Everything at once
Vijaykumar Nishad
- Tybms
WHAT IS
WINDOWS 8
Next version of Microsoft Windows
Next-generation development platform
New way of thinking about UI and UX

The most revolutionary software Microsoft ever shipped
ROADMAP OF
WINDOWS 8
2011

2012

Windows 8
Developer Preview

Windows 8
Consumer Preview

Windows 8
Release Preview

September 13

February 29

May 31

2013
Windows 8
RTM

August 1

Windows 8
Release

October 26

Windows Phone 8,
Xbox 720
TWO WORLDS
OF WINDOWS 8

METRO

CLASSIC
Targeted Platforms
TARGETED
PLATFORMS
Windows 8 is effective combination of mobile and desktop OS
All of the versions of Windows 8 have shared core
TARGETED
PLATFORMS
Desktop PCs
TARGETED
PLATFORMS

Tablets
TARGETED
PLATFORMS

Phones
TARGETED
PLATFORMS

Gaming Consoles
Versioning
VERSIONS
Windows 8

Baseline version of Windows 8 for consumers
Runs on PC and x86-based tablets

Windows 8 Pro

Advanced version of Windows 8 for business
Runs on PC and x86-based tablets
Enhanced virtualization, file system encryption

Windows 8 Enterprise

Advanced version of Windows 8 for enterprise
Runs on PC
Enhanced virtualization, advanced security
PC management and deployment
Windows To Go

Windows RT

Special version of Windows 8 for ARM
Runs only on ARM-based tablets and PCs
Supports only METRO part of the OS
Cannot be purchased, preinstalled on device

Windows Phone 8

Special version of Windows 8 for mobile phones
Supports only METRO part of the OS
Still has a lot of differences despite shared OS core
Cannot be purchased, preinstalled on device
SYSTEM
REQUIREMENTS
Windows8 Works Great on the Same Hardware that Powers

Windows7
Processor :- 1GHz or Faster
RAM :- 1GB (32bit) or 2GB (64bit)
Hard Disk Space :- 16GB (32bit) or 20GB (64bit)

Graphics Card :- Microsoft DirectX 9 Graphics Device or
Higher
User Interface
WHAT IS
METRO
Typography based design language by Microsoft
First appearance on Windows Phone 7
METRO
DESIGN

Make your application feels
like canvas with lots of
things to explore
METRO
DESIGN

Design made easy with clear guidelines
Microsoft has clear guidelines on everything
Fonts, colors and positioning are driven by guidelines
Guideline not a rule

Visit next resources
Font guidelines
Color guidelines
Layout guidelines
Metro style Apps

Model
Controller

View

XAML
C/C++

Desktop Apps

HTML / CSS
C#, VB

JavaScript
(Chakra)

HTML
JS

C
C++

C#
VB

Win32

.NE
T
SL

Kernel

System Services

Windows Runtime APIs
Communication
& Data

Graphics &
Media
Application Model

Devices &
Printing
Internet
Explorer

Windows Kernel Services
REVOLUTION OF
START MENU
Applications
WINDOWS
APPLICATIONS

Key characteristics
Immersive
Full screen
Touch-optimized
Good for both mobile and desktop
WINDOWS STORE
APPLICATIONS
How they got distributed?

Windows Store
WINDOWS STORE
APPLICATIONS
Programming Alternatives

C++/CX
Features
WINDOWS 8
FEATURES

There is lots of more
than this…….
WINDOWS
WEAKNESSES
A Whole new Interface to Introduce
Start Menu
All Software’s are not Compatible with it
Windows7 VS Windows8
The Start Screen
Window 7 At start screen we

have Desktop with a Start Menu toolbar.

Windows 8 At Start screen there is
all new Metro UI.
Task Management
Window 7 A simple and easy to handle
Task Manager dialog box

Window 8 A Whole New Task

manager dialog box with more details of
running applications.
Interface Issues
Windows 7 The interface of it
was same as earlier versions with
little changes

Windows 8 All new interface which
is hard to understand at the
beginning for a newbie. Every
window is having a ribbon with it.
Lock Screen
Windows 7 No Lock Screen
Feature in it.

Windows 8 A new lock

screen feature which allows to lock
your PC/ Laptop same as a
Smartphone.
Copy Style
Windows 7  Old Copy Style.

Windows 8 All new Copy Style.
POLL VERDICT

Poll
4%

6%

20%

How they got distributed?

45%

25%

I'll upgrade my existing PC to Windows 8 as
soon as it's available.
I plan to download and test the Windows 8
beta before deciding.
I'll stick with Windows 7, thank you very
much.
I want no part of any current or future
Microsoft operating system.
Other

Windows Store
Explore your world
though

Windows 8 Apps
Everything at once

Ppt on windows 8