SlideShare a Scribd company logo
Project Methodology based on
PRINCE2
Yuko Soma
PRINCE2
C S
Organization Theme
6 Tolerance
/ Variables
8 Themes
7 Principles
7 Processes
Change Theme
Quality Theme
Risk Theme
I P S BS U M PD P C P
Business Case Theme Progress Theme
Plan Theme
QualityBenefits Risk Cost Time
Tailoring Theme
(SU) Starting up a Project, (IP) Initiating a Project, (DP) Directing a Project, (CS) Controlling a Stage,
(MP) Managing Product Delivery, (SB) Managing a Stage Boundary, (CP) Closing a Project
Continued Business
Justification
Learn from
Experience
Defied Roles and
Responsibilities
Manage by
Stages
Manage by
Exception
Focus on
Product
Tailoring
Scope
Project TimelineDeliveringManagementDirectionCorp
S U I P
D P
C P
M P
S B
Project
Mandate
Authorize
Project Closure
Authorize
Work Package
C S
Stage 1
C S
Stage 2
C S
Stage 3
S B
Execute
Work Package
Work Package
Complete
Work Package
・ Quality expectations
・ Capture Previous lessons.
・ “Project Brief” includes
Appoint Executive, PM,
PM Team
Business reason PPD
Outline Business Case
Project Approach
・ Exception Assessment
・ Highlight Report
・ Maintain Business Case
・ Closure recommend
・ Draft closure notification
・ Assess Business Case
・ End Project Report
・ Lesson Report
Initiation Post-ProjectFinal StageDelivery Stages
Stage
Plan
Exception
Plan
Team
Plan
Stage
Plan
Plan Theme
Progress Theme
・ Exception Report
・ Checkpoint Report
(SU) Starting up a Project, (IP) Initiating a Project, (DP) Directing a Project, (CS) Controlling a Stage,
(MP) Managing Product Delivery, (SB) Managing a Stage Boundary, (CP) Closing a Project
Project
Plan
・ Update
Business Case
Authorize
a Project
Authorize
a Stage
・ Confirm
the benefit
・ Review ConMS
Update then
replace
Escalation
・ Updated PID
・ PBS, mind map
・ Product Flow
Diagram
・ Full BC with
Planned Cost
(budget, Resource)
Benefit Review
Plan
Authorize
Initiation
Pre-Project
・ Create “PID”
Management Strategy
Organization Theme
Communication
Management
Strategy
Configuration
Management
Strategy
Quality
Management
Strategy
Risk
Management
Strategy
・ CMD includes means and frequency of communication internally
and externally, roles and responsibilities, report type (email,
printed doc etc.), Project Brief
・ PM creates this in IP stage and it’s reviewed in the SB stage.
・ PM will use ComMS documents template from corporate
Change Theme
Quality Theme
・ Use Risk Management Strategy documents from corporate
・ Access Proximity (Aug 3, 2015), Response Category (Avoid, Enhance, Reduce, Fallback, Transfer), Risk
Status (Active), Risk Category (Financial, Organization, or safety)
・ Impact ($) x Probability (50%) = 1000 $ x 0.5 = Expected Value 500
・ PM creates RMS
・ Identify -- > Access -- > Plan (How to respond) -- > Implement -- > Communicate
Risk Theme
・ “Issue Control” and “Change Control” procedure
・ PM will use ConMS documents template from corporate
・ Project Support updates “Quality Register” with actual to Work Package.
・ ConMS is needed to manage the creation, safekeeping and controlled change to the project’s
products.
・ PM submit then PB or change authority approves “Exception Report” with RFC or off-
specification, change budget.
・ Create “Project Description” in SU
・ Create “Quality Tolerance” and “Quality File” consists
of “Quality Register”, Quality review invitations, quality review results.
M P
Roles and Responsibility
Corporate/Programme Manager
・ Set corporate tolerances. Appoint Executive
Project Board
Customer Supplier
Senior User
・ Realize post-project benefits
・ Specify user requirements.
Executive
・ Create and verify Business Case
・ Approve BRP
・ Responsible for Business Case
・ Single point of accountability.
・ Appoint Project Manager
Project Manager
・ Manage the project on a day to day
basis.
Assess and update Business Case at
the CP
・ Assist Executive to create BC
・ Approve “Exception Plan”, then
report it to Project Board
Team Manager
・ Configuration Management
・ Admin support for Project
Manager
・ Issue “Change Request”.
・ Manage Team Member
・ Create ”Exception Plan”
・ Produce products consistent
with PD.
Project Assurance
・ Advises the PM
・ Monitors performance
Senior Supplier
・ Ensure that products will be
delivered as expected (Timeframe,
cost)
ProjectManagementTeam
BU S
Verifying the BC, Approve “Exception Plan” then replace “Stage Plan”, Escalate the
“Exception Report” to higher management, Accountable for project success or failure.
Team MemberTeam Member
B = Business, U = User, S = Supplier
Change Authority
・ Control change requests
and off-specifications.
・ Approve change budget
according to level
Business Case
BC includes 1. business reason, 2. business option (Do nothing, do minimum), 3. expected benefits. 4. expected dis-
benefits, 5. timescale, 6. cost (Project and maintenance), 7. ROI, 8. major risk
Category: Business Strategy Develop Competitive Water Product
A. Introduction Develop new high quality mineral water to increase market share to 80%
B. Overall Plan 1. Target Customer: Rich elderly consumers, Expensive Italian, French restaurants
2. Benefit: 10% sales increase, 2000 USD / year increase
3. Dis-benefit: Sales has to learn new things. Hire new people for this project.
3. Project Timescale : 6 Months
4. Target date: Oct 1, 2015
C. Business Impact 1. Tolerance: Cost: 10% Timescale : 20 business day delay
2. Market Share 20% increase by Dec. 31, 2015
3. Project Cost: 1000 USD
4. Maintenance Cost: 100 USD/ year
5. ROI : 2000 - (300+500+1000)/1100 = 0.18 for the first year.
2000 - (300+500)/100 = 1992 for the 2nd year.
6. Non Financial Aspect: High quality water increase customer loyalty.
D. Risk 1. Water quality degrades due to environmental change: Probability 30% x Impact 1000 USD =
300 USD
2. Import troubles at custom clearance: Probability 50 % x Impact 1000 USD = 500 USD
E. Business Option Do minimum
F. Recommendations 1. Develop another Business Case for not doing anything and for buying out a competitor to
save this project cost.
2. Adding this water’s photo to our New Year calendar advertising the product.
References
Bentley, Colin, PRINCE 2 for Beginners, New York: Routledge, 2015
Management Plaza http://mplaza.pm/
7

More Related Content

What's hot

PMP Worldwide Training
PMP Worldwide TrainingPMP Worldwide Training
PMP Worldwide Training
Order Lortab
 
2 a introduction to agile
2 a introduction to agile2 a introduction to agile
2 a introduction to agile
qtntpam
 
20150630 나pm17회 pm자격증길라잡이_백훈성
20150630 나pm17회 pm자격증길라잡이_백훈성20150630 나pm17회 pm자격증길라잡이_백훈성
20150630 나pm17회 pm자격증길라잡이_백훈성
Dong-Hwan Han, Ph.D.
 
Contracting for Agile Software Development
Contracting for Agile Software DevelopmentContracting for Agile Software Development
Contracting for Agile Software Development
cspag67
 
The prince2 business case
The prince2 business caseThe prince2 business case
The prince2 business caseprojectingIT
 
PRINCE2-Foundation PRINCE2 Real Exam Questions - 100% Free Prince2-Foundation...
PRINCE2-Foundation PRINCE2 Real Exam Questions - 100% Free Prince2-Foundation...PRINCE2-Foundation PRINCE2 Real Exam Questions - 100% Free Prince2-Foundation...
PRINCE2-Foundation PRINCE2 Real Exam Questions - 100% Free Prince2-Foundation...
passleaders
 
Dr Dev Kambhampati | Stage Gate Innovation Management
Dr Dev Kambhampati | Stage Gate Innovation ManagementDr Dev Kambhampati | Stage Gate Innovation Management
Dr Dev Kambhampati | Stage Gate Innovation Management
Dr Dev Kambhampati
 
Case Study: Project and Change Management
Case Study: Project and Change ManagementCase Study: Project and Change Management
Case Study: Project and Change Management
Shivakumar Patil
 
PMI Central Indiana Chapter - The Agile PMO - Michael Nir - Slide deck
PMI Central Indiana Chapter - The Agile PMO - Michael Nir - Slide deckPMI Central Indiana Chapter - The Agile PMO - Michael Nir - Slide deck
PMI Central Indiana Chapter - The Agile PMO - Michael Nir - Slide deck
Michael Nir Business Agility Speaker and Coach
 
Agile adoption julen c. mohanty
Agile adoption   julen c. mohantyAgile adoption   julen c. mohanty
Agile adoption julen c. mohantyJulen Mohanty
 
Vol. VII Quality Gates
Vol. VII Quality GatesVol. VII Quality Gates
Vol. VII Quality Gates
Ivan Jimenez Alcantar
 
Top Agile Metrics
Top Agile MetricsTop Agile Metrics
Top Agile Metrics
XBOSoft
 
Overview of PRINCE2
Overview of PRINCE2Overview of PRINCE2
Overview of PRINCE2
iHub
 
PMI Michigan capital - The Agile PMO - Michael Nir - Slide deck
PMI Michigan capital - The Agile PMO - Michael Nir - Slide deckPMI Michigan capital - The Agile PMO - Michael Nir - Slide deck
PMI Michigan capital - The Agile PMO - Michael Nir - Slide deck
Michael Nir Business Agility Speaker and Coach
 
PRINCE2 Foundation Workshops -- Organization
PRINCE2 Foundation Workshops -- OrganizationPRINCE2 Foundation Workshops -- Organization
PRINCE2 Foundation Workshops -- Organization
Frank Turley
 
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112McDonald Stewart
 
Prince2 - Business Case
Prince2 - Business CasePrince2 - Business Case
Prince2 - Business Case
Matt Trigg
 
Global 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleGlobal 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training Module
Frank-G. Adler
 
Project management presentation (power point)
Project management presentation (power point)Project management presentation (power point)
Project management presentation (power point)
jafrin akter
 

What's hot (20)

PMP Worldwide Training
PMP Worldwide TrainingPMP Worldwide Training
PMP Worldwide Training
 
Prince2 quick guide
Prince2 quick guidePrince2 quick guide
Prince2 quick guide
 
2 a introduction to agile
2 a introduction to agile2 a introduction to agile
2 a introduction to agile
 
20150630 나pm17회 pm자격증길라잡이_백훈성
20150630 나pm17회 pm자격증길라잡이_백훈성20150630 나pm17회 pm자격증길라잡이_백훈성
20150630 나pm17회 pm자격증길라잡이_백훈성
 
Contracting for Agile Software Development
Contracting for Agile Software DevelopmentContracting for Agile Software Development
Contracting for Agile Software Development
 
The prince2 business case
The prince2 business caseThe prince2 business case
The prince2 business case
 
PRINCE2-Foundation PRINCE2 Real Exam Questions - 100% Free Prince2-Foundation...
PRINCE2-Foundation PRINCE2 Real Exam Questions - 100% Free Prince2-Foundation...PRINCE2-Foundation PRINCE2 Real Exam Questions - 100% Free Prince2-Foundation...
PRINCE2-Foundation PRINCE2 Real Exam Questions - 100% Free Prince2-Foundation...
 
Dr Dev Kambhampati | Stage Gate Innovation Management
Dr Dev Kambhampati | Stage Gate Innovation ManagementDr Dev Kambhampati | Stage Gate Innovation Management
Dr Dev Kambhampati | Stage Gate Innovation Management
 
Case Study: Project and Change Management
Case Study: Project and Change ManagementCase Study: Project and Change Management
Case Study: Project and Change Management
 
PMI Central Indiana Chapter - The Agile PMO - Michael Nir - Slide deck
PMI Central Indiana Chapter - The Agile PMO - Michael Nir - Slide deckPMI Central Indiana Chapter - The Agile PMO - Michael Nir - Slide deck
PMI Central Indiana Chapter - The Agile PMO - Michael Nir - Slide deck
 
Agile adoption julen c. mohanty
Agile adoption   julen c. mohantyAgile adoption   julen c. mohanty
Agile adoption julen c. mohanty
 
Vol. VII Quality Gates
Vol. VII Quality GatesVol. VII Quality Gates
Vol. VII Quality Gates
 
Top Agile Metrics
Top Agile MetricsTop Agile Metrics
Top Agile Metrics
 
Overview of PRINCE2
Overview of PRINCE2Overview of PRINCE2
Overview of PRINCE2
 
PMI Michigan capital - The Agile PMO - Michael Nir - Slide deck
PMI Michigan capital - The Agile PMO - Michael Nir - Slide deckPMI Michigan capital - The Agile PMO - Michael Nir - Slide deck
PMI Michigan capital - The Agile PMO - Michael Nir - Slide deck
 
PRINCE2 Foundation Workshops -- Organization
PRINCE2 Foundation Workshops -- OrganizationPRINCE2 Foundation Workshops -- Organization
PRINCE2 Foundation Workshops -- Organization
 
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112
 
Prince2 - Business Case
Prince2 - Business CasePrince2 - Business Case
Prince2 - Business Case
 
Global 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleGlobal 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training Module
 
Project management presentation (power point)
Project management presentation (power point)Project management presentation (power point)
Project management presentation (power point)
 

Similar to Project Methodology based on PRINCE2 【Continuous Study】

Pmp training bangalore
Pmp training bangalorePmp training bangalore
Pmp training bangalore
priyankaravilla
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project ValueLeanleaders.org
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project ValueLeanleaders.org
 
U1 - S1 - Modern Project Management.pdf
U1 - S1 - Modern Project Management.pdfU1 - S1 - Modern Project Management.pdf
U1 - S1 - Modern Project Management.pdf
Md. Masudur Rahman, PMP
 
Prince2 2009
Prince2  2009Prince2  2009
Introduction to PMP Brief Presentation
Introduction to PMP Brief PresentationIntroduction to PMP Brief Presentation
Introduction to PMP Brief Presentationjamilireifij
 
PMO Services Client Annual Review 2015
PMO Services Client Annual Review 2015PMO Services Client Annual Review 2015
PMO Services Client Annual Review 2015Owen Grant
 
Surviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits ManagementSurviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits Management
combera
 
Best Practice Showcase Presentation Surviving The Credit Crunch
Best Practice Showcase Presentation Surviving The Credit CrunchBest Practice Showcase Presentation Surviving The Credit Crunch
Best Practice Showcase Presentation Surviving The Credit Crunch
rmoret
 
Foods Case StudyWhat to coverExecuti.docx
            Foods Case StudyWhat to coverExecuti.docx            Foods Case StudyWhat to coverExecuti.docx
Foods Case StudyWhat to coverExecuti.docx
hallettfaustina
 
Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2Kenneth Ifidon
 
Merck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMerck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCM
Mike Poland, CMRP
 
Observe, Orient, Design, Act - OODA and Project Management
Observe, Orient, Design, Act - OODA and Project ManagementObserve, Orient, Design, Act - OODA and Project Management
Observe, Orient, Design, Act - OODA and Project Management
statelibaz
 
Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...
  Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...  Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...
Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...
Wellingtone
 
Basho Stephen - Resume 02-2016
Basho Stephen - Resume 02-2016Basho Stephen - Resume 02-2016
Basho Stephen - Resume 02-2016Stephen Basho
 
Business Proposal PowerPoint Presentation Slides
Business Proposal PowerPoint Presentation SlidesBusiness Proposal PowerPoint Presentation Slides
Business Proposal PowerPoint Presentation Slides
SlideTeam
 
Oscar Padilla, PMP
Oscar Padilla, PMPOscar Padilla, PMP
Oscar Padilla, PMP
Ozzy d'Osbourne
 

Similar to Project Methodology based on PRINCE2 【Continuous Study】 (20)

Pmp training bangalore
Pmp training bangalorePmp training bangalore
Pmp training bangalore
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
U1 - S1 - Modern Project Management.pdf
U1 - S1 - Modern Project Management.pdfU1 - S1 - Modern Project Management.pdf
U1 - S1 - Modern Project Management.pdf
 
Prince2 2009
Prince2  2009Prince2  2009
Prince2 2009
 
Introduction to PMP Brief Presentation
Introduction to PMP Brief PresentationIntroduction to PMP Brief Presentation
Introduction to PMP Brief Presentation
 
Mahibub_CV_PM
Mahibub_CV_PMMahibub_CV_PM
Mahibub_CV_PM
 
satya v0.2
satya v0.2satya v0.2
satya v0.2
 
PMO Services Client Annual Review 2015
PMO Services Client Annual Review 2015PMO Services Client Annual Review 2015
PMO Services Client Annual Review 2015
 
Surviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits ManagementSurviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits Management
 
Best Practice Showcase Presentation Surviving The Credit Crunch
Best Practice Showcase Presentation Surviving The Credit CrunchBest Practice Showcase Presentation Surviving The Credit Crunch
Best Practice Showcase Presentation Surviving The Credit Crunch
 
Foods Case StudyWhat to coverExecuti.docx
            Foods Case StudyWhat to coverExecuti.docx            Foods Case StudyWhat to coverExecuti.docx
Foods Case StudyWhat to coverExecuti.docx
 
Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2
 
Merck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMerck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCM
 
Observe, Orient, Design, Act - OODA and Project Management
Observe, Orient, Design, Act - OODA and Project ManagementObserve, Orient, Design, Act - OODA and Project Management
Observe, Orient, Design, Act - OODA and Project Management
 
Pm fundamentals
Pm fundamentalsPm fundamentals
Pm fundamentals
 
Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...
  Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...  Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...
Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...
 
Basho Stephen - Resume 02-2016
Basho Stephen - Resume 02-2016Basho Stephen - Resume 02-2016
Basho Stephen - Resume 02-2016
 
Business Proposal PowerPoint Presentation Slides
Business Proposal PowerPoint Presentation SlidesBusiness Proposal PowerPoint Presentation Slides
Business Proposal PowerPoint Presentation Slides
 
Oscar Padilla, PMP
Oscar Padilla, PMPOscar Padilla, PMP
Oscar Padilla, PMP
 

More from Jerimi Soma

IRCA ISMS Auditor Certification for Version 2022 (Since 2017)
IRCA ISMS Auditor Certification for Version 2022 (Since 2017)IRCA ISMS Auditor Certification for Version 2022 (Since 2017)
IRCA ISMS Auditor Certification for Version 2022 (Since 2017)
Jerimi Soma
 
Another ITIL4 story of a Japanese business hotel
Another ITIL4 story of a Japanese business hotelAnother ITIL4 story of a Japanese business hotel
Another ITIL4 story of a Japanese business hotel
Jerimi Soma
 
Japan Data Privacy Auditor Certification (Since Jan. 2021)
Japan Data Privacy Auditor Certification (Since Jan. 2021)Japan Data Privacy Auditor Certification (Since Jan. 2021)
Japan Data Privacy Auditor Certification (Since Jan. 2021)
Jerimi Soma
 
ITILv3 /2011 Edition Case Study
ITILv3 /2011 Edition Case StudyITILv3 /2011 Edition Case Study
ITILv3 /2011 Edition Case Study
Jerimi Soma
 
ITIL4 Managing Professtioal
ITIL4 Managing ProfesstioalITIL4 Managing Professtioal
ITIL4 Managing Professtioal
Jerimi Soma
 
JRCA ISO27017 Cloud Security Training & Exam
JRCA ISO27017 Cloud  Security Training & ExamJRCA ISO27017 Cloud  Security Training & Exam
JRCA ISO27017 Cloud Security Training & Exam
Jerimi Soma
 
ITIL v2011 Expert 6 exams
ITIL v2011 Expert 6 examsITIL v2011 Expert 6 exams
ITIL v2011 Expert 6 exams
Jerimi Soma
 
QSA training & exam in 2017, 2018, 2019, 2020, 2021 and PCIP in 2022 - 2025
QSA training & exam in 2017, 2018, 2019, 2020, 2021 and PCIP in 2022 - 2025QSA training & exam in 2017, 2018, 2019, 2020, 2021 and PCIP in 2022 - 2025
QSA training & exam in 2017, 2018, 2019, 2020, 2021 and PCIP in 2022 - 2025
Jerimi Soma
 
ISO20000-1 Training Completion in 2022
ISO20000-1 Training Completion in 2022ISO20000-1 Training Completion in 2022
ISO20000-1 Training Completion in 2022
Jerimi Soma
 
Six Sigma Black Belt
Six Sigma Black BeltSix Sigma Black Belt
Six Sigma Black Belt
Jerimi Soma
 
IRCA BCMS Lead Auditor Training & Exam
IRCA BCMS Lead Auditor Training & ExamIRCA BCMS Lead Auditor Training & Exam
IRCA BCMS Lead Auditor Training & Exam
Jerimi Soma
 
BSI ISO27001 Lead Implementer ENR-00775738
BSI ISO27001 Lead Implementer ENR-00775738BSI ISO27001 Lead Implementer ENR-00775738
BSI ISO27001 Lead Implementer ENR-00775738
Jerimi Soma
 
IRCA QMS Lead Auditor 5-day training & exam
IRCA QMS Lead Auditor 5-day training & examIRCA QMS Lead Auditor 5-day training & exam
IRCA QMS Lead Auditor 5-day training & exam
Jerimi Soma
 
IRCA ISMS Lead Auditor Training & Exam in 2014
IRCA ISMS Lead Auditor Training & Exam in 2014IRCA ISMS Lead Auditor Training & Exam in 2014
IRCA ISMS Lead Auditor Training & Exam in 2014
Jerimi Soma
 
Henry James Study
Henry James StudyHenry James Study
Henry James Study
Jerimi Soma
 
My Gap analysis results between ISO27001: 2022 and 2013 version as of 2022 fall.
My Gap analysis results between ISO27001: 2022 and 2013 version as of 2022 fall.My Gap analysis results between ISO27001: 2022 and 2013 version as of 2022 fall.
My Gap analysis results between ISO27001: 2022 and 2013 version as of 2022 fall.
Jerimi Soma
 
ISO20000-1 Auditors note 【My Continuous Learning】
ISO20000-1 Auditors note 【My Continuous Learning】ISO20000-1 Auditors note 【My Continuous Learning】
ISO20000-1 Auditors note 【My Continuous Learning】
Jerimi Soma
 
Business Impact Analysis 【My Continuous Learning】
Business Impact Analysis 【My Continuous Learning】Business Impact Analysis 【My Continuous Learning】
Business Impact Analysis 【My Continuous Learning】
Jerimi Soma
 
BCMS Audit Report【My Continuous Learning】
BCMS Audit  Report【My Continuous Learning】BCMS Audit  Report【My Continuous Learning】
BCMS Audit Report【My Continuous Learning】
Jerimi Soma
 
SixSigma 【Continuous Study】
SixSigma 【Continuous Study】SixSigma 【Continuous Study】
SixSigma 【Continuous Study】
Jerimi Soma
 

More from Jerimi Soma (20)

IRCA ISMS Auditor Certification for Version 2022 (Since 2017)
IRCA ISMS Auditor Certification for Version 2022 (Since 2017)IRCA ISMS Auditor Certification for Version 2022 (Since 2017)
IRCA ISMS Auditor Certification for Version 2022 (Since 2017)
 
Another ITIL4 story of a Japanese business hotel
Another ITIL4 story of a Japanese business hotelAnother ITIL4 story of a Japanese business hotel
Another ITIL4 story of a Japanese business hotel
 
Japan Data Privacy Auditor Certification (Since Jan. 2021)
Japan Data Privacy Auditor Certification (Since Jan. 2021)Japan Data Privacy Auditor Certification (Since Jan. 2021)
Japan Data Privacy Auditor Certification (Since Jan. 2021)
 
ITILv3 /2011 Edition Case Study
ITILv3 /2011 Edition Case StudyITILv3 /2011 Edition Case Study
ITILv3 /2011 Edition Case Study
 
ITIL4 Managing Professtioal
ITIL4 Managing ProfesstioalITIL4 Managing Professtioal
ITIL4 Managing Professtioal
 
JRCA ISO27017 Cloud Security Training & Exam
JRCA ISO27017 Cloud  Security Training & ExamJRCA ISO27017 Cloud  Security Training & Exam
JRCA ISO27017 Cloud Security Training & Exam
 
ITIL v2011 Expert 6 exams
ITIL v2011 Expert 6 examsITIL v2011 Expert 6 exams
ITIL v2011 Expert 6 exams
 
QSA training & exam in 2017, 2018, 2019, 2020, 2021 and PCIP in 2022 - 2025
QSA training & exam in 2017, 2018, 2019, 2020, 2021 and PCIP in 2022 - 2025QSA training & exam in 2017, 2018, 2019, 2020, 2021 and PCIP in 2022 - 2025
QSA training & exam in 2017, 2018, 2019, 2020, 2021 and PCIP in 2022 - 2025
 
ISO20000-1 Training Completion in 2022
ISO20000-1 Training Completion in 2022ISO20000-1 Training Completion in 2022
ISO20000-1 Training Completion in 2022
 
Six Sigma Black Belt
Six Sigma Black BeltSix Sigma Black Belt
Six Sigma Black Belt
 
IRCA BCMS Lead Auditor Training & Exam
IRCA BCMS Lead Auditor Training & ExamIRCA BCMS Lead Auditor Training & Exam
IRCA BCMS Lead Auditor Training & Exam
 
BSI ISO27001 Lead Implementer ENR-00775738
BSI ISO27001 Lead Implementer ENR-00775738BSI ISO27001 Lead Implementer ENR-00775738
BSI ISO27001 Lead Implementer ENR-00775738
 
IRCA QMS Lead Auditor 5-day training & exam
IRCA QMS Lead Auditor 5-day training & examIRCA QMS Lead Auditor 5-day training & exam
IRCA QMS Lead Auditor 5-day training & exam
 
IRCA ISMS Lead Auditor Training & Exam in 2014
IRCA ISMS Lead Auditor Training & Exam in 2014IRCA ISMS Lead Auditor Training & Exam in 2014
IRCA ISMS Lead Auditor Training & Exam in 2014
 
Henry James Study
Henry James StudyHenry James Study
Henry James Study
 
My Gap analysis results between ISO27001: 2022 and 2013 version as of 2022 fall.
My Gap analysis results between ISO27001: 2022 and 2013 version as of 2022 fall.My Gap analysis results between ISO27001: 2022 and 2013 version as of 2022 fall.
My Gap analysis results between ISO27001: 2022 and 2013 version as of 2022 fall.
 
ISO20000-1 Auditors note 【My Continuous Learning】
ISO20000-1 Auditors note 【My Continuous Learning】ISO20000-1 Auditors note 【My Continuous Learning】
ISO20000-1 Auditors note 【My Continuous Learning】
 
Business Impact Analysis 【My Continuous Learning】
Business Impact Analysis 【My Continuous Learning】Business Impact Analysis 【My Continuous Learning】
Business Impact Analysis 【My Continuous Learning】
 
BCMS Audit Report【My Continuous Learning】
BCMS Audit  Report【My Continuous Learning】BCMS Audit  Report【My Continuous Learning】
BCMS Audit Report【My Continuous Learning】
 
SixSigma 【Continuous Study】
SixSigma 【Continuous Study】SixSigma 【Continuous Study】
SixSigma 【Continuous Study】
 

Recently uploaded

Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Tobias Schneck
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Ramesh Iyer
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
ODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User GroupODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User Group
CatarinaPereira64715
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
DianaGray10
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
Product School
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
Ralf Eggert
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
Product School
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
RTTS
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Thierry Lestable
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Product School
 

Recently uploaded (20)

Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
ODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User GroupODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User Group
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 

Project Methodology based on PRINCE2 【Continuous Study】

  • 1. Project Methodology based on PRINCE2 Yuko Soma
  • 2. PRINCE2 C S Organization Theme 6 Tolerance / Variables 8 Themes 7 Principles 7 Processes Change Theme Quality Theme Risk Theme I P S BS U M PD P C P Business Case Theme Progress Theme Plan Theme QualityBenefits Risk Cost Time Tailoring Theme (SU) Starting up a Project, (IP) Initiating a Project, (DP) Directing a Project, (CS) Controlling a Stage, (MP) Managing Product Delivery, (SB) Managing a Stage Boundary, (CP) Closing a Project Continued Business Justification Learn from Experience Defied Roles and Responsibilities Manage by Stages Manage by Exception Focus on Product Tailoring Scope
  • 3. Project TimelineDeliveringManagementDirectionCorp S U I P D P C P M P S B Project Mandate Authorize Project Closure Authorize Work Package C S Stage 1 C S Stage 2 C S Stage 3 S B Execute Work Package Work Package Complete Work Package ・ Quality expectations ・ Capture Previous lessons. ・ “Project Brief” includes Appoint Executive, PM, PM Team Business reason PPD Outline Business Case Project Approach ・ Exception Assessment ・ Highlight Report ・ Maintain Business Case ・ Closure recommend ・ Draft closure notification ・ Assess Business Case ・ End Project Report ・ Lesson Report Initiation Post-ProjectFinal StageDelivery Stages Stage Plan Exception Plan Team Plan Stage Plan Plan Theme Progress Theme ・ Exception Report ・ Checkpoint Report (SU) Starting up a Project, (IP) Initiating a Project, (DP) Directing a Project, (CS) Controlling a Stage, (MP) Managing Product Delivery, (SB) Managing a Stage Boundary, (CP) Closing a Project Project Plan ・ Update Business Case Authorize a Project Authorize a Stage ・ Confirm the benefit ・ Review ConMS Update then replace Escalation ・ Updated PID ・ PBS, mind map ・ Product Flow Diagram ・ Full BC with Planned Cost (budget, Resource) Benefit Review Plan Authorize Initiation Pre-Project ・ Create “PID”
  • 4. Management Strategy Organization Theme Communication Management Strategy Configuration Management Strategy Quality Management Strategy Risk Management Strategy ・ CMD includes means and frequency of communication internally and externally, roles and responsibilities, report type (email, printed doc etc.), Project Brief ・ PM creates this in IP stage and it’s reviewed in the SB stage. ・ PM will use ComMS documents template from corporate Change Theme Quality Theme ・ Use Risk Management Strategy documents from corporate ・ Access Proximity (Aug 3, 2015), Response Category (Avoid, Enhance, Reduce, Fallback, Transfer), Risk Status (Active), Risk Category (Financial, Organization, or safety) ・ Impact ($) x Probability (50%) = 1000 $ x 0.5 = Expected Value 500 ・ PM creates RMS ・ Identify -- > Access -- > Plan (How to respond) -- > Implement -- > Communicate Risk Theme ・ “Issue Control” and “Change Control” procedure ・ PM will use ConMS documents template from corporate ・ Project Support updates “Quality Register” with actual to Work Package. ・ ConMS is needed to manage the creation, safekeeping and controlled change to the project’s products. ・ PM submit then PB or change authority approves “Exception Report” with RFC or off- specification, change budget. ・ Create “Project Description” in SU ・ Create “Quality Tolerance” and “Quality File” consists of “Quality Register”, Quality review invitations, quality review results. M P
  • 5. Roles and Responsibility Corporate/Programme Manager ・ Set corporate tolerances. Appoint Executive Project Board Customer Supplier Senior User ・ Realize post-project benefits ・ Specify user requirements. Executive ・ Create and verify Business Case ・ Approve BRP ・ Responsible for Business Case ・ Single point of accountability. ・ Appoint Project Manager Project Manager ・ Manage the project on a day to day basis. Assess and update Business Case at the CP ・ Assist Executive to create BC ・ Approve “Exception Plan”, then report it to Project Board Team Manager ・ Configuration Management ・ Admin support for Project Manager ・ Issue “Change Request”. ・ Manage Team Member ・ Create ”Exception Plan” ・ Produce products consistent with PD. Project Assurance ・ Advises the PM ・ Monitors performance Senior Supplier ・ Ensure that products will be delivered as expected (Timeframe, cost) ProjectManagementTeam BU S Verifying the BC, Approve “Exception Plan” then replace “Stage Plan”, Escalate the “Exception Report” to higher management, Accountable for project success or failure. Team MemberTeam Member B = Business, U = User, S = Supplier Change Authority ・ Control change requests and off-specifications. ・ Approve change budget according to level
  • 6. Business Case BC includes 1. business reason, 2. business option (Do nothing, do minimum), 3. expected benefits. 4. expected dis- benefits, 5. timescale, 6. cost (Project and maintenance), 7. ROI, 8. major risk Category: Business Strategy Develop Competitive Water Product A. Introduction Develop new high quality mineral water to increase market share to 80% B. Overall Plan 1. Target Customer: Rich elderly consumers, Expensive Italian, French restaurants 2. Benefit: 10% sales increase, 2000 USD / year increase 3. Dis-benefit: Sales has to learn new things. Hire new people for this project. 3. Project Timescale : 6 Months 4. Target date: Oct 1, 2015 C. Business Impact 1. Tolerance: Cost: 10% Timescale : 20 business day delay 2. Market Share 20% increase by Dec. 31, 2015 3. Project Cost: 1000 USD 4. Maintenance Cost: 100 USD/ year 5. ROI : 2000 - (300+500+1000)/1100 = 0.18 for the first year. 2000 - (300+500)/100 = 1992 for the 2nd year. 6. Non Financial Aspect: High quality water increase customer loyalty. D. Risk 1. Water quality degrades due to environmental change: Probability 30% x Impact 1000 USD = 300 USD 2. Import troubles at custom clearance: Probability 50 % x Impact 1000 USD = 500 USD E. Business Option Do minimum F. Recommendations 1. Develop another Business Case for not doing anything and for buying out a competitor to save this project cost. 2. Adding this water’s photo to our New Year calendar advertising the product.
  • 7. References Bentley, Colin, PRINCE 2 for Beginners, New York: Routledge, 2015 Management Plaza http://mplaza.pm/ 7