SlideShare a Scribd company logo
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 1 of 17
MACHINING
Level - III
Learning Guide 17
Unit of Competence: Prevent and Eliminate MUDA
Module Title: Preventing and Eliminating MUDA
LG Code: IND MAC3 17 0217
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 2 of 17
Instruction Sheet Learning Guide #1
This learning guide is developed to provide you the necessary information regarding the following
content coverage and topics:
1. Prepare for work.
2. Identify MUDA.
3. Eliminate wastes/MUDA
4. Prevent occurrence of wastes/MUDA
This guide will also assist you to attain the learning outcome stated in the cover page. Specifically,
upon completion of this Learning Guide, you will be able to:
• Identify Safety equipment and tools
• Tools and techniques are used to draw and analyze current situation of the work
place.
• Wastes/MUDA are identified and measured based on relevant procedures.
• Necessary attitude and the ten basic principles for improvement are adopted to
eliminate waste/MUDA.
• wastes/MUDA are prevented by using visual and auditory control methods.
Learning Instructions:
1. Read the specific objectives of this Learning Guide.
2. Follow the instructions described below 3 to 17.
3. Read the information written in the information “Sheet.
4. Accomplish the “Self-check test.
5. Do the “LAP test”.
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 3 of 17
What is Waste?
The elimination of waste is the primary goal of any lean system. In effect, lean
declares war on waste – any waste. Waste or muda is anything that does not have
value or does not add value.
Waste is something the customer will not pay for. When the great Italian sculptor
Michelangelo was asked what he was sculpting, he responded he was not sculpting
but releasing the figure (value) inside by removing the unnecessary rocks (wastes).
Like Michelangelo, we should eliminate all forms of wastes in any process or
product until only what is valuable remains. The key is to spot waste and then stop
waste.
There are two types of wastes: obvious wastes and hidden wastes. It is important to
uncover and eliminate the latter since they are usually bigger. Wastes take the
shape of an iceberg, the tip consists of the obvious wastes while the seen bulk
under the water contain the hidden wastes. Wastes are not necessarily ugly, and
most are outside the waste can! Waste can be in the form of unnecessary output,
input, or processing. It can be in the form of materials, stocks, equipment,
facilities, manhours, utilities, documents, expenses, motion, and other activities
that do not add value.
The steps to effective waste elimination are:
1. Make waste visible.
2. Be conscious of the waste.
3. Be accountable for the waste.
4. Measure the waste.
5. Eliminate or reduce the waste
In other words, before one can stop waste, he should able to see it, recognize it as
waste, identify who is responsible, and finally appreciate its size and magnitude.
Waste that is not seen cannot be eliminated. When something is denied as waste, it
also cannot be stopped. When one refuses to accept responsibility for the waste,
then he will not eliminate it. Finally, when the waste is not measured, people may
think it is small or trivial and therefore will not be motivated to stop it. As the
saying goes “What is not measured, is not improved”.
Muda, Mura, Muri
Aside from “muda” or wastes, the lean system also attacks and avoids “mura” or
overload or overburden and “muri” or unevenness. Mura refers more specifically
to overloading an equipment, facility, or human resource beyond its capacity. This
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 4 of 17
undue stress may cause downtime, defects, delays, and even disasters. Muri refers
to unevenness in production volume.
The wild fluctuations due to extreme highs (peaks) and lows (valleys) in
production scheduling cause periods of overload and long idle time. One way to
reduce muri is to implement heijunka or production leveling. In a way, mura and
muri also cause wastes but in a particular way. Muda, mura, and muri cause
inefficiencies and high costs in any operation.
What are the seven types of wastes or “muda”?
A lean system declares war on wastes or “muda”. These wastes are classified into 7
types:
1. Over-production waste
2. Processing waste
3. Transport waste
4. Waiting-time waste
5. Inventory waste
6. Motion waste
7. Defects
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 5 of 17
➢ Over-production waste
✓ Definition
• producing more than what is needed
• producing faster than what is needed
✓ Causes
• volume incentives (sales, pay, purchasing)
• high capacity equipment
• line imbalance; poor scheduling/shifting
• poor production planning
• cost accounting practices that encourage build up of inventory
Over-production waste occurs when more goods are produced than can be sold,
resulting in idle finished goods inventory. Over-produced goods are often hidden
wastes since many think they are assets with value, when in fact most of them may
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 6 of 17
be obsolete or costing the company unnecessary expenses just to keep them until
they can be sold if ever. The just-in-time, pull system, and kanban rules prevent
over-production wastes. Also, lean systems favor smaller equipment over large
ones to avoid overproduction due to high but unnecessary capacity utilization.
Producing more than your customer is requesting or before they request it
➢ Processing waste
✓ Definition
• non-value added man processing
• non-value added machine processing
✓ Causes
• unclear customer specifications
• frequent engineering changes
• excessive quality (refinements)
• inadequate value analysis/value engineering
• unclear work instructions
Processing waste comes from unnecessary processing that does not add value to
the item being produced or worked on. Examples are additional steps that do not
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 7 of 17
enhance quality or steps that simply adds excess quality which customers do not
require. Unnecessary documentation is also a form of processing waste. Identify
value-adding and non-value adding activities in the process using techniques such
as value stream analysis and the waterfall diagram.
Unnecessary manual work that does not contribute value to the product
➢ Transport waste
✓ Definition
• unnecessary material movement
• unnecessary tools or equipment movement
✓ Causes
• poor route planning
• distant suppliers
• complex material flows
• poor layout
• disorganized workplace
• line imbalance
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 8 of 17
When anything – people, equipment, supplies, tools, documents, or materials – is
moved or transported unnecessarily from one location to another, transport waste is
generated. Examples are transporting the wrong parts, sending materials to the
wrong location or at the wrong time, transporting defects, and sending documents
that should not be sent at all. One way to cut transport waste is co-location,
wherein customers are served by nearby suppliers, usually less than one-hour
driving distance away. Departments working with each other or serving each other
are also put near each other to cut transport waste. For example, materials and tools
departments may be moved, relocated, or pre-positioned beside or nearer the user
departments or their internal customers.
Unnecessary conveyance of products, from one location to another, or handoff
from one employee to another
➢ Waiting time waste
✓ Definition
• man idle or waiting time
• machine idle or waiting time
✓ Causes
• unsynchronized processes; line imbalance
• inflexible work force
• over-staffing
• unscheduled machine downtime
• long set-up
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 9 of 17
• material shortage or delay
• manpower shortage or delay
When resources like people and equipment are forced to wait unnecessarily
because of delays in the arrival or availability of other resources including
information, there is waiting time waste. Waiting for late attendees in a meeting,
waiting for tools to start work, waiting for a signature for a process to continue,
waiting for a late vehicle to transport workers to a project site are examples
of this waste.
Waiting done by customers or by employees
➢ Inventory Waste
✓ Definition
• excessive process (WIP) inventories
• excessive raw material inventories and supplies
✓ Causes
• over-production
• imbalanced line
• big batch sizes
• long lead times
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 10 of 17
• local optimization (turf mentality)
• large minimum order quantities
• high rework rate
• JIT-incapable suppliers
• lack of material requisition and issuance standards
Inventory wastes come from the purchasing, issuance, storage of excess or
excessive supplies, materials, and other resources. This waste can also be caused
by overproduction as excess materials and work-in-process are accumulated.
Inventory waste is often due to lack of planning and failure to match purchases
with the actual consumption or usage rate of a particular resource. Another
example is the storing of slow-moving and obsolete stocks like tools and materials.
More materials or information than is required
➢ Motion Waste
✓ Definition
• unnecessary movement and motions of worker
✓ Causes
• poor lay-out and housekeeping
• disorganized work place and storage locations
• unclear, non-standardized work instructions
• unclear process and materials flow
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 11 of 17
Motion waste happens when unnecessary body movements are made when
performing a task. Examples are searching, reaching, walking, bending, lifting, and
other unnecessary bodily movements. Workers commit this form of waste by
searching for tools or documents when their workplace is cluttered or disorganized.
Motion waste often delays the start of work and disrupts workflow.
Unnecessary physical or mental motion often associated with searching
➢ Defects
✓ Definition
• processing due to the production of defects
• processing due to rework or repair of defects
• materials used due to defect and rework
✓ Causes
• unclear customer specifications
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 12 of 17
• incapable processes
• lack of process control
• unskilled personnel
• departmental rather than total quality
• incapable suppliers
Quality is doing the right thing right the first time. It is about prevention and
planning, not correction and inspection. Bad quality or defects do not only result in
customer dissatisfaction and damage to company image, but also in wastes due to
additional costs and time to recall, rework, repair, and replace the defective items.
Continuous quality improvement and preventive measures are the most effective
means to cut defect wastes.
A mistake which reaches the customer
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 13 of 17
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 14 of 17
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 15 of 17
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 16 of 17
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 17 of 17

More Related Content

What's hot

A CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCEA CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCEZubair Ali ali
 
7 Types of Muda
7 Types of Muda7 Types of Muda
7 Types of Muda
Joshua Paul Salazar
 
Muda,Mura & Muri
Muda,Mura & MuriMuda,Mura & Muri
Muda,Mura & Murimanijayjay
 
Different Types of Security In Records Management
Different Types of Security In Records ManagementDifferent Types of Security In Records Management
Different Types of Security In Records Management
Record Nations
 
Filing
FilingFiling
Filing
conga1418
 
Perceiving Muda
Perceiving MudaPerceiving Muda
Perceiving Muda
Elvie Badajos
 
Introduction to maintenance strategy
Introduction to maintenance strategyIntroduction to maintenance strategy
Introduction to maintenance strategy
Dr. Munthear Alqaderi
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
Vijay325
 
Mura muri muda
Mura muri mudaMura muri muda
Mura muri muda
Swapnil Chavan
 
Problem Solving and Decision Making Tools and Techniques
Problem Solving and Decision Making Tools and TechniquesProblem Solving and Decision Making Tools and Techniques
Problem Solving and Decision Making Tools and Techniques
Jo Balucanag - Bitonio
 
Effective documents filling system
Effective documents filling systemEffective documents filling system
Effective documents filling system
Gambari Isiaka
 
Manufacturing wastes
Manufacturing wastesManufacturing wastes
Manufacturing wastes
Mohamed EL-Sayed
 
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
SedhuSiddarth
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
GoLeanSixSigma.com
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
skchawla4
 
1 what is a project
1   what is a project1   what is a project
1 what is a project
projectingIT
 
Lean ppt
Lean pptLean ppt
Lean ppt
shoban44
 

What's hot (20)

A CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCEA CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCE
 
7 Types of Muda
7 Types of Muda7 Types of Muda
7 Types of Muda
 
Muda,Mura & Muri
Muda,Mura & MuriMuda,Mura & Muri
Muda,Mura & Muri
 
Different Types of Security In Records Management
Different Types of Security In Records ManagementDifferent Types of Security In Records Management
Different Types of Security In Records Management
 
Filing
FilingFiling
Filing
 
Process mapping
Process mappingProcess mapping
Process mapping
 
Perceiving Muda
Perceiving MudaPerceiving Muda
Perceiving Muda
 
Introduction to maintenance strategy
Introduction to maintenance strategyIntroduction to maintenance strategy
Introduction to maintenance strategy
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
Mura muri muda
Mura muri mudaMura muri muda
Mura muri muda
 
Problem Solving and Decision Making Tools and Techniques
Problem Solving and Decision Making Tools and TechniquesProblem Solving and Decision Making Tools and Techniques
Problem Solving and Decision Making Tools and Techniques
 
Effective documents filling system
Effective documents filling systemEffective documents filling system
Effective documents filling system
 
Manufacturing wastes
Manufacturing wastesManufacturing wastes
Manufacturing wastes
 
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
 
WASTE ELIMINATION
WASTE ELIMINATIONWASTE ELIMINATION
WASTE ELIMINATION
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
TPM Activity
TPM ActivityTPM Activity
TPM Activity
 
1 what is a project
1   what is a project1   what is a project
1 what is a project
 
Lean ppt
Lean pptLean ppt
Lean ppt
 

Similar to Prevent and Eliminate MUDA.pdf

SevenWastes.pdfasdfghjkl;xdfcgvhbjnkml,;./
SevenWastes.pdfasdfghjkl;xdfcgvhbjnkml,;./SevenWastes.pdfasdfghjkl;xdfcgvhbjnkml,;./
SevenWastes.pdfasdfghjkl;xdfcgvhbjnkml,;./
SakaYane
 
Seven wastes
Seven wastesSeven wastes
Seven wastes
karanbir singh sandhu
 
Seven wastes
Seven wastesSeven wastes
Seven wastes
chebli hanane
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
Anuj Kulkarni
 
Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturing
lakshya bhardwaj
 
Module 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations ManagementModule 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations Management
AnushreeSingh49
 
Lean means eliminating wasting
Lean means eliminating wastingLean means eliminating wasting
Lean means eliminating wasting
Jo Padilha
 
LEAN SYSTEM ENGINEERING
LEAN SYSTEM ENGINEERINGLEAN SYSTEM ENGINEERING
LEAN SYSTEM ENGINEERING
Endashaw Yohannes Hailu
 
Waste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in LeanWaste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in Lean
CIToolkit
 
Waste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in LeanWaste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in Lean
CIToolkit
 
Industrial engineer
Industrial engineerIndustrial engineer
Lean manufanturing
Lean manufanturingLean manufanturing
Lean manufanturing
shahrool
 
Presentation1.pptx preventing and eliminating muda
Presentation1.pptx preventing and eliminating mudaPresentation1.pptx preventing and eliminating muda
Presentation1.pptx preventing and eliminating muda
Gebreyohanstesfay2
 
Preventing and eliminating muda and waste
Preventing and eliminating muda and wastePreventing and eliminating muda and waste
Preventing and eliminating muda and waste
Gebreyohanstesfay2
 
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
IslamAbdouAbbas1
 
Chapter-Two-Lean.pdf
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdf
mengist4
 
05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophy05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophy
Dr. Chandan Vichoray
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
Ankit Sharma
 

Similar to Prevent and Eliminate MUDA.pdf (20)

SevenWastes.pdfasdfghjkl;xdfcgvhbjnkml,;./
SevenWastes.pdfasdfghjkl;xdfcgvhbjnkml,;./SevenWastes.pdfasdfghjkl;xdfcgvhbjnkml,;./
SevenWastes.pdfasdfghjkl;xdfcgvhbjnkml,;./
 
Seven wastes
Seven wastesSeven wastes
Seven wastes
 
Seven wastes
Seven wastesSeven wastes
Seven wastes
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturing
 
Module 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations ManagementModule 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations Management
 
Lean means eliminating wasting
Lean means eliminating wastingLean means eliminating wasting
Lean means eliminating wasting
 
LEAN SYSTEM ENGINEERING
LEAN SYSTEM ENGINEERINGLEAN SYSTEM ENGINEERING
LEAN SYSTEM ENGINEERING
 
Waste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in LeanWaste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in Lean
 
Waste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in LeanWaste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in Lean
 
Industrial engineer
Industrial engineerIndustrial engineer
Industrial engineer
 
Lean manufanturing
Lean manufanturingLean manufanturing
Lean manufanturing
 
Presentation1.pptx preventing and eliminating muda
Presentation1.pptx preventing and eliminating mudaPresentation1.pptx preventing and eliminating muda
Presentation1.pptx preventing and eliminating muda
 
Preventing and eliminating muda and waste
Preventing and eliminating muda and wastePreventing and eliminating muda and waste
Preventing and eliminating muda and waste
 
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
 
Chapter-Two-Lean.pdf
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdf
 
05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophy05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophy
 
Lean Waste
Lean WasteLean Waste
Lean Waste
 
Session 1 2
Session 1 2Session 1 2
Session 1 2
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
 

Recently uploaded

power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 

Recently uploaded (20)

power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 

Prevent and Eliminate MUDA.pdf

  • 1. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 1 of 17 MACHINING Level - III Learning Guide 17 Unit of Competence: Prevent and Eliminate MUDA Module Title: Preventing and Eliminating MUDA LG Code: IND MAC3 17 0217
  • 2. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 2 of 17 Instruction Sheet Learning Guide #1 This learning guide is developed to provide you the necessary information regarding the following content coverage and topics: 1. Prepare for work. 2. Identify MUDA. 3. Eliminate wastes/MUDA 4. Prevent occurrence of wastes/MUDA This guide will also assist you to attain the learning outcome stated in the cover page. Specifically, upon completion of this Learning Guide, you will be able to: • Identify Safety equipment and tools • Tools and techniques are used to draw and analyze current situation of the work place. • Wastes/MUDA are identified and measured based on relevant procedures. • Necessary attitude and the ten basic principles for improvement are adopted to eliminate waste/MUDA. • wastes/MUDA are prevented by using visual and auditory control methods. Learning Instructions: 1. Read the specific objectives of this Learning Guide. 2. Follow the instructions described below 3 to 17. 3. Read the information written in the information “Sheet. 4. Accomplish the “Self-check test. 5. Do the “LAP test”.
  • 3. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 3 of 17 What is Waste? The elimination of waste is the primary goal of any lean system. In effect, lean declares war on waste – any waste. Waste or muda is anything that does not have value or does not add value. Waste is something the customer will not pay for. When the great Italian sculptor Michelangelo was asked what he was sculpting, he responded he was not sculpting but releasing the figure (value) inside by removing the unnecessary rocks (wastes). Like Michelangelo, we should eliminate all forms of wastes in any process or product until only what is valuable remains. The key is to spot waste and then stop waste. There are two types of wastes: obvious wastes and hidden wastes. It is important to uncover and eliminate the latter since they are usually bigger. Wastes take the shape of an iceberg, the tip consists of the obvious wastes while the seen bulk under the water contain the hidden wastes. Wastes are not necessarily ugly, and most are outside the waste can! Waste can be in the form of unnecessary output, input, or processing. It can be in the form of materials, stocks, equipment, facilities, manhours, utilities, documents, expenses, motion, and other activities that do not add value. The steps to effective waste elimination are: 1. Make waste visible. 2. Be conscious of the waste. 3. Be accountable for the waste. 4. Measure the waste. 5. Eliminate or reduce the waste In other words, before one can stop waste, he should able to see it, recognize it as waste, identify who is responsible, and finally appreciate its size and magnitude. Waste that is not seen cannot be eliminated. When something is denied as waste, it also cannot be stopped. When one refuses to accept responsibility for the waste, then he will not eliminate it. Finally, when the waste is not measured, people may think it is small or trivial and therefore will not be motivated to stop it. As the saying goes “What is not measured, is not improved”. Muda, Mura, Muri Aside from “muda” or wastes, the lean system also attacks and avoids “mura” or overload or overburden and “muri” or unevenness. Mura refers more specifically to overloading an equipment, facility, or human resource beyond its capacity. This
  • 4. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 4 of 17 undue stress may cause downtime, defects, delays, and even disasters. Muri refers to unevenness in production volume. The wild fluctuations due to extreme highs (peaks) and lows (valleys) in production scheduling cause periods of overload and long idle time. One way to reduce muri is to implement heijunka or production leveling. In a way, mura and muri also cause wastes but in a particular way. Muda, mura, and muri cause inefficiencies and high costs in any operation. What are the seven types of wastes or “muda”? A lean system declares war on wastes or “muda”. These wastes are classified into 7 types: 1. Over-production waste 2. Processing waste 3. Transport waste 4. Waiting-time waste 5. Inventory waste 6. Motion waste 7. Defects
  • 5. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 5 of 17 ➢ Over-production waste ✓ Definition • producing more than what is needed • producing faster than what is needed ✓ Causes • volume incentives (sales, pay, purchasing) • high capacity equipment • line imbalance; poor scheduling/shifting • poor production planning • cost accounting practices that encourage build up of inventory Over-production waste occurs when more goods are produced than can be sold, resulting in idle finished goods inventory. Over-produced goods are often hidden wastes since many think they are assets with value, when in fact most of them may
  • 6. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 6 of 17 be obsolete or costing the company unnecessary expenses just to keep them until they can be sold if ever. The just-in-time, pull system, and kanban rules prevent over-production wastes. Also, lean systems favor smaller equipment over large ones to avoid overproduction due to high but unnecessary capacity utilization. Producing more than your customer is requesting or before they request it ➢ Processing waste ✓ Definition • non-value added man processing • non-value added machine processing ✓ Causes • unclear customer specifications • frequent engineering changes • excessive quality (refinements) • inadequate value analysis/value engineering • unclear work instructions Processing waste comes from unnecessary processing that does not add value to the item being produced or worked on. Examples are additional steps that do not
  • 7. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 7 of 17 enhance quality or steps that simply adds excess quality which customers do not require. Unnecessary documentation is also a form of processing waste. Identify value-adding and non-value adding activities in the process using techniques such as value stream analysis and the waterfall diagram. Unnecessary manual work that does not contribute value to the product ➢ Transport waste ✓ Definition • unnecessary material movement • unnecessary tools or equipment movement ✓ Causes • poor route planning • distant suppliers • complex material flows • poor layout • disorganized workplace • line imbalance
  • 8. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 8 of 17 When anything – people, equipment, supplies, tools, documents, or materials – is moved or transported unnecessarily from one location to another, transport waste is generated. Examples are transporting the wrong parts, sending materials to the wrong location or at the wrong time, transporting defects, and sending documents that should not be sent at all. One way to cut transport waste is co-location, wherein customers are served by nearby suppliers, usually less than one-hour driving distance away. Departments working with each other or serving each other are also put near each other to cut transport waste. For example, materials and tools departments may be moved, relocated, or pre-positioned beside or nearer the user departments or their internal customers. Unnecessary conveyance of products, from one location to another, or handoff from one employee to another ➢ Waiting time waste ✓ Definition • man idle or waiting time • machine idle or waiting time ✓ Causes • unsynchronized processes; line imbalance • inflexible work force • over-staffing • unscheduled machine downtime • long set-up
  • 9. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 9 of 17 • material shortage or delay • manpower shortage or delay When resources like people and equipment are forced to wait unnecessarily because of delays in the arrival or availability of other resources including information, there is waiting time waste. Waiting for late attendees in a meeting, waiting for tools to start work, waiting for a signature for a process to continue, waiting for a late vehicle to transport workers to a project site are examples of this waste. Waiting done by customers or by employees ➢ Inventory Waste ✓ Definition • excessive process (WIP) inventories • excessive raw material inventories and supplies ✓ Causes • over-production • imbalanced line • big batch sizes • long lead times
  • 10. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 10 of 17 • local optimization (turf mentality) • large minimum order quantities • high rework rate • JIT-incapable suppliers • lack of material requisition and issuance standards Inventory wastes come from the purchasing, issuance, storage of excess or excessive supplies, materials, and other resources. This waste can also be caused by overproduction as excess materials and work-in-process are accumulated. Inventory waste is often due to lack of planning and failure to match purchases with the actual consumption or usage rate of a particular resource. Another example is the storing of slow-moving and obsolete stocks like tools and materials. More materials or information than is required ➢ Motion Waste ✓ Definition • unnecessary movement and motions of worker ✓ Causes • poor lay-out and housekeeping • disorganized work place and storage locations • unclear, non-standardized work instructions • unclear process and materials flow
  • 11. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 11 of 17 Motion waste happens when unnecessary body movements are made when performing a task. Examples are searching, reaching, walking, bending, lifting, and other unnecessary bodily movements. Workers commit this form of waste by searching for tools or documents when their workplace is cluttered or disorganized. Motion waste often delays the start of work and disrupts workflow. Unnecessary physical or mental motion often associated with searching ➢ Defects ✓ Definition • processing due to the production of defects • processing due to rework or repair of defects • materials used due to defect and rework ✓ Causes • unclear customer specifications
  • 12. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 12 of 17 • incapable processes • lack of process control • unskilled personnel • departmental rather than total quality • incapable suppliers Quality is doing the right thing right the first time. It is about prevention and planning, not correction and inspection. Bad quality or defects do not only result in customer dissatisfaction and damage to company image, but also in wastes due to additional costs and time to recall, rework, repair, and replace the defective items. Continuous quality improvement and preventive measures are the most effective means to cut defect wastes. A mistake which reaches the customer
  • 13. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 13 of 17
  • 14. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 14 of 17
  • 15. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 15 of 17
  • 16. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 16 of 17
  • 17. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 17 of 17