This document provides information on preventing and eliminating MUDA (waste) in machining. It defines MUDA as anything that does not add value from the customer's perspective. The 7 types of MUDA are identified as overproduction, processing, transport, waiting time, inventory, motion, and defects. Specific examples and causes of each type of MUDA are described. The document also discusses mura (unevenness or overload) and muri (uneven production load) and how eliminating MUDA, mura, and muri can increase efficiency and reduce costs.
This presentation will help you identify waste in your environment. Reducing these wastes from your life will give you more time and freedom for more important things which matter to you in your life.
Some key points if you are looking to lower costs and increase productivity. This presentation was meant to be a short one hour overview of Process Improvement.
This presentation will help you identify waste in your environment. Reducing these wastes from your life will give you more time and freedom for more important things which matter to you in your life.
Some key points if you are looking to lower costs and increase productivity. This presentation was meant to be a short one hour overview of Process Improvement.
Different Types of Security In Records ManagementRecord Nations
Security threats in records management come from all directions ranging from malware and data breaches to theft, fire, or flood.
In this SlideShare find more information about why using multiple security strategies is important, where top security threats come from, and the specific types of securities used with electronic document management systems and paper records storage today.
For more in-depth information on how to identify security risks and steps you can take to avoid them visit https://www.recordnations.com/articles/shoring-up-records-management-security/.
In this 1-hour webinar you’ll learn what Lean is, why Lean is good for business and how some of the basic Lean concepts like 8 Wastes and Visual Management can improve and transform your operation.
Download the slides and more at https://goleansixsigma.com/webinar-introduction-to-lean/
Start your free Yellow Belt Training at http://www.goleansixsigma.com/free-lean-six-sigma-training/
Get The 8 Wastes Poster at https://goleansixsigma.com/product/the-8-wastes-poster/
In this presentation we are going to witness the following.
1) What is a Project
2) How projects are different
3) What stakeholders expect
4) Using a method to manage a project
Warm Regards,
projectingIT
(http://www.projectingit.com)
Different Types of Security In Records ManagementRecord Nations
Security threats in records management come from all directions ranging from malware and data breaches to theft, fire, or flood.
In this SlideShare find more information about why using multiple security strategies is important, where top security threats come from, and the specific types of securities used with electronic document management systems and paper records storage today.
For more in-depth information on how to identify security risks and steps you can take to avoid them visit https://www.recordnations.com/articles/shoring-up-records-management-security/.
In this 1-hour webinar you’ll learn what Lean is, why Lean is good for business and how some of the basic Lean concepts like 8 Wastes and Visual Management can improve and transform your operation.
Download the slides and more at https://goleansixsigma.com/webinar-introduction-to-lean/
Start your free Yellow Belt Training at http://www.goleansixsigma.com/free-lean-six-sigma-training/
Get The 8 Wastes Poster at https://goleansixsigma.com/product/the-8-wastes-poster/
In this presentation we are going to witness the following.
1) What is a Project
2) How projects are different
3) What stakeholders expect
4) Using a method to manage a project
Warm Regards,
projectingIT
(http://www.projectingit.com)
Waste Analysis involves identifying, quantifying, eliminating and preventing waste in manufacturing, service and office environments. There are many classifications of waste, and one of the most basic and widely used is the Eight Wastes.
Waste Analysis involves identifying, quantifying, eliminating and preventing waste in manufacturing, service and office environments. There are many classifications of waste, and one of the most basic and widely used is the Eight Wastes.
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingAnkit Sharma
Waste is any step or action in a process that is not required to complete a process (called “Non Value-Adding”) successfully. When Waste is removed, only the steps that are required (called “Value-Adding”) to deliver a satisfactory product or service to the customer remain in the process.
In any business, the greatest enemy of profitability is waste-- typically of time or money. In lean manufacturing, waste is any expense or effort that is put forward which does not transform raw materials into an item the customer is willing to pay for. There are 8 types of waste in Lean Manufacturing. Seven of the eight wastes are production process oriented, while the eighth waste is directly related to management’s ability to utilize personnel.
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
1. Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 1 of 17
MACHINING
Level - III
Learning Guide 17
Unit of Competence: Prevent and Eliminate MUDA
Module Title: Preventing and Eliminating MUDA
LG Code: IND MAC3 17 0217
2. Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 2 of 17
Instruction Sheet Learning Guide #1
This learning guide is developed to provide you the necessary information regarding the following
content coverage and topics:
1. Prepare for work.
2. Identify MUDA.
3. Eliminate wastes/MUDA
4. Prevent occurrence of wastes/MUDA
This guide will also assist you to attain the learning outcome stated in the cover page. Specifically,
upon completion of this Learning Guide, you will be able to:
• Identify Safety equipment and tools
• Tools and techniques are used to draw and analyze current situation of the work
place.
• Wastes/MUDA are identified and measured based on relevant procedures.
• Necessary attitude and the ten basic principles for improvement are adopted to
eliminate waste/MUDA.
• wastes/MUDA are prevented by using visual and auditory control methods.
Learning Instructions:
1. Read the specific objectives of this Learning Guide.
2. Follow the instructions described below 3 to 17.
3. Read the information written in the information “Sheet.
4. Accomplish the “Self-check test.
5. Do the “LAP test”.
3. Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 3 of 17
What is Waste?
The elimination of waste is the primary goal of any lean system. In effect, lean
declares war on waste – any waste. Waste or muda is anything that does not have
value or does not add value.
Waste is something the customer will not pay for. When the great Italian sculptor
Michelangelo was asked what he was sculpting, he responded he was not sculpting
but releasing the figure (value) inside by removing the unnecessary rocks (wastes).
Like Michelangelo, we should eliminate all forms of wastes in any process or
product until only what is valuable remains. The key is to spot waste and then stop
waste.
There are two types of wastes: obvious wastes and hidden wastes. It is important to
uncover and eliminate the latter since they are usually bigger. Wastes take the
shape of an iceberg, the tip consists of the obvious wastes while the seen bulk
under the water contain the hidden wastes. Wastes are not necessarily ugly, and
most are outside the waste can! Waste can be in the form of unnecessary output,
input, or processing. It can be in the form of materials, stocks, equipment,
facilities, manhours, utilities, documents, expenses, motion, and other activities
that do not add value.
The steps to effective waste elimination are:
1. Make waste visible.
2. Be conscious of the waste.
3. Be accountable for the waste.
4. Measure the waste.
5. Eliminate or reduce the waste
In other words, before one can stop waste, he should able to see it, recognize it as
waste, identify who is responsible, and finally appreciate its size and magnitude.
Waste that is not seen cannot be eliminated. When something is denied as waste, it
also cannot be stopped. When one refuses to accept responsibility for the waste,
then he will not eliminate it. Finally, when the waste is not measured, people may
think it is small or trivial and therefore will not be motivated to stop it. As the
saying goes “What is not measured, is not improved”.
Muda, Mura, Muri
Aside from “muda” or wastes, the lean system also attacks and avoids “mura” or
overload or overburden and “muri” or unevenness. Mura refers more specifically
to overloading an equipment, facility, or human resource beyond its capacity. This
4. Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 4 of 17
undue stress may cause downtime, defects, delays, and even disasters. Muri refers
to unevenness in production volume.
The wild fluctuations due to extreme highs (peaks) and lows (valleys) in
production scheduling cause periods of overload and long idle time. One way to
reduce muri is to implement heijunka or production leveling. In a way, mura and
muri also cause wastes but in a particular way. Muda, mura, and muri cause
inefficiencies and high costs in any operation.
What are the seven types of wastes or “muda”?
A lean system declares war on wastes or “muda”. These wastes are classified into 7
types:
1. Over-production waste
2. Processing waste
3. Transport waste
4. Waiting-time waste
5. Inventory waste
6. Motion waste
7. Defects
5. Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 5 of 17
➢ Over-production waste
✓ Definition
• producing more than what is needed
• producing faster than what is needed
✓ Causes
• volume incentives (sales, pay, purchasing)
• high capacity equipment
• line imbalance; poor scheduling/shifting
• poor production planning
• cost accounting practices that encourage build up of inventory
Over-production waste occurs when more goods are produced than can be sold,
resulting in idle finished goods inventory. Over-produced goods are often hidden
wastes since many think they are assets with value, when in fact most of them may
6. Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 6 of 17
be obsolete or costing the company unnecessary expenses just to keep them until
they can be sold if ever. The just-in-time, pull system, and kanban rules prevent
over-production wastes. Also, lean systems favor smaller equipment over large
ones to avoid overproduction due to high but unnecessary capacity utilization.
Producing more than your customer is requesting or before they request it
➢ Processing waste
✓ Definition
• non-value added man processing
• non-value added machine processing
✓ Causes
• unclear customer specifications
• frequent engineering changes
• excessive quality (refinements)
• inadequate value analysis/value engineering
• unclear work instructions
Processing waste comes from unnecessary processing that does not add value to
the item being produced or worked on. Examples are additional steps that do not
7. Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 7 of 17
enhance quality or steps that simply adds excess quality which customers do not
require. Unnecessary documentation is also a form of processing waste. Identify
value-adding and non-value adding activities in the process using techniques such
as value stream analysis and the waterfall diagram.
Unnecessary manual work that does not contribute value to the product
➢ Transport waste
✓ Definition
• unnecessary material movement
• unnecessary tools or equipment movement
✓ Causes
• poor route planning
• distant suppliers
• complex material flows
• poor layout
• disorganized workplace
• line imbalance
8. Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 8 of 17
When anything – people, equipment, supplies, tools, documents, or materials – is
moved or transported unnecessarily from one location to another, transport waste is
generated. Examples are transporting the wrong parts, sending materials to the
wrong location or at the wrong time, transporting defects, and sending documents
that should not be sent at all. One way to cut transport waste is co-location,
wherein customers are served by nearby suppliers, usually less than one-hour
driving distance away. Departments working with each other or serving each other
are also put near each other to cut transport waste. For example, materials and tools
departments may be moved, relocated, or pre-positioned beside or nearer the user
departments or their internal customers.
Unnecessary conveyance of products, from one location to another, or handoff
from one employee to another
➢ Waiting time waste
✓ Definition
• man idle or waiting time
• machine idle or waiting time
✓ Causes
• unsynchronized processes; line imbalance
• inflexible work force
• over-staffing
• unscheduled machine downtime
• long set-up
9. Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 9 of 17
• material shortage or delay
• manpower shortage or delay
When resources like people and equipment are forced to wait unnecessarily
because of delays in the arrival or availability of other resources including
information, there is waiting time waste. Waiting for late attendees in a meeting,
waiting for tools to start work, waiting for a signature for a process to continue,
waiting for a late vehicle to transport workers to a project site are examples
of this waste.
Waiting done by customers or by employees
➢ Inventory Waste
✓ Definition
• excessive process (WIP) inventories
• excessive raw material inventories and supplies
✓ Causes
• over-production
• imbalanced line
• big batch sizes
• long lead times
10. Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 10 of 17
• local optimization (turf mentality)
• large minimum order quantities
• high rework rate
• JIT-incapable suppliers
• lack of material requisition and issuance standards
Inventory wastes come from the purchasing, issuance, storage of excess or
excessive supplies, materials, and other resources. This waste can also be caused
by overproduction as excess materials and work-in-process are accumulated.
Inventory waste is often due to lack of planning and failure to match purchases
with the actual consumption or usage rate of a particular resource. Another
example is the storing of slow-moving and obsolete stocks like tools and materials.
More materials or information than is required
➢ Motion Waste
✓ Definition
• unnecessary movement and motions of worker
✓ Causes
• poor lay-out and housekeeping
• disorganized work place and storage locations
• unclear, non-standardized work instructions
• unclear process and materials flow
11. Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 11 of 17
Motion waste happens when unnecessary body movements are made when
performing a task. Examples are searching, reaching, walking, bending, lifting, and
other unnecessary bodily movements. Workers commit this form of waste by
searching for tools or documents when their workplace is cluttered or disorganized.
Motion waste often delays the start of work and disrupts workflow.
Unnecessary physical or mental motion often associated with searching
➢ Defects
✓ Definition
• processing due to the production of defects
• processing due to rework or repair of defects
• materials used due to defect and rework
✓ Causes
• unclear customer specifications
12. Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 12 of 17
• incapable processes
• lack of process control
• unskilled personnel
• departmental rather than total quality
• incapable suppliers
Quality is doing the right thing right the first time. It is about prevention and
planning, not correction and inspection. Bad quality or defects do not only result in
customer dissatisfaction and damage to company image, but also in wastes due to
additional costs and time to recall, rework, repair, and replace the defective items.
Continuous quality improvement and preventive measures are the most effective
means to cut defect wastes.
A mistake which reaches the customer