Cofely Fabricom is a leading supplier of oil and gas solutions with over 2,300 employees and 30 years of experience. It provides multi-technical expertise across various stages of projects from engineering to installation and maintenance. It has a global reach with offices and fabrication facilities across Europe, Africa, the Middle East, and Canada. Cofely Fabricom ensures smooth project execution through its internally-developed project management system and prioritizes safety across its operations.
Al Mazroui Engineering Co. L.L.C is a well established national Company & one among the renowned Al Mazroui Group of Companies.
Clientele include Abu Dhabi Water & Electricity Authority ADWEA ,ADNOC , Takreer ,ADMA-OPCO, GASCO, ADCO, ADGAS ,ADOC ,ZADCO, NDC ,NPCC ,FERTIL
Al Mazroui Engineering Co. L.L.C is a well established national Company & one among the renowned Al Mazroui Group of Companies.
Clientele include Abu Dhabi Water & Electricity Authority ADWEA ,ADNOC , Takreer ,ADMA-OPCO, GASCO, ADCO, ADGAS ,ADOC ,ZADCO, NDC ,NPCC ,FERTIL
Process Engineer having more than 13 years of experience in Oil and Gas based industry with exposure to detailed design EPCM and PMC Projects with clear understanding of managing the project within contract scope.
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECTSAJJAD KHUDHUR ABBAS
The Project management plan presented here will describe the project manager’s approach and the general responsibilities of the project team. In addition to the project management plan, several other documents will be developed and used to ensure compliance with project requirements as well regulations and industry specific standards. The specific plans will include processes, flow diagrams, responsibility matrices, organizational charts, and other pertinent information to guide the project staff.
Công ty TNHH Kỹ Thuật Gas Phúc Sang Minh chuyên thiết kế, cung cấp, thi công hệ thống gas trung tâm, gas công nghiệp và là nhà phân phối chính thức thiết bị đồng hồ đo lưu lượng, van giảm áp, đầu báo dò gas.
http://www.jpsgas.com.vn/
Process Engineer having more than 13 years of experience in Oil and Gas based industry with exposure to detailed design EPCM and PMC Projects with clear understanding of managing the project within contract scope.
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECTSAJJAD KHUDHUR ABBAS
The Project management plan presented here will describe the project manager’s approach and the general responsibilities of the project team. In addition to the project management plan, several other documents will be developed and used to ensure compliance with project requirements as well regulations and industry specific standards. The specific plans will include processes, flow diagrams, responsibility matrices, organizational charts, and other pertinent information to guide the project staff.
Công ty TNHH Kỹ Thuật Gas Phúc Sang Minh chuyên thiết kế, cung cấp, thi công hệ thống gas trung tâm, gas công nghiệp và là nhà phân phối chính thức thiết bị đồng hồ đo lưu lượng, van giảm áp, đầu báo dò gas.
http://www.jpsgas.com.vn/
Abfad ltd Company Profile November 2014Chris Haritou
Innovative Project Management and Solution
Development of Rope Access Projects
Abfad Ltd takes a unique approach to Rope Access Services; we focus on developing rope access skills for trade personnel. Time‐ served
welder, for example, can be taught the specific rope access skills however methodologies for actually performing hot work at height need
to be fine‐tuned to carry out welding work efficiently, productively and safely, the same level of expertise can be delivered to all trades by
short in house training.
Many rope access personnel now train on a three day blasting and spraying course through OPITO (Offshore Petroleum Industry Training
Organisation) and promote themselves as blaster/sprayers, they do not have the necessary skills to perform this work safely or provide the
quality necessary for clients. Abfad can deliver scalable trade testing to ensure that personnel mobilising do have the necessary trade skills to
perform the work.
We believe the correct process is to train trades persons to work at height so they can provide a quality service for clients.
Unskilled persons with a rope access level 1 or 2 need to be apprenticed with skilled labour so they can attain the necessary skills to be a
valuable asset to a company. ABFAD Ltd take this approach with our personnel and train necessary skills as required for projects.
Falls from height are the most frequent cause of fatalities at construction sites and continue to be a major concern with the HSE. It is
particularly important that Health and Safety Systems are second to none when working at heights. ABFAD has a remarkable history of safety
during our 16 years in business. Although I have good experience in H&S offshore and onshore over the past 30 years I maintain training in Occupational Health and Safety and am currently finishing an NVQ level 5 in Occupational Health and Safety, modules I am informed are equivalent to Degree Level.
World‐class Technology Solutions
Abfad have also developed a patented double skin lining system for underground and above‐ground storage tanks.that is currently in the final stages of accreditation from Europe’s most significant assessment arm TUV Nord. The system has already generated huge interest on the worldwide stage, with significant enquiries being generated from as far afield as China, Saudi Arabia, United States and Canada.
FUELVAC® double skin liner is the most environmentally‐friendly system developed and in use in the UK and, we believe, the World.
The system uses engineered manufactured materials and solvent‐free resins which creates a seamless liner.
A description of the features and benefits of the system is also available on the website.
Since 2006 to present time over 100 underground storage tanks have been installed within the UK and in 2011 Abfad double skin lined two tanks for Simon Storage. FUELVAC® double‐skin liner installed with vacuum leak detection monitoring is the highest fo
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...The Images Group
Presentation prepared by Glass Frog for Abfad Limited for a presentation to a major international engineering company. The presentation covers the many Rope Access Projects undertaken by the company on a worldwide stage.
Noborg provides Project Management Services for Construction.
On site PM activities - Project Management, Contact Management, Planning, Commissioning, QC/QA, Cost Control
Recruitment
Consultancy
Development of project management
Development of reporting tools
Training
Abfad Ltd General Services PresentationAbfad Limited
Abfad Ltd have been established since 1996, offering industrial rope access solutions to a variety of industries, such as power generation, oil and gas, renewable, offshore, shipyards and more.
Along side rope access Abfad also provide specialist solvent free coatings and corrosion protection, including single and double skin storage tank lining with integrated leak detection monitoring and pipeline corrosion prevention and monitoring systems.
This is a company profile of Abfad Ltd and a general presentation of the services we can provide and some of the big projects we have worked on over the years.
www.lngsummit.com/pdf/Enrique_Alonso.pdf
3RD GEN MODULAR EXECUTION. SM DESIGN AND .... Steel / Pipe / E&I Work. COST ACCOUNT. Hours ...
Modular Designs Which Maximize Movement of Hours Offsite
• “Modularization Drives Layout” not “Layout Drives
Modularization”
• “Standardized” not “Customized” Designs
• Maximum Collaboration Between Owner, Engineer,
Procurement, Construction, Project Management and
Fabricato
Webinar: How to manage technical risk in CO2 capture technology developmentGlobal CCS Institute
Scaling up, integrating and optimising CO2 capture plants can be associated with high risks and costs. Currently, there is a lack of standard codes and procedures to be used, making the development of CCS projects challenging. In this webinar, DNV GL presented the recommended qualification procedure for scaling-up CO2 capture technologies, from the lab to commercial scale.
The technical risks associated with new CO2 capture technologies can be managed through a systematic qualification process. This process focuses on the identification of the risks and indicates how they can be evaluated and reduced with adequate qualification methods, such as analyses and testing. Aker Solutions illustrated how this procedure has been applied for scaling up their proprietary CO2 capture technology.
This webinar was presented by Anastasia Isaenko, Consultant, Carbon Capture and Storage from DNV GL and Oscar Graff, Chief Technology Officer, Department of Clean Carbon from Aker Solutions.
• Fourteen (14) years solid experience in different facets of Power Plant industry.
• Strong understanding with different EPC philosophies in power generations and transmissions.
• Well-exposed and experienced in the installation and operation of the following;
• GE Frame 7FA Gas Turbine-Generator Units
• GE Frame 9E Gas Turbine-Generator Units
• Ansaldo Energia Gas Turbine-Generator Units
• Rotating Equipment Maintenance & Operation
• Fourteen (14) years solid experience in different facets of Power Plant industry.
• Strong understanding with different EPC philosophies in power generations and transmissions.
• Well-exposed and experienced in the installation and operation of the following;
• GE Frame 7FA Gas Turbine-Generator Units
• GE Frame 9E Gas Turbine-Generator Units
• Ansaldo Energia Gas Turbine-Generator Units
• Rotating Equipment Maintenance & Operation
2. Cofely Fabricom has activities in Europe, Africa, the Middle East and Canada.
We offer a multi-technical expertise and have complementary capabilities at strategic locations throughout the region.
Every project is given the utmost attention to detail, from beginning to end, in order to meet our client’s requirements.
A multidisciplinary organization
with global reach
2,300
employees
500
engineers
19
offices and
fabrication
facilities
> Feasibility study
> Conceptual design
> High level budget
estimate
> Initial option screening
> Risk identification
& analysis
> Technology assessment
> Scope of work definition
> Basis of design
development
> Long lead item
identification
> Capacities & performance
requirements definition
> Risked cost estimate &
project schedule
> Optimum solutions
selection
> Process design
> Computation fluid dynamics
> Separator assessment –
Full separator modeling &
production enhancement
> Structural analysis design
> Piping stress calculations
> PDMS (3D modeling)
> Laser modeling of existing
facilities
> Piping & structural
engineering
> Composition of all
datasheets
> Bulk material enquiries
> Logistics planning
> Technical data sheets
> Quotation evaluation
> Supplier selection
> Tender & order activity
> Inspection services
> Documentation
> Commercial management
feasibility
& cOncept
studies
feed studies engineering
prOcurement
& lOgistics
Many of our projects run into thousands of man-hours with
engineering, fabrication, installation, commissioning and
maintenance. It may include thousands of welds, tons of steel
structure, thousands of meters of cable and thousands of
connections, …
Our internally developed Cofely Fabricom Project Management
System “Panamax” ensures smooth, efficient execution of all
multidisciplinary projects.
Smooth & efficient
project management
QUALITY
MANAGEMENT
PROJECT
PLANNING
HSE
MANAGEMENT
PROJECT
CONTROLS
PANAMAX
COFELY FABRICOM
PROJECT MANAGEMENT
SYSTEM
A to Z services and support
3. Core business activities in Oil & Gas
Offsite fabrication of:
> Modular structures:
- Power and
instrumentation modules
- Process modules
> Piping fabrication
> Prefabricated structures
Overall scope:
> Assembly and full testing
included to finished product
delivery
> Multi-technical installlation
> Piping and mechanical
> Electrical & instrumentation,
including painting, insulation,
heat tracing, scaffolding
> Logistics included in scope
if required
> Up to mechanical completion
> Hydro tests piping
> Electrical & loop tests E&I
> Tests using DCS systems
> Remote access control
> Start-up assistance
> Depending on the local
capabilities
fabricatiOn
installatiOn,
hOOk-up &
mechanical
cOmpletiOn
test,
cOmmissiOning
& start-up
OperatiOnal
suppOrt &
maintenance
HSEQ is part of our DNA
All accidents can be avoided; that is our corporate
philosophy. Our safety record is our license to work
and it remains our top priority in everything we do.
as premier solutions provider for the upstream, midstream and downstream
sectors of the Oil & gas industry, we provide services at every stage of a
project by means of different contractual arrangements : epcic (engineering,
procurement, construction, installation and commissioning) or mmO
(maintenance and mOdification), or specialized prefabrication work.
> Upstream Services
> Long Term Maintenance & Modification contracts
> EPCI contracts
> Engineering & Project Management
> Major Onshore Projects
> Mid- & Downstream: plant shutdowns
> Plants
> Modular construction
> EPCI Construction
> Onsite installation
> Tank Farm
> EPCI construction
> Maintenance
> Induction Bending
10 years
of continuously outperforming
safety sector average*
*Calculated on OHSA base
OHSA performance :
daWcf 0,31
trif 1,06
sf 12,23
4. capabilities in major onshore projects
include the fabrication and installation
of complex structures such as piping,
mechanical, electrical and instrumentation
for the balance of plants.
Major Onshore Projects
staff on peak moment to deliver
a deliver a 1,300 MW plant
1,500
key activities:
> refinery plant shutdowns & extensions
> compressor stations for gazoducs
> lng & gas terminals
> underground gas storage
PROJECT //BergerMeer / THe neTHerlAndS
Cofely Fabricom fabricated and installed the complex pipework and
equipment (e.g. the giant compressors). A truly extraordinary compressor
station, capable of delivering 4.1 billion cubic meters of gas in 112 days and
withdrawing the same quantity in 97 days, leaving a permanent cushion
of 4.3 billion cubic meters underground.
PROJECT // el gOleA / AlgerIA
Turbomach, part of the Caterpillar Group, assigned Cofely Fabricom with
the responsibility of the Balance of Plant (BoP) at a new 40 MW gas turbine
power plant in El Golea which encompasses the installation of five gas
turbines. With temperatures reaching 50°Celsius, the working conditions
were challenging. The installation is now fully operational.
5. cofely fabricom offers a wide range of
greenfield and brownfield services aimed
at maximising the safety, reliability and
profitability of operations, from construction
over maintenance to revamps.
Upstream Services
permanent offshore
maintenance employees
630
key activities:
> long term maintenance
& modification contracts
> epci contracts
> engineering & project management
PROJECT// SleIPner / nOrwAy
in July 2010, Statoil awarded Cofely Fabricom a maintenance and
modification (M&M) contract on the Sleipner field in the North Sea, extending
the partnership at least until July 2016. in 2013 Statoil awarded Cofely
Fabricom another contract as an amendment to the Sleipner M&M contract,
this time for the Gudrun platform.
PROJECT// dAnA MedwAy / THe neTHerlAndS
As from 2011, Cofely Fabricom started the topside modification of the de
Ruyter Platform, involving integration of 2 new subsea wells on top of the
3 existing wells. innovative habitats were used to guarantee safety while
minimizing shutdown hours. Specially shielded X-ray welding equipment
avoided interference with production process sensors.
6. modular construction offers quality, safety and shorter, guaranteed delivery schedules for
large projects. With more than 30 years experience in the fabrication of modules, we are
well placed to partner with epc players for complex onshore modules and to increase our
involvement in upstream offshore modular modifications.
PROJECT // Q13A-A / BelgIUM
The pre-fabrication at the hoboken Module Yard of the 1850 tonnes topside for GdF SUEZ E&P Nederland’s Q13a-A well protector platform demonstrates
the value of modular construction for offshore upstream projects. in addition to the fabrication of the 2 modules (power and living quarters), Cofely
Fabricom also was responsible for incorporating the related piping, electrical, instrumentation, insulation, hVAC, architectural and coating works and
was involved in the load-out and sea fastening.
Modular Construction
Our recently opened Canadian subsidiary has its place of business
in Calgary and operations in Edmonton. Building on our expertise
in Europe, the business unit optimizes, fabricates and assembles
innovative solutions to meet the demands of the expanding oil
sands and energy markets. The current generation modules we
deliver for onshore plants feature as much as 95% of all steel and
piping, 85% of the electrical and 95% of the total instrumentation
works, with cabling, writing and testing operations carried out in the
module yard. 90% of field hours is relocated to the module yard,
allowing a “Plug & Play” philosophy with only the final loop check
to be performed onsite.
PROJECT // TeCHnICAl HIgH-end MOdUleS / CAnAdA
capacity up to
3,000 t
7. PROJECT // BP/STATOIl / CenTrAl ASIA
The bending workshop has commenced production of no less than 327 induction-bends of 1 to 1.2 m in diameter. They are to be used in a 691 km-
long gas pipeline starting at the Caspian sea and running across Azerbaijan and Georgia to connect with another gas pipeline crossing Turkey and
Greece. The customer is a joint venture involving BP (technical operation), Statoil (commercial operation) and others. This is one of the biggest orders
for the bending department in recent years.
We offer engineering, construction and maintenance for single tanks and storage terminals.
Tank Farm
Our induction bends are renowned throughout the world. from plain carbon steel to highly
sophisticated alloy steel, our induction bends meet the strict requirements of corrosion
resistance and superior metal hardness set by the industry.
Induction Bending
PROJECT // M.e.T. / THe neTHerlAndS
Construction of two crude oil storage tanks of 100,000 m3
capacity to at the Rotterdam site of M.E.T.
(Maatschap Europoort Terminal) (Nl). The project comprised engineering, procurement, construction
and commissioning assistance complete with the civil works, piping under and above ground,
instrumentation and electrical installations. Apart from demonstrating our safety capability with a record
of 225,000 safe working man-hours, this project confirms the capacity of Cofely Fabricom to organize,
manage and deliver a large project on time, within the required specification and within budget.
storage systems:
> atmospheric or low pressure
cylindrical tanks
> pressurised storage systems
up to and above
80 mdiameter