3. Two 42-inch butterfly valve and four 36-inch butterfly valves
36-inch Steel Pipe Welding HDD Slurry Equipment
Small Portion of Upper Intertie
Lower Intertie
2000 ft steel pipe getting ready for HDD installation
Lower Intertie
City of McMinnville, Oregon - Second Tunnel – Jacobs Engineering and HDR, Spring 2015
This $ 5,000,000 Second Tunnel construction project consisted of 36-inch, 2200 feet long HDD installed
steel pipe, designed by Jacobs Engineering was successfully completed in Spring of 2015. System
hydraulics, between the Water Treatment Plant and the City of McMinnville ( L= 10 mile of dual
transmission mains), their operational requirements and design of 36-inch L= 700 feet long ductile iron
pipe, upper and lower pipe interties consisting of automated valves and flow control equipment was
provided by Nesh Mucibabic, PE of HDR.

More Related Content

What's hot

ProTec Recent Projects Brochure
ProTec Recent Projects BrochureProTec Recent Projects Brochure
ProTec Recent Projects BrochureSteven MacDonald
 
New Street In Colour
New Street In ColourNew Street In Colour
New Street In ColourKen Crook
 
Energy efficient for part 9 buildings and city bylaws
Energy efficient for part 9 buildings and city bylawsEnergy efficient for part 9 buildings and city bylaws
Energy efficient for part 9 buildings and city bylawsXiangyang Tan
 
Greener Greater Building Plan Overview
Greener Greater Building Plan Overview Greener Greater Building Plan Overview
Greener Greater Building Plan Overview REBNY
 
EHHResume062815
EHHResume062815EHHResume062815
EHHResume062815Ed Humble
 

What's hot (7)

ProTec Recent Projects Brochure
ProTec Recent Projects BrochureProTec Recent Projects Brochure
ProTec Recent Projects Brochure
 
New Street In Colour
New Street In ColourNew Street In Colour
New Street In Colour
 
Energy efficient for part 9 buildings and city bylaws
Energy efficient for part 9 buildings and city bylawsEnergy efficient for part 9 buildings and city bylaws
Energy efficient for part 9 buildings and city bylaws
 
Greener Greater Building Plan Overview
Greener Greater Building Plan Overview Greener Greater Building Plan Overview
Greener Greater Building Plan Overview
 
EHHResume062815
EHHResume062815EHHResume062815
EHHResume062815
 
SC Biodata 2016_v1
SC Biodata 2016_v1SC Biodata 2016_v1
SC Biodata 2016_v1
 
RESUME 2016
RESUME 2016RESUME 2016
RESUME 2016
 

Viewers also liked

Regulamento visanet pag 8 jpg
Regulamento visanet pag 8 jpgRegulamento visanet pag 8 jpg
Regulamento visanet pag 8 jpgmegacidadania
 
Serie Manual de Gestión y proceso para contraparte Local - Colección enferme...
Serie Manual de Gestión y proceso para contraparte Local -  Colección enferme...Serie Manual de Gestión y proceso para contraparte Local -  Colección enferme...
Serie Manual de Gestión y proceso para contraparte Local - Colección enferme...Silvia Ester Heckel Ochoteco
 
Seven50 Polling Results
Seven50 Polling Results Seven50 Polling Results
Seven50 Polling Results Roar Media
 
Brage & Gustafsson Aman - Is it possible to support workplace information lit...
Brage & Gustafsson Aman - Is it possible to support workplace information lit...Brage & Gustafsson Aman - Is it possible to support workplace information lit...
Brage & Gustafsson Aman - Is it possible to support workplace information lit...IL Group (CILIP Information Literacy Group)
 
LA VISPA TERESA (ovvero il ministro Galletti e il SISTRI)
LA VISPA TERESA  (ovvero il ministro Galletti e il SISTRI)LA VISPA TERESA  (ovvero il ministro Galletti e il SISTRI)
LA VISPA TERESA (ovvero il ministro Galletti e il SISTRI)tramerper
 
Detecccion de necesidades de capacitacion dnc
Detecccion de necesidades de capacitacion dncDetecccion de necesidades de capacitacion dnc
Detecccion de necesidades de capacitacion dnclalo9612
 
Chris Lyon Resume
Chris Lyon ResumeChris Lyon Resume
Chris Lyon ResumeChris Lyon
 

Viewers also liked (12)

Kräuterspätzle
KräuterspätzleKräuterspätzle
Kräuterspätzle
 
Regulamento visanet pag 8 jpg
Regulamento visanet pag 8 jpgRegulamento visanet pag 8 jpg
Regulamento visanet pag 8 jpg
 
Serie Manual de Gestión y proceso para contraparte Local - Colección enferme...
Serie Manual de Gestión y proceso para contraparte Local -  Colección enferme...Serie Manual de Gestión y proceso para contraparte Local -  Colección enferme...
Serie Manual de Gestión y proceso para contraparte Local - Colección enferme...
 
Febmarc2
Febmarc2Febmarc2
Febmarc2
 
Seven50 Polling Results
Seven50 Polling Results Seven50 Polling Results
Seven50 Polling Results
 
Sản phẩm
Sản phẩmSản phẩm
Sản phẩm
 
Brage & Gustafsson Aman - Is it possible to support workplace information lit...
Brage & Gustafsson Aman - Is it possible to support workplace information lit...Brage & Gustafsson Aman - Is it possible to support workplace information lit...
Brage & Gustafsson Aman - Is it possible to support workplace information lit...
 
Valle de cauca tare a miguel
Valle de cauca tare a miguelValle de cauca tare a miguel
Valle de cauca tare a miguel
 
LA VISPA TERESA (ovvero il ministro Galletti e il SISTRI)
LA VISPA TERESA  (ovvero il ministro Galletti e il SISTRI)LA VISPA TERESA  (ovvero il ministro Galletti e il SISTRI)
LA VISPA TERESA (ovvero il ministro Galletti e il SISTRI)
 
Detecccion de necesidades de capacitacion dnc
Detecccion de necesidades de capacitacion dncDetecccion de necesidades de capacitacion dnc
Detecccion de necesidades de capacitacion dnc
 
Alisha Wilmoth Resume
Alisha Wilmoth ResumeAlisha Wilmoth Resume
Alisha Wilmoth Resume
 
Chris Lyon Resume
Chris Lyon ResumeChris Lyon Resume
Chris Lyon Resume
 

Similar to Mc Minville Improvements2

Similar to Mc Minville Improvements2 (20)

Pump Replacement Project
Pump Replacement ProjectPump Replacement Project
Pump Replacement Project
 
Brookwood Parkway Improvement
Brookwood Parkway ImprovementBrookwood Parkway Improvement
Brookwood Parkway Improvement
 
Sewer Design - Conflict Resolution
Sewer Design  - Conflict ResolutionSewer Design  - Conflict Resolution
Sewer Design - Conflict Resolution
 
Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014
 
MW Project Experience Updated 7-24-16
MW Project Experience Updated 7-24-16MW Project Experience Updated 7-24-16
MW Project Experience Updated 7-24-16
 
SENIOR DESIGN PROJECT
SENIOR DESIGN PROJECTSENIOR DESIGN PROJECT
SENIOR DESIGN PROJECT
 
odunlami prese_033552.pptx
odunlami prese_033552.pptxodunlami prese_033552.pptx
odunlami prese_033552.pptx
 
SCOTT RESUME
SCOTT RESUMESCOTT RESUME
SCOTT RESUME
 
odun dgdgf_125332.pptx
odun dgdgf_125332.pptxodun dgdgf_125332.pptx
odun dgdgf_125332.pptx
 
MES Case Study - Carlton Park Substation
MES Case Study - Carlton Park SubstationMES Case Study - Carlton Park Substation
MES Case Study - Carlton Park Substation
 
Intro infrastructure project 2015.02.26
Intro infrastructure project 2015.02.26Intro infrastructure project 2015.02.26
Intro infrastructure project 2015.02.26
 
Project report
Project reportProject report
Project report
 
attcofinal
attcofinalattcofinal
attcofinal
 
EADIPS FGR annual journal 2012
EADIPS FGR annual journal 2012EADIPS FGR annual journal 2012
EADIPS FGR annual journal 2012
 
Contech DuroMaxx Steel Reinforced Polyethylene
Contech DuroMaxx Steel Reinforced PolyethyleneContech DuroMaxx Steel Reinforced Polyethylene
Contech DuroMaxx Steel Reinforced Polyethylene
 
Paper
PaperPaper
Paper
 
CE2-Jose (1).docx
CE2-Jose (1).docxCE2-Jose (1).docx
CE2-Jose (1).docx
 
Wind Power EPCM
Wind Power EPCMWind Power EPCM
Wind Power EPCM
 
Muhammad_Aslam_CV
Muhammad_Aslam_CVMuhammad_Aslam_CV
Muhammad_Aslam_CV
 
Everett Nichols_Resume_Dec_2015
Everett Nichols_Resume_Dec_2015Everett Nichols_Resume_Dec_2015
Everett Nichols_Resume_Dec_2015
 

Mc Minville Improvements2

  • 1. 3. Two 42-inch butterfly valve and four 36-inch butterfly valves 36-inch Steel Pipe Welding HDD Slurry Equipment Small Portion of Upper Intertie Lower Intertie 2000 ft steel pipe getting ready for HDD installation Lower Intertie City of McMinnville, Oregon - Second Tunnel – Jacobs Engineering and HDR, Spring 2015 This $ 5,000,000 Second Tunnel construction project consisted of 36-inch, 2200 feet long HDD installed steel pipe, designed by Jacobs Engineering was successfully completed in Spring of 2015. System hydraulics, between the Water Treatment Plant and the City of McMinnville ( L= 10 mile of dual transmission mains), their operational requirements and design of 36-inch L= 700 feet long ductile iron pipe, upper and lower pipe interties consisting of automated valves and flow control equipment was provided by Nesh Mucibabic, PE of HDR.