Organizational Influences on Project Management
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
An organization’s
culture, style, and
structure
influence how its
projects are
performed
Most organizations have developed unique cultures over time by practice
and common usage.
 Shared visions, mission, values, beliefs, and expectations;
 Regulations, policies, methods, and procedures; Motivation and reward systems.
 Risk tolerance;
 View of leadership, hierarchy, and authority relationships.
 Code of conduct, work ethic, and work hours; and Operating environments.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Cultures and styles
are develop over time
Its critical point
In defining project
success
 Different types of organizational structures will have a positive or negative effect on the
effectiveness of project management in your organization.
There are
• Functional
• Matrix (Weak, Balanced, Strong)
• Projectized
* Organizational structure is an enterprise environmental factor EEF
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Advantages
* Clearly defined career paths
* Familiar structure
* Direct supervisor reporting structure
* Employees are experts
• Disadvantages
* Employee’s job difficult to change
* Much contention for resources and project priority
* Performance reviews and promotions are functional
manager responsibility
* PM has little or no authority
* PM usually part time - no clearly defined career path for
the PM
The classic functional organization, shown in Figure 2-1, is a hierarchy where each employee has one clear superior. Staff members are
grouped by specialty, such as production, marketing, engineering, and accounting at the top level.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
• Weak matrix organizations maintain many of the characteristics of a functional organization, and the role of the project
manager is more of a coordinator or expediter.
* A project expediter works as staff assistant and communications coordinator.
* The expediter cannot personally make or enforce decisions.
* Project coordinators have power to make some decisions, have some authority, and report to a higher-level manager.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
project power and influence
is shared
Between the
project manager
and
the functional manager
• not provide the project manager with the full authority over the project
and project funding
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Strong matrix organizations have
many of the characteristics of the
projectized organization, and have
full-time project managers with
considerable authority and full-time
project administrative staff.
Advantages:
* Objectives remain visible
* Increased support from functional managers
* Increased control by project manager Improved flexibility
*Job remains after project is complete
*Multiple inputs on team members’ performance
Disadvantages:
*Multiple bosses
*Adds complexity
*Additional policies and procedures are necessary
*Different priorities or objectives may exist
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
• The project manager has ultimate authority over the project, including the timeline, the budget, the
resources, the scope, the quality and, ultimately, customer satisfaction
Advantages:
* Dedicated project focus
* Project loyalty
* Efficient project organization
* Efficient project communication
Disadvantages:
* Job is gone once project is complete
* NO HOME
* Job functions and facilities can be duplicated
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
The composite organization consists of
elements of functional, matrix, and
projectized organizations in that a project
can be approached using any one of the
three afore mentioned methods.
Depending on the complexity of the
project, the organization may use all
three approaches on the same project.
 EXAM QUESTION TYPES ???
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
 Influence of organizational structures on projects
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
.
 Exam Tip: you may see the term 'tight matrix' on an exam question. A tight matrix simply
means that the offices for the project team are co-located in the same room.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Organizational process assets are the plans, processes, policies, procedures, and knowledge
bases specific to and used by the performing organization.
Examples:-
* Procedures, Guidelines , policies , Specific organizational standards such as policies
(e.g., human resources policies, health safety policies, ethics policies, and project management policies),
product and project life cycles.
* Templates (e.g., risk register, work breakdown structure, project schedule network diagram,
and contract templates).
Exam Tip: * all of the above can be contained in the corporate knowledge base
* assets can include formal plans, informal plans, lessons learned,
historical information, completed schedules risk data and earned value data.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
conditions, not under the control of the project team, that influence ,
constrain, or direct the project.
Examples:-
 Organizational culture, structure, and governance;
 Geographic distribution of facilities and resources;
 Government or industry standards
 Infrastructure
 Existing human resources
 Personnel administration
 Company work authorization systems*****
 Marketplace conditions;
 Stakeholder risk tolerances
 Political climate
 Organization’s established communications channels
 Commercial databases
 Project management information system****
*Exam Tip: A work authorization system is designed to ensure that work is approved before it begins,
and to ensure the work is done at the right time and in the correct sequence. Use of a work
authorization system also helps to prevent scope creep as well as gold plating.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
*Project governance is an oversight function that is aligned with the organization’s governance model and that encompasses the project life
cycle.
Project governance framework provides the project manager and team with structure, processes, decision-making models
and tools for managing the project, while supporting and controlling the project for successful delivery.
*Organizations use governance to establish strategic direction and performance parameters. The strategic direction provides
the purpose, expectations, goals, and actions necessary to guide business pursuit and is aligned with business
objectives.
(( Project management activities should be aligned with top-level business direction
and if there is a change, then project objectives need to be realigned ))
project based organizations (PBO's) .
The general characteristics of a PBO are outlined below:
1 Can exist in functional, matrix, or projectized organizations
2 Can diminish hierarchy and bureaucracy inside the organization because work is measured by result rather than by position or politics
3 PBO's can reference the entire company, a multi-firm consortium, or a network
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Since projects are temporary in nature, the success of the project should be measured in terms of completing
the project within the constraints of scope, time, cost, quality, resources, and risk as approved between
the project managers and senior management.
*The project manager is responsible and accountable for setting realistic and achievable boundaries
for the project and to accomplish the project within the approved baselines.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
The project team includes the project manager and the resources who act together performing the work
of the project to achieve its objectives.
Include
• Project Management Staff • Business Partners or Business Partner Members
• Project Staff: team members • Supporting Experts User or Customer Representatives
• Sellers
• Dedicated: team is usually co-located and reports directly to the project manager
• Part-Time: the functional manager usually maintain control over the team members and the resources allocated
to the project. In this case, part-time team members may be assigned more than one project at a time
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
A project life cycle is the series of
phases that a project passes through
from its initiation to its closure.
•Cost are low at start
•Peak as the work is carried out
•Cost of changes is lowest at the
beginning of project
•Cost of changes and correcting
errors typically increases as
project approaches completion
•Stakeholder influences ,risk , uncertainty
are greatest at the start of the project
•Decrease over the life of the project
* Phase-to-Phase Relationships
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
A predictive lifecycle
is also known as a plan driven or 'waterfall' approach to
delivering the scope of the project. In this approach, the scope,
time, and cost required to deliver that scope are determined as
early in the project lifecycle
Iterative
With an iterative or incremental lifecycle, project phases are
intentionally repeated as the team's understanding of the product
increases.
The product is developed through a series of repeated cycles
while the product incrementally grows at the completion of each
iteration. Each iteration incrementally builds on the deliverables
from the previous iterations until the exit criteria for the project
are met.
As a result, the work required for a given set of deliverables may
vary in duration and effort.
This approach is similar to PMI's concept of rolling wave planning
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Adaptive
The adaptive lifecycle, also known as 'change driven' or 'agile' is designed to address high levels of
change, risk, and/or uncertainty in a project. Agile projects are also incremental and iterative, but with
the singular difference that the iterations are generally very short term; usually 2 to 4 weeks.
One of the most effective agile methods currently used in the project
management space is known as Scrum.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®

Project management frame work part 2

  • 1.
    Project Management FrameWork Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 2.
    Project Management framework Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 3.
    Organizational Influences onProject Management Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP® An organization’s culture, style, and structure influence how its projects are performed
  • 4.
    Most organizations havedeveloped unique cultures over time by practice and common usage.  Shared visions, mission, values, beliefs, and expectations;  Regulations, policies, methods, and procedures; Motivation and reward systems.  Risk tolerance;  View of leadership, hierarchy, and authority relationships.  Code of conduct, work ethic, and work hours; and Operating environments. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP® Cultures and styles are develop over time Its critical point In defining project success
  • 5.
     Different typesof organizational structures will have a positive or negative effect on the effectiveness of project management in your organization. There are • Functional • Matrix (Weak, Balanced, Strong) • Projectized * Organizational structure is an enterprise environmental factor EEF Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 6.
    Preparedby Presentedby: Engr. MohamedEid , PMP® Engr. Mohamed Abdulhaq , PMP® Advantages * Clearly defined career paths * Familiar structure * Direct supervisor reporting structure * Employees are experts • Disadvantages * Employee’s job difficult to change * Much contention for resources and project priority * Performance reviews and promotions are functional manager responsibility * PM has little or no authority * PM usually part time - no clearly defined career path for the PM The classic functional organization, shown in Figure 2-1, is a hierarchy where each employee has one clear superior. Staff members are grouped by specialty, such as production, marketing, engineering, and accounting at the top level.
  • 7.
    Preparedby Presentedby: Engr. MohamedEid , PMP® Engr. Mohamed Abdulhaq , PMP® • Weak matrix organizations maintain many of the characteristics of a functional organization, and the role of the project manager is more of a coordinator or expediter. * A project expediter works as staff assistant and communications coordinator. * The expediter cannot personally make or enforce decisions. * Project coordinators have power to make some decisions, have some authority, and report to a higher-level manager.
  • 8.
    Preparedby Presentedby: Engr. MohamedEid , PMP® Engr. Mohamed Abdulhaq , PMP® project power and influence is shared Between the project manager and the functional manager • not provide the project manager with the full authority over the project and project funding
  • 9.
    Preparedby Presentedby: Engr. MohamedEid , PMP® Engr. Mohamed Abdulhaq , PMP® Strong matrix organizations have many of the characteristics of the projectized organization, and have full-time project managers with considerable authority and full-time project administrative staff.
  • 10.
    Advantages: * Objectives remainvisible * Increased support from functional managers * Increased control by project manager Improved flexibility *Job remains after project is complete *Multiple inputs on team members’ performance Disadvantages: *Multiple bosses *Adds complexity *Additional policies and procedures are necessary *Different priorities or objectives may exist Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 11.
    Preparedby Presentedby: Engr. MohamedEid , PMP® Engr. Mohamed Abdulhaq , PMP® • The project manager has ultimate authority over the project, including the timeline, the budget, the resources, the scope, the quality and, ultimately, customer satisfaction
  • 12.
    Advantages: * Dedicated projectfocus * Project loyalty * Efficient project organization * Efficient project communication Disadvantages: * Job is gone once project is complete * NO HOME * Job functions and facilities can be duplicated Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 13.
    Preparedby Presentedby: Engr. MohamedEid , PMP® Engr. Mohamed Abdulhaq , PMP® The composite organization consists of elements of functional, matrix, and projectized organizations in that a project can be approached using any one of the three afore mentioned methods. Depending on the complexity of the project, the organization may use all three approaches on the same project.
  • 14.
     EXAM QUESTIONTYPES ??? Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 15.
    Preparedby Presentedby: Engr. MohamedEid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 16.
     Influence oforganizational structures on projects Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 17.
    Preparedby Presentedby: Engr. MohamedEid , PMP® Engr. Mohamed Abdulhaq , PMP® .
  • 18.
     Exam Tip:you may see the term 'tight matrix' on an exam question. A tight matrix simply means that the offices for the project team are co-located in the same room. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 19.
    Organizational process assetsare the plans, processes, policies, procedures, and knowledge bases specific to and used by the performing organization. Examples:- * Procedures, Guidelines , policies , Specific organizational standards such as policies (e.g., human resources policies, health safety policies, ethics policies, and project management policies), product and project life cycles. * Templates (e.g., risk register, work breakdown structure, project schedule network diagram, and contract templates). Exam Tip: * all of the above can be contained in the corporate knowledge base * assets can include formal plans, informal plans, lessons learned, historical information, completed schedules risk data and earned value data. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 20.
    conditions, not underthe control of the project team, that influence , constrain, or direct the project. Examples:-  Organizational culture, structure, and governance;  Geographic distribution of facilities and resources;  Government or industry standards  Infrastructure  Existing human resources  Personnel administration  Company work authorization systems*****  Marketplace conditions;  Stakeholder risk tolerances  Political climate  Organization’s established communications channels  Commercial databases  Project management information system**** *Exam Tip: A work authorization system is designed to ensure that work is approved before it begins, and to ensure the work is done at the right time and in the correct sequence. Use of a work authorization system also helps to prevent scope creep as well as gold plating. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 21.
    *Project governance isan oversight function that is aligned with the organization’s governance model and that encompasses the project life cycle. Project governance framework provides the project manager and team with structure, processes, decision-making models and tools for managing the project, while supporting and controlling the project for successful delivery. *Organizations use governance to establish strategic direction and performance parameters. The strategic direction provides the purpose, expectations, goals, and actions necessary to guide business pursuit and is aligned with business objectives. (( Project management activities should be aligned with top-level business direction and if there is a change, then project objectives need to be realigned )) project based organizations (PBO's) . The general characteristics of a PBO are outlined below: 1 Can exist in functional, matrix, or projectized organizations 2 Can diminish hierarchy and bureaucracy inside the organization because work is measured by result rather than by position or politics 3 PBO's can reference the entire company, a multi-firm consortium, or a network Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 22.
    Since projects aretemporary in nature, the success of the project should be measured in terms of completing the project within the constraints of scope, time, cost, quality, resources, and risk as approved between the project managers and senior management. *The project manager is responsible and accountable for setting realistic and achievable boundaries for the project and to accomplish the project within the approved baselines. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 23.
    Preparedby Presentedby: Engr. MohamedEid , PMP® Engr. Mohamed Abdulhaq , PMP® The project team includes the project manager and the resources who act together performing the work of the project to achieve its objectives. Include • Project Management Staff • Business Partners or Business Partner Members • Project Staff: team members • Supporting Experts User or Customer Representatives • Sellers • Dedicated: team is usually co-located and reports directly to the project manager • Part-Time: the functional manager usually maintain control over the team members and the resources allocated to the project. In this case, part-time team members may be assigned more than one project at a time
  • 24.
    Preparedby Presentedby: Engr. MohamedEid , PMP® Engr. Mohamed Abdulhaq , PMP® A project life cycle is the series of phases that a project passes through from its initiation to its closure.
  • 25.
    •Cost are lowat start •Peak as the work is carried out •Cost of changes is lowest at the beginning of project •Cost of changes and correcting errors typically increases as project approaches completion •Stakeholder influences ,risk , uncertainty are greatest at the start of the project •Decrease over the life of the project
  • 26.
    * Phase-to-Phase Relationships PreparedbyPresentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 27.
    A predictive lifecycle isalso known as a plan driven or 'waterfall' approach to delivering the scope of the project. In this approach, the scope, time, and cost required to deliver that scope are determined as early in the project lifecycle Iterative With an iterative or incremental lifecycle, project phases are intentionally repeated as the team's understanding of the product increases. The product is developed through a series of repeated cycles while the product incrementally grows at the completion of each iteration. Each iteration incrementally builds on the deliverables from the previous iterations until the exit criteria for the project are met. As a result, the work required for a given set of deliverables may vary in duration and effort. This approach is similar to PMI's concept of rolling wave planning Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 28.
    Adaptive The adaptive lifecycle,also known as 'change driven' or 'agile' is designed to address high levels of change, risk, and/or uncertainty in a project. Agile projects are also incremental and iterative, but with the singular difference that the iterations are generally very short term; usually 2 to 4 weeks. One of the most effective agile methods currently used in the project management space is known as Scrum. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®