Project details
The Prospect Water Filtration Plant was opened by the Premier
of New South Wales, the Honourable Bob Carr, on the 4th of
November 1996.
The plant was built under a 25 year Build, Own and Operate
contract between Sydney Water Corporation, and the Prospect
Water Partnership, a consortium consisting of Lyonnaise des Eaux
(now SUEZ ENVIRONNEMENT), Ondeo and Unisuper. Degrémont (a
subsidiary of SUEZ ENVIRONNEMENT) is the plant operator.
The project manager during construction was Civil & Civic, now
trading as Bovis Lend Lease, and the principal designer was the
Prospect Water Group, a joint venture of Australian Consultants
CMPS&F and Sinclair Knight Mertz.
Technical Innovation
Plant Hydraulics
Plant location and layout meant that only 5.2m of head was available
to allow gravity flow to be maintained throughout the Plant. Several
innovations in the passive flow control systems were incorporated
resulting in:
•	 Excellent level of accuracy in flow split to each filter, plus or minus 2%
•	 Even flow conditions past chemical dosing points, maximising
chemical usage efficiency and filter yields
•	 Minimal headloss
•	 Plant layout rationalisation resulting in construction cost savings of
approximately $40 million
Chemical Mixing
The sheer size of the four contact channels, each over 4m wide and
6m deep and the low head available, meant that innovative solutions
for chemical mixing systems had to be developed to ensure rapid
and even dispersion and efficiency. Hydraulic flash mixing was
developed on a scale never before attempted. The result was:
•	 Full chemical dispersion across the channel within one second
resulting in highly efficient coagulation
•	 Minimum chemical consumption.
Filters
At Prospect, solids removal occurs directly on the filters, eliminating
the need for a sedimentation stage. However, to achieve adequate
filter runs, major innovations in filter design were required. The result
is filters:
•	 With a filtration rate of 24m/hour, which is double the previous
average for conventional filters
•	 That are among the world’s largest, with an individual bed size of
almost 240m2
•	 Have the highest capacity per m3
of any in the world
In addition, an innovative non-expanded bed backwashing system
with simultaneous air and water backwash was incorporated into the
filter system.
The outcome has been:
•	 Treated water of a quality that has consistently and substantially
exceeded contractual requirements
•	 Improved filter yields
•	 50% less backwash water used over conventional expanded
backwash system.
The Prospect Water Filtration Plant is recognised as
one of the world’s largest water filtration plants, with
a capacity to provide drinking water to 80 per cent of
Sydney’s population – 3.5 million people.
Located at Prospect Reservoir some 15 kilometres
west of Sydney’s CBD, the Prospect Plant operates
24 hours a day and uses innovative water filtration
techniques to purify the water. It can currently filter
up to three billion litres of water a day.
The Plant provides Sydney with high quality drinking
water that complies with Australian Drinking Water
Guidelines published by the National Health and
Medical Research Council.
Operational Reliability
To achieve an extremely comprehensive level of operational
reliability, a highly automated process and management system was
incorporated into the Plant. The inherent flexibility in being able to
adapt to change, has also allowed the plant to operate at maximum
efficiency.
Innovation in the Delivery Process
Construction / Project Management
Construction of the plant was completed:
•	 6 months ahead of schedule
•	 Within budget
•	 Overcoming major site limitations to produce a very compact and
cost effective plant
Environmental Sustainability
Environmental sustainability was a key concern at Prospect from the
beginning. The following practices were adopted:
•	 An Environmental Management Plan outlining agreed standards
was implemented and reviewed before construction commenced
•	 All workers receive environmental training as part of their site
induction
•	 Very effective silk curtains were developed, preventing sediments
entering Prospect Reservoir
Quality Assurance Systems
The Plant complied with the requirements of ISO 9001 during
construction, and has since been certified ISO 14000 and ISO 9002
for operation as well as obtaining the NSCA 5 star safety rating.
Commissioning
The commissioning process, based on a 30 day Operating Trial, was
completed without a single failed day, and was described by Sydney
Water as exemplary.
Human Resource Management
An innovative human resource management (HRM) system was
developed which is based on:
•	 Self directed and cross functional teams focused on continuous
improvement
•	 Multi-skilled
•	 Empowered staff with a customer focus
•	 Remuneration system based on annualized salary
•	 A flat management structure with only four levels from Plant
Technicians to Managing Director
•	 A fully autonomous site. The result has been high job satisfaction,
and excellent relations with trade unions, including ratification of
an Enterprise Agreement by the Australian Services Union.
Operations
The Plant is performing even better than expected.
•	 The average treated water quality has been consistently better
than the quality required in the contract;
•	 The Plant has been operating efficiently since commissioning,
with operating costs within budget; and an excellent operating
reliability track record.
DEGRÉMONT
LEVEL 7, 5 RIDER BOULEVARD
PO BOX 3246 RHODES NSW 2138
AUSTRALIA
TEL:	 +61	(0)2 8759 7900
FAX:	+61	(0)2 9332 6882
WWW.DEGREMONT.COM.AU
Warragamba
Pipelines
1. Warragamba Pre Chlorination
2. Pre Oxidation
3. ph Adjustment / Filtered Supermatant Return
4. Pre Chlorination (Prospect)
5. Ferric Chloride
6. Catonic Ploymer / Lime Water
7. Non Ionic Polymer (NIP)
8. ph Adjustment
9. Chlorine / Floride
10. Chlorine
11. Ammonia
12. Anionic polymer
13. Ferric Chloride / Catonic Polymer / NIP
14. NIP
UpperCanal
1 2 3
5
6
7
4
8
10
11
12
14
13
9
ProsPect
(Wetherill Park, NSW, Australia)
Characteristics
Raw water
criteria
Treated
water
objectives
Treated
water
criteria
Capacity up to 3,000 MLD
Filtration rate up to 24 m/h
Turbidity
(NTU)
Max 40 <0.1 <0.5
True Colour
(HU)
Max 60 <5 <10
Alkalinity
(mg/l as
CaCO3)
21 – 45
pH 6.27 – 7.87 7.7 7.5 – 7.9
Chlorine
Residual
(mg/l)
1.7 1.5 – 1.9
Chlorine:
Ammonia
4:1
3.7:
1 – 4.3:1
Algae
(ASU/ml)
1000
Compliance
with
Guidelines
Compliance
with
Guidelines

More Related Content

What's hot

Aspek Teknis Operasional Pengelolaan Sampah (3/4)
Aspek Teknis Operasional Pengelolaan Sampah (3/4)Aspek Teknis Operasional Pengelolaan Sampah (3/4)
Aspek Teknis Operasional Pengelolaan Sampah (3/4)Joy Irman
 
SDT-Timbulan, Komposisi dan Karakteristik Sph-Agt2021.pptx
SDT-Timbulan, Komposisi dan Karakteristik Sph-Agt2021.pptxSDT-Timbulan, Komposisi dan Karakteristik Sph-Agt2021.pptx
SDT-Timbulan, Komposisi dan Karakteristik Sph-Agt2021.pptxSantriBiologiKonserv
 
Trailing Suction Hopper Dredger
Trailing Suction Hopper DredgerTrailing Suction Hopper Dredger
Trailing Suction Hopper DredgerYuris Mahendra
 
Permen lhk no.68 2016 ttg baku mutu air limbah domestik
Permen lhk no.68 2016 ttg baku mutu air limbah domestikPermen lhk no.68 2016 ttg baku mutu air limbah domestik
Permen lhk no.68 2016 ttg baku mutu air limbah domestikRizki Darmawan
 
Kerangka acuan-pt.-bigslim-kapur
Kerangka acuan-pt.-bigslim-kapurKerangka acuan-pt.-bigslim-kapur
Kerangka acuan-pt.-bigslim-kapurGilang K
 
pengelolaan limbah b3 (pengurangan, penyimpanan dan pengangkutan).pdf
pengelolaan limbah b3 (pengurangan, penyimpanan dan pengangkutan).pdfpengelolaan limbah b3 (pengurangan, penyimpanan dan pengangkutan).pdf
pengelolaan limbah b3 (pengurangan, penyimpanan dan pengangkutan).pdfWakhidahKurniawati1
 
Rencana Induk Persampahan (Master Plan)
Rencana Induk Persampahan (Master Plan)Rencana Induk Persampahan (Master Plan)
Rencana Induk Persampahan (Master Plan)Joy Irman
 
Perencanaan tps dan pengelolaan sampah produktif
Perencanaan tps dan pengelolaan sampah produktifPerencanaan tps dan pengelolaan sampah produktif
Perencanaan tps dan pengelolaan sampah produktifRafi Perdana Setyo
 
Physical Unit Operation- Screening, Grit Removal, Equalization
Physical Unit Operation-Screening, Grit Removal,EqualizationPhysical Unit Operation-Screening, Grit Removal,Equalization
Physical Unit Operation- Screening, Grit Removal, EqualizationYash Patel
 
Pengelolaan dana REDD+: Indonesian Environment Fund
Pengelolaan dana REDD+: Indonesian Environment FundPengelolaan dana REDD+: Indonesian Environment Fund
Pengelolaan dana REDD+: Indonesian Environment FundCIFOR-ICRAF
 
Derivasi Pertama Formula Pemuda Super.pptx
Derivasi Pertama Formula Pemuda Super.pptxDerivasi Pertama Formula Pemuda Super.pptx
Derivasi Pertama Formula Pemuda Super.pptxqueenina1
 
Reformasi Perizinan di Bidang Pertambangan Mineral dan Batubara Pasca Berlaku...
Reformasi Perizinan di Bidang Pertambangan Mineral dan Batubara Pasca Berlaku...Reformasi Perizinan di Bidang Pertambangan Mineral dan Batubara Pasca Berlaku...
Reformasi Perizinan di Bidang Pertambangan Mineral dan Batubara Pasca Berlaku...Publish What You Pay (PWYP) Indonesia
 
Permen PU Nomor 3 Tahun 2013 tentang Penyelenggaraan Prasarana Dan Sarana Per...
Permen PU Nomor 3 Tahun 2013 tentang Penyelenggaraan Prasarana Dan Sarana Per...Permen PU Nomor 3 Tahun 2013 tentang Penyelenggaraan Prasarana Dan Sarana Per...
Permen PU Nomor 3 Tahun 2013 tentang Penyelenggaraan Prasarana Dan Sarana Per...Penataan Ruang
 
3. Solid and Hazardous Waste Management.pptx
3. Solid and Hazardous Waste Management.pptx3. Solid and Hazardous Waste Management.pptx
3. Solid and Hazardous Waste Management.pptxAsaithambiperumal2
 
Pola Kebijakan Pengelolaan Sampah DKI Jakarta (2006)
Pola Kebijakan Pengelolaan Sampah DKI Jakarta (2006)Pola Kebijakan Pengelolaan Sampah DKI Jakarta (2006)
Pola Kebijakan Pengelolaan Sampah DKI Jakarta (2006)Oswar Mungkasa
 
Perencanaan Teknis dan Teknologi Pengolahan Lumpur
Perencanaan Teknis dan Teknologi Pengolahan LumpurPerencanaan Teknis dan Teknologi Pengolahan Lumpur
Perencanaan Teknis dan Teknologi Pengolahan LumpurJoy Irman
 

What's hot (20)

Aspek Teknis Operasional Pengelolaan Sampah (3/4)
Aspek Teknis Operasional Pengelolaan Sampah (3/4)Aspek Teknis Operasional Pengelolaan Sampah (3/4)
Aspek Teknis Operasional Pengelolaan Sampah (3/4)
 
SDT-Timbulan, Komposisi dan Karakteristik Sph-Agt2021.pptx
SDT-Timbulan, Komposisi dan Karakteristik Sph-Agt2021.pptxSDT-Timbulan, Komposisi dan Karakteristik Sph-Agt2021.pptx
SDT-Timbulan, Komposisi dan Karakteristik Sph-Agt2021.pptx
 
9. audit-lingkungan
9. audit-lingkungan9. audit-lingkungan
9. audit-lingkungan
 
Bab 5 triaxial
Bab 5 triaxialBab 5 triaxial
Bab 5 triaxial
 
Trailing Suction Hopper Dredger
Trailing Suction Hopper DredgerTrailing Suction Hopper Dredger
Trailing Suction Hopper Dredger
 
Eia procedures
Eia proceduresEia procedures
Eia procedures
 
Permen lhk no.68 2016 ttg baku mutu air limbah domestik
Permen lhk no.68 2016 ttg baku mutu air limbah domestikPermen lhk no.68 2016 ttg baku mutu air limbah domestik
Permen lhk no.68 2016 ttg baku mutu air limbah domestik
 
Kerangka acuan-pt.-bigslim-kapur
Kerangka acuan-pt.-bigslim-kapurKerangka acuan-pt.-bigslim-kapur
Kerangka acuan-pt.-bigslim-kapur
 
pengelolaan limbah b3 (pengurangan, penyimpanan dan pengangkutan).pdf
pengelolaan limbah b3 (pengurangan, penyimpanan dan pengangkutan).pdfpengelolaan limbah b3 (pengurangan, penyimpanan dan pengangkutan).pdf
pengelolaan limbah b3 (pengurangan, penyimpanan dan pengangkutan).pdf
 
Rencana Induk Persampahan (Master Plan)
Rencana Induk Persampahan (Master Plan)Rencana Induk Persampahan (Master Plan)
Rencana Induk Persampahan (Master Plan)
 
Perencanaan tps dan pengelolaan sampah produktif
Perencanaan tps dan pengelolaan sampah produktifPerencanaan tps dan pengelolaan sampah produktif
Perencanaan tps dan pengelolaan sampah produktif
 
Physical Unit Operation- Screening, Grit Removal, Equalization
Physical Unit Operation-Screening, Grit Removal,EqualizationPhysical Unit Operation-Screening, Grit Removal,Equalization
Physical Unit Operation- Screening, Grit Removal, Equalization
 
Screening
ScreeningScreening
Screening
 
Pengelolaan dana REDD+: Indonesian Environment Fund
Pengelolaan dana REDD+: Indonesian Environment FundPengelolaan dana REDD+: Indonesian Environment Fund
Pengelolaan dana REDD+: Indonesian Environment Fund
 
Derivasi Pertama Formula Pemuda Super.pptx
Derivasi Pertama Formula Pemuda Super.pptxDerivasi Pertama Formula Pemuda Super.pptx
Derivasi Pertama Formula Pemuda Super.pptx
 
Reformasi Perizinan di Bidang Pertambangan Mineral dan Batubara Pasca Berlaku...
Reformasi Perizinan di Bidang Pertambangan Mineral dan Batubara Pasca Berlaku...Reformasi Perizinan di Bidang Pertambangan Mineral dan Batubara Pasca Berlaku...
Reformasi Perizinan di Bidang Pertambangan Mineral dan Batubara Pasca Berlaku...
 
Permen PU Nomor 3 Tahun 2013 tentang Penyelenggaraan Prasarana Dan Sarana Per...
Permen PU Nomor 3 Tahun 2013 tentang Penyelenggaraan Prasarana Dan Sarana Per...Permen PU Nomor 3 Tahun 2013 tentang Penyelenggaraan Prasarana Dan Sarana Per...
Permen PU Nomor 3 Tahun 2013 tentang Penyelenggaraan Prasarana Dan Sarana Per...
 
3. Solid and Hazardous Waste Management.pptx
3. Solid and Hazardous Waste Management.pptx3. Solid and Hazardous Waste Management.pptx
3. Solid and Hazardous Waste Management.pptx
 
Pola Kebijakan Pengelolaan Sampah DKI Jakarta (2006)
Pola Kebijakan Pengelolaan Sampah DKI Jakarta (2006)Pola Kebijakan Pengelolaan Sampah DKI Jakarta (2006)
Pola Kebijakan Pengelolaan Sampah DKI Jakarta (2006)
 
Perencanaan Teknis dan Teknologi Pengolahan Lumpur
Perencanaan Teknis dan Teknologi Pengolahan LumpurPerencanaan Teknis dan Teknologi Pengolahan Lumpur
Perencanaan Teknis dan Teknologi Pengolahan Lumpur
 

Similar to NSW Australia Water Filtration Plant Prospect

A SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANES
A SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANESA SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANES
A SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANESiQHub
 
The Cleaner Seas Project Alliance
The Cleaner Seas Project AllianceThe Cleaner Seas Project Alliance
The Cleaner Seas Project AllianceUGL Limited
 
A SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATION
A SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATIONA SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATION
A SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATIONwle-ss
 
The role of AnMBR LEtm Anaerobic MBR in environmental improvements at the Gle...
The role of AnMBR LEtm Anaerobic MBR in environmental improvements at the Gle...The role of AnMBR LEtm Anaerobic MBR in environmental improvements at the Gle...
The role of AnMBR LEtm Anaerobic MBR in environmental improvements at the Gle...BerghofKevin
 
Barangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact SheetBarangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact SheetDeanDallwitz
 
Supplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment NeedsSupplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment NeedsDustin Powell, MBA
 
Houston Commercial Cooling Tower Case Study - Aug. 22 2016
Houston Commercial Cooling Tower Case Study - Aug. 22 2016Houston Commercial Cooling Tower Case Study - Aug. 22 2016
Houston Commercial Cooling Tower Case Study - Aug. 22 2016Bevan Brinkley
 
Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Iain McGregor
 
New Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USNew Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USKristopher Vardell
 
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdfINNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdfPRITI CHHATOI
 
Southern_Peacehaven_2014
Southern_Peacehaven_2014Southern_Peacehaven_2014
Southern_Peacehaven_2014Iain McGregor
 
Suez Victorian Desalination Project
Suez Victorian Desalination ProjectSuez Victorian Desalination Project
Suez Victorian Desalination ProjectRick Nabett
 
BULLITT CENTER, SEATTLE, WASHINGTON.pptx
BULLITT CENTER, SEATTLE, WASHINGTON.pptxBULLITT CENTER, SEATTLE, WASHINGTON.pptx
BULLITT CENTER, SEATTLE, WASHINGTON.pptxPushpaHarshitha05
 
Uniform plumbing codes & water use efficiency_Neeta Sharma_2013
Uniform plumbing codes & water use efficiency_Neeta Sharma_2013Uniform plumbing codes & water use efficiency_Neeta Sharma_2013
Uniform plumbing codes & water use efficiency_Neeta Sharma_2013India Water Portal
 
Solutions for decentralised waste water treatment
Solutions for decentralised waste water treatmentSolutions for decentralised waste water treatment
Solutions for decentralised waste water treatmentA.T.E. Private Limited
 

Similar to NSW Australia Water Filtration Plant Prospect (20)

A SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANES
A SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANESA SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANES
A SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANES
 
The Cleaner Seas Project Alliance
The Cleaner Seas Project AllianceThe Cleaner Seas Project Alliance
The Cleaner Seas Project Alliance
 
A SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATION
A SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATIONA SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATION
A SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATION
 
Aquatis brochure A4-lowres
Aquatis brochure A4-lowresAquatis brochure A4-lowres
Aquatis brochure A4-lowres
 
The role of AnMBR LEtm Anaerobic MBR in environmental improvements at the Gle...
The role of AnMBR LEtm Anaerobic MBR in environmental improvements at the Gle...The role of AnMBR LEtm Anaerobic MBR in environmental improvements at the Gle...
The role of AnMBR LEtm Anaerobic MBR in environmental improvements at the Gle...
 
Barangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact SheetBarangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact Sheet
 
Sunstone drinking water unit
Sunstone   drinking water unitSunstone   drinking water unit
Sunstone drinking water unit
 
Supplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment NeedsSupplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment Needs
 
Personal Resume of Darrell CordeiroV3
Personal Resume of Darrell CordeiroV3Personal Resume of Darrell CordeiroV3
Personal Resume of Darrell CordeiroV3
 
Houston Commercial Cooling Tower Case Study - Aug. 22 2016
Houston Commercial Cooling Tower Case Study - Aug. 22 2016Houston Commercial Cooling Tower Case Study - Aug. 22 2016
Houston Commercial Cooling Tower Case Study - Aug. 22 2016
 
CV_2016_rev_4_RW
CV_2016_rev_4_RWCV_2016_rev_4_RW
CV_2016_rev_4_RW
 
Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014
 
New Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USNew Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 US
 
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdfINNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
 
Southern_Peacehaven_2014
Southern_Peacehaven_2014Southern_Peacehaven_2014
Southern_Peacehaven_2014
 
Kevin Fitzgibbon
Kevin FitzgibbonKevin Fitzgibbon
Kevin Fitzgibbon
 
Suez Victorian Desalination Project
Suez Victorian Desalination ProjectSuez Victorian Desalination Project
Suez Victorian Desalination Project
 
BULLITT CENTER, SEATTLE, WASHINGTON.pptx
BULLITT CENTER, SEATTLE, WASHINGTON.pptxBULLITT CENTER, SEATTLE, WASHINGTON.pptx
BULLITT CENTER, SEATTLE, WASHINGTON.pptx
 
Uniform plumbing codes & water use efficiency_Neeta Sharma_2013
Uniform plumbing codes & water use efficiency_Neeta Sharma_2013Uniform plumbing codes & water use efficiency_Neeta Sharma_2013
Uniform plumbing codes & water use efficiency_Neeta Sharma_2013
 
Solutions for decentralised waste water treatment
Solutions for decentralised waste water treatmentSolutions for decentralised waste water treatment
Solutions for decentralised waste water treatment
 

More from Rick Nabett

Suez water treatment
Suez water treatmentSuez water treatment
Suez water treatmentRick Nabett
 
Suez committed together to water a source of life
Suez committed together to water a source of lifeSuez committed together to water a source of life
Suez committed together to water a source of lifeRick Nabett
 
Suez Environnement Australia
Suez Environnement AustraliaSuez Environnement Australia
Suez Environnement AustraliaRick Nabett
 
Suez advanced solutions for water networks
Suez advanced solutions for water networksSuez advanced solutions for water networks
Suez advanced solutions for water networksRick Nabett
 
Wastewater management france
Wastewater management franceWastewater management france
Wastewater management franceRick Nabett
 
Mobile solution - optimal water management
Mobile solution - optimal water managementMobile solution - optimal water management
Mobile solution - optimal water managementRick Nabett
 
Pretreatmeant by reverse osmosis france
Pretreatmeant by reverse osmosis francePretreatmeant by reverse osmosis france
Pretreatmeant by reverse osmosis franceRick Nabett
 
Advanced solutions for water networks
Advanced solutions for water networksAdvanced solutions for water networks
Advanced solutions for water networksRick Nabett
 
Cronulla wastewater treatment plant
Cronulla wastewater treatment plantCronulla wastewater treatment plant
Cronulla wastewater treatment plantRick Nabett
 
Degrémont to deliver Australia’s first biological iron and manganese removal ...
Degrémont to deliver Australia’s first biological iron and manganese removal ...Degrémont to deliver Australia’s first biological iron and manganese removal ...
Degrémont to deliver Australia’s first biological iron and manganese removal ...Rick Nabett
 
Suez environnement in australia & new zealand
Suez environnement in australia & new zealandSuez environnement in australia & new zealand
Suez environnement in australia & new zealandRick Nabett
 
Pimpama recycled water plant (qld)
Pimpama recycled water plant (qld)Pimpama recycled water plant (qld)
Pimpama recycled water plant (qld)Rick Nabett
 
Noosa sewage treatment plant (qld)
Noosa sewage treatment plant (qld)Noosa sewage treatment plant (qld)
Noosa sewage treatment plant (qld)Rick Nabett
 
Perth seawater desalination plant (wa)
Perth seawater desalination plant (wa)Perth seawater desalination plant (wa)
Perth seawater desalination plant (wa)Rick Nabett
 
Desalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeDesalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeRick Nabett
 
Degremont operations and maintenance
Degremont operations and maintenanceDegremont operations and maintenance
Degremont operations and maintenanceRick Nabett
 
Degremont industry power brochure
Degremont industry power brochureDegremont industry power brochure
Degremont industry power brochureRick Nabett
 
Degremont industry mining
Degremont industry miningDegremont industry mining
Degremont industry miningRick Nabett
 
Desalination the sustainable alternative
Desalination the sustainable alternativeDesalination the sustainable alternative
Desalination the sustainable alternativeRick Nabett
 
Degremont process water
Degremont process waterDegremont process water
Degremont process waterRick Nabett
 

More from Rick Nabett (20)

Suez water treatment
Suez water treatmentSuez water treatment
Suez water treatment
 
Suez committed together to water a source of life
Suez committed together to water a source of lifeSuez committed together to water a source of life
Suez committed together to water a source of life
 
Suez Environnement Australia
Suez Environnement AustraliaSuez Environnement Australia
Suez Environnement Australia
 
Suez advanced solutions for water networks
Suez advanced solutions for water networksSuez advanced solutions for water networks
Suez advanced solutions for water networks
 
Wastewater management france
Wastewater management franceWastewater management france
Wastewater management france
 
Mobile solution - optimal water management
Mobile solution - optimal water managementMobile solution - optimal water management
Mobile solution - optimal water management
 
Pretreatmeant by reverse osmosis france
Pretreatmeant by reverse osmosis francePretreatmeant by reverse osmosis france
Pretreatmeant by reverse osmosis france
 
Advanced solutions for water networks
Advanced solutions for water networksAdvanced solutions for water networks
Advanced solutions for water networks
 
Cronulla wastewater treatment plant
Cronulla wastewater treatment plantCronulla wastewater treatment plant
Cronulla wastewater treatment plant
 
Degrémont to deliver Australia’s first biological iron and manganese removal ...
Degrémont to deliver Australia’s first biological iron and manganese removal ...Degrémont to deliver Australia’s first biological iron and manganese removal ...
Degrémont to deliver Australia’s first biological iron and manganese removal ...
 
Suez environnement in australia & new zealand
Suez environnement in australia & new zealandSuez environnement in australia & new zealand
Suez environnement in australia & new zealand
 
Pimpama recycled water plant (qld)
Pimpama recycled water plant (qld)Pimpama recycled water plant (qld)
Pimpama recycled water plant (qld)
 
Noosa sewage treatment plant (qld)
Noosa sewage treatment plant (qld)Noosa sewage treatment plant (qld)
Noosa sewage treatment plant (qld)
 
Perth seawater desalination plant (wa)
Perth seawater desalination plant (wa)Perth seawater desalination plant (wa)
Perth seawater desalination plant (wa)
 
Desalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeDesalination, The Sustainable Alternative
Desalination, The Sustainable Alternative
 
Degremont operations and maintenance
Degremont operations and maintenanceDegremont operations and maintenance
Degremont operations and maintenance
 
Degremont industry power brochure
Degremont industry power brochureDegremont industry power brochure
Degremont industry power brochure
 
Degremont industry mining
Degremont industry miningDegremont industry mining
Degremont industry mining
 
Desalination the sustainable alternative
Desalination the sustainable alternativeDesalination the sustainable alternative
Desalination the sustainable alternative
 
Degremont process water
Degremont process waterDegremont process water
Degremont process water
 

Recently uploaded

Soil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresSoil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresvasubhanot1234
 
ENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawnitinraj1000000
 
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxPoly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxAgrodome projects LLP
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"syalehistoricalreview
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhidelih Escorts
 
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527nagunakhan
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...Aqsa Yasmin
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionrgxv72jrgc
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170simranguptaxx69
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012sapnasaifi408
 
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdfsrivastavaakshat51
 
Abu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community ppAbu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community pp202215407
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量sehgh15heh
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一F dds
 

Recently uploaded (20)

Soil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresSoil pollution causes effects remedial measures
Soil pollution causes effects remedial measures
 
ENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental law
 
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxPoly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"s
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
 
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls ServicesGandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollution
 
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Serviceyoung call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
 
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
 
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
 
Abu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community ppAbu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community pp
 
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi NcrCall Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
 
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
 

NSW Australia Water Filtration Plant Prospect

  • 1. Prospect (New South Wales, Australia) Water Filtration plant
  • 2. Prospect (New South Wales, Australia) Water Filtration plant Project details The Prospect Water Filtration Plant was opened by the Premier of New South Wales, the Honourable Bob Carr, on the 4th of November 1996. The plant was built under a 25 year Build, Own and Operate contract between Sydney Water Corporation, and the Prospect Water Partnership, a consortium consisting of Lyonnaise des Eaux (now SUEZ ENVIRONNEMENT), Ondeo and Unisuper. Degrémont (a subsidiary of SUEZ ENVIRONNEMENT) is the plant operator. The project manager during construction was Civil & Civic, now trading as Bovis Lend Lease, and the principal designer was the Prospect Water Group, a joint venture of Australian Consultants CMPS&F and Sinclair Knight Mertz. Technical Innovation Plant Hydraulics Plant location and layout meant that only 5.2m of head was available to allow gravity flow to be maintained throughout the Plant. Several innovations in the passive flow control systems were incorporated resulting in: • Excellent level of accuracy in flow split to each filter, plus or minus 2% • Even flow conditions past chemical dosing points, maximising chemical usage efficiency and filter yields • Minimal headloss • Plant layout rationalisation resulting in construction cost savings of approximately $40 million Chemical Mixing The sheer size of the four contact channels, each over 4m wide and 6m deep and the low head available, meant that innovative solutions for chemical mixing systems had to be developed to ensure rapid and even dispersion and efficiency. Hydraulic flash mixing was developed on a scale never before attempted. The result was: • Full chemical dispersion across the channel within one second resulting in highly efficient coagulation • Minimum chemical consumption. Filters At Prospect, solids removal occurs directly on the filters, eliminating the need for a sedimentation stage. However, to achieve adequate filter runs, major innovations in filter design were required. The result is filters: • With a filtration rate of 24m/hour, which is double the previous average for conventional filters • That are among the world’s largest, with an individual bed size of almost 240m2 • Have the highest capacity per m3 of any in the world In addition, an innovative non-expanded bed backwashing system with simultaneous air and water backwash was incorporated into the filter system. The outcome has been: • Treated water of a quality that has consistently and substantially exceeded contractual requirements • Improved filter yields • 50% less backwash water used over conventional expanded backwash system. The Prospect Water Filtration Plant is recognised as one of the world’s largest water filtration plants, with a capacity to provide drinking water to 80 per cent of Sydney’s population – 3.5 million people. Located at Prospect Reservoir some 15 kilometres west of Sydney’s CBD, the Prospect Plant operates 24 hours a day and uses innovative water filtration techniques to purify the water. It can currently filter up to three billion litres of water a day. The Plant provides Sydney with high quality drinking water that complies with Australian Drinking Water Guidelines published by the National Health and Medical Research Council.
  • 3. Operational Reliability To achieve an extremely comprehensive level of operational reliability, a highly automated process and management system was incorporated into the Plant. The inherent flexibility in being able to adapt to change, has also allowed the plant to operate at maximum efficiency. Innovation in the Delivery Process Construction / Project Management Construction of the plant was completed: • 6 months ahead of schedule • Within budget • Overcoming major site limitations to produce a very compact and cost effective plant Environmental Sustainability Environmental sustainability was a key concern at Prospect from the beginning. The following practices were adopted: • An Environmental Management Plan outlining agreed standards was implemented and reviewed before construction commenced • All workers receive environmental training as part of their site induction • Very effective silk curtains were developed, preventing sediments entering Prospect Reservoir Quality Assurance Systems The Plant complied with the requirements of ISO 9001 during construction, and has since been certified ISO 14000 and ISO 9002 for operation as well as obtaining the NSCA 5 star safety rating. Commissioning The commissioning process, based on a 30 day Operating Trial, was completed without a single failed day, and was described by Sydney Water as exemplary. Human Resource Management An innovative human resource management (HRM) system was developed which is based on: • Self directed and cross functional teams focused on continuous improvement • Multi-skilled • Empowered staff with a customer focus • Remuneration system based on annualized salary • A flat management structure with only four levels from Plant Technicians to Managing Director • A fully autonomous site. The result has been high job satisfaction, and excellent relations with trade unions, including ratification of an Enterprise Agreement by the Australian Services Union. Operations The Plant is performing even better than expected. • The average treated water quality has been consistently better than the quality required in the contract; • The Plant has been operating efficiently since commissioning, with operating costs within budget; and an excellent operating reliability track record.
  • 4. DEGRÉMONT LEVEL 7, 5 RIDER BOULEVARD PO BOX 3246 RHODES NSW 2138 AUSTRALIA TEL: +61 (0)2 8759 7900 FAX: +61 (0)2 9332 6882 WWW.DEGREMONT.COM.AU Warragamba Pipelines 1. Warragamba Pre Chlorination 2. Pre Oxidation 3. ph Adjustment / Filtered Supermatant Return 4. Pre Chlorination (Prospect) 5. Ferric Chloride 6. Catonic Ploymer / Lime Water 7. Non Ionic Polymer (NIP) 8. ph Adjustment 9. Chlorine / Floride 10. Chlorine 11. Ammonia 12. Anionic polymer 13. Ferric Chloride / Catonic Polymer / NIP 14. NIP UpperCanal 1 2 3 5 6 7 4 8 10 11 12 14 13 9 ProsPect (Wetherill Park, NSW, Australia) Characteristics Raw water criteria Treated water objectives Treated water criteria Capacity up to 3,000 MLD Filtration rate up to 24 m/h Turbidity (NTU) Max 40 <0.1 <0.5 True Colour (HU) Max 60 <5 <10 Alkalinity (mg/l as CaCO3) 21 – 45 pH 6.27 – 7.87 7.7 7.5 – 7.9 Chlorine Residual (mg/l) 1.7 1.5 – 1.9 Chlorine: Ammonia 4:1 3.7: 1 – 4.3:1 Algae (ASU/ml) 1000 Compliance with Guidelines Compliance with Guidelines