittings, Air terminals.
 Bill of quantities of pipe fittings and plumbing fixtures.
 Bill of quantities of lighting fixture, cable trays, and cable trays fittings.
https://drive.google.com/file/d/0Bz6b69klDhN_a0hBSldWZ2ZXbDg
/view?usp=sharing
ASHRE 90.1, ASHRE 62.1, ISHRE and NBC
Name : RAJESH S ANGADI
Gender : Male
Date of Birth : 20/10/1990
Nationality : Indian
Marital status : Single
Languages Known : English, Hindi and Kannada
Address : c/o S M Angadi Koppadakeri
4th main MB Nagar
Dharwad – 580008
I do hereby declare that the above information is true to the best of my knowledge.
DECLARATION
RAJESH_RESUME

RAJESH_RESUME

  • 1.
    Rajesh.s.Angadi REVIT MEP, HVACdesigner Mobile No: +919738556909,+919902671219 E-mail: angadirajesh@yahoo.com JOB APPLICATION To HR Manager Subject: Job Application Respected Sir/Madam, I, Rajesh Angadi, with 6 months of experience as REVIT MEP, HVAC designer in various projects currently seeking a position of REVIT MEP, HVAC Designer in your esteemed organization and I would like to submit my resume for your kind perusal. I believe my qualifications will match your requirements. Please consider this letter as an expression of my sincere interest in pursuing the vacancy in your prestigious organization. I am capable of working hard, self-confident, optimistic, sincere and honest with good leadership qualities. I look forward to hear from you. Sincerely, Rajesh Angadi
  • 2.
    RESUME RAJESH.S.ANGADI Email-angadirajesh@yahoo.com B.E (MECHANICAL)Contact no- +919738556909,9902671219 DHARWAD CAREER OBJECTIVE To work in a firm with a professional work driven environment where I can utilize and apply my knowledge, skills which would enable me to grow while fulfilling organizational goals. BASIC ACADEMIC CREDENTIALS Qualification Board/University Percentage B.E (Mechanical) Visvesvaraya Technological University, Belgaum 63.36% PUC S.M.P.U , Dharwad 59% High School Karnataka Secondary Education Examination Board. 83.36% PROFESSIONAL COURSEUNDERGONE Course: REVIT MEP with HVAC Design Duration: Two months from September 2015 to December 2015. Successfully completed training program in HVAC as per standards from Desapex Engineering Consultants Training Program Contains:  Calculation of Cooling and Heating loads.  Duct designing using Duct sizer.  Primary and Secondary Pipe Designing using Pipe sizer.  Preparing Of Bill of Quantity (BOQ).
  • 3.
    SOFTWARESKILLS  Design andAnalysis: Revit 2014, AutoCAD 2014.  HVAC Software: McQuay ductsizer V6.4, McQuay Design tool pipesizer v6.2.  Software Packages: Microsoft Office 2013.  Operating Systems: Windows (95, 98, XP, Vista, Windows 7, Windows 8) REVIT SKILLS  Creating a MEP project, Linking a CAD file and REVIT file, Creating and modifying a project template, creating annotations and tagging by categories.  Creating spaces, zones for heat load calculation and also creating a zone color scheme.  Creating duct by manually or automatic routing, sizing of ducts, inspecting of the ducts by system inspector.  Creating of pipes for chilled water supply and return, sizing of pipes, Inspecting by system inspector.  Placing sanitary plumbing fixture and creating a sanitary system, creating cold and hot water system.  Adding lighting fixture, creating cable tray for lighting fixtures.  Designing of firefighting system, adding sprinkler, creating of piping system, modifying of pipe diameter according to standards.  Performing clash detection between various systems using their element ID.  Creating scheduling/documentation of project-scheduling of ducts, pipes, lighting fixture, air terminals etc. HVAC SKILLS  Heat load calculation.  Duct designing by Static regain method, Equal friction method, Velocity Reduction and by software like McQuay ductsizer V6.4.  Selection of air terminal based on the required CFM.  Chilled water piping by McQuay pipesizer v6.2.  Public Health Engineering(PHE) and chilled water plant.  BOQ of duct, duct fittings, air terminals.
  • 4.
    PROJECT UNDERTAKEN Type: OfficeSpace (ground floor+6 floors) Location: Bangalore Total area: 102,051 square ft. Load calculation: 225 TR Total CFM: 8500  Architecture model:- Linking the 2D file or CAD file into REVIT project & then developed architecture model using architecture template.  Heat load:-  Creating spaces: Creation of spaces within the room bounding element such as wall, roof & room separation lines that exists in an architectural model.  Creating a space properties schedule: Created working schedule of the building space properties and defined the different parameters to calculate the heat load.  Creating zones: After creating the spaces, created the zones for space function to maintain a common environment like temperature, humidity, and so on.  Performing heat load analysis: Once creation of all spaces and defined respective parameters, conditioning system, and space construction defined, the next step is to pull this all data into heat load analysis report.
  • 5.
     Equipment selection:- Aftercompleting the heat load report selected the equipment’s depends on the types of air conditioning system. Chiller : Air cooled scroll chiller of 25 TR : Two Water cooled screw chiller of 90 TR Cooling tower : Induced draft cooling tower of 225 TR AHU : Floor mounted AHU with top discharge With requisite capacities of 6 row cooling Aluminum fins. Duct design:- Based on the Air flow rate, calculated the duct size by using the Equal friction method. And also calculated duct size using Mcquay duct size software.  Air distribution:- Selection of air distribution devices such as supply and return air diffusers, grills. These must be selected to maintain noise level. And then placed the air terminals on the false ceiling and these terminals are connected to the duct systemthrough the flexible ducts. Distribute air to the rooms from the AHU unit through the duct system and air terminals.  Fire protectionsystem:- Selected the smoke detectors and then placed smoke detectors on the false ceiling to avoid the fire hazards.  Light system: - As per the cable tray size created the cable tray layout and then placed the Lighting fixtures.
  • 6.
    PERSONALINFORMATION STANDARDS REFERED PROJECTPORTFOLIOLINK  BOQ’S:- Creationof scheduled quantities (BOQ or BOM) material used in the HVAC system.  Bill of quantities of Duct and Duct fittings, Air terminals.  Bill of quantities of pipe fittings and plumbing fixtures.  Bill of quantities of lighting fixture, cable trays, and cable trays fittings. https://drive.google.com/file/d/0Bz6b69klDhN_a0hBSldWZ2ZXbDg /view?usp=sharing ASHRE 90.1, ASHRE 62.1, ISHRE and NBC Name : RAJESH S ANGADI Gender : Male Date of Birth : 20/10/1990 Nationality : Indian Marital status : Single Languages Known : English, Hindi and Kannada Address : c/o S M Angadi Koppadakeri 4th main MB Nagar Dharwad – 580008 I do hereby declare that the above information is true to the best of my knowledge. DECLARATION