PRESENT SIMPLEPrepared by: HSC
The use of present simple•Describe everyday lifestyle•Habit•Routine•Things that are always/ generally true•Repeated or regular actions•State/being•Schedules events in the near future•Current
Present Simple•Verb to be•Verb•Singular/Plural•Affirmative•Negative•Question•Possessives•Progressive
Verb to be –state/being 
I 
am 
He 
is 
She 
is 
It 
is 
You 
are 
We 
are 
They 
are 
For example: 
I ama teacher. 
He isan engineer. (Ali is an engineer) 
She isfrom Malaysia. (Sara is from Malaysia) 
It isa car. (Proton is a car) 
You arethe winner of the contest. 
We areat the office. (Ali and I are at the office) 
They arestudents. (Ahmad and Sara are students)
Possessives 
Pronoun (subject) 
Pronoun (object) 
Possessiveadjectives 
Possessive pronoun 
I 
Me 
my 
mine 
You 
You 
your 
yours 
He 
Him 
his 
his 
She 
Her 
her 
hers 
It 
It 
its 
its 
We 
Us 
our 
ours 
They 
Them 
their 
theirs 
Example 
1.Iam a teacher.subject 
2.Heis from Perak.subject 
3.This is me.object 
4.Myname is Sarah.Possessive adjectives 
5.Hisname is Joe.Possessive adjectives 
6.This bag is mine.Possessive pronoun 
7.That house is theirs.Possessive pronoun 
8.It is hiscar.Possessive adjectives 
9.Do you love him?object 
10.That is herbag.Possessive adjectives
Verb –use as base form. Add –s for third person I like chocolate. We live at Port Dickson. They go to gym regularly. You hate football. He lovescoffee. She plays futsal. It smilesat me. 
For verbs that end with: -ch, -sh, -ss, -o, -x and –z, we add - esfor the third person. 
1.GoHe goes to school by bus. 
2.CatchShe catches the train on time. 
3.WashMy father washes the dishes everyday. 
4.KissLily kisses her daughter goodbye. 
5.BuzzHe buzzes the bell. 
6.FixShe fixes the tap.
Verb –the spelling for third personFor verbs which end with a consonant + y, we remove the ‘y’ and add –ies. 1.MarryJohn marries Sally. 2.StudyHe studiesFrench. 3.CarryShe carriesthe baby. 4.Worry He worriesabout me. For verbs that end with a vowel + y, we add –s. 1.PlayShe playsfootball and tennis. 2.EnjoyHe enjoyssushi very much. 3.SayShe saysOk.
Affirmative 
Singular 
Plural 
I eatbread. 
We writeemail. 
You drink coffee. 
They singin a choir. 
He sleeps 10hours everyday. 
She comes from Kuala Lumpur 
It eatsfish for dinner.
Negative•Add don’tand doesn’t to make negatives with all verbs (except verb to be, modal verbs –can, might, should etc) •We add don’tand doesn’tbetween the subject and verb 
I 
don’t 
You 
We 
They 
he 
doesn’t 
she 
it 
1.I don’tdrink coffee. 
2.You don’teat meat. 
3.We don’tlike football. 
4.They don’tlive here anymore. 
5.He doesn’tplay football. 
6.She doesn’tdrink tea. 
7.It doesn’tsleep out.
Negative•Add Not to all verb to be, modal verbs (can, could, might, should etc), add not after the vtb, modal verbs. Not could also be in a contracted form –‘t. 
1.He is not married/ he isn’tmarried. 
2.I am not working/I’m not working. 
3.They are not students/ They aren’tstudents. 
4.She is notat her office/ She isn’tat her office. 
5.We cannotdance/ We can’tdance. 
6.You should not smoke here/ You shouldn’tsmoke here. 
7.I might not attend to the meeting. 
8.She must not yell at him/ She mustn't’ yell at him. 
9.We could not tell him/ We couldn’ttell him.
Affirmative -Negative 
1. We like dancing. 
1. We don’t like dancing. 
2. Idrink coffee. 
2. I don’t drink coffee. 
3. You playbadminton. 
3. You don’t play badminton. 
4. He wearsT-shirt to work. 
4. He doesn’t wearT –shirt to work. 
5. She speaksGerman. 
5. She doesn’t speakGerman. 
6.He is single. 
6. He isn’t single. 
7. She is a teacher. 
7. She isn’t a teacher. 
8. Iam from Malaysia. 
8. I am not from Malaysia. 
9. You are beautiful. 
9. You are not beautiful. 
10.They are rich. 
10. They are not rich. 
11. We are poor. 
11. We are not poor. 
Affirmative: 
Subject + verb + ……. 
Subject + modal verb + verb + ……. 
Negative: 
Subject + don’t/doesn’t + verb + …… 
Subject + vtb+ NOT + …… 
Subject + modal verb + NOT + ……
Question•We normally use door doesin order to make question. •We begin with Do/Doesin the beginning of the sentence. •Do/Does + subject + verb + rest of the sentenceExample: Doyou like coffee? Dothey drink soft drinks? Doesshe play football? Doeshe speaks English?
Question•We make questions with the verb to be and modal verbs in the beginning. Example: Areyou married? Ishe an engineer? Arethey students? Canyou speak English? Mustyou sleep here?
Question –short answers•Questions that begin with do/does, verb to be and modal verbs are usually answered in short form as in Yes/No. Example: 1.Doyou speak English?Yes, I do. No, I don’t. 2.Doeshe work at Aker?Yes, he does. No, he doesn’t. 3.IsJoe married?Yes, he is. No, he isn’t. 4.Arewe there yet?Yes, we are. No, we aren’t. 5.Canyou swim?Yes, I can. No, I can’t. 6.Shouldhe smoke?Yes, he should. No, he shouldn’t
Progressive•Present progressive is used for action is happening at or around the moment of speaking. •Temporary situation•Changing or developing situation•Fixed for the near future•We add –ingto all verbs Subject + verb to be + verb + -ingAffirmativeSubject + verb to be + NOT + verb + -ingNegativeVTB + subject + verb + -ingQuestion
ProgressivePresent progressive is used for action is happening at or around the moment of speaking. I am working at Aker.She is studying English. I am not working at Aker.She is not studying English. Are you working at Aker?Is she studying English? They are having a meeting.He is washing the dishes. They are not having a meeting.He is not washing the dishes. Are they having a meeting?Is he washing the dishes?
Progressive•Temporary situationI am staying with my parents. I am not staying with my parents. Are you staying with your parents? She is doing her homework now. She is not doing her homework now. Is she doing her homework now?
Progressive•Changing or developing situationHe is getting better.Today the weather is getting warmer. He is not getting better.The weather is not getting warmer. Is he getting better?Is it getting warmer today? Fixed for the near futureI am getting married next week.They are celebrating a party next week. I am not getting married next week.They aren’t celebrating next week. Are you getting married next week?Are they celebrating next week?
Present Simple•We use the adverbs of frequency to express our routines in detail. •Adverbs of frequency will be in front of theverb of the sentence. •Subject + adverb + verbI always drink coffee in the morning. He often plays football in the evening. She usually goes shopping alone. We sometimes have lunch at Paradigm. You rarely have dinner at home. They never go picnic. 
Degree 
adverbs 
100% 
always 
80% 
usually 
60% 
often 
40% 
sometimes 
20% 
rarely 
0% 
never 
Note: 
The rule for third person singular still applies for the verb.
Present simpleApplying adverbs in frequency in questions: 1. Do you often play football?Yes, I do. No, I don’t. I rarely play football nowadays. 2.How oftendo you play football?2 times in a week/twice weekly. 3.Does she always drink coffee?Yes, she does. No, she doesn’t. She sometimes drink coffee. 4.How often does she drink coffee?5 times in a day.
Present simple –WhquestionsWe use whquestions to seek for information: what, who, where, why, when, how and how then. 
What 
General information 
who 
people 
when 
time 
where 
places 
why 
reasons 
how 
theway/method 
howthen 
frequency 
how much 
price 
1.What is your name? 
2.Who is your teacher? 
3.When do you start your English class? 
4.Where do you have your class? 
5.Why do you study English? 
6.How often do you have your English class?
Present simple –whquestionsAnswer the questions about your company and your work. 1.Who do you work for?I work for……… 2.What does your company produce?My company produces…… 3.Where do you work?I work at……. 4.Why do you like your job?I like my job because…… 5.When do you start work?I start work at…… 6.How often do you take MC?I never/rarely……
Sequencing wordsWe use sequencing words to describe on the stages of process. Example: first of all, then, next, after that and finally. First of all, I check the emails. Then, I reply and forward the emails. Next, I conduct my morning briefing. After that, I proceed to the various departments to oversee the work flow. Finally, I prepare daily progress report. 
First of all 
Then 
Next 
After that 
Finally
Self IntroductionGood morning! My name is Sara and I’m 27 years old. I come from Penang, the island of food paradise and I am now living at SubangJaya. I work as a flight attendant for MalindoAir. My job is to ensure passenger safety, first aider and customer service. I love my job because I like travelling and meeting people of different cultures. Hello, I am Azlina. I am 25 years old and I am from Langkawi. Langkawi is an island of tourist attraction and duty free. I work as a secretary in an advertising agency at Kuala Lumpur. My tasks are to filter telephone calls for my managers and administration duties. I like my job because it is easy and fun.
Introducing othersSara is my friend. She is 27 years old and comes from Penang. Penang is an island of food paradise and famous for sight –seeing. Sara works as a flight attendant for MalindoAir. Her job is to ensure passenger safety and comfort throughout the flight. She is also equipped with first aid knowledge. Sara loves her job because of traveling and meeting people. She is friendly, warmth and kind hearted. Azlinais my colleague. She is 25 years old and comes from Langkawi. She works as a secretary for an advertising company. She reports to two managers. Her job is to filter telephone calls, prepare minutes meeting and administration duties. Azlinalikes her job because it is easy. She is always happy.

Present simple

  • 1.
  • 2.
    The use ofpresent simple•Describe everyday lifestyle•Habit•Routine•Things that are always/ generally true•Repeated or regular actions•State/being•Schedules events in the near future•Current
  • 3.
    Present Simple•Verb tobe•Verb•Singular/Plural•Affirmative•Negative•Question•Possessives•Progressive
  • 4.
    Verb to be–state/being I am He is She is It is You are We are They are For example: I ama teacher. He isan engineer. (Ali is an engineer) She isfrom Malaysia. (Sara is from Malaysia) It isa car. (Proton is a car) You arethe winner of the contest. We areat the office. (Ali and I are at the office) They arestudents. (Ahmad and Sara are students)
  • 5.
    Possessives Pronoun (subject) Pronoun (object) Possessiveadjectives Possessive pronoun I Me my mine You You your yours He Him his his She Her her hers It It its its We Us our ours They Them their theirs Example 1.Iam a teacher.subject 2.Heis from Perak.subject 3.This is me.object 4.Myname is Sarah.Possessive adjectives 5.Hisname is Joe.Possessive adjectives 6.This bag is mine.Possessive pronoun 7.That house is theirs.Possessive pronoun 8.It is hiscar.Possessive adjectives 9.Do you love him?object 10.That is herbag.Possessive adjectives
  • 6.
    Verb –use asbase form. Add –s for third person I like chocolate. We live at Port Dickson. They go to gym regularly. You hate football. He lovescoffee. She plays futsal. It smilesat me. For verbs that end with: -ch, -sh, -ss, -o, -x and –z, we add - esfor the third person. 1.GoHe goes to school by bus. 2.CatchShe catches the train on time. 3.WashMy father washes the dishes everyday. 4.KissLily kisses her daughter goodbye. 5.BuzzHe buzzes the bell. 6.FixShe fixes the tap.
  • 7.
    Verb –the spellingfor third personFor verbs which end with a consonant + y, we remove the ‘y’ and add –ies. 1.MarryJohn marries Sally. 2.StudyHe studiesFrench. 3.CarryShe carriesthe baby. 4.Worry He worriesabout me. For verbs that end with a vowel + y, we add –s. 1.PlayShe playsfootball and tennis. 2.EnjoyHe enjoyssushi very much. 3.SayShe saysOk.
  • 8.
    Affirmative Singular Plural I eatbread. We writeemail. You drink coffee. They singin a choir. He sleeps 10hours everyday. She comes from Kuala Lumpur It eatsfish for dinner.
  • 9.
    Negative•Add don’tand doesn’tto make negatives with all verbs (except verb to be, modal verbs –can, might, should etc) •We add don’tand doesn’tbetween the subject and verb I don’t You We They he doesn’t she it 1.I don’tdrink coffee. 2.You don’teat meat. 3.We don’tlike football. 4.They don’tlive here anymore. 5.He doesn’tplay football. 6.She doesn’tdrink tea. 7.It doesn’tsleep out.
  • 10.
    Negative•Add Not toall verb to be, modal verbs (can, could, might, should etc), add not after the vtb, modal verbs. Not could also be in a contracted form –‘t. 1.He is not married/ he isn’tmarried. 2.I am not working/I’m not working. 3.They are not students/ They aren’tstudents. 4.She is notat her office/ She isn’tat her office. 5.We cannotdance/ We can’tdance. 6.You should not smoke here/ You shouldn’tsmoke here. 7.I might not attend to the meeting. 8.She must not yell at him/ She mustn't’ yell at him. 9.We could not tell him/ We couldn’ttell him.
  • 11.
    Affirmative -Negative 1.We like dancing. 1. We don’t like dancing. 2. Idrink coffee. 2. I don’t drink coffee. 3. You playbadminton. 3. You don’t play badminton. 4. He wearsT-shirt to work. 4. He doesn’t wearT –shirt to work. 5. She speaksGerman. 5. She doesn’t speakGerman. 6.He is single. 6. He isn’t single. 7. She is a teacher. 7. She isn’t a teacher. 8. Iam from Malaysia. 8. I am not from Malaysia. 9. You are beautiful. 9. You are not beautiful. 10.They are rich. 10. They are not rich. 11. We are poor. 11. We are not poor. Affirmative: Subject + verb + ……. Subject + modal verb + verb + ……. Negative: Subject + don’t/doesn’t + verb + …… Subject + vtb+ NOT + …… Subject + modal verb + NOT + ……
  • 12.
    Question•We normally usedoor doesin order to make question. •We begin with Do/Doesin the beginning of the sentence. •Do/Does + subject + verb + rest of the sentenceExample: Doyou like coffee? Dothey drink soft drinks? Doesshe play football? Doeshe speaks English?
  • 13.
    Question•We make questionswith the verb to be and modal verbs in the beginning. Example: Areyou married? Ishe an engineer? Arethey students? Canyou speak English? Mustyou sleep here?
  • 14.
    Question –short answers•Questionsthat begin with do/does, verb to be and modal verbs are usually answered in short form as in Yes/No. Example: 1.Doyou speak English?Yes, I do. No, I don’t. 2.Doeshe work at Aker?Yes, he does. No, he doesn’t. 3.IsJoe married?Yes, he is. No, he isn’t. 4.Arewe there yet?Yes, we are. No, we aren’t. 5.Canyou swim?Yes, I can. No, I can’t. 6.Shouldhe smoke?Yes, he should. No, he shouldn’t
  • 15.
    Progressive•Present progressive isused for action is happening at or around the moment of speaking. •Temporary situation•Changing or developing situation•Fixed for the near future•We add –ingto all verbs Subject + verb to be + verb + -ingAffirmativeSubject + verb to be + NOT + verb + -ingNegativeVTB + subject + verb + -ingQuestion
  • 16.
    ProgressivePresent progressive isused for action is happening at or around the moment of speaking. I am working at Aker.She is studying English. I am not working at Aker.She is not studying English. Are you working at Aker?Is she studying English? They are having a meeting.He is washing the dishes. They are not having a meeting.He is not washing the dishes. Are they having a meeting?Is he washing the dishes?
  • 17.
    Progressive•Temporary situationI amstaying with my parents. I am not staying with my parents. Are you staying with your parents? She is doing her homework now. She is not doing her homework now. Is she doing her homework now?
  • 18.
    Progressive•Changing or developingsituationHe is getting better.Today the weather is getting warmer. He is not getting better.The weather is not getting warmer. Is he getting better?Is it getting warmer today? Fixed for the near futureI am getting married next week.They are celebrating a party next week. I am not getting married next week.They aren’t celebrating next week. Are you getting married next week?Are they celebrating next week?
  • 19.
    Present Simple•We usethe adverbs of frequency to express our routines in detail. •Adverbs of frequency will be in front of theverb of the sentence. •Subject + adverb + verbI always drink coffee in the morning. He often plays football in the evening. She usually goes shopping alone. We sometimes have lunch at Paradigm. You rarely have dinner at home. They never go picnic. Degree adverbs 100% always 80% usually 60% often 40% sometimes 20% rarely 0% never Note: The rule for third person singular still applies for the verb.
  • 20.
    Present simpleApplying adverbsin frequency in questions: 1. Do you often play football?Yes, I do. No, I don’t. I rarely play football nowadays. 2.How oftendo you play football?2 times in a week/twice weekly. 3.Does she always drink coffee?Yes, she does. No, she doesn’t. She sometimes drink coffee. 4.How often does she drink coffee?5 times in a day.
  • 21.
    Present simple –WhquestionsWeuse whquestions to seek for information: what, who, where, why, when, how and how then. What General information who people when time where places why reasons how theway/method howthen frequency how much price 1.What is your name? 2.Who is your teacher? 3.When do you start your English class? 4.Where do you have your class? 5.Why do you study English? 6.How often do you have your English class?
  • 22.
    Present simple –whquestionsAnswerthe questions about your company and your work. 1.Who do you work for?I work for……… 2.What does your company produce?My company produces…… 3.Where do you work?I work at……. 4.Why do you like your job?I like my job because…… 5.When do you start work?I start work at…… 6.How often do you take MC?I never/rarely……
  • 23.
    Sequencing wordsWe usesequencing words to describe on the stages of process. Example: first of all, then, next, after that and finally. First of all, I check the emails. Then, I reply and forward the emails. Next, I conduct my morning briefing. After that, I proceed to the various departments to oversee the work flow. Finally, I prepare daily progress report. First of all Then Next After that Finally
  • 24.
    Self IntroductionGood morning!My name is Sara and I’m 27 years old. I come from Penang, the island of food paradise and I am now living at SubangJaya. I work as a flight attendant for MalindoAir. My job is to ensure passenger safety, first aider and customer service. I love my job because I like travelling and meeting people of different cultures. Hello, I am Azlina. I am 25 years old and I am from Langkawi. Langkawi is an island of tourist attraction and duty free. I work as a secretary in an advertising agency at Kuala Lumpur. My tasks are to filter telephone calls for my managers and administration duties. I like my job because it is easy and fun.
  • 25.
    Introducing othersSara ismy friend. She is 27 years old and comes from Penang. Penang is an island of food paradise and famous for sight –seeing. Sara works as a flight attendant for MalindoAir. Her job is to ensure passenger safety and comfort throughout the flight. She is also equipped with first aid knowledge. Sara loves her job because of traveling and meeting people. She is friendly, warmth and kind hearted. Azlinais my colleague. She is 25 years old and comes from Langkawi. She works as a secretary for an advertising company. She reports to two managers. Her job is to filter telephone calls, prepare minutes meeting and administration duties. Azlinalikes her job because it is easy. She is always happy.