SlideShare a Scribd company logo
Pre-Fabricated home for
CORONA RIDDEN.
Affordable house concept for Corona ridden.
by Mr. Sumit Kumavat ( Civil Engineer
)
Content
• INTRODUCTION
• ADVANTAGES
• INSTALLATION
• HOUSE SIZE
• LAYOUT
• TIMELINE AND CAPACITY
• COST
• CONSTRUCTION PROCESS
• CONCLUSION
Introduction
Easy – Rapid Assemble, Affordable and Durable
• Modular “Pre Fab. homes” are in many ways an ideal building solution because
they are strong, durable, stackable, cuttable, movable, modular, plentiful and
relatively cheap. Architects as well as laypeople have used them to build many
types of buildings such as penthouses, PG/Student accommodations , offices,
condos,, dormitories, artists' studios and emergency shelters.
• The “Pre Fab. homes” are built with a light gauge steel structure frame, high
strength, strong weather resistance, it is suitable for all kinds of damp, strong
corrosive environment.
• The ““Pre Fab. homes” ” benefits are waterproof, sound insulation, thermal
insulation, easy to clean, easy maintenance, beautiful appearances and many
more. Because the homes are made from light steel, it has a strong anti-
deformation capability and can be used for 15-20 years. It can be refurbished,
leased and sold within 20 years. Pods are convenient for hoisting and can be
moved easily when changing the site.
Advantages of “Pre Fab. homes
RAPID CONSTRUCTION
• Can construct and commission in 12 hours
• Modular in nature, Laymen with proper tools can construct
• Can also deconstruct to move to another place
• Can be moved in a container to any kind of terrain
ENERGY EFFICIENT
• Sandwiched Wall panels are an excellent thermal insulation material.
• Generally used in cold storages and soundproof rooms such as theaters
• Helps lower heating and cooling costs.
• Helps eliminate unwanted air infiltration.
• Creates a more comfortable indoor living environment.
MINIMAL WASTE
• Pre-cut to the specific requirement of your design.
• Simplifies framing, insulation and sheeting to one process.
• Faster construction cycle reduces labour costs.
Advantages of “Pre Fab. homes
STRONG STRUCTURE
• Made with light gauge steel and cold rolled to give extra strength
• Columns and beams are designed using engineering of containers
SUSTAINABLE MATERIAL
• Will not Rot, Rust or Decompose.
• Maintenance Free.
• Maintains structural strength.
• Long life span (20 Years and more)
RECYCLABLE
• Steel and sandwich panels can be recycled in a number of ways.
• Ozone friendly material.
MOULD, INSECT AND RODENT RESISTANT
• Totally free of any nutritional value for insects.
• Excellent resistance to moisture absorption.
• Resists termites, other insects and rodents.
Easy Installation
• Basement will be prepared a day ahead of erection of the Pre Fab. Homes.
• Our panels are brought to site in a container and erected without the need for
excessive temporary works, craneage and scaffolding.
• This results in small weights easily handled by general operatives and reduces
the need for large scale structural pieces with their excessive health and safety
difficulties.
• The installation is generally completed in a 12 hours period with 3-member
crew.
Pre Fab. Homes Size -
18 Sq. Mt - Studio 25 Sq. Mt – 1 BHK 35 Sq. Mt – 2BHK
LAYOUT
TIMELINES / CAPACTITY
EXPECTED TIME PERIOD
MANUFACTURING SHIPPING DELIVERY SORTING ASSEMBLE
(1-5000/month) (21-28 days) (1-5 days) (1-5 days) (2 people–8 hrs/unit)
COST
• Mass production of homes
at low cost 1.5 lakhs to 3.5
lakhs based on size.
• Suitable for EWS housing in
villages with self installation
.
• Can be installed in one day
by 3 to 5 people.
• Current Capacity - Upto
5000 units per month .
• Can set up manufacturing in
India, if large volume is
there.
CONSTRUCTION PROCESS
CONSTRUCTION PROCESS
CONSTRUCTION PROCESS
CONSTRUCTION PROCESS
CONSTRUCTION PROCESS
Well finished home
Some other options – Disaster relief homes
CONCLUSION
Thank You

More Related Content

What's hot

UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURESUNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
Venkateswaran S
 
Alternative Building Technology
Alternative Building TechnologyAlternative Building Technology
Alternative Building Technology
Ayon Biswas
 
Comparison of conventional and nonconventional construction
Comparison of conventional and nonconventional constructionComparison of conventional and nonconventional construction
Comparison of conventional and nonconventional construction
Sruthy4
 
Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.
WorldHaus
 
Part 3 low cost housing
Part 3 low cost housingPart 3 low cost housing
Part 3 low cost housing
vigyanashram
 
Lowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesLowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure services
Ar Jitendra
 
Cost effective construction tech PPT
Cost effective construction tech PPT Cost effective construction tech PPT
Cost effective construction tech PPT
Nischay N Gowda
 
Aerated autoclaved-concrete
Aerated autoclaved-concreteAerated autoclaved-concrete
Aerated autoclaved-concrete
Aglaia Connect
 
AAC- The wonder Building Material
AAC- The wonder Building MaterialAAC- The wonder Building Material
AAC- The wonder Building Material
indiablockmachine
 
Low cost construction
Low cost constructionLow cost construction
Low cost construction
Anuj Singhal
 
LOW COST HOUSING
LOW COST HOUSINGLOW COST HOUSING
LOW COST HOUSING
preeti patil
 
Precast concrete - coen precast pty ltd
Precast concrete - coen precast pty ltdPrecast concrete - coen precast pty ltd
Precast concrete - coen precast pty ltd
Coen Precast Pty Ltd
 
GFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building SystemGFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building System
Rajdeep Chowdhury
 
LOW COST HOUSING
LOW COST HOUSINGLOW COST HOUSING
LOW COST HOUSING
SUJEESH A S
 
Contruction Material Supplier Cement, AAC Blocks, Aggregates, Premix Plaster
Contruction Material Supplier Cement, AAC Blocks, Aggregates, Premix PlasterContruction Material Supplier Cement, AAC Blocks, Aggregates, Premix Plaster
Contruction Material Supplier Cement, AAC Blocks, Aggregates, Premix Plaster
Digital Marketing Promotions
 
Module V MATERIAL TESTING AND EVALUATION [BTCVE506A]
Module V MATERIAL TESTING AND EVALUATION [BTCVE506A]Module V MATERIAL TESTING AND EVALUATION [BTCVE506A]
Module V MATERIAL TESTING AND EVALUATION [BTCVE506A]
Dr. BASWESHWAR JIRWANKAR
 
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
Dr. BASWESHWAR JIRWANKAR
 
low cost construction
low cost constructionlow cost construction
low cost construction
richa_15b
 
Low cost houisng and alternate building materials
Low cost houisng and alternate building materialsLow cost houisng and alternate building materials
Low cost houisng and alternate building materials
Naresh Yadav
 
Bamboo as a construction material
Bamboo as a construction materialBamboo as a construction material
Bamboo as a construction material
jeni67
 

What's hot (20)

UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURESUNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
 
Alternative Building Technology
Alternative Building TechnologyAlternative Building Technology
Alternative Building Technology
 
Comparison of conventional and nonconventional construction
Comparison of conventional and nonconventional constructionComparison of conventional and nonconventional construction
Comparison of conventional and nonconventional construction
 
Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.
 
Part 3 low cost housing
Part 3 low cost housingPart 3 low cost housing
Part 3 low cost housing
 
Lowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesLowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure services
 
Cost effective construction tech PPT
Cost effective construction tech PPT Cost effective construction tech PPT
Cost effective construction tech PPT
 
Aerated autoclaved-concrete
Aerated autoclaved-concreteAerated autoclaved-concrete
Aerated autoclaved-concrete
 
AAC- The wonder Building Material
AAC- The wonder Building MaterialAAC- The wonder Building Material
AAC- The wonder Building Material
 
Low cost construction
Low cost constructionLow cost construction
Low cost construction
 
LOW COST HOUSING
LOW COST HOUSINGLOW COST HOUSING
LOW COST HOUSING
 
Precast concrete - coen precast pty ltd
Precast concrete - coen precast pty ltdPrecast concrete - coen precast pty ltd
Precast concrete - coen precast pty ltd
 
GFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building SystemGFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building System
 
LOW COST HOUSING
LOW COST HOUSINGLOW COST HOUSING
LOW COST HOUSING
 
Contruction Material Supplier Cement, AAC Blocks, Aggregates, Premix Plaster
Contruction Material Supplier Cement, AAC Blocks, Aggregates, Premix PlasterContruction Material Supplier Cement, AAC Blocks, Aggregates, Premix Plaster
Contruction Material Supplier Cement, AAC Blocks, Aggregates, Premix Plaster
 
Module V MATERIAL TESTING AND EVALUATION [BTCVE506A]
Module V MATERIAL TESTING AND EVALUATION [BTCVE506A]Module V MATERIAL TESTING AND EVALUATION [BTCVE506A]
Module V MATERIAL TESTING AND EVALUATION [BTCVE506A]
 
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
 
low cost construction
low cost constructionlow cost construction
low cost construction
 
Low cost houisng and alternate building materials
Low cost houisng and alternate building materialsLow cost houisng and alternate building materials
Low cost houisng and alternate building materials
 
Bamboo as a construction material
Bamboo as a construction materialBamboo as a construction material
Bamboo as a construction material
 

Similar to Pre fabricated home corona ridden.

PRECAST.pptx
PRECAST.pptxPRECAST.pptx
PRECAST.pptx
Amitsonwane2
 
PRECAST.pdf
PRECAST.pdfPRECAST.pdf
PRECAST.pdf
Amitsonwane2
 
Types of cladding - Alucobond
Types of cladding - Alucobond Types of cladding - Alucobond
Types of cladding - Alucobond
Christina Cooper
 
Ct 2-Theory Presentation
Ct 2-Theory PresentationCt 2-Theory Presentation
Ct 2-Theory Presentation
bee_by
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technology
Anjith Augustine
 
Prefabrication system
Prefabrication systemPrefabrication system
Prefabrication system
Arun Arun
 
Glass Fiber Reinforced Gypsum (GFRG)
Glass Fiber Reinforced Gypsum (GFRG)Glass Fiber Reinforced Gypsum (GFRG)
Glass Fiber Reinforced Gypsum (GFRG)
Mukul Saini
 
Session 3 low cost housing
Session 3 low cost housingSession 3 low cost housing
Session 3 low cost housing
Amol Pawar
 
Prefab Building CR ppt.pptx
Prefab Building CR ppt.pptxPrefab Building CR ppt.pptx
Prefab Building CR ppt.pptx
dharmveersingh60
 
Ace Builders and Engineers
Ace Builders and EngineersAce Builders and Engineers
Ace Builders and Engineers
Amit Arora
 
Ace Builders and Engineers
Ace Builders and EngineersAce Builders and Engineers
Ace Builders and Engineers
acebuilders
 
Shipping Container Architecture Research
Shipping Container Architecture ResearchShipping Container Architecture Research
Shipping Container Architecture Research
PB4000XL
 
Marinetek floating
Marinetek floatingMarinetek floating
Marinetek floating
SOLVED
 
Volumetric Construction.pdf
Volumetric  Construction.pdfVolumetric  Construction.pdf
Volumetric Construction.pdf
LovelyLavakumarLK
 
Precast concrete - drywall
Precast  concrete - drywallPrecast  concrete - drywall
Precast concrete - drywall
Denis Patel
 
DRM Prefab Workshop & Warehouse
DRM Prefab Workshop & WarehouseDRM Prefab Workshop & Warehouse
DRM Prefab Workshop & Warehouse
DRM Investments LTD
 
SAKSHI MAHADIK_PRECAST ROOFING_FINAL SUBMISSION.pdf
SAKSHI MAHADIK_PRECAST ROOFING_FINAL SUBMISSION.pdfSAKSHI MAHADIK_PRECAST ROOFING_FINAL SUBMISSION.pdf
SAKSHI MAHADIK_PRECAST ROOFING_FINAL SUBMISSION.pdf
SakshiMahadik3
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
jagrutib22
 
LiveIn Quarters
LiveIn QuartersLiveIn Quarters
LiveIn Quarters
clicknow
 
Presentation of precast concrete
Presentation of precast concretePresentation of precast concrete
Presentation of precast concrete
Ashik Ásh
 

Similar to Pre fabricated home corona ridden. (20)

PRECAST.pptx
PRECAST.pptxPRECAST.pptx
PRECAST.pptx
 
PRECAST.pdf
PRECAST.pdfPRECAST.pdf
PRECAST.pdf
 
Types of cladding - Alucobond
Types of cladding - Alucobond Types of cladding - Alucobond
Types of cladding - Alucobond
 
Ct 2-Theory Presentation
Ct 2-Theory PresentationCt 2-Theory Presentation
Ct 2-Theory Presentation
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technology
 
Prefabrication system
Prefabrication systemPrefabrication system
Prefabrication system
 
Glass Fiber Reinforced Gypsum (GFRG)
Glass Fiber Reinforced Gypsum (GFRG)Glass Fiber Reinforced Gypsum (GFRG)
Glass Fiber Reinforced Gypsum (GFRG)
 
Session 3 low cost housing
Session 3 low cost housingSession 3 low cost housing
Session 3 low cost housing
 
Prefab Building CR ppt.pptx
Prefab Building CR ppt.pptxPrefab Building CR ppt.pptx
Prefab Building CR ppt.pptx
 
Ace Builders and Engineers
Ace Builders and EngineersAce Builders and Engineers
Ace Builders and Engineers
 
Ace Builders and Engineers
Ace Builders and EngineersAce Builders and Engineers
Ace Builders and Engineers
 
Shipping Container Architecture Research
Shipping Container Architecture ResearchShipping Container Architecture Research
Shipping Container Architecture Research
 
Marinetek floating
Marinetek floatingMarinetek floating
Marinetek floating
 
Volumetric Construction.pdf
Volumetric  Construction.pdfVolumetric  Construction.pdf
Volumetric Construction.pdf
 
Precast concrete - drywall
Precast  concrete - drywallPrecast  concrete - drywall
Precast concrete - drywall
 
DRM Prefab Workshop & Warehouse
DRM Prefab Workshop & WarehouseDRM Prefab Workshop & Warehouse
DRM Prefab Workshop & Warehouse
 
SAKSHI MAHADIK_PRECAST ROOFING_FINAL SUBMISSION.pdf
SAKSHI MAHADIK_PRECAST ROOFING_FINAL SUBMISSION.pdfSAKSHI MAHADIK_PRECAST ROOFING_FINAL SUBMISSION.pdf
SAKSHI MAHADIK_PRECAST ROOFING_FINAL SUBMISSION.pdf
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
 
LiveIn Quarters
LiveIn QuartersLiveIn Quarters
LiveIn Quarters
 
Presentation of precast concrete
Presentation of precast concretePresentation of precast concrete
Presentation of precast concrete
 

Recently uploaded

Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
Madan Karki
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
riddhimaagrawal986
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
AjmalKhan50578
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
GauravCar
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 

Recently uploaded (20)

Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 

Pre fabricated home corona ridden.

  • 1. Pre-Fabricated home for CORONA RIDDEN. Affordable house concept for Corona ridden. by Mr. Sumit Kumavat ( Civil Engineer )
  • 2. Content • INTRODUCTION • ADVANTAGES • INSTALLATION • HOUSE SIZE • LAYOUT • TIMELINE AND CAPACITY • COST • CONSTRUCTION PROCESS • CONCLUSION
  • 3. Introduction Easy – Rapid Assemble, Affordable and Durable • Modular “Pre Fab. homes” are in many ways an ideal building solution because they are strong, durable, stackable, cuttable, movable, modular, plentiful and relatively cheap. Architects as well as laypeople have used them to build many types of buildings such as penthouses, PG/Student accommodations , offices, condos,, dormitories, artists' studios and emergency shelters. • The “Pre Fab. homes” are built with a light gauge steel structure frame, high strength, strong weather resistance, it is suitable for all kinds of damp, strong corrosive environment. • The ““Pre Fab. homes” ” benefits are waterproof, sound insulation, thermal insulation, easy to clean, easy maintenance, beautiful appearances and many more. Because the homes are made from light steel, it has a strong anti- deformation capability and can be used for 15-20 years. It can be refurbished, leased and sold within 20 years. Pods are convenient for hoisting and can be moved easily when changing the site.
  • 4. Advantages of “Pre Fab. homes RAPID CONSTRUCTION • Can construct and commission in 12 hours • Modular in nature, Laymen with proper tools can construct • Can also deconstruct to move to another place • Can be moved in a container to any kind of terrain ENERGY EFFICIENT • Sandwiched Wall panels are an excellent thermal insulation material. • Generally used in cold storages and soundproof rooms such as theaters • Helps lower heating and cooling costs. • Helps eliminate unwanted air infiltration. • Creates a more comfortable indoor living environment. MINIMAL WASTE • Pre-cut to the specific requirement of your design. • Simplifies framing, insulation and sheeting to one process. • Faster construction cycle reduces labour costs.
  • 5. Advantages of “Pre Fab. homes STRONG STRUCTURE • Made with light gauge steel and cold rolled to give extra strength • Columns and beams are designed using engineering of containers SUSTAINABLE MATERIAL • Will not Rot, Rust or Decompose. • Maintenance Free. • Maintains structural strength. • Long life span (20 Years and more) RECYCLABLE • Steel and sandwich panels can be recycled in a number of ways. • Ozone friendly material. MOULD, INSECT AND RODENT RESISTANT • Totally free of any nutritional value for insects. • Excellent resistance to moisture absorption. • Resists termites, other insects and rodents.
  • 6. Easy Installation • Basement will be prepared a day ahead of erection of the Pre Fab. Homes. • Our panels are brought to site in a container and erected without the need for excessive temporary works, craneage and scaffolding. • This results in small weights easily handled by general operatives and reduces the need for large scale structural pieces with their excessive health and safety difficulties. • The installation is generally completed in a 12 hours period with 3-member crew.
  • 7. Pre Fab. Homes Size - 18 Sq. Mt - Studio 25 Sq. Mt – 1 BHK 35 Sq. Mt – 2BHK
  • 9. TIMELINES / CAPACTITY EXPECTED TIME PERIOD MANUFACTURING SHIPPING DELIVERY SORTING ASSEMBLE (1-5000/month) (21-28 days) (1-5 days) (1-5 days) (2 people–8 hrs/unit)
  • 10. COST • Mass production of homes at low cost 1.5 lakhs to 3.5 lakhs based on size. • Suitable for EWS housing in villages with self installation . • Can be installed in one day by 3 to 5 people. • Current Capacity - Upto 5000 units per month . • Can set up manufacturing in India, if large volume is there.
  • 16. Some other options – Disaster relief homes