Seal of Good Local Governance (SGLG) 2024Final.pptx
Production schedule and log for film
1. NAME: Mahfuza
Production Company: Dark Arts Production
Production schedule for filming the short horror film.
DATE TASK Who needstobe there and
where?
Evaluationof Task.
12/10/17
Treatmentforhorror
movie –
The draft treatmentforthe
horror movie isNoshin’stask.
Everyone didmore
researchintoposters,
trailersandshort horror
filmstogetan ideaon
how to write the
treatmentsand
proposals.Everyone
completedthe draft
proposalsand
treatmentsand
uploadedittoblogs.
14/10/17 Finalise anduploadto
blogsthe treatment
planfor our horror
movie
Thiswas Noshin’staskinthe
group.
Treatmentcompleted
and uploadedtoblogs.
17/10/17
19/10/17
22/10/17
Planningdraftscript All membersof the group
needtomeetat the MAC
room andstart to plan the
draft script.
Some of the beginning
of the scriptwas
written.
03/11/17
Finalisingthe draft
scriptand uploadto
blogs
Mahfuza tookit to finishthe
draft script.
Mariam and Noshinaddedon
to it.
Draft scriptcompleted.
Draft scriptwas
completedand
everyone contributed.
04/11/17 Get feedbackonscripts
and add improvements
Askedpeople togive me
feedbackonmy script,what
theylike/dislike aboutit.
Improvedscriptfrom
the feedback.Uploaded
to feedbackonthe
blogs.
07/11/17 Finalise the scriptand
uploadto blogs
All membersinthe MAC
room.
Everyone contributedto
the final of the draft
script.The script was
completedand
uploadedtoblogs.
08/11/17 Start and allocate roles
to each part of
storyboard
All membersinthe MAC
room.
Roleswere allocated.
Mariam drew the
storyboardsof the
beginningof the script.
Mahfuza drew the
middle partof the script
and Noshindrew the
end.It wasconvenient
that there wasthree of
2. us ass we coulddivide
the tasks equally.
17/11/17 Finishsectionsof the
storyboard.
Mariam – beginning,
Mahfuza – middle,
Noshin,end
All membersshouldcomplete
theirdrawingsandmeet
togetherinthe librarytoadd
themtogetherandimprove
thembasedon group
feedback.
The storyboardswere
completedand
improved.
23/11/2017
09/12/17
Create animatic
storyboard
Noshin’s taskinthe groupis
to create the animaticby
takingpicturesof each
storyboardand uploadingit
to iMovie.
Animaticstoryboard
was completed.
06/12/17
10/12/17
12/12/17
13/12/17
Filmingthe news
reporterscene
Draft editof thisscene
Editingthisscene.
Actor’spermissionslip
signedbyDave and
permissionfrom
actressestouse their
photos.
All membersmeetoutside
Mile End park andbring
equipment.Noshin –
microphone andboomwith
windmuff,Mariamtripodand
Mahfuza bringsthe camera
and lighting.
Mahfuza to contact actor to
tell himwhere we are and
that we’re readytofilm.
The nextday we shouldall
meetinthe MAC room and
uploadthe footage toFinal
Cut Pro andsave a copyof the
footage ona differentfile for
safetyincase we lose the
original.
Mahfuza to contact the
actressesforphotos.
FilmingDave’spartof
the newsreporter,
takingmultiple shots
and eachhavinga go at
filming,holdingthe
boomand holdingthe
lighting.
The footage was
uploadedtothe
computerandno
footage waslost.Each
had a go at cutting
downsome of the
footage andwe all
agreedonwhichclip
was bestto use inour
horror film.Noshinto
editthisscene while
Mahfuza contactsthe
actressesasbulliesto
give uspermissionto
use theirphotosinthe
horror movie.
27/12/17 Filmingthe scenesin
the house.
All groupmembersandthe
actressto meetinMariam’s
house tofilmthe scenesin
the house. Mahfuzato get
the camera and lighting,
Mariam the boom andNoshin
the tripod.
The scene was filmed
successfully.Everyone
participated.The
footage wassavedonto
the mac andediting
software.
28/12/17 Filmingthe scenesin
the house.
All groupmembersandthe
actressto meetinMariam’s
house tofilmthe scenesin
the house. Mahfuzato get
the tripod,Mariam the
The scene was filmed
successfully.Everyone
participated.The
footage wassavedonto
3. camera andlighting,and
Noshinthe boom.
the mac andediting
software.
05/12/17 Filmingthe bullying
scene.
All groupmembersand
actressesinthe school
playgroundsothat we can
filmthisscene.Mahfuzato
getthe cameraand lighting,
Mariam the tripodand Noshin
the boom.
The scene was filmed
successfully.Everyone
participated.The
footage wassavedonto
the mac andediting
software.
08/12/17 Filmingthe operation
theatre scene inthe
local GP.
All groupmembersand
actressestomeetinthe GP
withthe equipment.
The scene was filmed
successfully.The
footage wassavedonto
the mac andediting
software.
09/12/17 Allocate rolestogroup
memberssothat each
personhassomething
to editonFinal Cut Pro.
Mariam takesthe beginning
footage toedit,Mahfuza
takesthe middle andNoshin
takesthe end.These are to be
editedinthe Mac room on
Final CutPro.
Each personwas
allocatedwithscenesto
edit.
04/01/18 Editing All groupmembersediting
the videofootage inthe MAC
room
05/01/18 Editing All groupmembersediting
the videofootage inthe MAC
room
08/01/18 Editing All groupmembersediting
the video footage inthe MAC
room
11/01/18 Editing All groupmembersediting
the videofootage inthe MAC
room
15/01/18 Editing All groupmembersediting
the videofootage inthe MAC
room
16/01/18 Editing All groupmembersediting
the videofootage inthe MAC
room
19/01/18 Editing All groupmembersediting
the videofootage inthe MAC
room