1. CLIENTS > WRIGLEY BIESHEIM
TAILOR-MADE
SUPPORT
to meet all environmental
requirements
You were quick off the mark in delivering the best solution to our
requirements
Mrs Sophie Cardot, Environmental Officer for Wrigley Biesheim
«I appreciated the speed at which you responded to our needs. You went over and
above the terms of the contract and we are highly satisfied with performance
levels at the site. If I had to, I would have no hesitation in recommending you.»
2. Ondeo INDUSTRIAL SOLUTIONS
Tour CB 21 – 16, place de l’Iris
92040 Paris la Défense Cedex – FRANCE
Tél. : +33 1 58 81 74 00 – Fax : +33 1 58 81 74 01
info@ondeo-is.com – www.ondeo-is.com
Over 800 people work across five production lines, producing up to 250 tonnes of chewing gum every day
(Airwaves, Freedent, Eclipse, etc.).The site is currently diversifying production with a range of confectionery.
In 2002, the Biesheim plant, which has its own water treatment units, was faced with a situation where its water
treatment facilities were unable to treat its effluent to required quality levels, meaning that the plant could not
guarantee the conformity of its discharges to applicable standards.
CUSTOMER NEEDS
Wrigley is the world's number one chewing gum
manufacturer. The Biesheim plant in France's Haut-Rhin
region is currently the largest in the world,producing over
50 000 tonnes of products every year, and the Wrigley
Group's only chewing gum production plant in France.
Benefits
Successful support that mirrors changes>>
in production and adapts to requirements
Wrigley can focus on production and rely on the•
water treatment expertise of our teams, who
guarantee that facilities are always available.
The solution meets Wrigley's immediate•
requirements and also keeps track of and adapts
to changes in production (construction of an
additional buffer tank in response to increased
flow rates).
Our attentiveness to the customer's needs and•
communication with the environmental officer
led to a real climate of trust.
Facilities offering superior reliability>>
Guaranteed discharges with a performance rate•
of 99%.
COD treatment increased by a factor of•
nearly 10.
Reliableoperationfromthepreviouslyfault-prone•
pumping station.
After just one year of operation, our successful partnership has enabled Wrigley to receive acclaim
and be cited for the exemplary quality of its discharges by France's Regional Office for Industry &
Environment.
July2010–1.1–Photocredits:Wrigley–PrintedonPEFCcertifiedpaper–433503984RCSNanterre
OUR SOLUTIONS
We embarked on a joint approach with Wrigley with two intimately related phases, initially to
gear the facility towards the quantity of water requiring treatment by setting up a preliminary
treatment line, and subsequently through a commitment to operate all facilities as part of a
performance-based contract.
This performance contract included overall wastewater management:
Day-to-day operation of the treatment plant (1.5 people permanently on site).•
Analyses.•
Maintenance.•